BRESCIA – WFGT - L1+L2 Quench + separator +condenser LAB/TG/4th Nov2022

Nozzles position discrepancies between as built scrubbers and LAB/TKC 3D model for piping
North
LAB 3D Model
L1 condenser L1 quench

L2 condenser L2 quench

South
North

L1 condenser L1 quench

LAB 3D Model
With
TKC access structure to
instruments & manholes

L2 condenser L2 quench

South
N32
N16 N17 MH2
N23
N18

Line 1 – 221014 –
North Side
Line 1 – North Side – TKC 3D Model
Separator
Condenser

N17 missing
N32 missing N18 missing

N23 missing N16 missing


N35

Manhole MH2
missing
N8bis Quench

N8

L1 - South Side - 221014


N17

N32 N18

N23
N16

L1 - South Side - TKC 3D Model


N32
N17
N23
N16
N18

N8
L1 - South Side - LAB 3D Model
Quench L1 - GCER 2D manufacturing
drawing
Nozzles N16/17/18 in wrong location
versus LAB 3D model

North South
South North

Condenser L1 - GCER 2D
manufacturing drawing R05
MH2 + Nozzles N23/N32 in wrong
location