B wiring for the power points using 3x2.5mm copper cable single core
Red Roll 2 97,000 194,000
Black Roll 2 97,000 194,000
Yellow green Roll 2 97,000 194,000
C Wiring from adaptable box to CU3 using 3x25mm amoured cable M 12 60,000 720,000
D Wiring from CU3 using 3x16mm amoured cable to other units M 40 38,000 1,520,000
TOTAL CARRIED FORWARD
TOTAL CARRIED TO SUMMARY 4,632,200
SN DESCRIPTION UNIT QTY RATE AMOUNT
EXTERNAL LEARNING AREA
First fix materials
A 25mm pvc conduits light guage black Pc 10 5,000 50,000
B 32mm pvc conduit light guage black Pc 2 8,000 16,000
C 25mm pvc bend Pc 8 700 5,600
D 32mm pvc bend Pc 2 1,300 2,600
E 25mm pvc couplers Pc 6 500 3,000
F 32mm pvc couplers Pc 1 1,000 1,000
G Adaptable box 250x250mm Pc 1 27,000 27,000
H 25mm circular box 4ways Pc 6 1,000 6,000
I 25mm circular covers Pc 6 1,000 6,000
TOTAL CARRIED FORWARD
Second fix
I 0 -
Wiring for the voice and data points using Cat 6 cable No
MAIN SUMMARY
7 Ampitheatre 8,389,800