2016
No Nama Barang Satuan
Daerah Daerah
Datar Pegunungan
1 2 3 6 7
2. 2. 4. 5. TANAMAN MERAMBAT
2. 2. 4. 5. 1 Air Mata Pengantin Pot 20,000.00 20,000.00
Pertamanan dan Kebersihan : 3
2016
No Nama Barang Satuan
2. 2. 4. 5. 2 Alamanda Pot 15,000.00 15,000.00
2. 2. 4. 5. 3 Mandivila Pot 25,000.00 25,000.00
2. 2. 4. 5. 4 Sirih Gading Pot 250,000.00 250,000.00
2. 2. 4. 5. 5 Stepanut Pot 20,000.00 20,000.00
2. 2. 4. 5. 6 Stepanut Ungu Pot 25,000.00 25,000.00
2. 2. 4. 6. TANAMAN EKSOTIS ( A )
2. 2. 4. 6. 1 Agave (tinggi= 0.5 m) Polibag 25,000.00 25,000.00
2. 2. 4. 6. 2 Agave Putih Pohon 30,000.00 30,000.00
2. 2. 4. 6. 3 Bakung Pohon 30,000.00 30,000.00
2. 2. 4. 6. 4 Cemara Norfolk Pohon 50,000.00 50,000.00
2. 2. 4. 6. 5 Tiris (tinggi= 0.5 m) Polibag 3,000.00 3,000.00
2. 2. 4. 7. TANAMAN EKSOTIS ( B )
2. 2. 4. 7. 1 Beringin Bonsai Pohon 100,000.00 100,000.00
2. 2. 4. 7. 2 Beringin Bonsai Bentukan Pohon 250,000.00 250,000.00
2. 2. 4. 7. 3 Bonsai Serut Pohon 2,500,000.00 2,500,000.00
2. 2. 4. 7. 4 Bonsai Sianton Pohon 2,000,000.00 2,000,000.00
2. 2. 4. 7. 5 Cemara Norfolk Pohon 2,500,000.00 2,500,000.00
2. 2. 4. 7. 6 Cemara Pipa Mas Pohon 2,000,000.00 2,000,000.00
2. 2. 4. 7. 7 Hebbra Pohon 3,000,000.00 3,000,000.00
2. 2. 4. 7. 8 Jambu Bangkok Pohon 500,000.00 500,000.00
2. 2. 4. 7. 9 Jeruk Lingkit Pohon 350,000.00 350,000.00
2. 2. 4. 7. 10 Jeruk Sunkist Pohon 150,000.00 150,000.00
2. 2. 4. 7. 11 Pakis Monyet Pohon 350,000.00 350,000.00
2. 2. 4. 7. 12 Palem Putri Pot 75,000.00 75,000.00
2. 2. 4. 7. 13 Palem Ratu Pohon 250,000.00 250,000.00
2. 2. 4. 7. 14 Palem Regu Pot 70,000.00 70,000.00
2. 2. 4. 7. 15 Pinang Merah Pohon 1,500,000.00 1,500,000.00
2. 2. 4. 7. 16 Pisang Kipas Pohon 1,500,000.00 1,500,000.00
2. 2. 4. 7. 17 Pule lingkar pohon 1 m Pohon 7,500,000.00 7,500,000.00
2. 2. 4. 7. 18 Pule lingkar pohon 2 m Pohon 15,000,000.00 15,000,000.00
2. 2. 4. 7. 19 Pule lingkar pohon 3 m Pohon 25,000,000.00 25,000,000.00
2. 2. 4. 7. 20 Pule lingkar pohon 4 m Pohon 35,000,000.00 35,000,000.00
2. 2. 4. 8. TANAMAN BORDER
2. 2. 4. 8. 1 Anjuang Kribo, Srikit, Pakis, Gonongkes I Teduh M2 117,000.00 117,000.00
2. 2. 4. 8. 2 Balanceng Marandra, Dinding Klas II Teduh M2 80,000.00 80,000.00
2. 2. 4. 8. 3 Nusa Indah, Kelabang, Krokot Klas II Panas M2 85,000.00 85,000.00
2. 2. 4. 8. 4 Puring-puring Gelatik, Pakis Rol Klas I Panas M2 100,000.00 100,000.00
PJU: PMK: 8
1 2 3 4 5
3 6 1 61 Ignitor untuk Lampu Philips, S1- 51 putih Bh 35,000.00 35,000.00
3 6 1 62 Ignitor untuk Lampu Philips, SN- 58 kuning Bh 41,000.00 41,000.00
3 6 1 63 Isolasi Nachi Bh 8,500.00 8,500.00
3 6 1 64 Jet power lampu selang (soket) Bh 35,000.00 35,000.00
3 6 1 65 Kabel NYA 1.5 mm / eterna M' 2,900.00 2,900.00
3 6 1 66 Kabel NYA 2.5 mm 100 m Rol 278,000.00 278,000.00
3 6 1 67 Kabel NYA 2.5 mm M' 4,300.00 4,300.00
3 6 1 68 Kabel NYA 4 mm M' 7,500.00 7,500.00
3 6 1 69 Kabel NYA 6 mm M' 11,000.00 11,000.00
3 6 1 70 Kabel NYA 10 mm M' 19,000.00 19,000.00
3 6 1 71 Kabel NYM 2 x 1,5 mm M' 5,500.00 5,500.00
3 6 1 72 Kabel NYM 2 x 2,5 mm M' 6,500.00 6,500.00
3 6 1 73 Kabel NYM 3 x 1,5 mm M' 6,000.00 6,000.00
3 6 1 74 Kabel NYM 3 x 2,5 mm M' 8,500.00 8,500.00
3 6 1 75 Kabel NYM 3 x 4 mm M' 14,000.00 14,000.00
3 6 1 76 Kabel NYM 4 x 2,5 mm M' 12,300.00 12,300.00
3 6 1 77 Kabel MYM Focus 4 x 4 mm hakiki 100m Rol 2,350,000.00 2,350,000.00
3 6 1 78 Kabel NYM 3 x 4 mm Rol 1,650,000.00 1,650,000.00
3 6 1 79 Kabel NYM 4 x 2,5 mm Rol 1,300,000.00 1,300,000.00
3 6 1 80 Kabel Nymhy (serabut) 2 x 0.75 mm Roll 431,000.00 431,000.00
3 6 1 81 Kabel Nymhy (serabut) 2 x 2.5 mm Roll 1,103,000.00 1,103,000.00
3 6 1 82 Kabel Nymhy (serabut) 4 x 2.5 mm Roll 2,015,000.00 2,015,000.00
3 6 1 83 Kabel NYY 2 x 1,5 mm M' 8,500.00 8,500.00
3 6 1 84 Kabel NYY 2 x 2,5 mm M' 11,000.00 11,000.00
3 6 1 85 Kabel NYY 3 x 1,5 mm M' 10,000.00 10,000.00
3 6 1 86 Kabel NYY 3 x 2,5 mm M' 14,000.00 14,000.00
3 6 1 87 Kabel NYY 3 x 4 mm M' 20,000.00 20,000.00
3 6 1 88 Kabel NYY 4 x 2,5 mm M' 16,500.00 16,500.00
3 6 1 89 Kabel NYY 4 x 4 mm M' 26,500.00 26,500.00
3 6 1 90 Kabel NYY 4 x 6 mm M' 34,000.00 34,000.00
3 6 1 91 Kabel NYY 4 x 10 mm M' 45,000.00 45,000.00
3 6 1 92 Kabel NYY 2 x 1,5 mm Rol 829,000.00 829,000.00
3 6 1 93 Kabel NYY 2 x 1,5 mm @ 100 m Rol 829,000.00 829,000.00
3 6 1 94 Kabel NYY 2 x 2,5 mm @ 100 m Rol 1,114,000.00 1,114,000.00
3 6 1 95 Kabel NYY 3 x 1,5 mm @ 100 m Rol 1,022,000.00 1,022,000.00
3 6 1 96 Kabel NYY 3 x 2,5 mm @ 100 m Rol 1,371,000.00 1,371,000.00
3 6 1 97 Kabel NYY 4 x 2,5 mm @ 100 m Rol 1,650,000.00 1,650,000.00
3 6 1 98 Kabel NYY 4 x 4 mm @ 100 m Rol 2,672,000.00 2,672,000.00
3 6 1 99 Kabel NYY 4 x 6 mm @ 100 m Rol 3,470,000.00 3,470,000.00
3 6 1 100 Kabel NYY HYO 2 x 0,75 mm @ 100 m Rol 431,000.00 431,000.00
3 6 1 101 Kabel NYY HYO 2 x 1,5 mm @ 100 m Rol 725,000.00 725,000.00
3 6 1 102 Kabel NYY HYO 2x 2,5 mm @ 100 m Rol 1,103,000.00 1,103,000.00
3 6 1 103 Kabel NYY HYO 3 x 1,5 mm @ 100 m Rol 1,020,000.00 1,020,000.00
3 6 1 104 Kabel NYY HYO 3 x 2,5 mm @ 100 m Rol 1,485,000.00 1,485,000.00
3 6 1 105 Kabel PVC 2 x 23 mm Rol 205,000.00 205,000.00
3 6 1 106 Kabel telepon M' 2,000.00 2,000.00
3 6 1 107 Kabel Twistied 2 x 10 mm M' 6,000.00 6,000.00
3 6 1 108 Kabel Twistied 2 x 12 mm M' 10,500.00 10,500.00
3 6 1 109 Kabel Twistied 2 x 16 mm M' 25,000.00 25,000.00
3 6 1 110 Kabel Twistied 3 x 35 mm2 + 1 x 25 mm2 M' 32,000.00 32,000.00
3 6 1 111 Kabel Twistied 3 x 50 mm2 + 1 x 35 mm2 M' 41,000.00 41,000.00
3 6 1 112 Kabel Twistied 4 x 25 mm2 M' 39,000.00 39,000.00
3 6 1 113 Kap Halogen 1000 NISO Rol 108,000.00 108,000.00
3 6 1 114 Kap Halogen 150 NISO Rol 37,000.00 37,000.00
3 6 1 115 Kap Halogen 500/300 NISO Rol 54,000.00 54,000.00
3 6 1 116 Kap HPIT 250 Watt NISO Bh 335,000.00 335,000.00
3 6 1 117 Kap HPIT 400 Watt Bh 335,000.00 335,000.00
3 6 1 118 Kap ijo E- 27 pasific Bh 10,000.00 10,000.00
3 6 1 119 Kap ijo E- 40 dexta Bh 19,000.00 19,000.00
3 6 1 120 Kap Lampu TL 20 Watt balak TKOU 1 X 20 Bh 45,000.00 45,000.00
3 6 1 121 Kap Lampu TL 40 Watt balak TKOU 1 X 40 Bh 80,000.00 80,000.00
3 6 1 122 Kap lampu jalan CT Bh 350,000.00 350,000.00
3 6 1 123 Kap lampu tancap PAR Bh 27,500.00 27,500.00
3 6 1 124 Kap Reflektor (putih) Kap. Industri 8" E40 Bh 92,000.00 92,000.00
3 6 1 125 Kap Totok MC Bh 1,250,000.00 1,250,000.00
3 6 1 126 Kap totok mercuri / osiwa SRL-012 E 40 Bh 350,000.00 350,000.00
3 6 1 127 Kap totok mercuri / Goll Type GE 400 E 40 Bh 400,000.00 400,000.00
3 6 1 128 Kapasitor 25 µ Bh 38,000.00 38,000.00
3 6 1 129 Kapasitor 30 µ Bh 45,000.00 45,000.00
3 6 1 130 Kawat Tarik uk 14 Kg 25,000.00 25,000.00
PJU: PMK: 9
1 2 3 4 5
3 6 1 131 Klem Imundex no 10 Dos 9,000.00 9,000.00
3 6 1 132 Klem Imundex no 12 Dos 13,800.00 13,800.00
3 6 1 133 Klem Imundex no 17 Dos 16,000.00 16,000.00
3 6 1 134 Klem Imundex no 4 Dos 7,000.00 7,000.00
3 6 1 135 Klem Imundex no 5 Dos 2,750.00 2,750.00
3 6 1 136 Klem Imundex no 6 Dos 3,500.00 3,500.00
3 6 1 137 Klem Imundex no 7 Dos 3,750.00 3,750.00
3 6 1 138 Klem Imundex no 8 Dos 4,800.00 4,800.00
3 6 1 139 Klem Imundex no 9 Dos 8,500.00 8,500.00
3 6 1 140 Konektor 6-25 mm Bh 7,500.00 7,500.00
3 6 1 141 Kontaktor Telemekanik SN 32 / 50A / 220V Bh 550,000.00 550,000.00
3 6 1 142 Lampu Halopika spring Bh 43,500.00 43,500.00
3 6 1 143 Lampu Spot JCDR 20 Watt Bh 10,500.00 10,500.00
3 6 1 144 Lampu Spot JCDR 50 Watt Bh 10,500.00 10,500.00
3 6 1 145 Lampu TL 2 x 20 watt komplit Bh 83,000.00 83,000.00
3 6 1 146 Lampu dop pijar 200 W Bh 15,000.00 15,000.00
3 6 1 147 Lampu dop pijar 5 W Bh 4,000.00 4,000.00
3 6 1 148 Lampu Hias (Selang) 10m Bh 150,000.00 150,000.00
3 6 1 149 Lampu selang LED Kotak / Putih Rol 3,500,000.00 3,500,000.00
3 6 1 150 Lampu LED 5 m / Runbay Multicolor Bh 180,000.00 180,000.00
3 6 1 151 Lampu LED 10 m / Runbay Multicolor Bh 270,000.00 270,000.00
3 6 1 152 Lampu led 14 watt Bh 210,000.00 210,000.00
3 6 1 153 Lampu led water prof far light Bh 2,500,000.00 2,500,000.00
3 6 1 154 Lampu Selang Shinyoku 3 j / merah Rol 4,500,000.00 4,500,000.00
3 6 1 155 Lampu Hias Meteor Uk. 40 cm Bh 113,000.00 113,000.00
3 6 1 156 Lampu Hias Meteor Uk. 60 cm Bh 136,000.00 136,000.00
3 6 1 157 Lampu Hias Meteor Uk. 80 cm Bh 155,000.00 155,000.00
3 6 1 158 Lampu LHE 13 Watt ( E 27 ) Bh 34,000.00 34,000.00
3 6 1 159 Lampu LHE 18 Watt Spiral( E 27 ) Bh 36,500.00 36,500.00
3 6 1 160 Lampu LHE 23 Watt ( E 27 ) Bh 33,500.00 33,500.00
3 6 1 161 Lampu LHE 24 Watt ( E 27 ) Bh 45,000.00 45,000.00
3 6 1 162 Lampu LHE 25 Watt Spiral ( E 27 ) Bh 41,000.00 41,000.00
3 6 1 163 Lampu LHE 36 Watt ( E 27 ) Bh 88,000.00 88,000.00
3 6 1 164 Lampu LHE 36 Watt Kuning ( E 27 ) Spiral Bh 104,000.00 104,000.00
3 6 1 165 Lampu LHE 45 Watt (E27) Bh 137,500.00 137,500.00
3 6 1 166 Lampu LHE 45 Watt Kuning (E27) Spiral Bh 110,000.00 110,000.00
3 6 1 167 Lampu LHE 65 Watt Kuning ( E 27 ) Spiral Bh 185,000.00 185,000.00
3 6 1 168 Lampu LHE 68 Watt ( E 27 ) Bh 165,000.00 165,000.00
3 6 1 169 Lampu LHE 85 Watt ( E 40 ) Spiral Visalux Bh 185,000.00 185,000.00
3 6 1 170 Lampu MC 125 Watt Bh 35,000.00 35,000.00
3 6 1 171 Lampu MC 250 Watt Bh 60,000.00 6,000.00
3 6 1 172 Lampu MC 400 Watt Bh 75,000.00 75,000.00
3 6 1 173 Lampu ML 160 Watt Bh 45,000.00 45,000.00
3 6 1 174 Lampu ML 250 W Bh 58,000.00 58,000.00
3 6 1 175 Lampu ML 500 W Bh 78,000.00 78,000.00
3 6 1 176 Lampu Sokle 300 Watt Bh 73,000.00 73,000.00
3 6 1 177 Lampu sorot Bh 55,000.00 55,000.00
3 6 1 178 Lampu Sorot PAR 220 V 120 W Bh 114,000.00 114,000.00
3 6 1 179 Lampu Sorot PAR 220 V 80 W Bh 103,000.00 103,000.00
3 6 1 180 Lampu spot light 150 watt eks philips ( lengkap) Bh 90,000.00 90,000.00
3 6 1 181 Lampu spot light 300 watt eks philips ( lengkap) Bh 112,500.00 112,500.00
3 6 1 182 Lampu TL 2 x 40 watt komplit Bh 154,000.00 154,000.00
3 6 1 183 Lampu TL 10 Watt Bh 8,000.00 8,000.00
3 6 1 184 Lampu TL 20 Watt Bh 11,000.00 11,000.00
3 6 1 185 Lampu TL 20 watt komplit Bh 61,000.00 61,000.00
3 6 1 186 Lampu TL 32 Watt Bulat Bh 33,500.00 33,500.00
3 6 1 187 Lampu TL 40 Watt Bh 12,000.00 12,000.00
3 6 1 188 Lampu TL 40 watt komplit Bh 77,000.00 77,000.00
3 6 1 189 MCB 2 A / 1 Phase / Merlin Gerin Bh 48,000.00 48,000.00
3 6 1 190 MCB 4 A / 1 Phase Bh 48,000.00 48,000.00
3 6 1 191 MCB 6 A / 1 Phase Bh 46,000.00 46,000.00
3 6 1 192 MCB 10 A / 1 Phase Bh 46,000.00 46,000.00
3 6 1 193 MCB 16 A / 1 Phase Bh 46,000.00 46,000.00
3 6 1 194 MCB 20 A / 1 Phase Bh 46,000.00 46,000.00
3 6 1 195 MCB 25 A / 1 Phase Bh 47,000.00 47,000.00
3 6 1 196 MCB 32 A / 1 Phase Bh 49,000.00 49,000.00
3 6 1 197 MCB 35 A / 1 Phase Bh 49,000.00 49,000.00
3 6 1 198 MCB 40 A / 1 Phase Bh 53,000.00 53,000.00
3 6 1 199 MCB 50 A / 1 Phase Bh 119,500.00 119,500.00
3 6 1 200 MCB 63 A / 1 Phase Bh 130,000.00 130,000.00
PJU: PMK: 10
1 2 3 4 5
3 6 1 201 Mitsubishi Magnetic SN-35/220 Bh 350,000.00 350,000.00
3 6 1 202 NFB 75 A Bh 530,000.00 530,000.00
3 6 1 203 NFB 100 A Bh 560,000.00 560,000.00
3 6 1 204 NFB 125 A Bh 870,000.00 870,000.00
3 6 1 205 NYAF 10mm eterna m' 15,000.00 15,000.00
3 6 1 206 NYAF 6mm eterna m' 10,000.00 10,000.00
3 6 1 207 NYM 2X1.5mm hakiki Roll 56,000.00 56,000.00
3 6 1 208 NYM 2X2.5mm hakiki Roll 798,000.00 798,000.00
3 6 1 209 NYM 2X4mm hakiki Roll 1,360,000.00 1,360,000.00
3 6 1 210 NYM 3X1.5mm hakiki Roll 715,000.00 715,000.00
3 6 1 211 NYM 3X2.5mm hakiki Roll 1,022,000.00 1,022,000.00
3 6 1 212 NYM 3X4mm hakiki Roll 1,650,000.00 1,650,000.00
3 6 1 213 NYM 3X6mm hakiki Roll 2,500,000.00 2,500,000.00
3 6 1 214 NYM 4X1.5mm hakiki Roll 883,000.00 883,000.00
3 6 1 215 NYM 4X2.5mm hakiki Roll 1,300,000.00 1,300,000.00
3 6 1 216 NYM 4X4mm hakiki Roll 2,350,000.00 2,350,000.00
3 6 1 217 NYZ 2X23 (oval) hakiki Roll 256,000.00 256,000.00
3 6 1 218 Ongkos pasang titik lampu + instalasi Ttk 150,000.00 150,000.00
3 6 1 219 Ornamen pipa medium 1,5" / 2 mm / 6 m unit 1,250,000.00 1,250,000.00
3 6 1 220 Paket PJU Solar Cell 5 m Modul 50 WP (10 watt) Pkt 20,000,000.00 20,000,000.00
3 6 1 221 Paket PJU Solar Cell 6 m Modul 80 WP (20 watt) Pkt 22,500,000.00 22,500,000.00
3 6 1 222 Paket PJU Solar Cell 4 m Modul 100 WP (30 watt) Pkt 25,630,000.00 25,630,000.00
3 6 1 223 Paket PJU Solar Cell 7 m Modul 100 WP (60 watt) Pkt 36,630,000.00 36,630,000.00
3 6 1 224 Paket PJU Solar Cell 9 m Modul 100 WP (80 watt) Pkt 45,870,000.00 45,870,000.00
3 6 1 225 Panel Box (40x60x20) Bh 335,000.00 335,000.00
3 6 1 226 Panel Box putar biasa ( 20 x 30 x 12 )" saka. Bh 128,000.00 128,000.00
3 6 1 227 Pasang KWH Meter 1300 VA Psg 2,800,000.00 2,800,000.00
3 6 1 228 Pasang KWH Meter 2200 VA Psg 3,600,000.00 3,600,000.00
3 6 1 229 Pasang KWH Meter 3500 VA Psg 4,500,000.00 4,500,000.00
3 6 1 230 Pasang KWH Meter 4400 VA Psg 5,800,000.00 5,800,000.00
3 6 1 231 Pasang KWH Meter 900 VA Psg 2,700,000.00 2,700,000.00
3 6 1 232 Philips jari essential 11 w Bh 26,000.00 26,000.00
3 6 1 233 Philips jari essential 13 w Bh 31,000.00 31,000.00
3 6 1 234 Philips jari essential 14 w Bh 27,000.00 27,000.00
3 6 1 235 Philips jari essential 18 w Bh 28,000.00 28,000.00
3 6 1 236 Philips jari essential 23 w Bh 33,500.00 33,500.00
3 6 1 237 Philips jari essential 26 w Bh 39,000.00 39,000.00
3 6 1 238 Philips jari essential 36 w Bh 54,000.00 54,000.00
3 6 1 239 Philips jari essential 45 w Bh 100,000.00 100,000.00
3 6 1 240 Philips jari essential 5 w Bh 20,000.00 20,000.00
3 6 1 241 Philips jari essential 65 w Bh 136,500.00 136,500.00
3 6 1 242 Philips jari essential 8 w Bh 22,000.00 22,000.00
3 6 1 243 Philips jari essential 85 w Bh 210,000.00 210,000.00
3 6 1 244 Rel barr Pcs 45,000.00 45,000.00
3 6 1 245 Rel MCB Lot 11,000.00 11,000.00
3 6 1 246 Saklar Panasonic (ganda) Bh 19,000.00 19,000.00
3 6 1 247 Saklar Panasonic (tunggal) Bh 11,750.00 11,750.00
3 6 1 248 Sambungan Jet P Lampu Selang Rol 14,000.00 14,000.00
3 6 1 249 Sekring Matsuka 2 A - 10 A Bh 21,000.00 21,000.00
3 6 1 250 Selcon photosel 06A Bh 32,500.00 32,500.00
3 6 1 251 Sevis (penguat tarikan) Bh 7,500.00 7,500.00
3 6 1 252 Shinyoku PLC 40w E-27 Bh 93,000.00 93,000.00
3 6 1 253 Shinyoku PLC 45w E-27 Bh 99,000.00 99,000.00
3 6 1 254 Sisir MCB / 3 fase Lot 95,000.00 95,000.00
3 6 1 255 Skun Kabel 16 mm Bh 3,000.00 3,000.00
3 6 1 256 Skun Kabel 25 mm Bh 3,900.00 3,900.00
3 6 1 257 Skun Konektor Kabel Ø 25 mm2 Bh 7,000.00 7,000.00
3 6 1 258 Skun Konektor Kabel Ø 35 mm2 Bh 11,000.00 11,000.00
3 6 1 259 Skun Konektor Kabel Ø 50 mm2 Bh 15,000.00 15,000.00
3 6 1 260 Soket Halogen 1000 Watt Bh 16,000.00 16,000.00
3 6 1 261 Soket Halogen 150 Watt Bh 12,000.00 12,000.00
3 6 1 262 Soket Halogen 500/300 Watt Bh 13,000.00 13,000.00
3 6 1 263 SON-H 250W Philips Bh 220,000.00 220,000.00
3 6 1 264 SON-H 350W Philips Bh 275,000.00 275,000.00
3 6 1 265 SON-T 250W Philips Bh 99,000.00 99,000.00
3 6 1 266 SON-T 400W Philips Bh 115,500.00 115,500.00
3 6 1 267 SON-T 70 Watt Bh 75,000.00 75,000.00
3 6 1 268 SON-T 150 Watt Bh 88,000.00 88,000.00
3 6 1 269 Sprayer Rol 84,000.00 84,000.00
3 6 1 270 Stater / S2 Bh 5,500.00 5,500.00
PJU: PMK: 11
1 2 3 4 5
3 6 1 271 Stater / S4 /S10 Bh 5,500.00 5,500.00
3 6 1 272 Steker arde Bh 7,800.00 7,800.00
3 6 1 273 Stop Kontak IB / Tanem Bh 15,000.00 15,000.00
3 6 1 274 Stop Kontak Tempel lubang 1 Bh 11,000.00 11,000.00
3 6 1 275 Stop Kontak Tempel lubang 2 Bh 19,000.00 19,000.00
3 6 1 276 Stop Kontak Tempel lubang 3 Bh 23,000.00 23,000.00
3 6 1 277 Stop Kontak Tempel lubang 4 Bh 32,000.00 32,000.00
3 6 1 278 Stop Kontak Tempel lubang 5 Bh 35,000.00 35,000.00
3 6 1 279 Stop Kontak Tempel lubang 6 Bh 45,000.00 45,000.00
3 6 1 280 Sunnyco 45W/putih Bh 96,500.00 96,500.00
3 6 1 281 T Dos 20 mm / bulat bh 2,000.00 2,000.00
3 6 1 282 T. Dos Kotak Bh 10,000.00 10,000.00
3 6 1 283 Tali Ties 10 cm Pak 4,000.00 4,000.00
3 6 1 284 Tali Ties 15 cm Pak 5,500.00 5,500.00
3 6 1 285 Tali Ties 20 cm Pak 8,000.00 8,000.00
3 6 1 286 Terminal 6 mm Bh 7,000.00 7,000.00
3 6 1 287 Terminal 10 mm Bh 10,000.00 10,000.00
3 6 1 288 Terminal 16 mm Bh 12,500.00 12,500.00
3 6 1 289 Terminal 25 mm Bh 21,000.00 21,000.00
3 6 1 290 Tiang PJU pipa medium 4", 3", 2,5", 2" /2mm/7m unit 3,500,000.00 3,500,000.00
3 6 1 291 Timer theben sul 181 Bh 350,000.00 350,000.00
3 6 1 292 TL 10 Watt Philips Bh 10,000.00 10,000.00
3 6 1 293 TL 18 Watt Philips Bh 15,000.00 15,000.00
3 6 1 294 TL 36 Watt Philips Bh 17,000.00 17,000.00
3 6 1 295 Trafo BSN 70 Watt / 3 kaki Bh 105,000.00 105,000.00
3 6 1 296 Trafo BSN 150 Watt / 3 kaki Bh 145,000.00 145,000.00
3 6 1 297 Trafo BSN 125W / kaki 3 Bh 106,000.00 106,000.00
3 6 1 298 Trafo BSN 250 Watt / kaki 3 Bh 210,000.00 210,000.00
3 6 1 299 Trafo BSN 400 Watt / kaki 3 Bh 360,000.00 360,000.00
3 6 1 300 Trafo Elektrik TL 20 Watt ex, Philips Bh 33,000.00 33,000.00
3 6 1 301 Trafo Elektrik TL 40 Watt ex. Philips Bh 33,000.00 33,000.00
3 6 1 302 Trafo 5 Am Bh 151,000.00 151,000.00
3 6 1 303 Trafo MC 250 Watt Bh 176,000.00 176,000.00
3 6 1 304 Trafo MC 400 Watt Bh 205,000.00 205,000.00
3 6 1 305 Trafo TL 20 Watt Bh 27,500.00 27,500.00
3 6 1 306 Trafo TL 40 Watt Bh 30,000.00 30,000.00
3 6 1 307 Trafo Ericon Power Supply Model S-120-12 Bh 150,000.00 150,000.00
3 6 1 308 Trek Schok Bh 88,000.00 88,000.00
PJU: PMK: 12
1 2 3 4 5
3 6 3 7 Sarung tangan Psg 195,000.00 195,000.00
3 6 3 8 Sepatu Psg 500,000.00 500,000.00
3 6 3 9 Sepatu harian Psg 225,000.00 225,000.00
3 6 3 10 Topi kerja Bh 38,500.00 38,500.00
PJU: PMK: 13
ANALISA HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG PEKERJAAN UMUM
KABUPATEN : TULUNGAGUNG
SISTEM : SWAKELOLA
HARGA : BAWAH
Overhead dan profit = 0.0000
1
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
2
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Plywood ( 120 x 240 ) cm, tbl. 4 mm Lembar 1.3500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
3
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
A.2.2.1.17 10 m2 Membongkar lantai lama, berikut membersihkan bata-bata lama atau ubin-ubin yang dibongkar
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 1.0000 Err:504 Err:504
Mandor oh 0.1000 Err:504 Err:504
Err:504 - - Err:504
Overhead dan profit - Err:504 - - Err:504
Err:504 - - Err:504
A.2.2.1.17b 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap akan dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 0.2000 Err:504 Err:504
Mandor oh 0.1000 Err:504 Err:504
Err:504 - - Err:504
Overhead dan profit - Err:504 - - Err:504
Err:504 - - Err:504
A.2.2.1.17c 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap tidak dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 0.2000 Err:504 Err:504
Mandor oh 0.1000 Err:504 Err:504
Err:504 - - Err:504
Overhead dan profit - Err:504 - - Err:504
Err:504 - - Err:504
A.2.2.1.17d 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran hendak dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 1.0000 Err:504 Err:504
Tukang kayu oh 0.2500 Err:504 Err:504
Kepala Tukang oh 0.2500 Err:504 Err:504
Mandor oh 0.0500 Err:504 Err:504
Err:504 - - Err:504
Overhead dan profit - Err:504 - - Err:504
Err:504 - - Err:504
A.2.2.1.17e 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran tidak dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 1.0000 Err:504 Err:504
Mandor oh 0.0500 Err:504 Err:504
Err:504 - - Err:504
Overhead dan profit - Err:504 - - Err:504
Err:504 - - Err:504
4
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 - - Err:504
Utk.bangunan yg tingginya kurang dari 3,5 m
/m3 = 2/3 x total
5
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0100 Err:504 Err:504
Err:504 - - Err:504
Overhead dan profit - Err:504 - - Err:504
Err:504 - - Err:504
6
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.3.2.1 PEKERJAAN PONDASI
7
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0750 Err:504 Err:504
Mandor L.04 oh 0.0750 Err:504 Err:504
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm m3 1.2000 Err:504 Err:504
Kapur Batu m3 0.1700 Err:504 Err:504
PC / Portland cement kg 0.1700 Err:504 Err:504
Pasir pasang / beton m3 0.3400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.3.2.1.10 1 m3 Pasangan pondasi siklop 60 % beton campuran 1 sp : 2 pb : 3 kr dan 40% batu belah
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 3.4000 Err:504 Err:504
Tukang batu L.02 oh 0.8500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0850 Err:504 Err:504
Mandor L.04 oh 0.1740 Err:504 Err:504
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm m3 0.4800 Err:504 Err:504
PC / Portland cement kg 194.0000 Err:504 Err:504
Pasir pasang / beton m3 0.3120 Err:504 Err:504
Batu pecah 2-3 cm m3 0.4680 Err:504 Err:504
Besi Beton / tulangan beton kg 126.0000 Err:504 Err:504
Kawat Beton / bendraat kg 1.8000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
8
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.1190 Err:504 Err:504
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm m3 0.4500 Err:504 Err:504
PC / Portland cement kg 194.0000 Err:504 Err:504
Pasir pasang / beton m3 0.3120 Err:504 Err:504
Batu pecah 2-3 cm m3 0.4680 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.3.2.1.11a 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang
SNI 2002 3.17 Tenaga
Pekerja / Buruh tak terlatih Oh 1.0000 Err:504 Err:504
Tukang batu Oh 0.6700 Err:504 Err:504
Kepala Tukang Oh 0.0670 Err:504 Err:504
Mandor Oh 0.0500 Err:504 Err:504
Bahan
Pasir Urug M3 0.0190 Err:504 Err:504
Pasir pasang / beton M3 0.9400 Err:504 Err:504
Batu pecah 2-3 cm M3 0.1500 Err:504 Err:504
PC / Portland cement Kg 60.5000 Err:504 Err:504
Besi Beton / tulangan beton Kg 45.0000 Err:504 Err:504
Kawat Beton / bendraat Kg 0.9000 Err:504 Err:504
Kayu bekisting M3 0.0320 Err:504 Err:504
Paku biasa Kg 0.1200 Err:504 Err:504
Minyak bekisting Lt 0.0900 Err:504 Err:504
Plamur Tembok Kg 0.2400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.3.2.1.11b 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang
SNI 2002 3.18 Tenaga
Pekerja / Buruh tak terlatih Oh 0.8000 Err:504 Err:504
Tukang batu Oh 0.5000 Err:504 Err:504
Kepala Tukang Oh 0.0500 Err:504 Err:504
Mandor Oh 0.0400 Err:504 Err:504
Bahan
Pasir Urug M3 0.0160 Err:504 Err:504
Pasir pasang / beton M3 0.0800 Err:504 Err:504
Batu pecah 2-3 cm M3 0.1250 Err:504 Err:504
PC / Portland cement Kg 49.0000 Err:504 Err:504
Besi Beton / tulangan beton Kg 34.5000 Err:504 Err:504
Kawat Beton / bendraat Kg 0.7000 Err:504 Err:504
Kayu bekisting M3 0.0270 Err:504 Err:504
Paku biasa Kg 0.1200 Err:504 Err:504
Minyak bekisting Lt 0.0900 Err:504 Err:504
Plamur Tembok Kg 0.2000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.1 1 m3 Membuat Beton mutu fc=7,4 Mpa (K100), Slump (12±2) cm, w/c = 0,87
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
PC / Portland cement kg 247.0000 Err:504 Err:504
Pasir pasang / beton m3 0.6207 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7400 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.2 1 m3 Membuat Beton mutu fc=9,8 Mpa (K125), Slump (12±2) cm, w/c = 0,78
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
9
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
PC / Portland cement kg 276.0000 Err:504 Err:504
Pasir pasang / beton m3 0.5914 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7496 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.3 1 m3 Membuat Beton mutu fc=12,2 Mpa (K150), Slump (12±2) cm, w/c = 0,72
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
PC / Portland cement kg 299.0000 Err:504 Err:504
Pasir pasang / beton m3 0.5707 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7533 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 Mpa ( K100) Slump (3-6) cm, w/c = 0,87
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.2000 Err:504 Err:504
Tukang batu L.02 oh 0.2000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0200 Err:504 Err:504
Mandor L.04 oh 0.0600 Err:504 Err:504
Bahan
PC / Portland cement kg 230.0000 Err:504 Err:504
Pasir pasang / beton m3 0.6379 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7607 Err:504 Err:504
Air bersih ltr 200.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.5 1 m3 Membuat Beton mutu fc=14,5 Mpa (K175), Slump (12±2) cm, w/c = 0,66
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
PC / Portland cement kg 326.0000 Err:504 Err:504
Pasir pasang / beton m3 0.5429 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7622 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.6 1 m3 Membuat Beton mutu fc=15,9 Mpa (K200), Slump (12±2) cm, w/c = 0,61
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
PC / Portland cement kg 352.0000 Err:504 Err:504
Pasir pasang / beton m3 0.5221 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7637 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.7 1 m3 Membuat Beton mutu fc=19,3 Mpa (K225), Slump (12±2) cm, w/c = 0,58
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
PC / Portland cement kg 371.0000 Err:504 Err:504
10
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pasir pasang / beton m3 0.4986 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7756 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.8 1 m3 Membuat Beton mutu fc=21,7 Mpa (K250), Slump (12±2) cm, w/c = 0,56
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
PC / Portland cement kg 384.0000 Err:504 Err:504
Pasir pasang / beton m3 0.4943 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7696 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.9 1 m3 Membuat Beton mutu fc=24,0 Mpa (K275), Slump (12±2) cm, w/c = 0,53
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
PC / Portland cement kg 406.0000 Err:504 Err:504
Pasir pasang / beton m3 0.4886 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7600 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.10 1 m3 Membuat Beton mutu fc=26,4 Mpa (K300), Slump (12±2) cm, w/c = 0,52
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 Err:504 Err:504
Tukang batu L.02 oh 0.2750 Err:504 Err:504
Kepala Tukang L.03 oh 0.0280 Err:504 Err:504
Mandor L.04 oh 0.0830 Err:504 Err:504
Bahan
PC / Portland cement kg 413.0000 Err:504 Err:504
Pasir pasang / beton m3 0.4864 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7563 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.11 1 m3 Membuat Beton mutu fc=28,8 Mpa (K325), Slump (12±2) cm, w/c = 0,49
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 2.1000 Err:504 Err:504
Tukang batu L.02 oh 0.3500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0350 Err:504 Err:504
Mandor L.04 oh 0.1050 Err:504 Err:504
Bahan
PC / Portland cement kg 439.0000 Err:504 Err:504
Pasir pasang / beton m3 0.4786 Err:504 Err:504
Batu pecah 2-3 cm m3 0.7452 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.1.12 1 m3 Membuat Beton mutu fc=31,2 Mpa (K350), Slump (12±2) cm, w/c = 0,48
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 2.1000 Err:504 Err:504
Tukang batu L.02 oh 0.3500 Err:504 Err:504
Kepala Tukang L.03 oh 0.3500 Err:504 Err:504
Mandor L.04 oh 0.1050 Err:504 Err:504
Bahan
PC / Portland cement kg 448.0000 Err:504 Err:504
Pasir pasang / beton m3 0.4764 Err:504 Err:504
11
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Batu pecah 2-3 cm m3 0.7407 Err:504 Err:504
Air bersih ltr 215.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
12
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Besi Beton / tulangan beton kg 10.5000 Err:504 Err:504
Kawat Beton / bendraat kg 0.1000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
13
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 0.3500 Err:504 Err:504
Bambu (Dia 6 - 8 cm x 600cm) btg 2.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
14
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang besi L.04 oh 1.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.2620 Err:504 Err:504
Mandor L.04 oh 0.2650 Err:504 Err:504
Bahan
Kayu bekisting m3 0.2000 Err:504 Err:504
Paku biasa kg 1.5000 Err:504 Err:504
Minyak bekisting ltr 0.4000 Err:504 Err:504
Besi Beton / tulangan beton kg 157.5000 Err:504 Err:504
Kawat Beton / bendraat kg 2.2500 Err:504 Err:504
PC / Portland cement kg 336.0000 Err:504 Err:504
Pasir pasang / beton m3 0.5400 Err:504 Err:504
Batu pecah 2-3 cm m3 0.8100 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
15
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pasir pasang / beton m3 0.5400 Err:504 Err:504
Batu pecah 2-3 cm m3 0.8100 Err:504 Err:504
Kayu bekisting m3 0.1400 Err:504 Err:504
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 2.8000 Err:504 Err:504
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m bh 16.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
16
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m bh 14.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.2.1 1 m2 Pembuatan lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1320 Err:504 Err:504
Tukang batu L.02 oh 0.0220 Err:504 Err:504
Kepala Tukang L.03 oh 0.0020 Err:504 Err:504
Mandor L.04 oh 0.0070 Err:504 Err:504
Bahan
PC / Portland cement kg 26.0800 Err:504 Err:504
Pasir pasang / beton m3 0.0434 Err:504 Err:504
Batu pecah 2-3 cm m3 0.0610 Err:504 Err:504
Air Bersih ltr 17.2000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.2.2 1 m2 Pembuatan lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1650 Err:504 Err:504
Tukang batu L.02 oh 0.0280 Err:504 Err:504
Kepala Tukang L.03 oh 0.0030 Err:504 Err:504
17
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
PC / Portland cement kg 32.6000 Err:504 Err:504
Pasir pasang / beton m3 0.0543 Err:504 Err:504
Batu pecah 2-3 cm m3 0.0762 Err:504 Err:504
Air Bersih ltr 21.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.2.3 1 m2 Pembuatan lahan produksi tebal 12 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1980 Err:504 Err:504
Tukang batu L.02 oh 0.0330 Err:504 Err:504
Kepala Tukang L.03 oh 0.0030 Err:504 Err:504
Mandor L.04 oh 0.0100 Err:504 Err:504
Bahan
PC / Portland cement kg 32.1200 Err:504 Err:504
Pasir pasang / beton m3 0.0651 Err:504 Err:504
Batu pecah 2-3 cm m3 0.0915 Err:504 Err:504
Air Bersih ltr 25.8000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.2.4 1 m2 Pembuatan lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2480 Err:504 Err:504
Tukang batu L.02 oh 0.0410 Err:504 Err:504
Kepala Tukang L.03 oh 0.0040 Err:504 Err:504
Mandor L.04 oh 0.0130 Err:504 Err:504
Bahan
PC / Portland cement kg 48.9000 Err:504 Err:504
Pasir pasang / beton m3 0.0814 Err:504 Err:504
Batu pecah 2-3 cm m3 0.1143 Err:504 Err:504
Air Bersih ltr 32.2500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.2.6 1 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0040 Err:504 Err:504
Tukang batu L.02 oh 0.0380 Err:504 Err:504
Kepala Tukang L.03 oh 0.0040 Err:504 Err:504
Mandor L.04 oh 0.0010 Err:504 Err:504
Bahan
Kayu bekisting m3 0.0050 Err:504 Err:504
Tripleks 122 x 244 tbl = 12 mm lbr 0.0430 Err:504 Err:504
minyak bekisting l 0.2000 Err:504 Err:504
Paku Ramset / dinabolt bh 0.6930 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.1.2.7 1 m2 Pembuatan bekisting untuk kolom beton pracetak ( 10-12 kali pakai )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0040 Err:504 Err:504
Tukang batu L.02 oh 0.0380 Err:504 Err:504
18
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0040 Err:504 Err:504
Mandor L.04 oh 0.0010 Err:504 Err:504
Bahan
Kayu bekisting m3 0.0040 Err:504 Err:504
Tripleks 122 x 244 tbl = 12 mm lbr 0.0480 Err:504 Err:504
minyak bekisting l 0.2000 Err:504 Err:504
Paku biasa kg 0.0460 Err:504 Err:504
Paku Ramset / dinabolt bh 0.6930 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
19
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Operator terlatih L.02 oh 0.1340 Err:504 Err:504
Kepala Tukang L.03 oh 0.0670 Err:504 Err:504
Mandor L.04 oh 0.0670 Err:504 Err:504
Bahan
Solar l 6.6760 Err:504 Err:504
Peralatan
Crane 10-15 ton HP 150 Kap.15 ton uh 0.0670 Err:504 Err:504
Sewa pipe support uh 1.1000 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
Overhead dan profit - Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
20
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.1.2.19 1 bh Melangsir komponen kolompracetak (± 20 m )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0190 Err:504 Err:504
Kepala Tukang L.02 oh 0.0380 Err:504 Err:504
Operator terlatih oh 0.0190 Err:504 Err:504
Pembantu operator oh 0.0190 Err:504 Err:504
Bahan
Solar l 1.8970 Err:504 Err:504
Peralatan
Crane 10-15 ton HP 150 Kap.15 ton uh 0.0190 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
Overhead dan profit - Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
21
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
A.4.2.1.4 1 m2 Pembuatan besi plat baja tebal 2 mm rangkap, rangka baja siku
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0500 Err:504 Err:504
Tukang las L.03 oh 1.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.1050 Err:504 Err:504
Mandor L.04 oh 0.0520 Err:504 Err:504
Bahan
Baja siku L 30.30.3 kg 15.0000 Err:504 Err:504
Besi plat kg 32.8000 Err:504 Err:504
Kawat las kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
22
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.1200 Err:504 Err:504
Mandor L.04 oh 0.0060 Err:504 Err:504
Bahan
Pintu Roling Door besi m2 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
23
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Profil kusen aluminium 4" m 4.4000 Err:504 Err:504
Kaca Bening t= 5 mm m 4.5000 Err:504 Err:504
Sealant Tube 0.2700 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
24
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.2.1.16c 1 m2 Pemasangan kawat burung
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000 Err:504 Err:504
Tukang las L.03 oh 0.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Kawat Ayakan Pasir (untuk pasang) m2 1.1000 Err:504 Err:504
Las besi / baja cm 11.1100 Err:504 Err:504
Besi strip + Mur Baut kg 1.7160 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.2.1.19 1 m Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang las L.03 oh 0.3000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0300 Err:504 Err:504
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
Seng Plat BJLS 30 lebar 0,90 m m 1.0500 Err:504 Err:504
Paku biasa kg 0.0100 Err:504 Err:504
Besi strip + Mur Baut kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.2.1.20 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x120 cm, dinding partisi
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2500 Err:504 Err:504
Tukang besi L.02 oh 0.2500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0250 Err:504 Err:504
Mandor L.04 oh 0.0130 Err:504 Err:504
Bahan
Pipa Besi 4/4 Tebal= 1.4 mm m1 3.5000 Err:504 Err:504
Assesoris (perkuatan,las dll) ls 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.2.1.21 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500 Err:504 Err:504
Tukang besi L.02 oh 0.3500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0350 Err:504 Err:504
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
25
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pipa Besi 4/4 Tebal= 1.4 mm m1 4.0000 Err:504 Err:504
Assesoris (perkuatan,las dll) ls 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
26
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
27
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih L.01 oh 0.3000 Err:504 Err:504
Tukang batu L.02 oh 0.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0150 Err:504 Err:504
Bahan
Batu Bata / Merah m3 70.0000 Err:504 Err:504
PC / Portland cement kg 8.3200 Err:504 Err:504
Pasir pasang / beton m3 0.0490 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
28
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
Hollow Block 20 m3 12.5000 Err:504 Err:504
PC / Portland cement kg 30.3200 Err:504 Err:504
Pasir pasang / beton m3 0.7280 Err:504 Err:504
Besi Beugel/Baut kg 0.2800 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
29
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Concrete Block 15 m3 12.5000 Err:504 Err:504
PC / Portland cement kg 22.7400 Err:504 Err:504
Pasir pasang / beton m3 0.5500 Err:504 Err:504
Besi Beugel/Baut kg 0.2800 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
30
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Hollow Block 10 m3 12.5000 Err:504 Err:504
PC / Portland cement kg 12.1300 Err:504 Err:504
Pasir pasang / beton m3 0.3880 Err:504 Err:504
Besi Beugel/Baut kg 0.2800 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
31
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
/m2 0.1000 Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
32
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0150 Err:504 Err:504
Bahan
PC / Portland cement kg 4.4160 Err:504 Err:504
Pasir pasang / beton m3 0.0270 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
33
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.4.2.12 1 m2 Pemasangan plesteran 1 sm : 1 kp : 2 pp tebal 15 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3600 Err:504 Err:504
Tukang batu L.03 oh 0.1200 Err:504 Err:504
Kepala Tukang L.03 oh 0.0120 Err:504 Err:504
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
Semen Merah m3 0.0070 Err:504 Err:504
Kapur Batu m3 0.0070 Err:504 Err:504
Pasir pasang / beton m3 0.0150 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
34
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
35
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
PC / Portland cement kg 4.3200 Err:504 Err:504
Pasir pasang / beton kg 0.0060 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
36
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Ubin Abu-abu m2 1.0608 Err:504 Err:504
PC / Portland cement kg 9.8000 Err:504 Err:504
Pasir pasang / beton m3 0.0450 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
37
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
38
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
39
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
40
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0090 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Plint ubin teraso m' 1.0590 Err:504 Err:504
PC / Portland cement kg 1.1400 Err:504 Err:504
Semen Putih / warna kg 0.1000 Err:504 Err:504
Pasir pasang / beton m3 0.0030 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.4.3.23 1 m1 Pemasangan Plint ubin teraso ukuran 10 x 40 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0900 Err:504 Err:504
Tukang batu L.02 oh 0.0900 Err:504 Err:504
Kepala Tukang L.03 oh 0.0090 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Plint ubin teraso m' 1.0600 Err:504 Err:504
PC / Portland cement kg 1.1400 Err:504 Err:504
Semen Putih / warna kg 0.1000 Err:504 Err:504
Pasir pasang / beton m3 0.0030 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
41
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Plint teralux kerang m' 1.0590 Err:504 Err:504
PC / Portland cement kg 1.1400 Err:504 Err:504
Semen Putih / warna kg 0.1000 Err:504 Err:504
Pasir pasang / beton m3 0.0030 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.4.3.28 1 m1 Pemasangan Plint ubin teralux marmer ukuran 10 x 60 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0900 Err:504 Err:504
Tukang batu L.02 oh 0.0900 Err:504 Err:504
Kepala Tukang L.03 oh 0.0090 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Plint teralux marmer m' 1.0200 Err:504 Err:504
PC / Portland cement kg 1.1400 Err:504 Err:504
Semen Putih / warna kg 0.1000 Err:504 Err:504
Pasir pasang / beton m3 0.0030 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
42
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
43
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
44
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
45
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.4.3.35m 1 m2 Pemasangan lantai keramik tekstur ukuran 20 x 20 cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang batu L.02 oh 0.3500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0350 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Keramik tekstur Uk. 20cm x 20 cm m2 1.0683 Err:504 Err:504
PC / Portland cement kg 10.0000 Err:504 Err:504
Pasir pasang / beton m3 0.0450 Err:504 Err:504
Semen Putih / warna kg 1.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
46
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0500 Err:504 Err:504
Tukang batu L.02 oh 0.5250 Err:504 Err:504
Kepala Tukang L.03 oh 0.0530 Err:504 Err:504
Mandor L.04 oh 0.0530 Err:504 Err:504
Bahan
ubin keramik m2 2.1780 Err:504 Err:504
PC / Portland cement kg 9.8000 Err:504 Err:504
Pasir pasang / beton m3 0.0450 Err:504 Err:504
Semen Putih / warna kg 4.3700 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
47
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih L.01 oh 0.7500 Err:504 Err:504
Tukang batu L.02 oh 0.7500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0750 Err:504 Err:504
Mandor L.04 oh 0.0380 Err:504 Err:504
Bahan
internal cove m' 1.0600 Err:504 Err:504
PC / Portland cement kg 1.1400 Err:504 Err:504
Pasir pasang / beton m3 0.0030 Err:504 Err:504
Semen Putih / warna kg 0.1000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
48
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang batu L.02 oh 0.3500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0350 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Batu Andisit Hijau m2 1.0600 Err:504 Err:504
PC / Portland cement kg 8.1900 Err:504 Err:504
Pasir pasang / beton m3 0.0450 Err:504 Err:504
Semen Putih / warna kg 0.6500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
49
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0350 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Batu lempeng m2 1.0600 Err:504 Err:504
PC / Portland cement kg 8.1900 Err:504 Err:504
Pasir pasang / beton m3 0.0450 Err:504 Err:504
Semen Putih / warna kg 0.6500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
50
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.4.3.47 1 m2 Pemasangan lantai kayu gymfloor
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.02 oh 0.3500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0350 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
parquet m2 1.0500 Err:504 Err:504
Lem PVC kg 0.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
51
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.4.3.52 1 m2 Pemasangan dinding keramik artistik 5 x 20 cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.9000 Err:504 Err:504
Tukang batu L.02 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0450 Err:504 Err:504
Bahan
keramik artistik m2 1.0600 Err:504 Err:504
PC / Portland cement kg 9.3000 Err:504 Err:504
Pasir pasang / beton m3 0.0180 Err:504 Err:504
Semen Putih / warna kg 2.9000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
52
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.9000 Err:504 Err:504
Tukang batu L.02 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0450 Err:504 Err:504
Bahan
Keramik dinding Uk. 20cm x 33 cm m2 1.0600 Err:504 Err:504
PC / Portland cement kg 9.3000 Err:504 Err:504
Pasir pasang / beton m3 0.0180 Err:504 Err:504
Semen Putih / warna kg 1.9400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
53
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih L.01 oh 0.9000 Err:504 Err:504
Tukang batu L.02 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0450 Err:504 Err:504
Bahan
Batu marmo warna m2 1.0600 Err:504 Err:504
PC / Portland cement kg 9.3000 Err:504 Err:504
Pasir pasang / beton m3 0.0180 Err:504 Err:504
Semen Putih / warna kg 1.9400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
54
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang batu L.02 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0450 Err:504 Err:504
Bahan
Batu andesit hitan m2 1.0600 Err:504 Err:504
PC / Portland cement kg 9.3000 Err:504 Err:504
Pasir pasang / beton m3 0.0180 Err:504 Err:504
Semen Putih / warna kg 1.9400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
55
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0450 Err:504 Err:504
Bahan
Batu candi hitam m2 1.0600 Err:504 Err:504
PC / Portland cement kg 9.3000 Err:504 Err:504
Pasir pasang / beton m3 0.0180 Err:504 Err:504
Semen Putih / warna kg 1.9400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
56
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0450 Err:504 Err:504
Bahan
Batu paras putih m2 1.0600 Err:504 Err:504
PC / Portland cement kg 9.3000 Err:504 Err:504
Pasir pasang / beton m3 0.0180 Err:504 Err:504
Semen Putih / warna kg 1.9400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
57
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Susun Sirih, andisit hitam uk. 3 x 30 cm m2 1.0600 Err:504 Err:504
PC / Portland cement kg 9.3000 Err:504 Err:504
Pasir pasang / beton m3 0.0180 Err:504 Err:504
Semen Putih / warna kg 1.9400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
58
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
bata pelapis buah 63.0000 Err:504 Err:504
PC / Portland cement kg 12.4400 Err:504 Err:504
Pasir pasang / beton m3 0.0250 Err:504 Err:504
Semen Putih / warna kg 2.7500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
59
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.4.3.61 1 m2 Pemasangan Floor harderner
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1200 Err:504 Err:504
Tukang batu L.02 oh 0.1200 Err:504 Err:504
Kepala Tukang L.03 oh 0.0120 Err:504 Err:504
Mandor L.04 oh 0.0060 Err:504 Err:504
Bahan
floor harderner Kg 5.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
60
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Tukang batu Oh 0.0600 Err:504 Err:504
Pekerja / Buruh tak terlatih Oh 0.2000 Err:504 Err:504
Bahan
Paving Stone abu - abu t= 8 cm, K300 M2 1.1000 Err:504 Err:504
Pasir pasang / beton M3 0.0350 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
61
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.4.3.63k 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 6 Cm K225
Tenaga
Tukang batu Oh 0.0600 Err:504 Err:504
Pekerja / Buruh tak terlatih Oh 0.2000 Err:504 Err:504
Bahan
Paving Stone warna t= 6 cm, K225 M2 1.1000 Err:504 Err:504
Pasir pasang / beton M3 0.0350 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
62
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
63
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.5.1.5 1 m2 Pemasangan langit - langit akustik ukuran ( 120 x 240 ) cm, tebal 3 mm,4mm & 6 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.1000 Err:504 Err:504
Tukang kayu L.02 oh 1.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Tripleks tebal 4 mm ( 1.20 x 2.40 ) m lembar 0.3750 Err:504 Err:504
Paku Asbes kg 0.0300 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.5.1.6 1 m2 Pemasangan langit - langit lambrisering kayu jati eks bojonegoro, tebal 9 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.02 oh 0.8000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0800 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0150 Err:504 Err:504
Paku Asbes kg 0.0100 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
64
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Paku Asbes kg 0.0100 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.5.1.6g 1 m2 Pemasangan langit - langit lambrisering kayu tahun ( mauni / akasia ), tebal 9 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.02 oh 0.8000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0800 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0150 Err:504 Err:504
Paku Asbes kg 0.0100 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
65
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang kayu L.02 oh 0.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0050 Err:504 Err:504
Mandor L.04 oh 0.0030 Err:504 Err:504
Bahan
List Eternit ( kayu ) m 1.0500 Err:504 Err:504
Paku Asbes kg 0.0100 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.5.1.10 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500 Err:504 Err:504
Tukang besi L.02 oh 0.3500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0350 Err:504 Err:504
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
Pipa Besi 4/4 Tebal= 1.4 mm m1 4.0000 Err:504 Err:504
Assesoris (perkuatan,las dll) ls 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
66
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang kayu L.03 oh 0.0750 Err:504 Err:504
Kepala Tukang L.011 oh 0.0075 Err:504 Err:504
Mandor L.15 oh 0.0080 Err:504 Err:504
Bahan
Genteng pres biasa buah 25.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
67
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang kayu L.03 oh 0.2000 Err:504 Err:504
Kepala Tukang L.11 oh 0.0200 Err:504 Err:504
Mandor L.15 oh 0.0020 Err:504 Err:504
Bahan
Bubungan Glasur ex. Kanmuri buah 5.0000 Err:504 Err:504
PC / Portland cement Kg 8.0000 Err:504 Err:504
Pasir pasang / beton m3 0.0320 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
68
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
69
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Paku Kait ( pancing ) Kg 0.1200 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
70
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Asbes Gelombang besar 110 x 225 tbl = 5 mm Lembar 0.4600 Err:504 Err:504
Paku Kait ( pancing ) Kg 0.1200 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit 0.0000 Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
71
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.11 oh 0.0130 Err:504 Err:504
Mandor L.15 oh 0.0040 Err:504 Err:504
Bahan
Asbes Nok 92 Lembar 1.2000 Err:504 Err:504
Paku Sekrup Kg 6.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
72
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih L.01 oh 0.2000 Err:504 Err:504
Tukang kayu L.03 oh 0.3000 Err:504 Err:504
Kepala Tukang L.11 oh 0.0030 Err:504 Err:504
Mandor L.15 oh 0.0100 Err:504 Err:504
Bahan
Genteng aspal Lembar 6.9000 Err:504 Err:504
Plywood 6 mm Kg 0.3500 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Plastik aerator bh 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
73
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Nok atap genteng metal bh 1.1000 Err:504 Err:504
Paku biasa kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
74
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.11 oh 0.0070 Err:504 Err:504
Mandor L.15 oh 0.0060 Err:504 Err:504
Bahan
Seng Plat BJLS 20 lebar 0,90 m lbr 0.3000 Err:504 Err:504
Paku Seng ( Paku payung ) kg 0.0400 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
75
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.6.1.1 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 Err:504 Err:504
Tukang kayu L.03 oh 21.0000 Err:504 Err:504
Kepala Tukang L.11 oh 2.1000 Err:504 Err:504
Mandor L.15 oh 0.3500 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.1000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.1a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 Err:504 Err:504
Tukang kayu L.03 oh 21.0000 Err:504 Err:504
Kepala Tukang L.11 oh 2.1000 Err:504 Err:504
Mandor L.15 oh 0.3500 Err:504 Err:504
Bahan
Kayu Jati Balok lokal m3 1.1000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.1b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 Err:504 Err:504
Tukang kayu L.03 oh 21.0000 Err:504 Err:504
Kepala Tukang L.11 oh 2.1000 Err:504 Err:504
Mandor L.15 oh 0.3500 Err:504 Err:504
Bahan
Kayu Kamper Balok m3 1.1000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.1c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 Err:504 Err:504
Tukang kayu L.03 oh 21.0000 Err:504 Err:504
Kepala Tukang L.11 oh 2.1000 Err:504 Err:504
Mandor L.15 oh 0.3500 Err:504 Err:504
Bahan
Kayu Balau Balok m3 1.1000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.1d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 Err:504 Err:504
Tukang kayu L.03 oh 21.0000 Err:504 Err:504
Kepala Tukang L.11 oh 2.1000 Err:504 Err:504
Mandor L.15 oh 0.3500 Err:504 Err:504
Bahan
Kayu Kempas Balok m3 1.1000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.1e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 Err:504 Err:504
Tukang kayu L.03 oh 21.0000 Err:504 Err:504
Kepala Tukang L.11 oh 2.1000 Err:504 Err:504
Mandor L.15 oh 0.3500 Err:504 Err:504
76
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Kayu Kruing Balok m3 1.1000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.1f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 Err:504 Err:504
Tukang kayu L.03 oh 21.0000 Err:504 Err:504
Kepala Tukang L.11 oh 2.1000 Err:504 Err:504
Mandor L.15 oh 0.3500 Err:504 Err:504
Bahan
Kayu Meranti Balok m3 1.1000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.1g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu tahun ( mahuni/akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 Err:504 Err:504
Tukang kayu L.03 oh 21.0000 Err:504 Err:504
Kepala Tukang L.11 oh 2.1000 Err:504 Err:504
Mandor L.15 oh 0.3500 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.1000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.2 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000 Err:504 Err:504
Tukang kayu L.03 oh 18.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.8000 Err:504 Err:504
Mandor L.04 oh 0.3000 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.2000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.2a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000 Err:504 Err:504
Tukang kayu L.03 oh 18.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.8000 Err:504 Err:504
Mandor L.04 oh 0.3000 Err:504 Err:504
Bahan
Kayu Jati Balok lokal m3 1.2000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.2b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000 Err:504 Err:504
Tukang kayu L.03 oh 18.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.8000 Err:504 Err:504
Mandor L.04 oh 0.3000 Err:504 Err:504
Bahan
Kayu Kamper Balok m3 1.2000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
77
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.2c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000 Err:504 Err:504
Tukang kayu L.03 oh 18.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.8000 Err:504 Err:504
Mandor L.04 oh 0.3000 Err:504 Err:504
Bahan
Kayu Balau Balok m3 1.2000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.2d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000 Err:504 Err:504
Tukang kayu L.03 oh 18.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.8000 Err:504 Err:504
Mandor L.04 oh 0.3000 Err:504 Err:504
Bahan
Kayu Kempas Balok m3 1.2000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.2e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000 Err:504 Err:504
Tukang kayu L.03 oh 18.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.8000 Err:504 Err:504
Mandor L.04 oh 0.3000 Err:504 Err:504
Bahan
Kayu Kruing Balok m3 1.2000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.2f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000 Err:504 Err:504
Tukang kayu L.03 oh 18.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.8000 Err:504 Err:504
Mandor L.04 oh 0.3000 Err:504 Err:504
Bahan
Kayu Meranti Balok m3 1.2000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.2g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000 Err:504 Err:504
Tukang kayu L.03 oh 18.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.8000 Err:504 Err:504
Mandor L.04 oh 0.3000 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.2000 Err:504 Err:504
Paku biasa kg 1.2500 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.3 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500 Err:504 Err:504
78
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang kayu L.03 oh 1.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.1050 Err:504 Err:504
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400 Err:504 Err:504
Paku biasa kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
79
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500 Err:504 Err:504
Tukang kayu L.03 oh 1.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.1050 Err:504 Err:504
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
Kayu Meranti Papan m3 0.0400 Err:504 Err:504
Paku biasa kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.3g 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500 Err:504 Err:504
Tukang kayu L.03 oh 1.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.1050 Err:504 Err:504
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400 Err:504 Err:504
Paku biasa kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.4 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500 Err:504 Err:504
Tukang kayu L.03 oh 1.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.1050 Err:504 Err:504
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400 Err:504 Err:504
Paku biasa kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
80
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.6.1.4g 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500 Err:504 Err:504
Tukang kayu L.03 oh 1.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.1050 Err:504 Err:504
Mandor L.04 oh 0.0180 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400 Err:504 Err:504
Paku biasa kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.5 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
81
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.5g 1 m2 Pembuatan dan pemasangan pintu panel, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400 Err:504 Err:504
82
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Lem ( Kayu + Tembok ) kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.6 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0240 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.6a 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Jati Papan lokal m3 0.0240 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.6b 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Kamper papan m3 0.0240 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.6c 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Balau Papan m3 0.0240 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.6d 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Kempas Papan m3 0.0240 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.6e 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
83
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Kayu Kruing Papan m3 0.0240 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.6f 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Meranti Papan m3 0.0240 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.6g 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Tahun papan ( Mauni/akasia)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0240 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.7 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu Jati papan eks. Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0640 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.7a 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu jati papan lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Jati Papan lokal m3 0.0640 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.7b 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kanfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Kamper papan m3 0.0640 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.7c 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
84
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Balau Papan m3 0.0640 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.7d 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Kempas Papan m3 0.0640 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.7e 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Kruing Papan m3 0.0640 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.7f 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Meranti Papan m3 0.0640 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.7g 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 Err:504 Err:504
Tukang kayu L.03 oh 3.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.3000 Err:504 Err:504
Mandor L.04 oh 0.0500 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0640 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.8 1 m2 Pembuatan daun pintu plywood rangka kayu Jati eks Bojonegoro tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.03 oh 2.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2100 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
85
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.6.1.8a 1 m2 Pembuatan daun pintu plywood rangka kayu Jati lokal tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.03 oh 2.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2100 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Kayu Jati Papan lokal m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.8b 1 m2 Pembuatan daun pintu plywood rangka kayu kamfer tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.03 oh 2.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2100 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Kayu Kamper papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.8c 1 m2 Pembuatan daun pintu plywood rangka kayu balau tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.03 oh 2.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2100 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Kayu Balau Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.8d 1 m2 Pembuatan daun pintu plywood rangka kayu kempas tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.03 oh 2.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2100 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Kayu Kempas Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.8e 1 m2 Pembuatan daun pintu plywood rangka kayu kruing tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.03 oh 2.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2100 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Kayu Kruing Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.8f 1 m2 Pembuatan daun pintu plywood rangka kayu meranti tertutup lebar sampai 90 Cm
86
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.03 oh 2.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2100 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Kayu Meranti Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.8g 1 m2 Pembuatan daun pintu plywood rangka kayu tahun ( mauni / akasia ) tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 Err:504 Err:504
Tukang kayu L.03 oh 2.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2100 Err:504 Err:504
Mandor L.04 oh 0.0350 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.9 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0560 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.9a 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Jati Papan lokal m3 0.0560 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
87
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Balau Papan m3 0.0560 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.9g 1 m2 Pembuatan daun pintu plywood rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0560 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5000 Err:504 Err:504
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
88
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang kayu L.03 oh 2.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2000 Err:504 Err:504
Mandor L.04 oh 0.3350 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0600 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
89
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.6700 Err:504 Err:504
Tukang kayu L.03 oh 2.0000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2000 Err:504 Err:504
Mandor L.04 oh 0.3350 Err:504 Err:504
Bahan
Kayu Meranti Papan m3 0.0600 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.11 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
90
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Kayu Balau Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.11g 1 m2 Pemasangan teakwood rangkap, rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 Err:504 Err:504
Tukang kayu L.03 oh 2.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.2400 Err:504 Err:504
Mandor L.04 oh 0.0400 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.3000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.12 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500 Err:504 Err:504
Tukang kayu L.03 oh 2.5500 Err:504 Err:504
Kepala Tukang L.03 oh 0.2550 Err:504 Err:504
Mandor L.04 oh 0.0430 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250 Err:504 Err:504
91
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.8000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Formika (120x240)cm lbr 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.12a 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500 Err:504 Err:504
Tukang kayu L.03 oh 2.5500 Err:504 Err:504
Kepala Tukang L.03 oh 0.2550 Err:504 Err:504
Mandor L.04 oh 0.0430 Err:504 Err:504
Bahan
Kayu Jati Papan lokal m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.8000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Formika (120x240)cm lbr 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.12b 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500 Err:504 Err:504
Tukang kayu L.03 oh 2.5500 Err:504 Err:504
Kepala Tukang L.03 oh 0.2550 Err:504 Err:504
Mandor L.04 oh 0.0430 Err:504 Err:504
Bahan
Kayu Kamper papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.8000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Formika (120x240)cm lbr 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.12c 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500 Err:504 Err:504
Tukang kayu L.03 oh 2.5500 Err:504 Err:504
Kepala Tukang L.03 oh 0.2550 Err:504 Err:504
Mandor L.04 oh 0.0430 Err:504 Err:504
Bahan
Kayu Balau Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.8000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Formika (120x240)cm lbr 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.12d 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500 Err:504 Err:504
Tukang kayu L.03 oh 2.5500 Err:504 Err:504
Kepala Tukang L.03 oh 0.2550 Err:504 Err:504
Mandor L.04 oh 0.0430 Err:504 Err:504
Bahan
Kayu Kempas Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.8000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Formika (120x240)cm lbr 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.12e 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500 Err:504 Err:504
Tukang kayu L.03 oh 2.5500 Err:504 Err:504
92
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.2550 Err:504 Err:504
Mandor L.04 oh 0.0430 Err:504 Err:504
Bahan
Kayu Kruing Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.8000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Formika (120x240)cm lbr 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.12f 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500 Err:504 Err:504
Tukang kayu L.03 oh 2.5500 Err:504 Err:504
Kepala Tukang L.03 oh 0.2550 Err:504 Err:504
Mandor L.04 oh 0.0430 Err:504 Err:504
Bahan
Kayu Meranti Papan m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.8000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Formika (120x240)cm lbr 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.12g 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500 Err:504 Err:504
Tukang kayu L.03 oh 2.5500 Err:504 Err:504
Kepala Tukang L.03 oh 0.2550 Err:504 Err:504
Mandor L.04 oh 0.0430 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250 Err:504 Err:504
Paku biasa kg 0.0300 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.8000 Err:504 Err:504
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000 Err:504 Err:504
Formika (120x240)cm lbr 0.5000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.13 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Eks Bojonegoro bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 Err:504 Err:504
Tukang kayu L.03 oh 12.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.2000 Err:504 Err:504
Mandor L.04 oh 0.2000 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.1000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.13a 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu lokal bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 Err:504 Err:504
Tukang kayu L.03 oh 12.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.2000 Err:504 Err:504
Mandor L.04 oh 0.2000 Err:504 Err:504
Bahan
Kayu Jati Balok lokal m3 1.1000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.13b 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Kamfer bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 Err:504 Err:504
Tukang kayu L.03 oh 12.0000 Err:504 Err:504
93
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 1.2000 Err:504 Err:504
Mandor L.04 oh 0.2000 Err:504 Err:504
Bahan
Kayu Kamper papan m3 1.1000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.13c 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Balau bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 Err:504 Err:504
Tukang kayu L.03 oh 12.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.2000 Err:504 Err:504
Mandor L.04 oh 0.2000 Err:504 Err:504
Bahan
Kayu Balau Balok m3 1.1000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.13d 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kempas bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 Err:504 Err:504
Tukang kayu L.03 oh 12.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.2000 Err:504 Err:504
Mandor L.04 oh 0.2000 Err:504 Err:504
Bahan
Kayu Kempas Balok m3 1.1000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.13e 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kruing bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 Err:504 Err:504
Tukang kayu L.03 oh 12.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.2000 Err:504 Err:504
Mandor L.04 oh 0.2000 Err:504 Err:504
Bahan
Kayu Kruing Balok m3 1.1000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.13f 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Meranti bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 Err:504 Err:504
Tukang kayu L.03 oh 12.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.2000 Err:504 Err:504
Mandor L.04 oh 0.2000 Err:504 Err:504
Bahan
Kayu Meranti Balok m3 1.1000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.13g 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu tahun ( mauni / akasia ) bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 Err:504 Err:504
Tukang kayu L.03 oh 12.0000 Err:504 Err:504
Kepala Tukang L.03 oh 1.2000 Err:504 Err:504
Mandor L.04 oh 0.2000 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.1000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
94
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.14 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.7000 Err:504 Err:504
Tukang kayu L.03 oh 20.1000 Err:504 Err:504
Kepala Tukang L.03 oh 2.0100 Err:504 Err:504
Mandor L.04 oh 0.3350 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.2000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
95
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih L.01 oh 6.7000 Err:504 Err:504
Tukang kayu L.03 oh 20.1000 Err:504 Err:504
Kepala Tukang L.03 oh 2.0100 Err:504 Err:504
Mandor L.04 oh 0.3350 Err:504 Err:504
Bahan
Kayu Kruing Balok m3 1.2000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.14g 1 m3 Pemasangan konstruksi kuda kuda expose kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.7000 Err:504 Err:504
Tukang kayu L.03 oh 20.1000 Err:504 Err:504
Kepala Tukang L.03 oh 2.0100 Err:504 Err:504
Mandor L.04 oh 0.3350 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.2000 Err:504 Err:504
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 5.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
96
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Besi strip + Mur Baut kg 15.0000 Err:504 Err:504
Paku biasa kg 3.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
97
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.6.1.16 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000 Err:504 Err:504
Tukang kayu L.03 oh 0.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0140 Err:504 Err:504
Kayu Jati Balok eks. Bojonegoro m3 0.0036 Err:504 Err:504
Paku biasa kg 0.2500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
98
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Kayu Kruing Balok m3 0.0140 Err:504 Err:504
Kayu Kruing Balok m3 0.0036 Err:504 Err:504
Paku biasa kg 0.2500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.16g 1 m2 Pemasangan rangka atap genteng keramik, kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000 Err:504 Err:504
Tukang kayu L.03 oh 0.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0140 Err:504 Err:504
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0036 Err:504 Err:504
Paku biasa kg 0.2500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.17 1 m2 Pemasangan rangka atap genteng beton, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000 Err:504 Err:504
Tukang kayu L.03 oh 0.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0140 Err:504 Err:504
Kayu Jati Balok eks. Bojonegoro m3 0.0057 Err:504 Err:504
Paku biasa kg 0.2500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
99
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
A.4.6.1.17g 1 m2 Pemasangan rangka atap genteng beton, kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000 Err:504 Err:504
Tukang kayu L.03 oh 0.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0140 Err:504 Err:504
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0057 Err:504 Err:504
Paku biasa kg 0.2500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
100
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0120 Err:504 Err:504
Mandor L.04 oh 0.0060 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0140 Err:504 Err:504
Paku biasa m3 0.0570 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
101
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih L.01 oh 0.1200 Err:504 Err:504
Tukang kayu L.03 oh 0.1200 Err:504 Err:504
Kepala Tukang L.03 oh 0.0120 Err:504 Err:504
Mandor L.04 oh 0.0060 Err:504 Err:504
Bahan
Kayu Meranti Balok m3 0.0140 Err:504 Err:504
Paku biasa m3 0.0570 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.19 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang kayu L.03 oh 0.3000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0300 Err:504 Err:504
Mandor L.04 oh 0.0750 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0154 Err:504 Err:504
Paku biasa kg 0.2000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
102
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.6.1.19d 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang kayu L.03 oh 0.3000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0300 Err:504 Err:504
Mandor L.04 oh 0.0750 Err:504 Err:504
Bahan
Kayu Kempas Balok m3 0.0154 Err:504 Err:504
Paku biasa kg 0.2000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.19g 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang kayu L.03 oh 0.3000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0300 Err:504 Err:504
Mandor L.04 oh 0.0750 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0154 Err:504 Err:504
Paku biasa kg 0.2000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
103
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
104
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
105
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kayu Kruing Papan m3 0.0108 Err:504 Err:504
Paku biasa kg 0.1000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
106
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Kayu Balau Papan m3 0.0110 Err:504 Err:504
Paku biasa kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.23 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang kayu L.03 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.23a 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
107
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang kayu L.03 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
Kayu Jati Papan lokal m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.23g 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Tahun ( mauni / akasia )
108
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang kayu L.03 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.24 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang kayu L.03 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Teakwood tebal 4mm (120 x 240) Cm lbr 0.8600 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5600 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
109
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
Kayu Kempas Balok m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Teakwood tebal 4mm (120 x 240) Cm lbr 0.8600 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5600 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.24g 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 Err:504 Err:504
Tukang kayu L.03 oh 0.4500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0450 Err:504 Err:504
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Teakwood tebal 4mm (120 x 240) Cm lbr 0.8600 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5600 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.25 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2000 Err:504 Err:504
Tukang kayu L.03 oh 0.6000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0600 Err:504 Err:504
Mandor L.04 oh 0.1000 Err:504 Err:504
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Plywood ( 120 x 240 ) cm, tbl. 4 mm lbr 0.8600 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5600 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
110
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.1000 Err:504 Err:504
Bahan
Kayu Jati Balok lokal m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Plywood ( 120 x 240 ) cm, tbl. 4 mm lbr 0.8600 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5600 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
111
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Kayu Meranti Balok m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Plywood ( 120 x 240 ) cm, tbl. 4 mm lbr 0.8600 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5600 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.25g 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2000 Err:504 Err:504
Tukang kayu L.03 oh 0.6000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0600 Err:504 Err:504
Mandor L.04 oh 0.1000 Err:504 Err:504
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0280 Err:504 Err:504
Paku biasa kg 0.1500 Err:504 Err:504
Plywood ( 120 x 240 ) cm, tbl. 4 mm lbr 0.8600 Err:504 Err:504
Lem ( Kayu + Tembok ) kg 0.5600 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.26 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati eks Bojoneoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.6000 Err:504 Err:504
Tukang kayu L.03 oh 1.8000 Err:504 Err:504
Kepala Tukang L.03 oh 0.1800 Err:504 Err:504
Mandor L.04 oh 0.0300 Err:504 Err:504
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0070 Err:504 Err:504
Paku biasa kg 0.1000 Err:504 Err:504
Paku Sekrup kg 0.1500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
112
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.6.1.26g 1 m2 Pemasangan dinding lambrisering dari papan kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.6000 Err:504 Err:504
Tukang kayu L.03 oh 1.8000 Err:504 Err:504
Kepala Tukang L.03 oh 0.1800 Err:504 Err:504
Mandor L.04 oh 0.0300 Err:504 Err:504
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0070 Err:504 Err:504
Paku biasa kg 0.1000 Err:504 Err:504
Paku Sekrup kg 0.1500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
113
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tukang kayu L.03 oh 0.0500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0050 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Bilik bambu Uk. 2m x 3m m2 1.5000 Err:504 Err:504
Kayu Jati Balok eks. Bojonegoro m3 0.0140 Err:504 Err:504
Paku biasa kg 0.0120 Err:504 Err:504
Kayu Jati Balok eks. Bojonegoro m3 0.0030 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
114
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0050 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Bilik bambu Uk. 2m x 3m m2 1.5000 Err:504 Err:504
Kayu Kruing Balok m3 0.0140 Err:504 Err:504
Paku biasa kg 0.0120 Err:504 Err:504
Kayu Kruing Balok m3 0.0030 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
115
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
116
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.6.2.5b 1 bh Pemasangan engsel pintu ( H )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0150 Err:504 Err:504
Tukang kayu L.03 oh 0.1500 Err:504 Err:504
Kepala Tukang L.03 oh 0.0150 Err:504 Err:504
Mandor L.04 oh 0.0008 Err:504 Err:504
Bahan
Engsel Pintu ( H ) bh 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
117
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0150 Err:504 Err:504
Mandor L.04 oh 0.0008 Err:504 Err:504
Bahan
Engsel sendok bh 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
118
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
119
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.6.2.6l 1 bh Pemasangan grendel tanam merk SES
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0100 Err:504 Err:504
Tukang kayu L.03 oh 0.1000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0005 Err:504 Err:504
Bahan
Grendel tanam merk SES bh 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
120
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0150 Err:504 Err:504
Mandor L.04 oh 0.0080 Err:504 Err:504
Bahan
Spring knip bh 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
121
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
122
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.6.2.12c 1 bh Pemasangan Handle pintu ganda Dekson 40 cm komplit
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0500 Err:504 Err:504
Tukang kayu L.03 oh 0.5000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0500 Err:504 Err:504
Mandor L.04 oh 0.0030 Err:504 Err:504
Bahan -
Handle pintu ganda Dekson 40 cm komplit bh 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
123
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0100 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan -
Door Stoper Stainless bh 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
124
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Sealant kg 0.0500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
125
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan -
Kaca Ray-band t= 7 mm bh 1.1000 Err:504 Err:504
Sealant kg 0.0700 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
126
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0700 Err:504 Err:504
Tukang cat L.02 oh 0.0090 Err:504 Err:504
Kepala Tukang L.03 oh 0.0060 Err:504 Err:504
Mandor L.04 oh 0.0030 Err:504 Err:504
Bahan
Cat Meny kayu kg 0.2000 Err:504 Err:504
Plamur kayu kg 0.1500 Err:504 Err:504
Cat Dasar Kayu kg 0.1700 Err:504 Err:504
Cat Kayu kg 0.2600 Err:504 Err:504
Kuas 3 " Bh 0.0100 Err:504 Err:504
Minyak Cat / Thiner B kg 0.0300 Err:504 Err:504
Kertas gosok ( rempelas ) Lbr 0.2000 Err:504 Err:504
127
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 3 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0700 Err:504 Err:504
Tukang cat L.02 oh 0.1050 Err:504 Err:504
Kepala Tukang L.03 oh 0.0040 Err:504 Err:504
Mandor L.04 oh 0.0030 Err:504 Err:504
Bahan
Cat Meny kayu kg 0.2000 Err:504 Err:504
Plamur kayu kg 0.1500 Err:504 Err:504
Cat Dasar Kayu kg 0.1700 Err:504 Err:504
Cat Kayu kg 0.3500 Err:504 Err:504
Kuas 3 " Bh 0.0100 Err:504 Err:504
Minyak Cat / Thiner B kg 0.0300 Err:504 Err:504
Kertas gosok ( rempelas ) Lbr 0.2000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur , 1 lapis dasar , 2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0200 Err:504 Err:504
Tukang cat L.02 oh 0.0630 Err:504 Err:504
128
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0063 Err:504 Err:504
Mandor L.04 oh 0.0030 Err:504 Err:504
Bahan
Plamur Tembok Kg 0.1000 Err:504 Err:504
Cat Tembok Kg 0.1000 Err:504 Err:504
Cat Tembok Kg 0.2600 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.7.1.11 1 m2 Pengecatan tembok lama (1 lapis cat dasar ,2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0280 Err:504 Err:504
Tukang cat L.02 oh 0.0420 Err:504 Err:504
Kepala Tukang L.03 oh 0.0042 Err:504 Err:504
Mandor L.04 oh 0.0030 Err:504 Err:504
Bahan
Cat Tembok Kg 0.1200 Err:504 Err:504
Cat Tembok Kg 0.1800 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
129
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.7.1.19 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat terakhir
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0600 Err:504 Err:504
Tukang cat L.02 oh 0.0600 Err:504 Err:504
130
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.0120 Err:504 Err:504
Mandor L.04 oh 0.0030 Err:504 Err:504
Bahan
Cat besi Kg 0.3000 Err:504 Err:504
Kuas 3 " Bh 0.0100 Err:504 Err:504
Minyak Cat / Thiner B l 0.0100 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
A.4.7.1.21 1 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat terakhir
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.4000 Err:504 Err:504
Tukang cat L.02 oh 0.7000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0700 Err:504 Err:504
Mandor L.04 oh 0.0200 Err:504 Err:504
Bahan
Cat besi Kg 0.3000 Err:504 Err:504
Minyak Cat / Thiner A l 0.0100 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
131
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
132
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
133
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kepala Tukang L.03 oh 0.1500 Err:504 Err:504
Mandor L.04 oh 0.0600 Err:504 Err:504
Bahan
Wastafel Besar Warna Muda ex.INA Unit 1.2000 Err:504 Err:504
PC / Portland cement Kg 6.0000 Err:504 Err:504
Pasir pasang / beton M3 0.0100 Err:504 Err:504
Perlengkapan % 0.1200 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
134
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0600 Err:504 Err:504
Bahan
Wastafel Besar Warna Tua ex.INA Unit 1.2000 Err:504 Err:504
PC / Portland cement Kg 6.0000 Err:504 Err:504
Pasir pasang / beton M3 0.0100 Err:504 Err:504
Perlengkapan % 0.1200 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
135
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
136
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0150 Err:504 Err:504
Bahan
Bak Cuci Stainlesstel (Royal) Unit 1.0000 Err:504 Err:504
Kran cucian dia 3/4" Bh 1.0000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
137
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Besi Beton / tulangan beton Kg 2.6000 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
138
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih L.01 oh 0.0100 Err:504 Err:504
Tukang batu L.02 oh 0.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0400 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Kran Toto 1/2" M 1.0000 Err:504 Err:504
Seal Tape Buah 0.0025 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
139
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.5.1.1.19i 1 m' Pemasangan stop kran diameter 3/4" kuningan
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0100 Err:504 Err:504
Tukang batu L.02 oh 0.4000 Err:504 Err:504
Kepala Tukang L.03 oh 0.0400 Err:504 Err:504
Mandor L.04 oh 0.0050 Err:504 Err:504
Bahan
Stop kran dia 3/4" kuningan M 1.0000 Err:504 Err:504
Seal Tape Buah 0.0025 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
140
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Err:504 Err:504 - Err:504
141
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
PVC AW Dia 0.75 " ( abu - abu ) M 1.2000 Err:504 Err:504
Perlengkapan % 0.3500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
142
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0040 Err:504 Err:504
Bahan
PVC AW Dia 4 " ( abu - abu ) M 1.2000 Err:504 Err:504
Perlengkapan % 0.3500 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
143
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
Buis Beton ø 40 Cm Bh 1.1000 Err:504 Err:504
Batu Bata / Merah M3 42.0000 Err:504 Err:504
PC / Portland cement Kg 10.3000 Err:504 Err:504
Pasir pasang / beton M3 0.0610 Err:504 Err:504
Pasir Urug M3 0.0690 Err:504 Err:504
Err:504 Err:504 - Err:504
Overhead dan profit - Err:504 Err:504 - Err:504
Err:504 Err:504 - Err:504
144
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
145
ANALISA HARGA SATUAN PEKERJAAN ( AHSP ) U K K 2022
BIDANG PEKERJAAN UMUM
KABUPATEN : NGANJUK
SISTEM : SWAKELOLA
HARGA : BAWAH
Overhead dan profit = 0.0000
1 2 3 4 5
A.2.2.1.17 10 m2 Membongkar lantai lama, berikut membersihkan bata-bata lama atau ubin-ubin yang dibongkar
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 1.0000
Mandor oh 0.1000
A.2.2.1.17b 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap akan dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 0.2000
Mandor oh 0.1000
A.2.2.1.17c 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap tidak dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 0.2000
Mandor oh 0.1000
A.2.2.1.17e 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran tidak dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 1.0000
Mandor oh 0.0500
A.3.2.1.10 1 m3 Pasangan pondasi siklop 60 % beton campuran 1 sp : 2 pb : 3 kr dan 40% batu belah
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 3.4000
Tukang batu L.02 oh 0.8500
Kepala Tukang L.03 oh 0.0850
Mandor L.04 oh 0.1740
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm m3 0.4800
PC / Portland cement kg 194.0000
Pasir pasang / beton m3 0.3120
Batu pecah 2-3 cm m3 0.4680
Besi Beton / tulangan beton kg 126.0000
Kawat Beton / bendraat kg 1.8000
A.3.2.1.11b 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang
SNI 2002 3.18Tenaga
Pekerja / Buruh tak terlatih Oh 0.8000
Tukang batu Oh 0.5000
Kepala Tukang Oh 0.0500
Mandor Oh 0.0400
Bahan
Pasir Urug M3 0.0160
Pasir pasang / beton M3 0.0800
Batu pecah 2-3 cm M3 0.1250
PC / Portland cement Kg 49.0000
Besi Beton / tulangan beton Kg 34.5000
Kawat Beton / bendraat Kg 0.7000
Kayu bekisting M3 0.0270
Paku biasa Kg 0.1200
Minyak bekisting Lt 0.0900
Plamur Tembok Kg 0.2000
A.4.1.1.1 1 m3 Membuat Beton mutu fc=7,4 Mpa (K100), Slump (12±2) cm, w/c = 0,87
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 247.0000
Pasir pasang / beton m3 0.6207
Batu pecah 2-3 cm m3 0.7400
Air bersih ltr 215.0000
Overhead dan profit -
A.4.1.1.2 1 m3 Membuat Beton mutu fc=9,8 Mpa (K125), Slump (12±2) cm, w/c = 0,78
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 276.0000
Pasir pasang / beton m3 0.5914
Batu pecah 2-3 cm m3 0.7496
Air bersih ltr 215.0000
A.4.1.1.3 1 m3 Membuat Beton mutu fc=12,2 Mpa (K150), Slump (12±2) cm, w/c = 0,72
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 299.0000
Pasir pasang / beton m3 0.5707
Batu pecah 2-3 cm m3 0.7533
Air bersih ltr 215.0000
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 Mpa ( K100) Slump (3-6) cm, w/c = 0,87
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.2000
Tukang batu L.02 oh 0.2000
Kepala Tukang L.03 oh 0.0200
Mandor L.04 oh 0.0600
Bahan
PC / Portland cement kg 230.0000
Pasir pasang / beton m3 0.6379
Batu pecah 2-3 cm m3 0.7607
Air bersih ltr 200.0000
A.4.1.1.5 1 m3 Membuat Beton mutu fc=14,5 Mpa (K175), Slump (12±2) cm, w/c = 0,66
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 326.0000
Pasir pasang / beton m3 0.5429
Batu pecah 2-3 cm m3 0.7622
Air bersih ltr 215.0000
A.4.1.1.6 1 m3 Membuat Beton mutu fc=15,9 Mpa (K200), Slump (12±2) cm, w/c = 0,61
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 352.0000
Pasir pasang / beton m3 0.5221
Batu pecah 2-3 cm m3 0.7637
Air bersih ltr 215.0000
A.4.1.1.7 1 m3 Membuat Beton mutu fc=19,3 Mpa (K225), Slump (12±2) cm, w/c = 0,58
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 371.0000
Pasir pasang / beton m3 0.4986
Batu pecah 2-3 cm m3 0.7756
Air bersih ltr 215.0000
A.4.1.1.8 1 m3 Membuat Beton mutu fc=21,7 Mpa (K250), Slump (12±2) cm, w/c = 0,56
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 384.0000
Pasir pasang / beton m3 0.4943
Batu pecah 2-3 cm m3 0.7696
Air bersih ltr 215.0000
A.4.1.1.9 1 m3 Membuat Beton mutu fc=24,0 Mpa (K275), Slump (12±2) cm, w/c = 0,53
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 406.0000
Pasir pasang / beton m3 0.4886
Batu pecah 2-3 cm m3 0.7600
Air bersih ltr 215.0000
A.4.1.1.10 1 m3 Membuat Beton mutu fc=26,4 Mpa (K300), Slump (12±2) cm, w/c = 0,52
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500
Tukang batu L.02 oh 0.2750
Kepala Tukang L.03 oh 0.0280
Mandor L.04 oh 0.0830
Bahan
PC / Portland cement kg 413.0000
Pasir pasang / beton m3 0.4864
Batu pecah 2-3 cm m3 0.7563
Air bersih ltr 215.0000
A.4.1.1.11 1 m3 Membuat Beton mutu fc=28,8 Mpa (K325), Slump (12±2) cm, w/c = 0,49
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 2.1000
Tukang batu L.02 oh 0.3500
Kepala Tukang L.03 oh 0.0350
Mandor L.04 oh 0.1050
Bahan
PC / Portland cement kg 439.0000
Pasir pasang / beton m3 0.4786
Batu pecah 2-3 cm m3 0.7452
Air bersih ltr 215.0000
A.4.1.1.12 1 m3 Membuat Beton mutu fc=31,2 Mpa (K350), Slump (12±2) cm, w/c = 0,48
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 2.1000
Tukang batu L.02 oh 0.3500
Kepala Tukang L.03 oh 0.3500
Mandor L.04 oh 0.1050
Bahan
PC / Portland cement kg 448.0000
Pasir pasang / beton m3 0.4764
Batu pecah 2-3 cm m3 0.7407
Air bersih ltr 215.0000
A.4.1.2.1 1 m2 Pembuatan lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1320
Tukang batu L.02 oh 0.0220
Kepala Tukang L.03 oh 0.0020
Mandor L.04 oh 0.0070
Bahan
PC / Portland cement kg 26.0800
Pasir pasang / beton m3 0.0434
Batu pecah 2-3 cm m3 0.0610
Air Bersih ltr 17.2000
A.4.1.2.2 1 m2 Pembuatan lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1650
Tukang batu L.02 oh 0.0280
Kepala Tukang L.03 oh 0.0030
Mandor L.04 oh 0.0080
Bahan
PC / Portland cement kg 32.6000
Pasir pasang / beton m3 0.0543
Batu pecah 2-3 cm m3 0.0762
Air Bersih ltr 21.5000
A.4.1.2.4 1 m2 Pembuatan lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2480
Tukang batu L.02 oh 0.0410
Kepala Tukang L.03 oh 0.0040
Mandor L.04 oh 0.0130
Bahan
PC / Portland cement kg 48.9000
Pasir pasang / beton m3 0.0814
Batu pecah 2-3 cm m3 0.1143
Air Bersih ltr 32.2500
A.4.1.2.6 1 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0040
Tukang batu L.02 oh 0.0380
Kepala Tukang L.03 oh 0.0040
Mandor L.04 oh 0.0010
Bahan
Kayu bekisting m3 0.0050
Tripleks 122 x 244 tbl = 12 mm lbr 0.0430
minyak bekisting l 0.2000
Paku Ramset / dinabolt bh 0.6930
A.4.1.2.7 1 m2 Pembuatan bekisting untuk kolom beton pracetak ( 10-12 kali pakai )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0040
Tukang batu L.02 oh 0.0380
Kepala Tukang L.03 oh 0.0040
Mandor L.04 oh 0.0010
Bahan
Kayu bekisting m3 0.0040
Tripleks 122 x 244 tbl = 12 mm lbr 0.0480
minyak bekisting l 0.2000
Paku biasa kg 0.0460
Paku Ramset / dinabolt bh 0.6930
A.4.2.1.4 1 m2 Pembuatan besi plat baja tebal 2 mm rangkap, rangka baja siku
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0500
Tukang las L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0520
Bahan
Baja siku L 30.30.3 kg 15.0000
Besi plat kg 32.8000
Kawat las kg 0.0500
A.4.2.1.19 1 m Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang las L.03 oh 0.3000
Kepala Tukang L.03 oh 0.0300
Mandor L.04 oh 0.0080
Bahan
Seng Plat BJLS 30 lebar 0,90 m m 1.0500
Paku biasa kg 0.0100
Besi strip + Mur Baut kg 0.5000
A.4.2.1.20 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x120 cm, dinding partisi
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2500
Tukang besi L.02 oh 0.2500
Kepala Tukang L.03 oh 0.0250
Mandor L.04 oh 0.0130
Bahan
Pipa Besi 4/4 Tebal= 1.4 mm m1 3.5000
Assesoris (perkuatan,las dll) ls 1.0000
A.4.2.1.21 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang besi L.02 oh 0.3500
Kepala Tukang L.03 oh 0.0350
Mandor L.04 oh 0.0180
Bahan
Pipa Besi 4/4 Tebal= 1.4 mm m1 4.0000
Assesoris (perkuatan,las dll) ls 1.0000
/m2 0.1000
Overhead dan profit -
A.4.5.1.5 1 m2 Pemasangan langit - langit akustik ukuran ( 120 x 240 ) cm, tebal 3 mm,4mm & 6 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.1000
Tukang kayu L.02 oh 1.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Tripleks tebal 4 mm ( 1.20 x 2.40 ) m lembar 0.3750
Paku Asbes kg 0.0300
A.4.5.1.6 1 m2 Pemasangan langit - langit lambrisering kayu jati eks bojonegoro, tebal 9 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.02 oh 0.8000
Kepala Tukang L.03 oh 0.0800
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0150
Paku Asbes kg 0.0100
A.4.5.1.6g 1 m2 Pemasangan langit - langit lambrisering kayu tahun ( mauni / akasia ), tebal 9 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.02 oh 0.8000
Kepala Tukang L.03 oh 0.0800
Mandor L.04 oh 0.0400
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0150
Paku Asbes kg 0.0100
A.4.5.1.10 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang besi L.02 oh 0.3500
Kepala Tukang L.03 oh 0.0350
Mandor L.04 oh 0.0180
Bahan
Pipa Besi 4/4 Tebal= 1.4 mm m1 4.0000
Assesoris (perkuatan,las dll) ls 1.0000
A.4.6.1.1 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Jati Balok lokal m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Kamper Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Balau Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Kempas Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Kruing Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Meranti Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu tahun ( mahuni/akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Jati Balok lokal m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Kamper Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Balau Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Kempas Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Kruing Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Meranti Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
Overhead dan profit -
A.4.6.1.2g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.3 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang kayu L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0180
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400
Paku biasa kg 0.0500
A.4.6.1.3g 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang kayu L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0180
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400
Paku biasa kg 0.0500
A.4.6.1.4 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang kayu L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0180
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400
Paku biasa kg 0.0500
A.4.6.1.4g 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang kayu L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0180
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400
Paku biasa kg 0.0500
A.4.6.1.5 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400
Lem ( Kayu + Tembok ) kg 0.0500
A.4.6.1.5g 1 m2 Pembuatan dan pemasangan pintu panel, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400
Lem ( Kayu + Tembok ) kg 0.0500
A.4.6.1.6 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6b 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Kamper papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6c 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Balau Papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6d 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Kempas Papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6e 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Kruing Papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6f 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Meranti Papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6g 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Tahun papan ( Mauni/akasia)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.7 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu Jati papan eks. Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7a 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu jati papan lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Jati Papan lokal m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7b 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kanfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Kamper papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7c 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Balau Papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7d 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Kempas Papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7e 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Kruing Papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7g 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.8 1 m2 Pembuatan daun pintu plywood rangka kayu Jati eks Bojonegoro tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8a 1 m2 Pembuatan daun pintu plywood rangka kayu Jati lokal tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Jati Papan lokal m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8c 1 m2 Pembuatan daun pintu plywood rangka kayu balau tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Balau Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8d 1 m2 Pembuatan daun pintu plywood rangka kayu kempas tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Kempas Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8e 1 m2 Pembuatan daun pintu plywood rangka kayu kruing tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Kruing Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
Overhead dan profit -
A.4.6.1.8f 1 m2 Pembuatan daun pintu plywood rangka kayu meranti tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Meranti Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8g 1 m2 Pembuatan daun pintu plywood rangka kayu tahun ( mauni / akasia ) tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.9 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0560
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.9a 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan lokal m3 0.0560
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.9g 1 m2 Pembuatan daun pintu plywood rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0560
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.11 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.3000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
A.4.6.1.11g 1 m2 Pemasangan teakwood rangkap, rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.3000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
A.4.6.1.12 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12a 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Jati Papan lokal m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12b 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Kamper papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12c 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Balau Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12d 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Kempas Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12f 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Meranti Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12g 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.13 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Eks Bojonegoro bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13a 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu lokal bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Jati Balok lokal m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13b 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Kamfer bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Kamper papan m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13c 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Balau bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Balau Balok m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13d 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kempas bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Kempas Balok m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
Overhead dan profit -
A.4.6.1.13e 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kruing bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Kruing Balok m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13f 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Meranti bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Meranti Balok m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13g 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu tahun ( mauni / akasia ) bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.14 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.7000
Tukang kayu L.03 oh 20.1000
Kepala Tukang L.03 oh 2.0100
Mandor L.04 oh 0.3350
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.2000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
Overhead dan profit -
A.4.6.1.14g 1 m3 Pemasangan konstruksi kuda kuda expose kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.7000
Tukang kayu L.03 oh 20.1000
Kepala Tukang L.03 oh 2.0100
Mandor L.04 oh 0.3350
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.2000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.16 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000
Tukang kayu L.03 oh 0.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0140
Kayu Jati Balok eks. Bojonegoro m3 0.0036
Paku biasa kg 0.2500
A.4.6.1.16g 1 m2 Pemasangan rangka atap genteng keramik, kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000
Tukang kayu L.03 oh 0.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0140
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0036
Paku biasa kg 0.2500
A.4.6.1.17 1 m2 Pemasangan rangka atap genteng beton, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000
Tukang kayu L.03 oh 0.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0140
Kayu Jati Balok eks. Bojonegoro m3 0.0057
Paku biasa kg 0.2500
A.4.6.1.17g 1 m2 Pemasangan rangka atap genteng beton, kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000
Tukang kayu L.03 oh 0.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0140
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0057
Paku biasa kg 0.2500
A.4.6.1.19 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.3000
Kepala Tukang L.03 oh 0.0300
Mandor L.04 oh 0.0750
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0154
Paku biasa kg 0.2000
A.4.6.1.19g 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.3000
Kepala Tukang L.03 oh 0.0300
Mandor L.04 oh 0.0750
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0154
Paku biasa kg 0.2000
A.4.6.1.23 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0280
Paku biasa kg 0.1500
Overhead dan profit -
A.4.6.1.23a 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Jati Papan lokal m3 0.0280
Paku biasa kg 0.1500
A.4.6.1.23g 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0280
Paku biasa kg 0.1500
A.4.6.1.24 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0280
Paku biasa kg 0.1500
Teakwood tebal 4mm (120 x 240) Cm lbr 0.8600
Lem ( Kayu + Tembok ) kg 0.5600
A.4.6.1.24g 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0280
Paku biasa kg 0.1500
Teakwood tebal 4mm (120 x 240) Cm lbr 0.8600
Lem ( Kayu + Tembok ) kg 0.5600
A.4.6.1.25 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2000
Tukang kayu L.03 oh 0.6000
Kepala Tukang L.03 oh 0.0600
Mandor L.04 oh 0.1000
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0280
Paku biasa kg 0.1500
Plywood ( 120 x 240 ) cm, tbl. 4 mm lbr 0.8600
Lem ( Kayu + Tembok ) kg 0.5600
A.4.6.1.25g 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2000
Tukang kayu L.03 oh 0.6000
Kepala Tukang L.03 oh 0.0600
Mandor L.04 oh 0.1000
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0280
Paku biasa kg 0.1500
Plywood ( 120 x 240 ) cm, tbl. 4 mm lbr 0.8600
Lem ( Kayu + Tembok ) kg 0.5600
A.4.6.1.26 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati eks Bojoneoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.6000
Tukang kayu L.03 oh 1.8000
Kepala Tukang L.03 oh 0.1800
Mandor L.04 oh 0.0300
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0070
Paku biasa kg 0.1000
Paku Sekrup kg 0.1500
A.4.6.1.26g 1 m2 Pemasangan dinding lambrisering dari papan kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.6000
Tukang kayu L.03 oh 1.8000
Kepala Tukang L.03 oh 0.1800
Mandor L.04 oh 0.0300
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0070
Paku biasa kg 0.1000
Paku Sekrup kg 0.1500
A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0700
Tukang cat L.02 oh 0.0090
Kepala Tukang L.03 oh 0.0060
Mandor L.04 oh 0.0030
Bahan
Cat Meny kayu kg 0.2000
Plamur kayu kg 0.1500
Cat Dasar Kayu kg 0.1700
Cat Kayu kg 0.2600
Kuas 3 " Bh 0.0100
Minyak Cat / Thiner B kg 0.0300
Kertas gosok ( rempelas ) Lbr 0.2000
A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur , 1 lapis dasar , 2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0200
Tukang cat L.02 oh 0.0630
Kepala Tukang L.03 oh 0.0063
Mandor L.04 oh 0.0030
Bahan
Plamur Tembok Kg 0.1000
Cat Tembok Kg 0.1000
Cat Tembok Kg 0.2600
A.4.7.1.11 1 m2 Pengecatan tembok lama (1 lapis cat dasar ,2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0280
Tukang cat L.02 oh 0.0420
Kepala Tukang L.03 oh 0.0042
Mandor L.04 oh 0.0030
Bahan
Cat Tembok Kg 0.1200
Cat Tembok Kg 0.1800
A.4.7.1.19 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat terakhir
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0600
Tukang cat L.02 oh 0.0600
Kepala Tukang L.03 oh 0.0120
Mandor L.04 oh 0.0030
Bahan
Cat besi Kg 0.3000
Kuas 3 " Bh 0.0100
Minyak Cat / Thiner B l 0.0100
A.4.7.1.21 1 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat terakhir
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.4000
Tukang cat L.02 oh 0.7000
Kepala Tukang L.03 oh 0.0700
Mandor L.04 oh 0.0200
Bahan
Cat besi Kg 0.3000
Minyak Cat / Thiner A l 0.0100
1 2 3
HARGA 2020
DAERAH DAERAH
DATAR PEGUNUNGAN
(Rp) (Rp)
4 5
74,250.00 74,250.00
77,000.00 77,000.00
115,000.00 115,000.00
80,000.00 80,000.00
120,000.00 120,000.00
89,500.00 89,500.00
84,000.00 84,000.00
89,500.00 89,500.00
94,500.00 94,500.00
68,500.00 68,500.00
68,500.00 68,500.00
68,500.00 68,500.00
68,500.00 68,500.00
68,500.00 68,500.00
81,500.00 81,500.00
110,000.00 110,000.00
110,000.00 110,000.00
110,000.00 110,000.00
110,000.00 110,000.00
110,000.00 110,000.00
110,000.00 110,000.00
110,000.00 110,000.00
150,000.00 150,000.00
1,000,000.00 1,000,000.00
1,000,000.00 1,000,000.00
1,000,000.00 1,000,000.00
1,000,000.00 1,000,000.00
7,000.00 7,000.00
8,000.00 8,000.00
117,800.00 129,580.00
4,300.00 4,730.00
163,700.00 180,070.00
190,600.00 209,660.00
268,600.00 295,460.00
274,600.00 302,060.00
264,100.00 290,510.00
213,000.00 234,300.00
196,400.00 216,040.00
294,800.00 324,280.00
129,600.00 142,560.00
900 990
146,100.00 160,710.00
141,400.00 155,540.00
141,400.00 155,540.00
2,310,000.00 2,541,000.00
220,100.00 242,110.00
275,000.00 302,500.00
183,400.00 201,740.00
179,100.00 197,010.00
190,900.00 209,990.00
111,000.00 122,100.00
109,800.00 120,780.00
75,100.00 82,610.00
93,400.00 102,740.00
127,100.00 139,810.00
110,100.00 121,110.00
340,000.00 350,000.00
340,000.00 350,000.00
300,000.00 320,000.00
285,000.00 300,000.00
250,000.00 265,000.00
275,000.00 302,500.00
275,000.00 302,500.00
192,500.00 211,750.00
192,500.00 211,750.00
185,000.00 205,000.00
451,000.00 496,100.00
467,500.00 514,250.00
93,100.00 102,410.00
147,300.00 162,030.00
7,700.00 8,470.00
1,800.00 1,980.00
1,270,500.00 1,397,550.00
5,200.00 5,720.00
3,300.00 3,630.00
1,800.00 1,980.00
264,000.00 290,400.00
173,300.00 190,630.00
1,400.00 1,540.00
150,200.00 165,220.00
3,000.00 3,300.00
187,000.00 205,700.00
187,000.00 205,700.00
181,500.00 199,650.00
181,500.00 199,650.00
181,500.00 199,650.00
11,000.00 12,100.00
49,500.00 54,450.00
82,500.00 90,750.00
104,500.00 114,950.00
231,000.00 254,100.00
1,045,000.00 1,149,500.00
6,200.00 6,820.00
4,100.00 4,510.00
12,100.00 13,310.00
28,900.00 31,790.00
31,200.00 34,320.00
86,700.00 95,370.00
69,300.00 76,230.00
30,000.00 33,000.00
46,200.00 50,820.00
173,300.00 190,630.00
253,000.00 278,300.00
20,800.00 22,880.00
187,000.00 205,700.00
10,725,000.00 11,797,500.00
11,825,000.00 13,007,500.00
3,465,000.00 3,811,500.00
30,800,000.00 33,880,000.00
20,900,000.00 22,990,000.00
36,850,000.00 40,535,000.00
22,550,000.00 24,805,000.00
10,450,000.00 11,495,000.00
11,550,000.00 12,705,000.00
77,000.00 84,700.00
79,800.00 87,780.00
85,300.00 93,830.00
93,500.00 102,850.00
99,000.00 108,900.00
5,750,046.00 15,180.00
7,425,000.00 8,167,500.00
8,525,000.00 9,377,500.00
6,875,000.00 7,562,500.00
7,975,000.00 8,772,500.00
5,500,000.00 6,050,000.00
6,050,000.00 6,655,000.00
4,950,000.00 5,445,000.00
5,225,000.00 5,747,500.00
110,000.00 121,000.00
22,000.00 24,200.00
65,000.00 71,500.00
94,300.00 103,730.00
155,500.00 171,050.00
189,000.00 207,900.00
21,700.00 23,870.00
64,900.00 71,390.00
99,300.00 109,230.00
105,200.00 115,720.00
115,500.00 127,050.00
109,500.00 120,450.00
79,300.00 87,230.00
115,500.00 127,050.00
121,300.00 133,430.00
49,100.00 54,010.00
57,200.00 62,920.00
94,700.00 104,170.00
50,400.00 55,440.00
83,600.00 91,960.00
67,800.00 74,580.00
72,300.00 79,530.00
75,700.00 83,270.00
83,600.00 91,960.00
62,900.00 69,190.00
86,800.00 95,480.00
93,000.00 102,300.00
88,300.00 97,130.00
55,600.00 61,160.00
80,500.00 88,550.00
67,800.00 74,580.00
111,000.00 122,100.00
51,600.00 56,760.00
71,200.00 78,320.00
84,500.00 92,950.00
101,300.00 111,430.00
38,700.00 42,570.00
32,200.00 35,420.00
69,300.00 76,230.00
37,500.00 41,250.00
20,600.00 22,660.00
25,700.00 28,270.00
440,000.00 484,000.00
50,800.00 55,880.00
59,500.00 65,450.00
68,200.00 75,020.00
76,200.00 83,820.00
605,000.00 665,500.00
467,500.00 514,250.00
440,000.00 484,000.00
220,000.00 242,000.00
242,000.00 266,200.00
346,500.00 381,150.00
231,000.00 254,100.00
63,600.00 69,960.00
34,700.00 38,170.00
20,200.00 22,220.00
34,700.00 38,170.00
825,000.00 907,500.00
935,000.00 1,028,500.00
1,017,500.00 1,119,250.00
33,600.00 36,960.00
10,500.00 11,550.00
14,300.00 15,730.00
52,300.00 57,530.00
275,000.00 302,500.00
5,800.00 6,380.00
2,600.00 2,860.00
5,000.00 5,500.00
4,800.00 5,280.00
4,800.00 5,280.00
6,400.00 7,040.00
5,000.00 5,500.00
4,800.00 5,280.00
6,200.00 6,820.00
3,100.00 3,410.00
10,000.00 11,000.00
11,400.00 12,540.00
30,800.00 33,880.00
3,200.00 3,520.00
65,200.00 71,720.00
2,000.00 2,200.00
2,300.00 2,530.00
78,100.00 85,910.00
69,900.00 76,890.00
76,500.00 84,150.00
5,200.00 5,720.00
17,600.00 19,360.00
20,400.00 22,440.00
23,100.00 25,410.00
27,500.00 30,250.00
14,900.00 16,390.00
15,000.00 16,500.00
7,800.00 8,580.00
18,100.00 19,910.00
15,500.00 17,050.00
12,400.00 13,640.00
27,900.00 30,690.00
35,100.00 38,610.00
41,800.00 45,980.00
52,600.00 57,860.00
29,400.00 32,340.00
36,900.00 40,590.00
55,400.00 60,940.00
42,300.00 46,530.00
52,600.00 57,860.00
63,900.00 70,290.00
51,500.00 56,650.00
67,000.00 73,700.00
82,400.00 90,640.00
46,400.00 51,040.00
74,200.00 81,620.00
101,000.00 111,100.00
62,000.00 68,200.00
40,000.00 44,000.00
60,000.00 66,000.00
44,000.00 48,400.00
64,000.00 70,400.00
28,000.00 30,800.00
45,000.00 49,500.00
65,000.00 71,500.00
13,996.00 15,395.60
8,000.00 8,800.00
34,550.00 38,005.00
15,850.00 17,435.00
62,800.00 69,080.00
60,400.00 66,440.00
86,550.00 95,205.00
83,350.00 91,685.00
122,350.00 134,585.00
117,750.00 129,525.00
132,450.00 145,695.00
148,600.00 163,460.00
125,550.00 138,105.00
120,800.00 132,880.00
135,900.00 149,490.00
149,650.00 164,615.00
126,850.00 139,535.00
122,050.00 134,255.00
137,200.00 150,920.00
152,500.00 167,750.00
164,850.00 181,335.00
158,600.00 174,460.00
178,400.00 196,240.00
198,150.00 217,965.00
169,000.00 185,900.00
162,650.00 178,915.00
183,000.00 201,300.00
202,100.00 222,310.00
170,650.00 187,715.00
164,250.00 180,675.00
184,700.00 203,170.00
204,100.00 224,510.00
208,000.00 228,800.00
200,100.00 220,110.00
225,100.00 247,610.00
225,100.00 247,610.00
251,850.00 277,035.00
242,450.00 266,695.00
272,650.00 299,915.00
303,150.00 333,465.00
31,500.00 34,650.00
39,350.00 43,285.00
31,500.00 34,650.00
39,350.00 43,285.00
33,000.00 36,300.00
41,350.00 45,485.00
62,000.00 68,200.00
46,450.00 51,095.00
57,900.00 63,690.00
69,350.00 76,285.00
86,700.00 95,370.00
553,000.00 608,300.00
50,000.00 55,000.00
65,000.00 71,500.00
80,000.00 88,000.00
45,000.00 49,500.00
72,000.00 79,200.00
98,000.00 107,800.00
14,500.00 15,950.00
7,500.00 8,250.00
17,500.00 19,250.00
15,000.00 16,500.00
12,000.00 13,200.00
27,000.00 29,700.00
34,000.00 37,400.00
40,500.00 44,550.00
51,000.00 56,100.00
28,500.00 31,350.00
35,750.00 39,325.00
53,750.00 59,125.00
41,000.00 45,100.00
51,000.00 56,100.00
62,000.00 68,200.00
73,500.00 80,850.00
41,800.00 45,980.00
47,300.00 52,030.00
52,800.00 58,080.00
3,000.00 3,300.00
23,100.00 25,410.00
17,400.00 19,140.00
94,600.00 104,060.00
140,800.00 154,880.00
44,600.00 49,060.00
36,900.00 40,590.00
53,900.00 59,290.00
60,500.00 66,550.00
39,700.00 43,670.00
209,100.00 230,010.00
85,300.00 93,830.00
63,800.00 70,180.00
72,100.00 79,310.00
99,000.00 108,900.00
76,500.00 84,150.00
62,200.00 68,420.00
94,600.00 104,060.00
13,200.00 14,520.00
56,100.00 61,710.00
91,300.00 100,430.00
55,600.00 61,160.00
89,100.00 98,010.00
74,300.00 81,730.00
89,100.00 98,010.00
123,800.00 136,180.00
75,400.00 82,940.00
22,600.00 24,860.00
39,100.00 43,010.00
24,200.00 26,620.00
31,400.00 34,540.00
42,400.00 46,640.00
21,500.00 23,650.00
34,700.00 38,170.00
41,800.00 45,980.00
74,300.00 81,730.00
80,300.00 88,330.00
90,200.00 99,220.00
83,700.00 92,070.00
98,200.00 108,020.00
179,100.00 197,010.00
225,300.00 247,830.00
231,000.00 254,100.00
37,400.00 41,140.00
51,200.00 56,320.00
79,800.00 87,780.00
83,100.00 91,410.00
133,100.00 146,410.00
77,000.00 84,700.00
53,400.00 58,740.00
58,300.00 64,130.00
71,500.00 78,650.00
75,900.00 83,490.00
247,500.00 272,250.00
Rp19,250.00
16,500.00 18,150.00
660,000.00 726,000.00
11,000.00 12,100.00
22,000.00 24,200.00
44,000.00 48,400.00
15,400.00 16,940.00
19,300.00 21,230.00
73,400.00 80,740.00
10,500.00 11,550.00
18,700.00 20,570.00
17,600.00 19,360.00
200,500.00 220,550.00
17,900.00 19,690.00
17,900.00 19,690.00
11,000.00 12,100.00
6,400.00 7,040.00
18,700.00 20,570.00
462,000.00 508,200.00
937,300.00 1,031,030.00
5,093,600.00 5,602,960.00
351,700.00 386,870.00
73,400.00 80,740.00
87,800.00 96,580.00
102,200.00 112,420.00
28,900.00 31,790.00
18,200.00 20,020.00
19,400.00 21,340.00
22,600.00 24,860.00
24,400.00 26,840.00
17,600.00 19,360.00
11,600.00 12,760.00
31,400.00 34,540.00
13,800.00 15,180.00
75,000.00 82,500.00
25,300.00 27,830.00
18,700.00 20,570.00
485,100.00 533,610.00
25,300.00 27,830.00
18,700.00 20,570.00
485,100.00 533,610.00
77,400.00 85,140.00
66,400.00 73,040.00
346,500.00 381,150.00
1,045,000.00 1,149,500.00
13,900.00 15,290.00
11,600.00 12,760.00
263,300.00 289,630.00
255,300.00 280,830.00
241,500.00 265,650.00
404,300.00 444,730.00
467,800.00 514,580.00
444,700.00 489,170.00
526,700.00 579,370.00
702,800.00 773,080.00
2,300.00 2,530.00
447,000.00 491,700.00
1,067,200.00 1,173,920.00
1,374,500.00 1,511,950.00
5,512,900.00 6,064,190.00
523,300.00 575,630.00
365,500.00 402,050.00
487,400.00 536,140.00
460,900.00 506,990.00
1,297,100.00 1,426,810.00
499,000.00 548,900.00
219,500.00 241,450.00
378,800.00 416,680.00
548,700.00 603,570.00
1,365,200.00 1,501,720.00
12,000.00 13,200.00
13,600.00 14,960.00
14,700.00 16,170.00
17,400.00 19,140.00
67,900.00 74,690.00
59,200.00 65,120.00
44,800.00 49,280.00
23,100.00 25,410.00
118,400.00 130,240.00
92,400.00 101,640.00
150,200.00 165,220.00
28,900.00 31,790.00
215,400.00 236,940.00
288,800.00 317,680.00
346,500.00 381,150.00
92,400.00 101,640.00
47,600.00 52,360.00
40,500.00 44,550.00
31,800.00 34,980.00
15,800.00 17,380.00
80,900.00 88,990.00
65,000.00 71,500.00
104,000.00 114,400.00
21,700.00 23,870.00
151,600.00 166,760.00
202,200.00 222,420.00
241,100.00 265,210.00
37,700.00 41,470.00
89,300.00 98,230.00
101,900.00 112,090.00
90,300.00 99,330.00
176,300.00 193,930.00
924,000.00 1,016,400.00
548,700.00 603,570.00
270,800.00 297,880.00
156,000.00 171,600.00
133,400.00 146,740.00
630,100.00 693,110.00
571,800.00 628,980.00
283,600.00 311,960.00
473,600.00 520,960.00
78,800.00 86,680.00
880,000.00 968,000.00
8,500.00 9,350.00
11,000.00 12,100.00
5,200.00 5,720.00
3,900.00 4,290.00
4,200.00 4,620.00
2,300.00 2,530.00
62,400.00 68,640.00
715,000.00 786,500.00
161,700.00 177,870.00
207,900.00 228,690.00
203,300.00 223,630.00
311,900.00 343,090.00
225,300.00 247,830.00
323,400.00 355,740.00
146,700.00 161,370.00
85,000.00 228,690.00
175,000.00 192,500.00
200,000.00 220,000.00
200,000.00 220,000.00
240,000.00 264,000.00
27,300.00 30,030.00
93,000.00 102,300.00
79,100.00 87,010.00
116,700.00 128,370.00
64,700.00 71,170.00
50,300.00 55,330.00
54,300.00 59,730.00
80,900.00 88,990.00
103,400.00 113,740.00
106,200.00 116,820.00
99,000.00 108,900.00
61,600.00 67,760.00
94,600.00 104,060.00
172,700.00 189,970.00
84,000.00 92,400.00
90,000.00 99,000.00
84,000.00 92,400.00
90,000.00 99,000.00
93,500.00 102,850.00
85,000.00 93,500.00
91,500.00 100,650.00
103,000.00 113,300.00
118,000.00 129,800.00
128,000.00 140,800.00
143,000.00 157,300.00
113,000.00 124,300.00
118,000.00 129,800.00
128,000.00 140,800.00
143,000.00 157,300.00
84,000.00 92,400.00
90,000.00 99,000.00
93,500.00 102,850.00
84,000.00 92,400.00
90,000.00 99,000.00
92,500.00 101,750.00
103,500.00 113,850.00
122,500.00 134,750.00
126,000.00 138,600.00
131,000.00 144,100.00
126,000.00 138,600.00
128,500.00 141,350.00
140,000.00 154,000.00
155,000.00 170,500.00
175,000.00 192,500.00
128,500.00 141,350.00
140,000.00 154,000.00
155,000.00 170,500.00
175,000.00 192,500.00
185,000.00 203,500.00
191,500.00 210,650.00
207,000.00 227,700.00
226,000.00 248,600.00
283,000.00 311,300.00
323,000.00 355,300.00
39,500.00 43,450.00
39,500.00 43,450.00
39,500.00 43,450.00
42,000.00 46,200.00
44,500.00 48,950.00
36,500.00 40,150.00
37,000.00 40,700.00
38,000.00 41,800.00
38,000.00 41,800.00
39,000.00 42,900.00
46,000.00 50,600.00
46,000.00 50,600.00
46,000.00 50,600.00
47,500.00 52,250.00
70,000.00 77,000.00
700,000.00 770,000.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
37,500.00 41,250.00
35,000.00 38,500.00
31,500.00 34,650.00
36,000.00 39,600.00
40,500.00 44,550.00
37,500.00 41,250.00
42,500.00 46,750.00
37,500.00 41,250.00
35,000.00 38,500.00
31,500.00 34,650.00
36,000.00 39,600.00
40,000.00 44,000.00
94,500.00 103,950.00
103,000.00 113,300.00
113,500.00 124,850.00
186,000.00 204,600.00
79,500.00 87,450.00
86,000.00 94,600.00
97,500.00 107,250.00
171,000.00 188,100.00
73,000.00 80,300.00
79,000.00 86,900.00
91,000.00 100,100.00
163,500.00 179,850.00
50,500.00 55,550.00
52,000.00 57,200.00
54,500.00 59,950.00
45,000.00 49,500.00
46,250.00 50,875.00
56,500.00 62,150.00
58,000.00 63,800.00
50,500.00 55,550.00
54,000.00 59,400.00
55,000.00 60,500.00
73,500.00 80,850.00
48,750.00 53,625.00
43,150.00 47,465.00
39,850.00 43,835.00
45,500.00 50,050.00
46,500.00 51,150.00
39,500.00 43,450.00
39,500.00 43,450.00
39,500.00 43,450.00
42,000.00 46,200.00
44,500.00 48,950.00
36,500.00 40,150.00
37,000.00 40,700.00
38,000.00 41,800.00
38,000.00 41,800.00
39,000.00 42,900.00
46,000.00 50,600.00
46,000.00 50,600.00
46,000.00 50,600.00
47,500.00 52,250.00
70,000.00 77,000.00
70,000.00 77,000.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
82,300.00 90,530.00
37,500.00 41,250.00
35,000.00 38,500.00
31,500.00 34,650.00
36,000.00 39,600.00
40,500.00 44,550.00
37,500.00 41,250.00
42,500.00 46,750.00
38,500.00 42,350.00
36,000.00 39,600.00
32,500.00 35,750.00
37,000.00 40,700.00
40,000.00 44,000.00
94,500.00 103,950.00
103,000.00 113,300.00
113,500.00 124,850.00
186,000.00 204,600.00
79,500.00 87,450.00
86,000.00 94,600.00
97,500.00 107,250.00
171,000.00 188,100.00
73,000.00 80,300.00
79,000.00 86,900.00
91,000.00 100,100.00
163,500.00 179,850.00
50,500.00 55,550.00
52,000.00 57,200.00
54,500.00 59,950.00
45,000.00 49,500.00
46,250.00 50,875.00
56,500.00 62,150.00
58,000.00 63,800.00
50,500.00 55,550.00
54,000.00 59,400.00
55,000.00 60,500.00
73,500.00 80,850.00
48,750.00 53,625.00
43,150.00 47,465.00
39,850.00 43,835.00
45,500.00 50,050.00
46,500.00 51,150.00
87,000.00 95,700.00
90,000.00 99,000.00
100,000.00 110,000.00
87,000.00 95,700.00
91,000.00 100,100.00
97,000.00 106,700.00
137,500.00 151,250.00
97,000.00 106,700.00
105,000.00 115,500.00
107,000.00 117,700.00
112,000.00 123,200.00
107,000.00 117,700.00
113,000.00 124,300.00
150,000.00 165,000.00
123,500.00 135,850.00
132,500.00 145,750.00
150,500.00 165,550.00
155,000.00 170,500.00
175,000.00 192,500.00
200,000.00 220,000.00
192,000.00 211,200.00
172,000.00 189,200.00
193,000.00 212,300.00
212,500.00 233,750.00
474,000.00 521,400.00
515,000.00 566,500.00
48,000.00 52,800.00
48,000.00 52,800.00
50,000.00 55,000.00
50,000.00 55,000.00
50,000.00 55,000.00
52,600.00 57,860.00
57,200.00 62,920.00
63,600.00 69,960.00
47,400.00 52,140.00
54,300.00 59,730.00
96,300.00 105,930.00
99,000.00 108,900.00
117,700.00 129,470.00
165,600.00 182,160.00
170,500.00 187,550.00
123,600.00 135,960.00
50,800.00 55,880.00
50,300.00 55,330.00
50,800.00 55,880.00
52,800.00 58,080.00
54,500.00 59,950.00
213,100.00 234,410.00
156,000.00 171,600.00
630,100.00 693,110.00
236,200.00 259,820.00
17,400.00 19,140.00
109,100.00 120,010.00
112,600.00 123,860.00
189,400.00 208,340.00
352,300.00 387,530.00
73,900.00 81,290.00
121,000.00 133,100.00
77,000.00 84,700.00
80,300.00 88,330.00
67,100.00 73,810.00
77,000.00 84,700.00
72,600.00 79,860.00
93,500.00 102,850.00
99,000.00 108,900.00
110,000.00 121,000.00
60,500.00 66,550.00
73,700.00 81,070.00
55,000.00 60,500.00
60,500.00 66,550.00
57,200.00 62,920.00
71,500.00 78,650.00
71,500.00 78,650.00
88,000.00 96,800.00
1,100.00 1,210.00
57,200.00 62,920.00
71,100.00 78,210.00
22,000.00 24,200.00
22,000.00 24,200.00
19,700.00 21,670.00
30,600.00 33,660.00
52,600.00 57,860.00
44,400.00 48,840.00
16,300.00 17,930.00
22,005.00 24,205.50
60,200.00 66,220.00
7,500.00 8,250.00
90,000.00 99,000.00
70,000.00 77,000.00
261,750.00 287,925.00
673,500.00 740,850.00
216,000.00 237,600.00
328,500.00 361,350.00
216,000.00 237,600.00
268,500.00 295,350.00
591,000.00 650,100.00
637,500.00 701,250.00
600,500.00 660,550.00
735,000.00 808,500.00
426,000.00 468,600.00
100 110
69,300.00 76,230.00
59,500.00 65,450.00
52,000.00 57,200.00
89,000.00 97,900.00
30,600.00 33,660.00
61,800.00 67,980.00
64,100.00 70,510.00
89,000.00 97,900.00
30,000.00 33,000.00
27,200.00 29,920.00
24,300.00 26,730.00
121,300.00 133,430.00
54,900.00 60,390.00
57,800.00 63,580.00
63,600.00 69,960.00
75,100.00 82,610.00
32,300.00 35,530.00
12,100.00 13,310.00
1,800.00 1,980.00
3,500.00 3,850.00
15,100.00 16,610.00
20,200.00 22,220.00
13,900.00 15,290.00
8,100.00 8,910.00
34,700.00 38,170.00
5,800.00 6,380.00
30,000.00 33,000.00
16,200.00 17,820.00
37,500.00 41,250.00
12,700.00 13,970.00
40,500.00 44,550.00
75,100.00 82,610.00
30,000.00 33,000.00
40,500.00 44,550.00
427,400.00 470,140.00
27,200.00 29,920.00
15,600.00 17,160.00
55,400.00 60,940.00
5,800.00 6,380.00
17,400.00 19,140.00
11,600.00 12,760.00
67,000.00 73,700.00
17,400.00 19,140.00
16,200.00 17,820.00
34,700.00 38,170.00
8,100.00 8,910.00
40,500.00 44,550.00
57,800.00 63,580.00
75,100.00 82,610.00
37,000.00 40,700.00
69,300.00 76,230.00
216,600.00 238,260.00
50,300.00 55,330.00
41,000.00 45,100.00
16,700.00 18,370.00
17,400.00 19,140.00
20,200.00 22,220.00
35,900.00 39,490.00
79,100.00 87,010.00
14,400.00 15,840.00
9,800.00 10,780.00
47,400.00 52,140.00
12,100.00 13,310.00
16,700.00 18,370.00
20,200.00 22,220.00
26,000.00 28,600.00
17,400.00 19,140.00
6,900.00 7,590.00
68,200.00 75,020.00
53,100.00 58,410.00
124,700.00 137,170.00
142,700.00 156,970.00
14,400.00 15,840.00
6,900.00 7,590.00
32,300.00 35,530.00
23,700.00 26,070.00
52,000.00 57,200.00
184,800.00 203,280.00
268,000.00 294,800.00
80,900.00 88,990.00
156,000.00 171,600.00
41,000.00 45,100.00
17,400.00 19,140.00
21,300.00 23,430.00
18,500.00 20,350.00
36,400.00 40,040.00
33,600.00 36,960.00
84,400.00 92,840.00
114,400.00 125,840.00
270,300.00 297,330.00
510,500.00 561,550.00
201,000.00 221,100.00
32,900.00 36,190.00
35,200.00 38,720.00
15,100.00 16,610.00
14,400.00 15,840.00
209,700.00 230,670.00
107,500.00 118,250.00
123,600.00 135,960.00
72,800.00 80,080.00
217,100.00 238,810.00
236,800.00 260,480.00
70,500.00 77,550.00
113,200.00 124,520.00
113,200.00 124,520.00
69,900.00 76,890.00
283,000.00 311,300.00
314,700.00 346,170.00
95,900.00 105,490.00
138,600.00 152,460.00
11,200.00 12,320.00
47,400.00 52,140.00
205,000.00 225,500.00
253,000.00 278,300.00
1,991,200.00 2,190,320.00
186,600.00 205,260.00
300,900.00 330,990.00
110,300.00 121,330.00
182,500.00 200,750.00
206,800.00 227,480.00
601,800.00 661,980.00
2,086,500.00 2,295,150.00
1,376,800.00 1,514,480.00
2,673,200.00 2,940,520.00
237,900.00 261,690.00
142,700.00 156,970.00
140,900.00 154,990.00
974,300.00 1,071,730.00
2,300.00 2,530.00
3,500.00 3,850.00
1,800.00 1,980.00
2,900.00 3,190.00
4,100.00 4,510.00
6,900.00 7,590.00
9,800.00 10,780.00
13,900.00 15,290.00
20,800.00 22,880.00
43,900.00 48,290.00
75,700.00 83,270.00
27,700.00 30,470.00
32,900.00 36,190.00
159,900.00 175,890.00
306,700.00 337,370.00
8,700.00 9,570.00
18,000.00 19,800.00
22,700.00 24,970.00
29,500.00 32,450.00
34,700.00 38,170.00
44,600.00 49,060.00
55,100.00 60,610.00
95,500.00 105,050.00
164,700.00 181,170.00
3,100.00 3,410.00
4,100.00 4,510.00
5,800.00 6,380.00
8,100.00 8,910.00
9,800.00 10,780.00
12,800.00 14,080.00
21,300.00 23,430.00
25,400.00 27,940.00
42,100.00 46,310.00
67,000.00 73,700.00
93,600.00 102,960.00
145,500.00 160,050.00
230,500.00 253,550.00
329,200.00 362,120.00
2,900.00 3,190.00
8,700.00 9,570.00
11,000.00 12,100.00
14,400.00 15,840.00
17,400.00 19,140.00
20,200.00 22,220.00
28,900.00 31,790.00
34,700.00 38,170.00
52,000.00 57,200.00
84,400.00 92,840.00
114,400.00 125,840.00
184,800.00 203,280.00
285,900.00 314,490.00
351,700.00 386,870.00
512,300.00 563,530.00
618,500.00 680,350.00
11,100.00 12,210.00
13,200.00 14,520.00
17,600.00 19,360.00
23,000.00 25,300.00
32,100.00 35,310.00
5,200.00 5,720.00
6,400.00 7,040.00
17,400.00 19,140.00
20,200.00 22,220.00
28,900.00 31,790.00
40,500.00 44,550.00
43,300.00 47,630.00
59,000.00 64,900.00
83,200.00 91,520.00
132,200.00 145,420.00
192,900.00 212,190.00
6,900.00 7,590.00
7,500.00 8,250.00
14,700.00 16,170.00
21,000.00 23,100.00
31,500.00 34,650.00
42,500.00 46,750.00
69,300.00 76,230.00
91,000.00 100,100.00
147,300.00 162,030.00
175,000.00 192,500.00
241,500.00 265,650.00
315,900.00 347,490.00
408,900.00 449,790.00
705,800.00 776,380.00
2,300.00 2,530.00
3,500.00 3,850.00
1,200.00 1,320.00
2,300.00 2,530.00
3,500.00 3,850.00
4,600.00 5,060.00
6,900.00 7,590.00
9,800.00 10,780.00
16,200.00 17,820.00
28,900.00 31,790.00
209,000.00 229,900.00
25,400.00 27,940.00
23,100.00 25,410.00
23,700.00 26,070.00
31,200.00 34,320.00
20,200.00 22,220.00
80,900.00 88,990.00
20,800.00 22,880.00
76,800.00 84,480.00
59,500.00 65,450.00
26,000.00 28,600.00
1,430,000.00 1,573,000.00
1,155,000.00 1,270,500.00
3,135,000.00 3,448,500.00
1,815,000.00 1,996,500.00
2,300.00 2,530.00
3,500.00 3,850.00
5,800.00 6,380.00
8,100.00 8,910.00
9,200.00 10,120.00
16,200.00 17,820.00
23,100.00 25,410.00
46,200.00 50,820.00
31,200.00 34,320.00
1,148,100.00 1,262,910.00
269,500.00 296,450.00
298,700.00 328,570.00
12,800.00 14,080.00
157,600.00 173,360.00
49,700.00 54,670.00
22,600.00 24,860.00
23,700.00 26,070.00
94,700.00 104,170.00
752,000.00 827,200.00
2,505,800.00 2,756,380.00
62,900.00 69,190.00
106,300.00 116,930.00
150,700.00 165,770.00
231,000.00 254,100.00
112,600.00 123,860.00
126,000.00 138,600.00
144,400.00 158,840.00
115,500.00 127,050.00
7,500.00 8,250.00
113,200.00 124,520.00
176,100.00 193,710.00
369,600.00 406,560.00
1,253,200.00 1,378,520.00
231,000.00 254,100.00
288,800.00 317,680.00
433,200.00 476,520.00
462,000.00 508,200.00
519,800.00 571,780.00
2,252,300.00 2,477,530.00
2,829,800.00 3,112,780.00
109,800.00 120,780.00
264,600.00 291,060.00
19,000.00 20,900.00
3,476,000.00 3,823,600.00
3,624,500.00 3,986,950.00
3,911,600.00 4,302,760.00
4,614,500.00 5,075,950.00
6,505,400.00 7,155,940.00
8,572,300.00 9,429,530.00
9,606,300.00 10,566,930.00
10,759,100.00 11,835,010.00
132,000.00 145,200.00
165,000.00 181,500.00
40,500.00 44,550.00
60,100.00 66,110.00
63,600.00 69,960.00
404,300.00 444,730.00
63,600.00 69,960.00
86,700.00 95,370.00
115,500.00 127,050.00
173,300.00 190,630.00
184,800.00 203,280.00
231,000.00 254,100.00
57,200.00 62,920.00
46,800.00 51,480.00
35,200.00 38,720.00
257,000.00 282,700.00
381,200.00 419,320.00
531,300.00 584,430.00
467,800.00 514,580.00
652,600.00 717,860.00
1,155,000.00 1,270,500.00
79,100.00 87,010.00
56,700.00 62,370.00
35,200.00 38,720.00
34,700.00 38,170.00
41,600.00 45,760.00
8,250,000.00 9,075,000.00
442,900.00 487,190.00
515,500.00 567,050.00
589,500.00 648,450.00
646,100.00 710,710.00
736,200.00 809,820.00
804,400.00 884,840.00
872,700.00 959,970.00
962,700.00 1,058,970.00
1,030,900.00 1,133,990.00
1,122,400.00 1,234,640.00
1,224,000.00 1,346,400.00
1,264,700.00 1,391,170.00
1,332,900.00 1,466,190.00
1,710,500.00 1,881,550.00
1,937,000.00 2,130,700.00
2,831,400.00 3,114,540.00
3,092,800.00 3,402,080.00
3,454,300.00 3,799,730.00
3,704,100.00 4,074,510.00
5,810,900.00 6,391,990.00
6,014,200.00 6,615,620.00
6,285,700.00 6,914,270.00
6,920,200.00 7,612,220.00
7,170,000.00 7,887,000.00
7,418,300.00 8,160,130.00
7,713,000.00 8,484,300.00
7,984,500.00 8,782,950.00
8,234,300.00 9,057,730.00
273,000.00 300,300.00
339,800.00 373,780.00
431,200.00 474,320.00
509,700.00 560,670.00
714,400.00 785,840.00
906,000.00 996,600.00
1,292,300.00 1,421,530.00
2,016,800.00 2,218,480.00
2,604,900.00 2,865,390.00
2,831,400.00 3,114,540.00
381,900.00 420,090.00
577,900.00 635,690.00
679,500.00 747,450.00
884,300.00 972,730.00
1,065,800.00 1,172,380.00
1,529,000.00 1,681,900.00
1,982,000.00 2,180,200.00
2,718,100.00 2,989,910.00
3,126,200.00 3,438,820.00
3,397,700.00 3,737,470.00
2,851,200.00 3,136,320.00
3,373,900.00 3,711,290.00
7,806,500.00 8,587,150.00
10,207,600.00 11,228,360.00
3,029,400.00 3,332,340.00
4,217,400.00 4,639,140.00
8,966,800.00 9,863,480.00
11,590,900.00 12,749,990.00
13,503,600.00 14,853,960.00
8,385,300.00 9,223,830.00
9,111,300.00 10,022,430.00
8,385,300.00 9,223,830.00
123,662,000.00 136,028,200.00
11,313,500.00 12,444,850.00
84,733,000.00 93,206,300.00
11,313,500.00 12,444,850.00
58,140,500.00 63,954,550.00
9,982,500.00 10,980,750.00
29,306,200.00 32,236,820.00
8,385,300.00 9,223,830.00
31,060,700.00 34,166,770.00
8,385,300.00 9,223,830.00
185,735,000.00 204,308,500.00
12,644,500.00 13,908,950.00
70,990,700.00 78,089,770.00
8,651,500.00 9,516,650.00
33,121,000.00 36,433,100.00
8,385,300.00 9,223,830.00
7,235,800.00 7,959,380.00
50,927,300.00 56,020,030.00
9,847,200.00 10,831,920.00
10,551,200.00 11,606,320.00
88,400,000.00 88,400,000.00
13,000,000.00 13,000,000.00
240,400,000.00 240,400,000.00
14,000,000.00 14,000,000.00
22,900.00 25,190.00
29,400.00 32,340.00
45,000.00 49,500.00
68,200.00 75,020.00
93,100.00 102,410.00
118,800.00 130,680.00
153,500.00 168,850.00
222,100.00 244,310.00
12,000.00 13,200.00
25,000.00 27,500.00
39,900.00 43,890.00
54,900.00 60,390.00
79,000.00 86,900.00
118,000.00 129,800.00
247,200.00 271,920.00
2,600.00 2,860.00
4,100.00 4,510.00
6,400.00 7,040.00
9,800.00 10,780.00
15,000.00 16,500.00
24,400.00 26,840.00
34,500.00 37,950.00
48,300.00 53,130.00
70,700.00 77,770.00
148,200.00 163,020.00
239,400.00 263,340.00
19,400.00 21,340.00
27,500.00 30,250.00
39,800.00 43,780.00
71,800.00 78,980.00
339,200.00 373,120.00
498,800.00 548,680.00
428,100.00 470,910.00
504,000.00 554,400.00
362,300.00 398,530.00
395,200.00 434,720.00
428,100.00 470,910.00
553,400.00 608,740.00
345,800.00 380,380.00
444,600.00 489,060.00
543,400.00 597,740.00
625,900.00 688,490.00
38,600.00 42,460.00
72,200.00 79,420.00
109,400.00 120,340.00
195,900.00 215,490.00
115,900.00 127,490.00
143,600.00 157,960.00
173,300.00 190,630.00
252,600.00 277,860.00
72,800.00 75,000.00
128,600.00 141,460.00
157,300.00 173,030.00
202,100.00 222,310.00
281,300.00 309,430.00
62,200.00 68,420.00
83,700.00 92,070.00
643,500.00 707,850.00
1,260,200.00 1,386,220.00
1,876,900.00 2,064,590.00
2,681,300.00 2,949,430.00
42,200.00 46,420.00
48,300.00 53,130.00
50,600.00 55,660.00
62,000.00 68,200.00
65,200.00 71,720.00
93,200.00 102,520.00
98,100.00 107,910.00
142,800.00 157,080.00
311,200.00 342,320.00
395,600.00 435,160.00
5,700.00 6,270.00
10,300.00 11,330.00
14,300.00 15,730.00
21,000.00 23,100.00
29,000.00 31,900.00
48,300.00 53,130.00
82,000.00 90,200.00
130,400.00 143,440.00
8,800.00 9,680.00
17,200.00 18,920.00
236,500.00 260,150.00
48,300.00 53,130.00
67,000.00 73,700.00
111,800.00 122,980.00
28,700.00 31,570.00
29,700.00 32,670.00
40,500.00 44,550.00
47,500.00 52,250.00
79,400.00 87,340.00
6,600.00 7,260.00
18,200.00 20,020.00
29,700.00 32,670.00
40,500.00 44,550.00
36,500.00 40,150.00
79,400.00 87,340.00
368,200.00 405,020.00
471,400.00 518,540.00
22,900.00 25,190.00
80,100.00 88,110.00
98,700.00 108,570.00
120,100.00 132,110.00
55,600.00 61,160.00
91,500.00 100,650.00
83,200.00 91,520.00
94,800.00 104,280.00
217,600.00 239,360.00
268,600.00 295,460.00
319,600.00 351,560.00
388,100.00 426,910.00
760,100.00 836,110.00
1,031,600.00 1,134,760.00
1,303,500.00 1,433,850.00
1,520,200.00 1,672,220.00
175,000.00 180,000.00
215,300.00 236,830.00
225,000.00 410,000.00
400,000.00 566,000.00
550,000.00 400,000.00
5,800.00 6,380.00
6,900.00 7,590.00
7,700.00 8,470.00
8,600.00 9,460.00
11,200.00 12,320.00
13,000.00 14,300.00
26,000.00 28,600.00
40,800.00 44,880.00
78,000.00 85,800.00
119,100.00 131,010.00
216,000.00 237,600.00
1,900.00 2,090.00
2,400.00 2,640.00
6,500.00 7,150.00
14,300.00 15,730.00
22,600.00 24,860.00
37,300.00 41,030.00
59,300.00 65,230.00
141,100.00 155,210.00
11,500.00 12,650.00
19,700.00 21,670.00
27,800.00 30,580.00
26,500.00 29,150.00
30,600.00 33,660.00
79,900.00 87,890.00
150,200.00 165,220.00
156,900.00 172,590.00
23,800.00 26,180.00
34,600.00 38,060.00
93,100.00 102,410.00
183,600.00 201,960.00
252,900.00 278,190.00
306,000.00 336,600.00
230,200.00 253,220.00
684,200.00 752,620.00
945,200.00 1,039,720.00
312,800.00 344,080.00
732,900.00 806,190.00
1,152,800.00 1,268,080.00
1,276,000.00 1,403,600.00
1,399,800.00 1,539,780.00
1,564,200.00 1,720,620.00
11,000.00 12,100.00
19,400.00 21,340.00
29,700.00 32,670.00
55,900.00 61,490.00
82,000.00 90,200.00
134,000.00 147,400.00
4,800.00 5,280.00
4,800.00 5,280.00
38,700.00 42,570.00
148,100.00 162,910.00
345,700.00 380,270.00
510,500.00 561,550.00
942,900.00 1,037,190.00
1,375,600.00 1,513,160.00
1,737,500.00 1,911,250.00
215,300.00 236,830.00
242,000.00 266,200.00
350,400.00 385,440.00
398,800.00 438,680.00
538,700.00 592,570.00
601,000.00 661,100.00
660,800.00 726,880.00
1,178,800.00 1,213,650.00
24,600.00 27,060.00
47,200.00 51,920.00
70,600.00 77,660.00
161,200.00 177,320.00
211,800.00 232,980.00
383,200.00 421,520.00
32,300.00 35,530.00
53,600.00 58,960.00
181,000.00 199,100.00
188,500.00 207,350.00
224,700.00 247,170.00
298,900.00 328,790.00
350,000.00 385,000.00
370,600.00 407,660.00
181,000.00 199,100.00
188,500.00 207,350.00
224,700.00 247,170.00
298,900.00 328,790.00
350,000.00 385,000.00
370,600.00 407,660.00
52,600.00 57,860.00
57,400.00 63,140.00
62,200.00 68,420.00
71,800.00 78,980.00
76,500.00 84,150.00
72,800.00 75,000.00
287,100.00 315,810.00
191,400.00 210,540.00
248,800.00 273,680.00
680,000.00 700,000.00
1,020,000.00 1,050,000.00
697,100.00 766,810.00
1,018,600.00 1,120,460.00
1,340,600.00 1,474,660.00
145,900.00 160,490.00
241,300.00 265,430.00
858,000.00 943,800.00
1,501,500.00 1,651,650.00
2,145,000.00 2,359,500.00
2,600,400.00 2,860,440.00
3,055,800.00 3,361,380.00
33,500.00 36,850.00
47,900.00 52,690.00
239,300.00 263,230.00
47,900.00 52,690.00
64,500.00 70,950.00
90,600.00 99,660.00
16,200.00 17,820.00
19,700.00 21,670.00
24,300.00 26,730.00
27,700.00 30,470.00
15,100.00 16,610.00
15,600.00 17,160.00
15,600.00 17,160.00
27,200.00 29,920.00
600 660
1,200.00 1,320.00
2,900.00 3,190.00
600 660
26,000.00 28,600.00
1,800.00 1,980.00
800 880
137,500.00 151,250.00
210,100.00 231,110.00
605,000.00 665,500.00
104,500.00 114,950.00
192,500.00 211,750.00
48,315,300.00 53,146,830.00
31,200.00 34,320.00
44,300.00 48,730.00
704,600.00 775,060.00
3,143,800.00 3,458,180.00
156,200.00 171,820.00
368,000.00 404,800.00
495,000.00 544,500.00
605,000.00 665,500.00
262,900.00 289,190.00
420,200.00 462,220.00
15,400.00 16,940.00
459,800.00 505,780.00
192,500.00 211,750.00
302,500.00 332,750.00
166,400.00 183,040.00
599,000.00 658,900.00
250,000.00 275,000.00
9,355,500.00 10,291,050.00
275,000.00 302,500.00
3,850,000.00 4,235,000.00
40,200.00 44,220.00
109,500.00 120,450.00
550,000.00 605,000.00
6,501,000.00 7,151,100.00
508,000.00 558,800.00
4,950,000.00 5,445,000.00
110,125,400.00 121,137,940.00
110,125,400.00 121,137,940.00
53,606,300.00 58,966,930.00
53,606,300.00 58,966,930.00
20,722,900.00 22,795,190.00
11,905,300.00 13,095,830.00
2,358,400.00 2,594,240.00
50,175,400.00 55,192,940.00
12,664,600.00 13,931,060.00
4,070,000.00 4,477,000.00
550,000.00 605,000.00
165,000,000.00 181,500,000.00
275,000.00 302,500.00
330,000.00 363,000.00
40,200.00 44,220.00
79,900.00 87,890.00
5,989,500.00 6,588,450.00
99,800.00 109,780.00
66,600.00 73,260.00
109,500.00 120,450.00
308,000.00 338,800.00
364,400.00 400,840.00
401,700.00 441,870.00
613,100.00 674,410.00
1,444,300.00 1,588,730.00
1,568,700.00 1,725,570.00
1,673,900.00 1,841,290.00
2,008,700.00 2,209,570.00
62,200.00 68,420.00
75,600.00 83,160.00
79,400.00 87,340.00
385,000.00 423,500.00
1,375,000.00 1,512,500.00
3,300,000.00 3,630,000.00
192,500.00 211,750.00
66,000.00 72,600.00
165,000.00 181,500.00
165,000.00 181,500.00
165,000.00 181,500.00
550,000.00 605,000.00
550,000.00 605,000.00
2,200.00 2,420.00
33,000.00 36,300.00
220,000.00 242,000.00
385,000.00 423,500.00
55,000.00 60,500.00
55,000.00 60,500.00
165,000.00 181,500.00
825,000.00 907,500.00
330,000.00 363,000.00
825,000.00 907,500.00
1,100,000.00 1,210,000.00
ANALISA HARGA SATUAN PEKERJAAN ( AHSP ) U K K 2022
BIDANG PEKERJAAN UMUM
KABUPATEN : NGANJUK
SISTEM : SWAKELOLA
HARGA : BAWAH
Overhead dan profit = 0.0000
A.2.2.1.17 10 m2 Membongkar lantai lama, berikut membersihkan bata-bata lama atau ubin-ubin yang dibongkar
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 1.0000 85,000.00 85,000.00
Mandor oh 0.1000 94,500.00 9,450.00
94,450.00
Overhead dan profit -
A.2.2.1.17b10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap akan dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 0.2000 85,000.00 17,000.00
Mandor oh 0.1000 94,500.00 9,450.00
26,450.00
Overhead dan profit -
26,450.00
A.2.2.1.17c10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap tidak dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 0.2000 85,000.00 17,000.00
Mandor oh 0.1000 94,500.00 9,450.00
26,450.00
Overhead dan profit -
26,450.00
A.2.2.1.17d10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran hendak dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 1.0000 85,000.00 85,000.00
Tukang kayu oh 0.2500 89,500.00 22,375.00
Kepala Tukang oh 0.2500 93,500.00 23,375.00
Mandor oh 0.0500 94,500.00 4,725.00
135,475.00
Overhead dan profit -
135,475.00
A.2.2.1.17e10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran tidak dipakai lagi)
Mukomoko Tenaga
Pekerja / Buruh tak terlatih oh 1.0000 85,000.00 85,000.00
Mandor oh 0.0500 94,500.00 4,725.00
89,725.00
Overhead dan profit -
89,725.00
A.3.2.1.10 1 m3 Pasangan pondasi siklop 60 % beton campuran 1 sp : 2 pb : 3 kr dan 40% batu belah
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 3.4000 85,000.00 289,000.00
Tukang batu L.02 oh 0.8500 89,000.00 75,650.00
Kepala Tukang L.03 oh 0.0850 93,500.00 7,947.50
Mandor L.04 oh 0.1740 94,500.00 16,443.00
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm m3 0.4800
PC / Portland cement kg 194.0000 1,600.00 310,400.00
Pasir pasang / beton m3 0.3120 264,000.00 82,368.00
Batu pecah 2-3 cm m3 0.4680 300,000.00 140,400.00
Besi Beton / tulangan beton kg 126.0000 10,500.00 1,323,000.00
Kawat Beton / bendraat kg 1.8000 17,600.00 31,680.00
389,040.50 1,887,848.00
Overhead dan profit -
389,040.50 1,887,848.00
A.3.2.1.11a 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang
SNI 2002 3.17
Tenaga
Pekerja / Buruh tak terlatih Oh 1.0000 85,000.00 85,000.00
Tukang batu Oh 0.6700 89,000.00 59,630.00
Kepala Tukang Oh 0.0670 93,500.00 6,264.50
Mandor Oh 0.0500 94,500.00 4,725.00
Bahan
Pasir Urug M3 0.0190 173,300.00 3,292.70
Pasir pasang / beton M3 0.9400 264,000.00 248,160.00
Batu pecah 2-3 cm M3 0.1500 300,000.00 45,000.00
PC / Portland cement Kg 60.5000 1,600.00 96,800.00
Besi Beton / tulangan beton Kg 45.0000 10,500.00 472,500.00
Kawat Beton / bendraat Kg 0.9000 17,600.00 15,840.00
Kayu bekisting M3 0.0320 3,465,000.00 110,880.00
Paku biasa Kg 0.1200 16,200.00 1,944.00
Minyak bekisting Lt 0.0900 5,800.00 522.00
Plamur Tembok Kg 0.2400 15,600.00 3,744.00
155,619.50 998,682.70
Overhead dan profit -
155,619.50 998,682.70
A.3.2.1.11b 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang
SNI 2002 3.18
Tenaga
Pekerja / Buruh tak terlatih Oh 0.8000 85,000.00 68,000.00
Tukang batu Oh 0.5000 89,000.00 44,500.00
Kepala Tukang Oh 0.0500 93,500.00 4,675.00
Mandor Oh 0.0400 94,500.00 3,780.00
Bahan
Pasir Urug M3 0.0160 173,300.00 2,772.80
Pasir pasang / beton M3 0.0800 264,000.00 21,120.00
Batu pecah 2-3 cm M3 0.1250 300,000.00 37,500.00
PC / Portland cement Kg 49.0000 1,600.00 78,400.00
Besi Beton / tulangan beton Kg 34.5000 10,500.00 362,250.00
Kawat Beton / bendraat Kg 0.7000 17,600.00 12,320.00
Kayu bekisting M3 0.0270 3,465,000.00 93,555.00
Paku biasa Kg 0.1200 16,200.00 1,944.00
Minyak bekisting Lt 0.0900 5,800.00 522.00
Plamur Tembok Kg 0.2000 15,600.00 3,120.00
120,955.00 613,503.80
Overhead dan profit -
120,955.00 613,503.80
A.4.1.1.1 1 m3 Membuat Beton mutu fc=7,4 Mpa (K100), Slump (12±2) cm, w/c = 0,87
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 12,379.50
Bahan
PC / Portland cement kg 247.0000 1,600.00 395,200.00
Pasir pasang / beton m3 0.6207 264,000.00 163,864.80
Batu pecah 2-3 cm m3 0.7400 300,000.00 222,000.00
Air bersih ltr 215.0000 100.00 21,500.00
179,722.50 802,564.80
Overhead dan profit -
179,722.50 802,564.80
A.4.1.1.2 1 m3 Membuat Beton mutu fc=9,8 Mpa (K125), Slump (12±2) cm, w/c = 0,78
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 7,843.50
Bahan
PC / Portland cement kg 276.0000 1,600.00 441,600.00
Pasir pasang / beton m3 0.5914 264,000.00 156,129.60
Batu pecah 2-3 cm m3 0.7496 300,000.00 224,880.00
Air bersih ltr 215.0000 100.00 21,500.00
175,186.50 844,109.60
Overhead dan profit -
175,186.50 844,109.60
A.4.1.1.3 1 m3 Membuat Beton mutu fc=12,2 Mpa (K150), Slump (12±2) cm, w/c = 0,72
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 7,843.50
Bahan
PC / Portland cement kg 299.0000 1,600.00 478,400.00
Pasir pasang / beton m3 0.5707 264,000.00 150,664.80
Batu pecah 2-3 cm m3 0.7533 300,000.00 225,990.00
Air bersih ltr 215.0000 100.00 21,500.00
175,186.50 876,554.80
Overhead dan profit -
175,186.50 876,554.80
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 Mpa ( K100) Slump (3-6) cm, w/c = 0,87
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.2000 85,000.00 102,000.00
Tukang batu L.02 oh 0.2000 89,000.00 17,800.00
Kepala Tukang L.03 oh 0.0200 93,500.00 1,870.00
Mandor L.04 oh 0.0600 94,500.00 5,670.00
Bahan
PC / Portland cement kg 230.0000 1,600.00 368,000.00
Pasir pasang / beton m3 0.6379 264,000.00 168,405.60
Batu pecah 2-3 cm m3 0.7607 300,000.00 228,210.00
Air bersih ltr 200.0000 100.00 20,000.00
127,340.00 784,615.60
Overhead dan profit -
127,340.00 784,615.60
A.4.1.1.5 1 m3 Membuat Beton mutu fc=14,5 Mpa (K175), Slump (12±2) cm, w/c = 0,66
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 7,843.50
Bahan
PC / Portland cement kg 326.0000 1,600.00 521,600.00
Pasir pasang / beton m3 0.5429 264,000.00 143,325.60
Batu pecah 2-3 cm m3 0.7622 300,000.00 228,660.00
Air bersih ltr 215.0000 100.00 21,500.00
175,186.50 915,085.60
Overhead dan profit -
175,186.50 915,085.60
A.4.1.1.6 1 m3 Membuat Beton mutu fc=15,9 Mpa (K200), Slump (12±2) cm, w/c = 0,61
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 7,843.50
Bahan
PC / Portland cement kg 352.0000 1,600.00 563,200.00
Pasir pasang / beton m3 0.5221 264,000.00 137,834.40
Batu pecah 2-3 cm m3 0.7637 300,000.00 229,110.00
Air bersih ltr 215.0000 100.00 21,500.00
175,186.50 951,644.40
Overhead dan profit -
175,186.50 951,644.40
A.4.1.1.7 1 m3 Membuat Beton mutu fc=19,3 Mpa (K225), Slump (12±2) cm, w/c = 0,58
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 7,843.50
Bahan
PC / Portland cement kg 371.0000 1,600.00 593,600.00
Pasir pasang / beton m3 0.4986 264,000.00 131,630.40
Batu pecah 2-3 cm m3 0.7756 300,000.00 232,680.00
Air bersih ltr 215.0000 100.00 21,500.00
175,186.50 979,410.40
Overhead dan profit -
175,186.50 979,410.40
A.4.1.1.8 1 m3 Membuat Beton mutu fc=21,7 Mpa (K250), Slump (12±2) cm, w/c = 0,56
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 7,843.50
Bahan
PC / Portland cement kg 384.0000 1,600.00 614,400.00
Pasir pasang / beton m3 0.4943 264,000.00 130,495.20
Batu pecah 2-3 cm m3 0.7696 300,000.00 230,880.00
Air bersih ltr 215.0000 100.00 21,500.00
175,186.50 997,275.20
Overhead dan profit -
175,186.50 997,275.20
A.4.1.1.9 1 m3 Membuat Beton mutu fc=24,0 Mpa (K275), Slump (12±2) cm, w/c = 0,53
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 7,843.50
Bahan
PC / Portland cement kg 406.0000 1,600.00 649,600.00
Pasir pasang / beton m3 0.4886 264,000.00 128,982.74
Batu pecah 2-3 cm m3 0.7600 300,000.00 228,000.00
Air bersih ltr 215.0000 100.00 21,500.00
175,186.50 1,028,082.74
Overhead dan profit -
175,186.50 1,028,082.74
A.4.1.1.10 1 m3 Membuat Beton mutu fc=26,4 Mpa (K300), Slump (12±2) cm, w/c = 0,52
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 85,000.00 140,250.00
Tukang batu L.02 oh 0.2750 89,000.00 24,475.00
Kepala Tukang L.03 oh 0.0280 93,500.00 2,618.00
Mandor L.04 oh 0.0830 94,500.00 7,843.50
Bahan
PC / Portland cement kg 413.0000 1,600.00 660,800.00
Pasir pasang / beton m3 0.4864 264,000.00 128,409.60
Batu pecah 2-3 cm m3 0.7563 300,000.00 226,890.00
Air bersih ltr 215.0000 100.00 21,500.00
175,186.50 1,037,599.60
Overhead dan profit -
175,186.50 1,037,599.60
A.4.1.1.11 1 m3 Membuat Beton mutu fc=28,8 Mpa (K325), Slump (12±2) cm, w/c = 0,49
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 2.1000 85,000.00 178,500.00
Tukang batu L.02 oh 0.3500 89,500.00 31,325.00
Kepala Tukang L.03 oh 0.0350 93,500.00 3,272.50
Mandor L.04 oh 0.1050 94,500.00 9,922.50
Bahan
PC / Portland cement kg 439.0000 1,600.00 702,400.00
Pasir pasang / beton m3 0.4786 264,000.00 126,350.40
Batu pecah 2-3 cm m3 0.7452 300,000.00 223,560.00
Air bersih ltr 215.0000 100.00 21,500.00
223,020.00 1,073,810.40
Overhead dan profit -
223,020.00 1,073,810.40
A.4.1.1.12 1 m3 Membuat Beton mutu fc=31,2 Mpa (K350), Slump (12±2) cm, w/c = 0,48
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 2.1000 85,000.00 178,500.00
Tukang batu L.02 oh 0.3500 89,500.00 31,325.00
Kepala Tukang L.03 oh 0.3500 93,500.00 32,725.00
Mandor L.04 oh 0.1050 94,500.00 9,922.50
Bahan
PC / Portland cement kg 448.0000 1,600.00 716,800.00
Pasir pasang / beton m3 0.4764 264,000.00 125,769.60
Batu pecah 2-3 cm m3 0.7407 300,000.00 222,210.00
Air bersih ltr 215.0000 100.00 21,500.00
252,472.50 1,086,279.60
Overhead dan profit -
252,472.50 1,086,279.60
A.4.1.2.1 1 m2 Pembuatan lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1320 85,000.00 11,220.00
Tukang batu L.02 oh 0.0220 89,000.00 1,958.00
Kepala Tukang L.03 oh 0.0020 93,500.00 187.00
Mandor L.04 oh 0.0070 94,500.00 661.50
Bahan
PC / Portland cement kg 26.0800 1,600.00 41,728.00
Pasir pasang / beton m3 0.0434 264,000.00 11,457.60
Batu pecah 2-3 cm m3 0.0610 300,000.00 18,300.00
Air Bersih ltr 17.2000 69,300.00 1,191,960.00
14,026.50 1,263,445.60
Overhead dan profit -
A.4.1.2.2 1 m2 Pembuatan lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1650 85,000.00 14,025.00
Tukang batu L.02 oh 0.0280 89,000.00 2,492.00
Kepala Tukang L.03 oh 0.0030 93,500.00 280.50
Mandor L.04 oh 0.0080 94,500.00 756.00
Bahan
PC / Portland cement kg 32.6000 1,600.00 52,160.00
Pasir pasang / beton m3 0.0543 264,000.00 14,335.20
Batu pecah 2-3 cm m3 0.0762 300,000.00 22,860.00
Air Bersih ltr 21.5000 69,300.00 1,489,950.00
17,553.50 1,579,305.20
Overhead dan profit -
A.4.1.2.3 1 m2 Pembuatan lahan produksi tebal 12 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1980 85,000.00 16,830.00
Tukang batu L.02 oh 0.0330 89,000.00 2,937.00
Kepala Tukang L.03 oh 0.0030 93,500.00 280.50
Mandor L.04 oh 0.0100 94,500.00 945.00
Bahan
PC / Portland cement kg 32.1200 1,600.00 51,392.00
Pasir pasang / beton m3 0.0651 264,000.00 17,186.40
Batu pecah 2-3 cm m3 0.0915 300,000.00 27,450.00
Air Bersih ltr 25.8000 69,300.00 1,787,940.00
20,992.50 1,883,968.40
Overhead dan profit -
A.4.1.2.4 1 m2 Pembuatan lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2480 85,000.00 21,080.00
Tukang batu L.02 oh 0.0410 89,000.00 3,649.00
Kepala Tukang L.03 oh 0.0040 93,500.00 374.00
Mandor L.04 oh 0.0130 94,500.00 1,228.50
Bahan
PC / Portland cement kg 48.9000 1,600.00 78,240.00
Pasir pasang / beton m3 0.0814 264,000.00 21,489.60
Batu pecah 2-3 cm m3 0.1143 300,000.00 34,290.00
Air Bersih ltr 32.2500 69,300.00 2,234,925.00
26,331.50 2,368,944.60
Overhead dan profit -
A.4.1.2.6 1 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0040 85,000.00 340.00
Tukang batu L.02 oh 0.0380 89,000.00 3,382.00
Kepala Tukang L.03 oh 0.0040 93,500.00 374.00
Mandor L.04 oh 0.0010 94,500.00 94.50
Bahan
Kayu bekisting m3 0.0050 3,465,000.00 17,325.00
Tripleks 122 x 244 tbl = 12 mm lbr 0.0430 179,100.00 7,701.30
minyak bekisting l 0.2000 5,800.00 1,160.00
Paku Ramset / dinabolt bh 0.6930 2,900.00 2,009.70
4,190.50 28,196.00
Overhead dan profit -
A.4.1.2.7 1 m2 Pembuatan bekisting untuk kolom beton pracetak ( 10-12 kali pakai )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0040 85,000.00 340.00
Tukang batu L.02 oh 0.0380 89,000.00 3,382.00
Kepala Tukang L.03 oh 0.0040 93,500.00 374.00
Mandor L.04 oh 0.0010 94,500.00 94.50
Bahan
Kayu bekisting m3 0.0040 3,465,000.00 13,860.00
Tripleks 122 x 244 tbl = 12 mm lbr 0.0480 179,100.00 8,596.80
minyak bekisting l 0.2000 5,800.00 1,160.00
Paku biasa kg 0.0460 16,200.00 745.20
Paku Ramset / dinabolt bh 0.6930 2,900.00 2,009.70
4,190.50 26,371.70
Overhead dan profit -
A.4.2.1.4 1 m2 Pembuatan besi plat baja tebal 2 mm rangkap, rangka baja siku
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0500
Tukang las L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0520
Bahan
Baja siku L 30.30.3 kg 15.0000
Besi plat kg 32.8000
Kawat las kg 0.0500
A.4.2.1.19 1 m Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang las L.03 oh 0.3000
Kepala Tukang L.03 oh 0.0300
Mandor L.04 oh 0.0080
Bahan
Seng Plat BJLS 30 lebar 0,90 m m 1.0500
Paku biasa kg 0.0100
Besi strip + Mur Baut kg 0.5000
A.4.2.1.20 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x120 cm, dinding partisi
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2500
Tukang besi L.02 oh 0.2500
Kepala Tukang L.03 oh 0.0250
Mandor L.04 oh 0.0130
Bahan
Pipa Besi 4/4 Tebal= 1.4 mm m1 3.5000
Assesoris (perkuatan,las dll) ls 1.0000
A.4.2.1.21 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang besi L.02 oh 0.3500
Kepala Tukang L.03 oh 0.0350
Mandor L.04 oh 0.0180
Bahan
Pipa Besi 4/4 Tebal= 1.4 mm m1 4.0000
Assesoris (perkuatan,las dll) ls 1.0000
/m2 0.1000
Overhead dan profit -
A.4.5.1.5 1 m2 Pemasangan langit - langit akustik ukuran ( 120 x 240 ) cm, tebal 3 mm,4mm & 6 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.1000
Tukang kayu L.02 oh 1.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Tripleks tebal 4 mm ( 1.20 x 2.40 ) m lembar 0.3750
Paku Asbes kg 0.0300
A.4.5.1.6 1 m2 Pemasangan langit - langit lambrisering kayu jati eks bojonegoro, tebal 9 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.02 oh 0.8000
Kepala Tukang L.03 oh 0.0800
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0150
Paku Asbes kg 0.0100
A.4.5.1.6g 1 m2 Pemasangan langit - langit lambrisering kayu tahun ( mauni / akasia ), tebal 9 mm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.02 oh 0.8000
Kepala Tukang L.03 oh 0.0800
Mandor L.04 oh 0.0400
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0150
Paku Asbes kg 0.0100
A.4.5.1.10 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500 85,000.00 29,750.00
Tukang besi L.02 oh 0.3500 110,000.00 38,500.00
Kepala Tukang L.03 oh 0.0350 93,500.00 3,272.50
Mandor L.04 oh 0.0180
Bahan
Pipa Besi 4/4 Tebal= 1.4 mm m1 4.0000 17,400.00 69,600.00
Assesoris (perkuatan,las dll) ls 1.0000 73,900.00 73,900.00
71,522.50 143,500.00
Overhead dan profit -
15.00 135.00
A.4.5.2.1b 1 m2 Pemasangan atap genteng Press biasa
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 85,000.00
Tukang kayu L.03 oh 0.0750 89,500.00
Kepala Tukang L.011 oh 0.0075 93,500.00 500,000.00 4,000,000.00
Mandor L.15 oh 0.0080 120,000.00
Bahan
Genteng pres biasa buah 25.0000
A.4.5.2.1c 1 m2 Pemasangan atap genteng Prentul eks Trenggalek / Tulungagung 4.00 15.00
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.0750
Kepala Tukang L.011 oh 0.0075 4,000.00 15,000.00
Mandor L.15 oh 0.0080
Bahan
Genteng bubung Prentul ex. Trenggalek / Tulungag buah 25.0000
Overhead dan profit -
A.4.6.1.1 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
Overhead dan profit -
A.4.6.1.1a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Jati Balok lokal m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Kamper Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Balau Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Kruing Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Meranti Balok m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.1g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu tahun ( mahuni/akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000
Tukang kayu L.03 oh 21.0000
Kepala Tukang L.11 oh 2.1000
Mandor L.15 oh 0.3500
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.1000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Jati Balok lokal m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Kamper Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Balau Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Kempas Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Kruing Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Meranti Balok m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.2g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.0000
Tukang kayu L.03 oh 18.0000
Kepala Tukang L.03 oh 1.8000
Mandor L.04 oh 0.3000
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.2000
Paku biasa kg 1.2500
Lem ( Kayu + Tembok ) kg 1.0000
A.4.6.1.3 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang kayu L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0180
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400
Paku biasa kg 0.0500
A.4.6.1.3g 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang kayu L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0180
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400
Paku biasa kg 0.0500
Overhead dan profit -
A.4.6.1.4 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang kayu L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0180
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400
Paku biasa kg 0.0500
A.4.6.1.4g 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3500
Tukang kayu L.03 oh 1.0500
Kepala Tukang L.03 oh 0.1050
Mandor L.04 oh 0.0180
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400
Paku biasa kg 0.0500
A.4.6.1.5 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0400
Lem ( Kayu + Tembok ) kg 0.0500
A.4.6.1.5g 1 m2 Pembuatan dan pemasangan pintu panel, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400
Lem ( Kayu + Tembok ) kg 0.0500
A.4.6.1.6 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 85,000.00 68,000.00
Tukang kayu L.03 oh 2.4000 89,500.00 214,800.00
Kepala Tukang L.03 oh 0.2400 93,500.00 22,440.00
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0240 36,850,000.00 884,400.00
Lem ( Kayu + Tembok ) kg 0.3000 13,900.00 4,170.00
305,240.00 888,570.00
Overhead dan profit -
A.4.6.1.6a 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 85,000.00 68,000.00
Tukang kayu L.03 oh 2.4000 89,500.00 214,800.00
Kepala Tukang L.03 oh 0.2400 93,500.00 22,440.00
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan lokal m3 0.0240 22,550,000.00 541,200.00
Lem ( Kayu + Tembok ) kg 0.3000 8,100.00 2,430.00
305,240.00 543,630.00
Overhead dan profit -
A.4.6.1.6b 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Kamper papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6c 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Balau Papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6d 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Kempas Papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6e 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Kruing Papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6f 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Meranti Papan m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.6g 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Tahun papan ( Mauni/akasia)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0240
Lem ( Kayu + Tembok ) kg 0.3000
A.4.6.1.7a 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu jati papan lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Jati Papan lokal m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7b 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kanfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Kamper papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7c 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Balau Papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7d 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kempas
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Kempas Papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7e 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Kruing Papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.7f 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000
Tukang kayu L.03 oh 3.0000
Kepala Tukang L.03 oh 0.3000
Mandor L.04 oh 0.0500
Bahan
Kayu Meranti Papan m3 0.0640
Lem ( Kayu + Tembok ) kg 0.5000
A.4.6.1.8 1 m2 Pembuatan daun pintu plywood rangka kayu Jati eks Bojonegoro tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8a 1 m2 Pembuatan daun pintu plywood rangka kayu Jati lokal tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Jati Papan lokal m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8b 1 m2 Pembuatan daun pintu plywood rangka kayu kamfer tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Kamper papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8c 1 m2 Pembuatan daun pintu plywood rangka kayu balau tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Balau Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8d 1 m2 Pembuatan daun pintu plywood rangka kayu kempas tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Kempas Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8e 1 m2 Pembuatan daun pintu plywood rangka kayu kruing tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Kruing Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8f 1 m2 Pembuatan daun pintu plywood rangka kayu meranti tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Meranti Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.8g 1 m2 Pembuatan daun pintu plywood rangka kayu tahun ( mauni / akasia ) tertutup lebar sampai 90 Cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000
Tukang kayu L.03 oh 2.1000
Kepala Tukang L.03 oh 0.2100
Mandor L.04 oh 0.0350
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.9 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0560
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.9a 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan lokal m3 0.0560
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.9g 1 m2 Pembuatan daun pintu plywood rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0560
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.5000
Plywood ( 90 x 220 ) cm, tbl. 4 mm lbr 1.0000
A.4.6.1.11 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.3000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
A.4.6.1.11g1 m2 Pemasangan teakwood rangkap, rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000
Tukang kayu L.03 oh 2.4000
Kepala Tukang L.03 oh 0.2400
Mandor L.04 oh 0.0400
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.3000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
A.4.6.1.12 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12a1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Jati Papan lokal m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12b1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kamfer
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Kamper papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12c1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Balau Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12e1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Kruing Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.12f 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Meranti
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Meranti Papan m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
Overhead dan profit -
A.4.6.1.12g1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8500
Tukang kayu L.03 oh 2.5500
Kepala Tukang L.03 oh 0.2550
Mandor L.04 oh 0.0430
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0250
Paku biasa kg 0.0300
Lem ( Kayu + Tembok ) kg 0.8000
Teakwood tebal 3mm (90 x 210) Cm lbr 1.0000
Formika (120x240)cm lbr 0.5000
A.4.6.1.13 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Eks Bojonegoro bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13a1 m3 Pemasangan konstruksi kuda kuda konvensional kayu lokal bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000 85,000.00 340,000.00
Tukang kayu L.03 oh 12.0000 89,500.00 1,074,000.00
Kepala Tukang L.03 oh 1.2000 93,500.00 112,200.00
Mandor L.04 oh 0.2000
Bahan
Kayu Jati Balok lokal m3 1.1000 20,900,000.00 22,990,000.00
Besi strip + Mur Baut kg 15.0000 18,700.00 280,500.00
Paku biasa kg 5.6000 16,200.00 90,720.00
1,526,200.00 23,361,220.00
Overhead dan profit -
A.4.6.1.13b1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Kamfer bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Kamper papan m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13c1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Balau bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Balau Balok m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13d1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kempas bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Kempas Balok m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13f 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Meranti bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Meranti Balok m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.13g1 m3 Pemasangan konstruksi kuda kuda konvensional kayu tahun ( mauni / akasia ) bentang 6 meter
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 4.0000
Tukang kayu L.03 oh 12.0000
Kepala Tukang L.03 oh 1.2000
Mandor L.04 oh 0.2000
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.1000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.14 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.7000
Tukang kayu L.03 oh 20.1000
Kepala Tukang L.03 oh 2.0100
Mandor L.04 oh 0.3350
Bahan
Kayu Jati Balok eks. Bojonegoro m3 1.2000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.14g1 m3 Pemasangan konstruksi kuda kuda expose kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.7000
Tukang kayu L.03 oh 20.1000
Kepala Tukang L.03 oh 2.0100
Mandor L.04 oh 0.3350
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.2000
Besi strip + Mur Baut kg 15.0000
Paku biasa kg 5.6000
A.4.6.1.16 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000
Tukang kayu L.03 oh 0.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0140
Kayu Jati Balok eks. Bojonegoro m3 0.0036
Paku biasa kg 0.2500
A.4.6.1.16g1 m2 Pemasangan rangka atap genteng keramik, kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000
Tukang kayu L.03 oh 0.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0140
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0036
Paku biasa kg 0.2500
A.4.6.1.17 1 m2 Pemasangan rangka atap genteng beton, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000
Tukang kayu L.03 oh 0.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0140
Kayu Jati Balok eks. Bojonegoro m3 0.0057
Paku biasa kg 0.2500
A.4.6.1.17g1 m2 Pemasangan rangka atap genteng beton, kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000
Tukang kayu L.03 oh 0.1000
Kepala Tukang L.03 oh 0.0100
Mandor L.04 oh 0.0050
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0140
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0057
Paku biasa kg 0.2500
A.4.6.1.19 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.3000
Kepala Tukang L.03 oh 0.0300
Mandor L.04 oh 0.0750
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0154
Paku biasa kg 0.2000
A.4.6.1.19g1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.3000
Kepala Tukang L.03 oh 0.0300
Mandor L.04 oh 0.0750
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0154
Paku biasa kg 0.2000
A.4.6.1.23 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0280
Paku biasa kg 0.1500
A.4.6.1.23a1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Jati Papan lokal m3 0.0280
Paku biasa kg 0.1500
A.4.6.1.23g1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0280
Paku biasa kg 0.1500
A.4.6.1.24 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0280
Paku biasa kg 0.1500
Teakwood tebal 4mm (120 x 240) Cm lbr 0.8600
Lem ( Kayu + Tembok ) kg 0.5600
Overhead dan profit -
A.4.6.1.24g1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500
Tukang kayu L.03 oh 0.4500
Kepala Tukang L.03 oh 0.0450
Mandor L.04 oh 0.0080
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0280
Paku biasa kg 0.1500
Teakwood tebal 4mm (120 x 240) Cm lbr 0.8600
Lem ( Kayu + Tembok ) kg 0.5600
A.4.6.1.25 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati eks Bojonegoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2000
Tukang kayu L.03 oh 0.6000
Kepala Tukang L.03 oh 0.0600
Mandor L.04 oh 0.1000
Bahan
Kayu Jati Balok eks. Bojonegoro m3 0.0280
Paku biasa kg 0.1500
Plywood ( 120 x 240 ) cm, tbl. 4 mm lbr 0.8600
Lem ( Kayu + Tembok ) kg 0.5600
A.4.6.1.25g1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2000
Tukang kayu L.03 oh 0.6000
Kepala Tukang L.03 oh 0.0600
Mandor L.04 oh 0.1000
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0280
Paku biasa kg 0.1500
Plywood ( 120 x 240 ) cm, tbl. 4 mm lbr 0.8600
Lem ( Kayu + Tembok ) kg 0.5600
Overhead dan profit -
A.4.6.1.26 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati eks Bojoneoro
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.6000
Tukang kayu L.03 oh 1.8000
Kepala Tukang L.03 oh 0.1800
Mandor L.04 oh 0.0300
Bahan
Kayu Jati Papan eks. Bojonegoro m3 0.0070
Paku biasa kg 0.1000
Paku Sekrup kg 0.1500
A.4.6.1.26g1 m2 Pemasangan dinding lambrisering dari papan kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.6000 85,000.00 51,000.00
Tukang kayu L.03 oh 1.8000 89,500.00 161,100.00
Kepala Tukang L.03 oh 0.1800 93,500.00 16,830.00
Mandor L.04 oh 0.0300 94,500.00 2,835.00
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0070 7,975,000.00 55,825.00
Paku biasa kg 0.1000 16,200.00 1,620.00
Paku Sekrup kg 0.1500 600.00 90.00
231,765.00 57,535.00
Overhead dan profit -
231,765.00 57,535.00
A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0700 85,000.00 5,950.00
Tukang cat L.02 oh 0.0090 110,000.00 990.00
Kepala Tukang L.03 oh 0.0060 93,500.00 561.00
Mandor L.04 oh 0.0030
Bahan
Cat Meny kayu kg 0.2000 27,200.00 5,440.00
Plamur kayu kg 0.1500 27,200.00 4,080.00
Cat Dasar Kayu kg 0.1700 30,600.00 5,202.00
Cat Kayu kg 0.2600 64,100.00 16,666.00
Kuas 3 " Bh 0.0100 15,100.00 151.00
Minyak Cat / Thiner B kg 0.0300 16,200.00 486.00
Kertas gosok ( rempelas ) Lbr 0.2000 3,500.00 700.00
7,501.00 32,725.00
Overhead dan profit -
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 3 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0700
Tukang cat L.02 oh 0.1050
Kepala Tukang L.03 oh 0.0040
Mandor L.04 oh 0.0030
Bahan
Cat Meny kayu kg 0.2000
Plamur kayu kg 0.1500
Cat Dasar Kayu kg 0.1700
Cat Kayu kg 0.3500
Kuas 3 " Bh 0.0100
Minyak Cat / Thiner B kg 0.0300
Kertas gosok ( rempelas ) Lbr 0.2000
Overhead dan profit -
A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur , 1 lapis dasar , 2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0200 85,000.00 1,700.00
Tukang cat L.02 oh 0.0630 110,000.00 6,930.00
Kepala Tukang L.03 oh 0.0063 93,500.00 589.05
Mandor L.04 oh 0.0030
Bahan
Plamur Tembok Kg 0.1000 15,600.00 1,560.00
Cat Tembok Kg 0.1000 24,300.00 2,430.00
Cat Tembok Kg 0.2600
9,219.05 3,990.00
Overhead dan profit -
A.4.7.1.11 1 m2 Pengecatan tembok lama (1 lapis cat dasar ,2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0280
Tukang cat L.02 oh 0.0420
Kepala Tukang L.03 oh 0.0042
Mandor L.04 oh 0.0030
Bahan
Cat Tembok Kg 0.1200
Cat Tembok Kg 0.1800
A.4.7.1.19 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat terakhir
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0600
Tukang cat L.02 oh 0.0600
Kepala Tukang L.03 oh 0.0120
Mandor L.04 oh 0.0030
Bahan
Cat besi Kg 0.3000
Kuas 3 " Bh 0.0100
Minyak Cat / Thiner B l 0.0100
A.4.7.1.21 1 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat terakhir
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.4000
Tukang cat L.02 oh 0.7000
Kepala Tukang L.03 oh 0.0700
Mandor L.04 oh 0.0200
Bahan
Cat besi Kg 0.3000
Minyak Cat / Thiner A l 0.0100
` Pemasangan Septitank
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 100,000.00
Tukang batu L.02 oh
Kepala Tukang L.03 oh
Mandor L.04 oh 200,000.00
Bahan
A.4.6.1.16e Bes deker Bh 3,700,000.00
b Batu Bata / Merah M3
PC / Portland cement Kg
Pasir pasang / beton M3
Pasir Urug M3
Overhead dan profit -
300,000.00
- 642,107.00
- -
- 642,107.00
743,607.00
743,607.00
519,102.00
529,102.00
649,756.50
649,756.50
1,888,850.00
1,888,850.00
#NAME?
1,792,710.00
1,792,710.00
1,731,800.00
1,731,800.00
13,225.00
13,225.00
287,152.20
287,152.20
253,701.00
253,701.00
115,112.50
115,112.50
598,163.50
598,163.50
12,228.26
12,228.26
436,019.00
436,019.00
94,450.00
94,450.00
44,682.50
44,682.50
26,450.00
26,450.00
26,450.00
26,450.00
135,475.00
135,475.00
89,725.00
89,725.00
952,000.00
952,000.00
593,100.00
593,100.00
66,112.50
66,112.50
80,752.50
80,752.50
95,581.50
95,581.50
88,024.00
88,024.00
133,170.00
133,170.00
106,252.50
106,252.50
106,252.50
106,252.50
28,995.00
28,995.00
28,995.00
28,995.00
47,225.00
199,746.20
199,746.20
438,943.50
438,943.50
161,826.00
161,826.00
248,012.50
248,012.50
122,612.50
122,612.50
659,590.00
659,590.00
606,430.00
606,430.00
569,566.00
569,566.00
543,654.00
543,654.00
508,126.00
508,126.00
201,262.50
201,262.50
622,601.50
622,601.50
578,420.00
578,420.00
225,792.00
2,276,888.50
2,276,888.50
827,093.50
827,093.50
1,154,302.20
1,154,302.20
734,458.80
734,458.80
982,287.30
982,287.30
1,019,296.10
1,019,296.10
1,051,741.30
1,051,741.30
911,955.60
911,955.60
1,090,272.10
1,090,272.10
1,126,830.90
1,126,830.90
1,154,596.90
1,154,596.90
1,172,461.70
1,172,461.70
1,203,269.24
1,203,269.24
1,212,786.10
1,212,786.10
1,296,830.40
1,296,830.40
1,338,752.10
1,338,752.10
1,229,740.00
1,229,740.00
58,644.00
58,644.00
77,843.00
77,843.00
106,262.00
106,262.00
113,922.50
113,922.50
121,486.00
121,486.00
302,454.50
302,454.50
156,128.00
156,128.00
166,253.00
166,253.00
277,899.00
277,899.00
288,294.00
288,294.00
382,399.00
382,399.00
339,280.00
339,280.00
621,459.00
4,978,279.00
4,978,279.00
8,900,706.50
8,900,706.50
10,876,665.00
9,351,384.50
8,070,684.00
86,217.50
108,460.00
340,000.00
1,277,472.10
1,596,858.70
1,904,960.90
2,395,276.10
275,907.66
32,386.50
281,525.00
67,599.60
32,330.00
124,477.50
165,223.50
44,434.00
215,022.50
25,672.00
86,123.75
101,123.75
104,018.00
1,057,877.50
843,955.00
1,193,810.00
848,870.00
24,887,420.00
43,420,485.00
14,380,485.00
274,030.00
314,325.00
314,325.00
93,002.00
93,002.00
290,315.00
290,315.00
289,300.00
289,300.00
233,475.00
233,475.00
289,300.00
289,300.00
50,090.00
50,090.00
582,709.40
583,709.40
418,494.40
418,409.40
36,759.40
36,759.40
241,434.40
241,434.40
185,334.40
185,334.40
###
###
152,609.40
152,609.40
143,259.40
143,259.40
301,493.50
301,493.50
281,793.50
281,793.50
121,247.50
121,247.50
76,497.50
76,497.50
122,933.50
122,933.50
188,733.50
188,733.50
85,333.50
85,333.50
57,178.10
57,178.10
95,278.10
95,278.10
30,578.10
30,578.10
25,978.10
25,978.10
63,578.10
63,578.10
32,878.10
32,878.10
36,378.10
36,378.10
42,178.10
42,178.10
28,278.10
28,278.10
30,982.25
30,982.25
27,482.25
27,482.25
28,182.25
28,182.25
27,285.00
27,285.00
17,682.25
17,682.25
43,082.25
43,082.25
34,482.25
34,482.25
62,782.25
62,782.25
195,582.25
195,582.25
278,782.25
278,782.25
176,782.25
176,782.25
51,782.25
51,782.25
45,717.25
49,617.25
49,617.25
46,817.25
46,817.25
64,717.25
64,717.25
61,917.25
61,917.25
61,917.25
61,917.25
34,258.50
34,258.50
270,558.50
270,558.50
231,264.50
231,264.50
129,064.50
129,064.50
21,564.50
21,564.50
304,564.50
304,564.50
304,470.00
304,470.00
###
###
###
###
104,258.50
104,258.50
168,358.50
168,358.50
168,358.50
168,358.50
324,258.50
324,258.50
564,458.50
564,485.50
254,958.50
254,958.50
167,158.50
167,158.50
167,158.50
167,158.50
123,858.50
123,858.50
61,507.50
61,507.50
335,210.00
335,210.00
41,360.35
41,360.35
42,060.35
42,060.35
59,860.35
59,860.35
62,160.35
62,160.35
86,318.10
86,318.10
235,038.10
235,038.10
144,178.10
144,178.10
134,058.10
134,058.10
141,648.10
141,648.10
185,434.55
185,434.55
213,374.55
213,374.55
174,942.50
40,226.00
13,209.05
46,245.00
RENCANA ANGGARAN BIAYA
U K K 2022
Harga Satuan
NO URAIAN Sat Vol. Jumlah Harga (Rp) Satuan Upah Satuan Bahan Jumlah Upah Jumlah Bahan TOTAL Biaya (Rp)
(Rp)
A. BIAYA FISIK 1 (Satu) RKB
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 227.50 13,225.00 3,008,687.50 13,225.00 3,008,687.50 3,008,687.50
2 Pengukuran dan Bowplang 4x pakai Ls 68.50 115,112.50 7,885,206.25 85,472.50 29,640.00 5,854,866.25 2,030,340.00 7,885,206.25
10,893,893.75
II PEKERJAAN TANAH
1 Galian tanah pondasi m3 69.41 66,112.50 4,588,868.63 66,112.50 4,588,868.63 4,588,868.63
2 Urug pasir bawah lantai, t=5 cm m3 2.65 199,746.20 529,327.43 26,445.00 173,301.20 70,079.25 459,248.18 529,327.43
3 Urug tanah kembali m3 17.35 47,225.00 819,353.75 47,225.00 819,353.75 819,353.75
4 Rabatan bawah lantai, t=5cm m3 11.37 47,225.00 536,948.25 47,225.00 536,948.25 536,948.25
5 urugan tanah halus /padat m3 9.46 122,612.50 1,159,914.25 23,612.50 99,000.00 223,374.25 936,540.00 1,159,914.25
7,634,412.31
IV PEKERJAAN BETON
1 Pek. Pondasi foot plat ( 80 X 80 )
a. Beton m3 2.56 1,338,752.10 3,427,205.38 Rp 252,472.50 Rp 1,086,279.60 Rp 646,329.60 Rp 2,780,875.78 Rp 3,427,205.38
b. Pembesian kg 0.51 113,922.50 58,100.48 Rp 1,032.50 Rp 112,890.00 Rp 526.58 Rp 57,573.90 Rp 58,100.48
2 Pek. Sloof ( 15 X 20 )
a. Beton m3 2.56 1,338,752.10 3,427,205.38 Rp 252,472.50 Rp 1,086,279.60 Rp 646,329.60 Rp 2,780,875.78 Rp 3,427,205.38
b. Pembesian kg 0.06 113,922.50 6,835.35 Rp 1,032.50 Rp 112,890.00 Rp 61.95 Rp 6,773.40 Rp 6,835.35
Pekerjaan Kolom beton (25x40)cm
3 a. Beton m3 0.08 1,338,752.10 107,100.17 Rp 252,472.50 Rp 1,086,279.60 Rp 20,197.80 Rp 86,902.37 Rp 107,100.17
b. Begisting 3x pakai m2 67.2 277,899.00 18,674,812.80 Rp 6,204.00 Rp 271,695.00 Rp 416,908.80 Rp 18,257,904.00 Rp 18,674,812.80
c. Pembesian kg 2.64 113,922.50 300,983.25 Rp 1,032.50 Rp 112,890.00 Rp 2,727.87 Rp 298,255.38 Rp 300,983.25
Pekerjaan Kolom Teras (15x25)cm
4 a. Beton m3 0.8 1,338,752.10 1,071,001.68 Rp 252,472.50 Rp 1,086,279.60 Rp 201,978.00 Rp 869,023.68 Rp 1,071,001.68
b. Begisting 3x pakai m2 2.10 277,899.00 583,587.90 Rp 6,204.00 Rp 271,695.00 Rp 13,028.40 Rp 570,559.50 Rp 583,587.90
c. Pembesian kg 1.34 113,922.50 152,656.15 Rp 1,032.50 Rp 112,890.00 Rp 1,383.55 Rp 151,272.60 Rp 152,656.15
Pek. Balok Late (15x15)cm
5 a. Beton m3 2.52 1,338,752.10 3,373,655.29 Rp 252,472.50 Rp 1,086,279.60 Rp 636,230.70 Rp 2,737,424.59 Rp 3,373,655.29
b. Begisting 1x pakai m2 12 288,294.00 3,459,528.00 Rp 6,204.00 Rp 282,090.00 Rp 74,448.00 Rp 3,385,080.00 Rp 3,459,528.00
c. Pembesian kg 0.06 113,922.50 6,835.35 Rp 1,032.50 Rp 112,890.00 Rp 61.95 Rp 6,773.40 Rp 6,835.35
Pek. Balok Anak (20x40)cm
6 a. Beton m3 8.96 1,338,752.10 11,995,218.82 Rp 252,472.50 Rp 1,086,279.60 Rp 2,262,153.60 Rp 9,733,065.22 Rp 11,995,218.82
b. Begisting 1x pakai m2 2.40 288,294.00 691,905.60 Rp 6,204.00 Rp 282,090.00 Rp 14,889.60 Rp 677,016.00 Rp 691,905.60
c. Pembesian kg 0.06 113,922.50 7,177.12 Rp 1,032.50 Rp 112,890.00 Rp 65.05 Rp 7,112.07 Rp 7,177.12
Pek. Balok Induk (25x40)cm
7 a. Beton m3 14.00 1,338,752.10 18,742,529.40 Rp 252,472.50 Rp 1,086,279.60 Rp 3,534,615.00 Rp 15,207,914.40 Rp 18,742,529.40
b. Begisting 1x pakai m2 0.25 288,294.00 72,073.50 Rp 6,204.00 Rp 282,090.00 Rp 1,551.00 Rp 70,522.50 Rp 72,073.50
c. Pembesian kg 0.06 113,922.50 7,177.12 Rp 1,032.50 Rp 112,890.00 Rp 65.05 Rp 7,112.07 Rp 7,177.12
Pek. Balok ring (15x20)cm
8 a. Beton m3 3.36 1,338,752.10 4,498,207.06 Rp 252,472.50 Rp 1,086,279.60 Rp 848,307.60 Rp 3,649,899.46 Rp 4,498,207.06
b. Begisting 1x pakai m2 0.25 288,294.00 72,073.50 Rp 6,204.00 Rp 282,090.00 Rp 1,551.00 Rp 70,522.50 Rp 72,073.50
c. Pembesian kg 0.06 113,922.50 7,177.12 Rp 1,032.50 Rp 112,890.00 Rp 65.05 Rp 7,112.07 Rp 7,177.12
Pek. Lantai Plat Deck Beton
a. Pasang plat deck beton, t=10 cm m3 0.50 1,338,752.10 666,698.55 Rp 252,472.50 Rp 1,086,279.60 Rp 125,731.31 Rp 540,967.24 Rp 666,698.55
b.Begisting Plat deck beton m2 22.75 288,294.00 6,558,688.50 Rp 6,204.00 Rp 282,090.00 Rp 141,141.00 Rp 6,417,547.50 Rp 6,558,688.50
c. Pembesian kg 0.06 113,922.50 7,177.12 Rp 1,032.50 Rp 112,890.00 Rp 65.05 Rp 7,112.07 Rp 7,177.12
Rp 77,975,610.55
V PEKERJAAN PASANGAN & PLESTERAN
1 Pas. Dinding 1/2 bata, 1:6 m2 41.50 281,525.00 11,683,287.50 73,505.00 208,020.00 3,050,457.50 8,632,830.00 11,683,287.50
2 Plesteran 1:6, tebal 15 mm m2 83.00 67,599.60 5,610,766.80 41,670.00 25,929.60 3,458,610.00 2,152,156.80 5,610,766.80
3 Pek. Acian m2 83.00 32,330.00 2,683,390.00 27,780.00 4,550.00 2,305,740.00 377,650.00 2,683,390.00
19,977,444.30
1 Pas. Kuda-Kuda Kayu Baru Ls 0.23 24,887,420.00 5,724,106.60 Rp 1,526,200.00 Rp 23,361,220.00 Rp 351,026.00 Rp 5,373,080.60 Rp 5,724,106.60
2 Gording Kayu 8/12 (Baru), (Ky. Klas2) m3 0.34 14,380,485.00 4,889,364.90 Rp 2,556,385.00 Rp 11,824,100.00 Rp 869,170.90 Rp 4,020,194.00 Rp 4,889,364.90
3 Usuk kayu 4/6, reng 2/3, kayu baru 28% (Ky. Klas 2) m2 94.06 316,152.40 29,737,294.74
4 Pasang Kalsiplang 2/20 m1 68.50 274,030.00 18,771,055.00 Rp 28,870.00 Rp 245,160.00 Rp 1,977,595.00 Rp 16,793,460.00 Rp 18,771,055.00
5 Penutup atap genting (Baru) model pentol (10%) m2 502.80 101,123.75 50,845,021.50 Rp 21,123.75 Rp 65,000.00 Rp 10,621,021.50 Rp 32,682,000.00 Rp 43,303,021.50
6 Pas. Bubungan m1 30.50 104,018.00 3,172,549.00 Rp 53,770.00 Rp 50,248.00 Rp 1,639,985.00 Rp 1,532,564.00 Rp 3,172,549.00
Rp 75,860,097.00
1 Pas. Lantai keramik 30x30 cm m2 87.75 124,477.50 10,922,900.63 94,097.50 30,380.00 8,257,055.63 2,665,845.00 10,922,900.63
2 Pas.Dinding Keramik 10x20 m2 20.25 165,223.50 3,345,775.88 120,757.50 44,466.00 2,445,339.38 900,436.50 3,345,775.88
14,268,676.50
NO URAIAN Sat Vol. Harga Satuan (Rp) Jumlah Harga (Rp) TOTAL Biaya (Rp)
A. BIAYA FISIK 1 (Satu) RKB
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 227.50 13,225.00 3,008,687.50
2 Pengukuran dan Bowplang 4x pakai Ls 68.50 115,112.50 7,885,206.25
10,893,893.75 10,893,893.75
II PEKERJAAN TANAH
1 Galian tanah pondasi m3 69.41 66,112.50 4,588,868.63
2 Urug pasir bawah lantai, t=5 cm m3 2.65 199,746.20 529,327.43
3 Urug tanah kembali m3 17.35 47,225.00 819,353.75
4 Rabatan bawah lantai, t=5cm m3 11.37 47,225.00 536,948.25
5 urugan tanah halus /padat m3 9.46 122,612.50 1,159,914.25
III PEKERJAAN PONDASI 7,634,412.31 7,634,412.31
1 Pas. Pondasi batu kali m3 41.16 543,654.00 22,376,798.64
2 pas. Batu kosong/anstamping m3 14.52 543,654.00 7,893,856.08
3 pas.Anstamping m3 13.70 225,792.00 3,093,350.40
IV PEKERJAAN BETON 33,364,005.12 33,364,005.12
Pek. Pondasi foot plat ( 80 X 80 )
a. Beton m3 2.56 1,338,752.10 3,427,205.38
b. Pembesian kg 0.51 113,922.50 58,100.48
1 Pek. Sloof ( 15 X 20 ) 3,485,305.85
a. Beton m3 2.56 1,338,752.10 3,427,205.38
b. Pembesian kg 0.06 113,922.50 6,835.35
2 Pekerjaan Kolom beton (15x15)cm 3,434,040.73
a. Beton m3 0.08 1,338,752.10 107,100.17
b. Begisting 4x pakai m2 67.2 277,899.00 18,674,812.80
c. Pembesian kg 2.64 113,922.50 300,983.25
3 Pekerjaan Kolom Teras utama 25x40) 19,082,896.21
a. Beton m3 0.8 1,338,752.10 1,071,001.68
b. Begisting 4x pakai m2 2.10 277,899.00 583,587.90
c. Pembesian kg 1.34 113,922.50 152,656.15
4 Pek. Balok Late (15x15)cm 1,807,245.73
a. Beton m3 2.52 1,338,752.10 3,373,655.29
b. Begisting 1x pakai m2 12 277,899.00 3,334,788.00
c. Pembesian kg 0.06 113,922.50 6,835.35
5 Pek. Balok Anak (20x40)cm 6,715,278.64
a. Beton m3 8.96 1,338,752.10 11,995,218.82
b. Begisting 4x pakai m2 2.40 277,899.00 666,957.60
c. Pembesian kg 0.06 113,922.50 7,177.12
6 Pek. Balok Induk (25x40)cm 12,669,353.53
a. Beton m3 14.00 1,338,752.10 18,742,529.40
b. Begisting 1x pakai m2 2.60 277,899.00 722,537.40
c. Pembesian kg 0.06 113,922.50 7,177.12
7 Pek. Balok ring (15x20)cm 19,472,243.92
a. Beton m3 3.36 1,338,752.10 4,498,207.06
b. Begisting 1x pakai m2 0.25 277,899.00 69,474.75
c. Pembesian kg 0.06 113,922.50 7,177.12
8 Pek. Lantai Plat Deck Beton 4,574,858.92
a. Pasang plat deck beton, t=10 cm m3 0.50 1,338,752.10 666,698.55
b.Begisting Plat deck beton m2 22.75 277,899.00 6,322,202.25
c. Pembesian kg 0.06 Rp 113,922.50 7177.1175
6,996,077.91 78,237,301.45
V PEKERJAAN PASANGAN & PLESTERAN
1 Pas. Dinding 1/2 bata, 1:6 m2 41.50 281,525.00 11,683,287.50
2 Plesteran 1:6, tebal 15 mm m2 83.00 67,599.60 5,610,766.80
3 Pek. Acian m2 83.00 32,330.00 2,683,390.00
19,977,444.30 19,977,444.30
VI PEKERJAAN KUSEN, DAUN PINTU & JENDELA
1 Kusen pintu dan jendela (Ky.Klas 2) m3 9.79 848,870.00 8,310,437.30
2 Pas pintu panil m2 3.24 843,955.00 2,734,414.20
4 Pas. Jendela kaca m2 10.97 848,870.00 9,312,103.90
5 Pas. Kaca 5 mm m2 16.27 134,058.10 2,181,125.29
22,538,080.69 22,538,080.69
VII PEKERJAAN CAT
1 Pengecatan kayu m2 62.65 40,226.00 2,520,158.90
2 Pengecatan Dinding dan Atap Deck m2 83.00 13,209.05 1,096,351.15
3,616,510.05 3,616,510.05
VIII PEKERJAAN RANGKA ATAP & PENUTUP ATAP
1 Pas. Kuda-Kuda Kayu Baru Ls 0.23 28,593,820.00 6,576,578.60
2 Gording Kayu 8/12 (Baru), (Ky. Klas2) m3 0.34 21,296,600.00 7,240,844.00
3 Usuk kayu 4/6, reng 2/3, kayu baru 28% (Ky. Klas 2) m2 94.06 316,152.40 29,737,294.74
4 Pasang Kalsiplang 2/20 m1 68.50 428,232.72 29,333,941.32
5 Penutup atap genting (Baru) model pentol (10%) m2 502.80 101,123.75 50,845,021.50
6 Pas. Bubungan m1 30.50 104,207.00 3,178,313.50
126,911,993.66 126,911,993.66
IX PEKERJAAN LANGIT-LANGIT (Plafond)
1 Pas. Rangka 1.00 x 1.00, (Kayu 4/6 Baru),(Ruang Dalam) m2 98.35 255,855.00 25,163,339.25
2 Pas. Plafond calsiboard, t=4mm (Baru) m2 98.35 234,816.00 23,094,153.60
3 Pas. List Plafond 1/5 (Baru) m2 102.45 25,730.00 2,636,038.50
50,893,531.35 50,893,531.35
X PEKERJAAN KUNCI & PENGGANTUNG
1 Pas. Kunci 2x putar bh 4.00 305,990.00 1,223,960.00
2 Pas. Engsel jendela 3" stel 16.00 32,878.10 526,049.60
3 Pas. Engsel pintu 4" bh 12.00 36,378.10 436,537.20
4 Pas. Grendel pintu bh 7.00 27,285.00 190,995.00
5 Pas. Grendel jendela stel 12.00 17,682.25 212,187.00
6 Pas. Hak angin stel 24.00 45,717.25 1,097,214.00
3,686,942.80 3,686,942.80
XI PEKERJAAN LANTAI KERAMIK
1 Pas. Lantai keramik 30x30 cm m2 87.75 124,477.50 10,922,900.63
2 Pas.Dinding Keramik 10x20 m2 20.25 165,223.50 3,345,775.88
XII PEKERJAAN SANITASI 14,268,676.50 14,268,676.50
1 Pek septictank lbh 1.00 4,000,000.00 4,000,000.00
2 Pek. Resapan bh 1.00 3,000,000.00 3,000,000.00
3 Pek. Tower air 500 Lt. bh 1.00 1,100,000.00 1,100,000.00
4 Pek. Perpipaan m' 42.00 46,245.00 1,942,290
10,042,290.00 10,042,290.00
XIII PEKERJAAN INSTALASI LISTRIK
1 Pas. Titik lampu titik 41.00 150,000.00 6,150,000.00
2 AC bh 2.00 4,500,000.00 9,000,000.00
3 Pas. Saklar ganda bh 10.00 19,000.00 190,000.00
4 Pas. Saklar Tunggal bh 11.00 11,750.00 129,250.00
5 Pas. Stop kontak bh 10.00 23,000.00 230,000.00
6 Pas. Lampu SL 8 watt bh 41.00 36,500.00 1,496,500.00
7 Pas. MCB 3A bh 1.00 48,000.00 48,000.00
REKAPITULASI
JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp)
A BIAYA KONSTRUKSI
JUMLAH
JUMLAH TOTAL Rp 401,808,831.98
DIBULATKAN Rp 402,000,000.00
NO URAIAN Sat Vol. Harga Satuan (Rp) Jumlah Harga (Rp) PROSENTASE
HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA URAIAN PERHITUNGAN VOLUME PEKERJAAN KET
M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan Luas Lahan = 16,25m x 14m = 227.5m² 227.5
2 Pemasangan Bouwplank Panjang Bouplank = ((14m+2m)+(16,25m+2m)) x 2sisi 68.5
= 68,5m¹
b). Tipe P2
Jumlah 9
Tinggi 2.26
Lebar 0.92
panjang kusen 5.44
volume kusen=0,06x0,15x5,44=0,048m3
volume kusen pintu=0,048x jumlah kusen P2
=0,048x9=0,432m3 0.432
c). Tipe P3
Jumlah 3
Tinggi 2.26
Lebar 0.72
panjang kusen 5.24
volume kusen=0,06x0,15x5,24=0,047m3
volume kusen pintu=0,047x jumlah kusen pintu P3
=0,047x3=0,141m3 0.141
d). Tipe P4
Jumlah 1
Tinggi 2.36
Lebar 3.02
panjang kusen 7.74
volume kusen; 0,06x0,15x7,74=0,06
volume kusen pintu =0,06xjumlah kusen pintu P4
=0,06m3 0.06
HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA URAIAN PERHITUNGAN VOLUME PEKERJAAN KET
M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
e). Tipe J1
Jumlah 5
Tinggi 1.86
Lebar 0.62
panjang kusen 4.96
volume kusen=0,06x0,15x4,96=0,04m3
volume kusen Jendela=0,04x jumlah kusen jendela J1
=0,04x5=0,20m3 0.2
HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA URAIAN PERHITUNGAN VOLUME PEKERJAAN KET
M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
f). Tipe J2
Jumlah 4
Tinggi 1.86
Lebar 0.52
panjang kusen 4.76
volume kusen=0,06x0,15x4,76=0,04m3
volume kusen jendela =0,04xjumlah kusen jendela J2
=0,04x4=0,16m3 0.16
g). Tipe J3
Jumlah 2
Tinggi 1.76
Lebar 1.18
panjang kusen 5.88
volume kusen=0,06x0,15x5,88=0,05
volume kusen jendela =0,05x jumlah kusen jendela J3
=0,05x2=0,10m3 0.1
h). Tipe J4
Jumlah 1
Tinggi 1.86
Lebar 1.72
panjang kusen 5.44
volume kusen=0,06x0,15x5,44=0,08
volume kusen jendela =0,08xjumlah kusen jendela J4
=0,08x1=0,08m3 0.08
i) Tipe J5
panjang kusen 6.24
Jumlah 1
Tinggi 2.1
Lebar 1.02
Volume kusen=0,06x0,15x6,24=0,05m3
volume kusen jendela=0,05xjumlah kusen jendela J5
=0,05x1=0,05m3 0.05
j) Tipe J6
Jumlah 1
Tinggi 2.1
Lebar 2.09
panjang kusen 7.06
volume kusen=0,06x0,15x7,06=0,06m3
volume kusen jendela=0,06x jumlah kusen jendela J6
=0,06 x1=0,06m3 0.06
k). Tipe J7
Jumlah 1
Tinggi 1.86
Lebar 1.18
panjang kusen 6.08
volume kusen=0,06x0,15x6,08=0,05m3
volume kusen jendela =0,05xjumlah kusen jendela J7
=0,05x1=0,05m3 0.05
l). Tipe J8
Jumlah 1
Tinggi 1.36
lebar 1.18
panjang kusen 5.08
volume kusen=0,06x0,15x5,08=0,04m3
volume kusen jendela =0,04xjumlah kusen jendela J8
=0,04x1=0,05m3 0.04
m). Tipe J9
Panjang kusen 3.96
Jumlah 1
Tinggi 1.36
Lebar 0.62
volume kusen=0,06x0,15x3,96=0,03m3
HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA URAIAN PERHITUNGAN VOLUME PEKERJAAN KET
M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
volume kusen jendela =0,03xjumlah kusen jendela J9
=0,03x1=0,03m3 0.03
n). Tipe bv1
Panjang kusen 2.28
Jumlah 3
Tinggi 0.52
Lebar 0.62
volume kusen =0,06x0,15x2,28=0,02m3
volume kusen jendela =0,02x jumlah kusen jendela bv1
=0,02x3=0,06m3 0.06
b). Pasangan Tembok Biasa tinggi 4
panjang pondasi keseluruhan lt1 231.5
luas kusen 34.85
tebal dinding 0.15
luas pas dinding=(p.pondasi keseluruhan lt1x4m)
- L kusen x tebal dinding
=(231,5x4)-34,85x0,15=133,74m2
tinggi 4
panjang pondasi keseluruhan lt2 171
luas kusen 34.85
tebal dinding 0.15
luas pas dinding=(p.pondasi keseluruhan lt2x4m)
- Luas kusen x tebal dinding
=(171x4)-34,85x0,15=97,37m2
IV PEKERJAAN BETON
1 Cor Beton Sloof 15/20
Panjang 68.5
Tinggi 0.2
Lebar 0.15
Volume Total
4 Pasangan Listplank
Panjang Total 68.5
6 Pasangan bubungan
Panjang total Bubungan Panjang 39.40
Lantai 2 47.5
Teras 1.9
98.35
Lantai 2 47.5
Emperan
Panjang Listplank 1.9
Panjang Total 102.45
VI PEKERJAAN KUSEN PINTU & JENDELA
1 Kayu Kusen Kelas 2 (5/12) panjang 2.26
a). Tipe Kusen P1 Panjang kusen 5.84
Lebar 1.32
tebal 0.15
X PEKERJAAN FINISHING
1 Cat Tembok
Luas Acian Tembok 231.11
Luas Acian Atap Deck 231.11
2 Cat Kayu
Luas Manie Kayu Kusen 18.95
Panjang Kusen 81.6
Lebar 17.41
Jumlah 1
b). Peresapan
Jumlah 1
PERHITUNGAN JUMLAH BERAT TULANGAN PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI
Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per Kbthn Pnjng Luasan
No. Tipe konstruksi Jumlah Begel
lbr tg panj (mm) (Kg/m') 1m' (kg) per m3 (kg) Per M3 bkstng (m2)
A. Tulangan Pokok
1 sloof 15 x 20 0.15 0.20 59.60 4 Ø 10.0 0.617 1.7138889 102.15 28.61 23.8400 166.67 167
2 Kolom beton 25 x 40 0.25 0.40 88.55 6 Ø 10.0 0.617 3.702 327.81 63.76 79.6950 50.00 50
3 Kolom teras 15 x 25 0.15 0.25 14.00 4 Ø 10.0 0.617 2.468 34.55 4.67 7.7000 133.33 167
4 Balok Late 15 x 15 0.15 0.15 110.60 4 Ø 10.0 0.617 2.468 272.96 36.87 49.7700 222.22 134
5 Balok Anak 20 x 40 0.20 0.40 16.30 6 Ø 10.0 0.617 3.702 60.34 8.15 13.0400 62.50 112
6 Balok Induk 25 x 40 0.25 0.40 43.30 7 Ø 10.0 0.617 4.319 187.01 25.26 38.9700 50.00 125
7 Balok ring 15 x 20 0.15 0.20 51.00 6 Ø 10.0 0.617 3.702 188.80 25.50 25.5000 166.67 100
8 Pondasi Plat 80 x 80 0.20 0.80 1.00 8 Ø 12.0 0.888 4.9333333 4.93 0.46 1.6000
9 Plat deck 10 cm 8.15 0.10 1.23 1 Ø 8.0 0.395 2.244 2.75 0.58 10.2454
PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI
Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per Kbthn Pnjng Kebutuhan Kawat
No. Tipe konstruksi
lbr tg panj (mm) (Kg/m') 1m' (kg) per m3 (kg) Per M3 Beton
B. Beugel/sengkang dan tul. bagi
1 sloof 15 x 20 0.15 0.20 59.60 4 Ø 6.0 0.222 0.89 52.92 19.87 0.0480
2 Kolom beton 25 x 40 0.25 0.40 88.55 6 Ø 6.0 0.222 1.33 117.95 44.28 0.0720 Kg
3 Kolom teras 15 x 25 0.15 0.25 14.00 4 Ø 6.0 0.222 0.89 12.43 3.24 0.0480 Kg
4 Balok Late 15 x 15 0.15 0.15 110.60 4 Ø 6.0 0.222 0.89 98.21 25.60 0.0480 Kg
5 Balok Anak 20 x 40 0.20 0.40 16.30 6 Ø 8.0 0.395 2.37 38.63 10.07 0.0720 Kg
6 Balok Induk 25 x 40 0.25 0.40 43.30 7 Ø 8.0 0.395 2.77 119.72 31.21 0.0840 Kg
7 Balok ring 15 x 20 0.15 0.20 51.00 6 Ø 8.0 0.395 2.37 120.87 31.51 0.0720 Kg
RENCANA ANGGARAN BIAYA
U K K 2022
TIME SCHEDULE U K K
I PEKERJAAN PERSIAPAN Rp 10,893,893.75 2.71 0.90 0.90 0.90 100.00 96.15 2.71 4.55 5.00 1 MINGGU 168
II PEKERJAAN TANAH Rp 7,634,412.31 1.90 0.95 0.95 92.31 88.46 1.90 3.19 4.00 1 MINGGU 168
III PEKERJAAN PONDASI Rp 33,364,005.12 8.30 0.69 1.38 1.38 1.38 1.38 0.69 0.69 0.69 84.62 80.77 8.30 13.95 14.00 2 MINGGU 168
IV PEKERJAAN BETON BERTULANG Rp 78,237,301.45 19.47 1.22 2.43 2.43 2.43 2.43 2.43 2.43 2.43 1.22 76.92 73.08 19.47 32.71 33.00 5 MINGGU 168
V PEKERJAAN PASANGAN Rp 19,977,444.30 4.97 0.41 1.66 1.66 0.83 0.41 69.23 65.38 4.97 8.35 9.00 2 MINGGU 168
VI PEKERJAAN KUSEN,DAUN PINTU DAN JENDELA Rp 22,538,080.69 5.61 0.93 1.87 0.93 0.93 0.93 61.54 57.69 5.61 9.42 10.00 2MINGGU 168
VII PEKERJAAN CAT Rp 3,616,510.05 0.90 0.90 53.85 50.00 0.90 1.51 2.00 1 MINGGU 168
VIII PEKERJAAN RANGKA ATAP & PENUTUP ATAP Rp 126,911,993.66 31.59 1.58 3.16 3.16 3.16 3.16 3.16 3.16 3.16 3.16 3.16 1.58 46.15 42.31 31.59 53.06 54.00 8 MINGGU 168
IX PEKERJAAN LANGIT-LANGIT Rp 50,893,531.35 12.67 0.79 1.58 1.58 1.58 1.58 1.58 1.58 1.58 0.79 38.46 34.62 12.67 21.28 23.00 3 MINGGU 168
X PEKERJAAN KUNCI & PENGGANTUNG Rp 3,686,942.80 0.92 0.92 30.77 26.92 0.92 1.54 2.00 1 MINGGU 168
XI PEKERJAAN LANTAI KERAMIK Rp 14,268,676.50 3.55 1.18 0.59 0.59 0.59 0.59 23.08 19.23 3.55 5.97 6.00 1 MINGGU 168
XII PEKERJAAN SANITASI Rp 10,042,290.00 2.50 1.25 0.62 0.62 15.38 11.54 2.50 4.20 5.00 1 MINGGU 168
XIII PEKERJAAN INSTALASI LISTRIK Rp 19,743,750.00 4.91 0.31 0.31 0.61 1.23 1.23 0.61 0.61 7.69 3.85 4.91 8.26 9.00 2 MINGGU 168
JUMLAH TOTAL 401,808,831.98 100.00 0.90 1.85 2.55 2.60 3.82 4.23 5.47 5.72 5.82 6.05 6.53 7.00 6.84 6.58 5.96 5.96 5.64 5.05 4.74 2.99 1.23 1.23 0.61 0.61 100.00 168.00
RENCANA 0.90 2.76 5.30 7.90 11.72 15.95 21.43 27.15 32.97 39.02 45.55 52.55 59.40 65.98 71.94 77.90 83.54 88.59 93.33 96.31 97.54 98.77 99.38 100.00
Tim Teknis
Pengawas