Job Number Sheet

Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Continuous Beam: edge beam short (Code of Practice : BS8110 - 1997)


2/28/2022 9:32:59 PM C01

Input Tables
fcu (MPa) 20
fy (MPa) 450
fyv (MPa) 250
% Redistribution 10
Downward/Optimized redistr. D
Cover to centre top steel(mm) 40
Cover to centre bot.steel(mm) 40
Dead Load Factor 1
Live Load Factor 1
Density of concrete (kN/m3) 24
% Live load permanent 25
Ø (Creep coefficient) 2
Ecs (Free shrinkage strain) 300E-6

Sec Bw D Bf-top Hf-top Bf-bot Hf-bot Y-offset Web Flange


No. (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset

1 225 350

Span Section Sec No Sec No


No Length(m) Left Right

1 2 1
2 3.6 1

Sup Code Column Below Code Column above Code


No. C,F F,P F,P
D(mm) B(mm) H(m) D(mm) B(mm) H(m)
1 225 225 3.5 225 225 3.5 P
2 225 225 3.5 225 225 3.5 P
3 225 225 3.5 225 225 3.5 P

Case Span Wleft Wright a b P a M a Load


D,L (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m) Description

Span M left M right


(kNm) (kNm)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Sections

225

350
SECTION 1

Beam Elevation

1 SPAN 1 2 SPAN 2 3

2.000 3.600
10.0
5.00
.100
.200
.300
.400
1.00
1.00
2.00
3.00
4.00
.200
.150
.100
.050
.080
.060
.040
.020

-5.00
-10.0
-15.0
-1.00
-2.00
-3.00
-2.00
-1.00
.200 .200 .200 .200 .200 .200

.400 .400 .400 .400 .400 .400

SHEAR: X-X

MOMENTS: X-X

Shear Steel: X-X


.600 .600 .600 .600 .600 .600

Bending Steel: X-X


E-Mail : mail@prokon.com

.800 .800 .800 .800 .800 .800


Software Consultants (Pty) Ltd
Internet: http://www.prokon.com

1.00 1.00 1.00 1.00 1.00 1.00

1.20 1.20 1.20 1.20 1.20 1.20


Client

1.40 1.40 1.40 1.40 1.40 1.40


Job Title

Calcs by

Elastic Deflections (Alternate spans loaded)


Job Number

1.60 1.60 1.60 1.60 1.60 1.60

1.80 1.80 1.80 1.80 1.80 1.80

2.00 2.00 2.00 2.00 2.00 2.00

2.20 2.20 2.20 2.20 2.20 2.20

2.40 2.40 2.40 2.40 2.40 2.40

2.60 2.60 2.60 2.60 2.60 Long-term Deflections (All spans loaded - using entered reinforcement) 2.60

2.80 2.80 2.80 2.80 2.80 2.80

3.00 3.00 3.00 3.00 3.00 3.00

3.20 3.20 3.20 3.20 3.20 3.20


Checked by

3.40 3.40 3.40 3.40 3.40 3.40


Deflection, Shear, Moment and Steel diagrams. Spans 1,2

3.60 3.60 3.60 3.60 3.60 3.60

3.80 3.80 3.80 3.80 3.80 3.80

4.00 4.00 4.00 4.00 4.00 4.00

4.20 4.20 4.20 4.20 4.20 4.20

4.40 4.40 4.40 4.40 4.40 4.40

4.60 4.60 4.60 4.60 4.60 4.60

4.80 4.80 4.80 4.80 4.80 4.80


Date

5.00 5.00 5.00 5.00 5.00 5.00

5.20 5.20 5.20 5.20 5.20 5.20

5.40 5.40 5.40 5.40 5.40 5.40


Sheet

As max = -16.97mm2 @ 2.00m


Asv max = .4140mm²/mm @ 0.00m
M max = -1.955kNm @ 2.00m
V max = 3.753kN @ 2.00m
Def max = .2128mm @ 4.05m
Def max = .0907mm @ 3.80m

5.60 5.60 5.60 5.60 5.60 5.60


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Reinforcing Tables
Beam type (1-5) 1
Maximum bar length (m) 6
TOP: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 12
BOTTOM: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 12
STIRRUP: Minimum diameter (mm) 6
Maximum diameter (mm) 6
Stirrup shape code 60
First bar mark - top A
First bar mark - mid.[optional]
First bar mark - bot.[optional]
Cover to stirrups - top (mm) 30
Cover to stirrups - bot (mm) 30
Cover to stirrups - sides (mm) 25
Minimum stirrups as % of nominal 100
Loose method of detailing (Y/N) y
Exploded elevation (Y/N) Y
Bending schedule scale 1: Auto
Number bars from left to right (Y/N) Y
Middle bar diameter (mm) Auto
Target Padds

Bars Mark SC Span Offset Length Hook Layer


2Y12 A 34 1 -0.087 1.875 L B
2Y12 B 34 1 -0.087 2.357 L T
2Y12 C 20 2 -0.692 1.385 L B
2Y12 D 34 2 -0.270 3.958 R T
2Y12 E 34 2 0.212 3.475 R B

Stirrup Section Bar Type + Shape Top Top Bottom


Number Number Diameter Mark Code Offset Flange Flange

1 1 R6 SA 60

Stirrup Length
Number Spacing Span Offset (m)

1 100 1 0.21 1.58


1 100 2 0.21 3.10

Section positions
Label Span Offset(m)
A 1 1.2
B 2 0.4
C 2 2.0
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

File name edge beam short.PAD


First span 1
Last span 2
Draw grid lines?(Y/N) Y
Draw columns?(Y/N) Y
Number/Letter of first grid A
Number (U)p or (D)own U
Drawing size?(A4 or A5) A5
Height (normal text) mm 2
Height (title text) mm 2.5
Height (sec. bar mark) mm 1.8
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Main and Shear Reinforcing diagrams. Spans 1,2

SPAN 1 - 2.000 SPAN 2 - 3.600

2Y12-B 2Y12-D

2Y12-A 2Y12-C 2Y12-E

MAIN REINFORCEMENT As max = 226.2mm2 @ .500m


-200

-100
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

4.60

4.80

5.00

5.20

5.40

5.60
100

200

SPAN 1 - 2.000 SPAN 2 - 3.600

17-SA-100 32-SA-100

SHEAR REINFORCEMENT Asv max = .5655mm²/mm @ .250m

.500

.400

.300

.200

.100
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

4.60

4.80

5.00

5.20

5.40

5.60

You might also like