Format 

no . 06
CONCRETE CUBE STRENGTH REPORT

01.REPORT  NO:‐  

02.NAME OF PACKAGE:‐   BALANCE WORK OF SG‐PAKG.AT 3X660 MW STG .03

03.LOA NO.& DATE:‐      

04. LOCATION OF GROUT :‐                                                                                                                        

05. ELEVATION/LAYER:‐    

06.IDENTIFICATION MARKS:‐ 

07.(A)CONCRETE GRADE WITH REFERENCE

             OF APPROVED MIX WITH W/C RATIO :‐

         (B)CONCRETE ADMIXTURE:

08.TOTAL CONCRETE INVOLED :‐ 

09 .DATE OF CONCRETING :     

10.TIME OF TAKING CUBE:‐   

11.DATE OF 03 DAYS,07DAYS &28 DAYS TEST :‐ 

12.SIZE OF CUBE SPECIMEN:‐   

*The following base are cleared for further erection after 7days of grouting.

COMPRESSIVE 
SL NO DATE OF TESTING DAYS LOAD  (KN) STRENGTH  PMPL(QC) DPSI(QC) NTPC
(N/MM²)