AMBONI SPINNING MILL LTD

RE: UTILITIES REPORT AS at February 2020


The following are Utilities activities carried out during the month of February 2020
Job Carried out Material Consumed Unit Qty. Unit Total Status/Re
Value value marks

1 Completion of company house to PVC cable 1.5mm2 Mtr. 50 50,000 50,000


resided by Mr. Obedi Magembe
Switch socket 13A Pcs 3 6,000 18,000
Light switch 2 gang Pc 1 3,000 3,000
Light switch 1 gang Pcs 3 2,000 6,000

Completed
Sq. pattrex box Pc 5 500 2,500
Lamp holder Pc 6 2,000 12,000
Cable clips 2” Pkt. 2 1,000 2,000
LED Bulb 7w Pc 2 3,500 7,000
Insulation tapes Pc 2 1,000 2,000
Mortice lock Pc 1 30,000 30,000
2 Completion of company house to be PVC cable 1.5mm2 Mtr. 50 50,000 50,000
resided by Mr. Sebastian Mchira.
Switch socket 13A Pcs 3 6,000 18,000
Light switch 1 gang Pcs 3 2,000 6,000
Light switch 2 gang Pc 1 3,000 3,000
Sq. pattrex box Pc 5 500 2,500
Lamp holder Pc 5 2,000 10,000

Completed
Cable clips 2” Pkt. 2 1,000 2,000
Insulation tapes Pc 2 1,000 2,000
LED Bulb 7w Pc 2 3,500 7,000
Mortise lock Pc 1 30,000 30,000
Tower bolts 4” pc 2 2,000 4,000
Portland Cement Bag 2 13,000 13,000
Emulsion paint Pail 1 25,000 25,000
3 Repair of sliver cans 32mm Sliver can ring base Pc 48 6,000 288,000
Blind rivets PC 192 25 4,800 completed
4 Fabrication of two wooden Canvas Material Mtr. 2 25,000 50,000
stretchers.
Hard wood timber 2” R/ft. 50 1,400 70,000
x 2”
Varnish Ltr. 1 5,500 5,500
S0lvent Ltr. 1 3,500 3,500
Paint brush 2” Pc 1 2,500 2,500

TOTAL 726,800