Professional Documents
Culture Documents
Blog
SeaQA
Companies
Tools
Contact
LOGIN
Q.How to plan oil cargo loading at load port while going from tropical load line to summer
load line and vice versa ?
Answer1 Answers
Rajeev JassalMaster
Follow
Let us say that you are loading in tropical load line zone and destined for a port in
summer load line zone.
The entry point of summer load line zone is 10 days sailing and ship's fuel
consumption per day is 40 tons.
So from load port to the entry of summer load line, fuel consumption would be 400
T.
Calculate the fresh water in the same way. After 10 days of sailing will you have
more, less or same amount of fresh water?
Let us say your fresh water generator produces 15 T of fresh water per day and
average consumption of fresh water is 10T. So in 10 days, you will have 50 T of
more fresh water.
So you can afford to load 350 T of more cargo above the summer load line. This
350 T will be consumed during 10 days of sailing and you will be at summer load
line after 10 days of sailing.
Let us say summer deadweight is 80000 T. Can you load 80350 T and comply with
the load line zones??
The answer is No. Because the compliance is not based on the deadweight but on
the freeboard (& hence the drafts) at the midship.
Here is how chief officer needs to plan this.
Plan for the point when the ship will enter the summer load line. Enter all the
consumable you will have at this point. Which will be 350 T of less fuel from the
date of loading and 50 T of more fresh water.
Enter these values in the loadicator. Each vessel experience different amount of
SAG when fully loaded. This is by the experience of the ship's crew. Usually, a Suez
max size vessel will have around 10 cm of SAG.
Once you have the loadicator condition for the point of entry of summer load line,
enter all the present values of fuel oil and fresh water etc.
This will be the condition that you have to load at the load port.
When going from the summer load line zone to tropical load line zone, there is
nothing extra you have to do. Because you are already in summer load line and
you can only load up to summer load line.
Comments (1)
Like (8)
Dislikes (0)
GIORGI GIORGI
Apr 3, 2019
First of all, thanks for the explanation . But what i wanna ask let's say that i have summer
load line for loading port and winter load line for discharge port , of course i need to make
loading for winter line , let's say that my winter load line draught is 13.0m , but if in
discharging port i have water dencity 1.000 FW what should i do then ? Should my winter
load line draught be 13.0m for SW or 13.0m FW ?
10 ECDIS questions SIRE inspectors ask and how to deal with it?
Safety Culture on ships: It is all about the trade-offs
Learn the difficult concepts of sailing described in a easy and story-telling way. These
detailed and well researched articles provides value reading for all ranks.
GO TO MYSEATIME BLOGS
Ask or answer a question on this forum. Knowledge dies if it remains in our head.
Share your knowledge by writing answers to the question
ASK OR ANSWER A QUESTION
COMING SOON
MySeaTime Podcast
This podcast on the maritime matters will provide value to the listeners. Short, crisp
and full of value. Stay tuned for this section.
Coming soon...