Date :- Contract Value :- Advance Payment 0.00
Project :-
Contractor :-
# Description of work % Amount % Done Amount REMARKS
A Sub-Structure 0.00% 0
1 ) السور+ الملحق+ تجهيز موقع (للفيال+ صبية النظافة 0 0.00
2 Footing لقواعدVV( اVILLA + K.B. + BOUNDARY ) 0 0.00
3 Ground Slab ألرضيةVVبة اVV( صVILLA + K.B. ) 0 0.00
B First Slab (Ground Floor slab) 0.00% 0
1 Columns (Villa + K.B. ) العمدةVVا 0 0.00
2 Steel in site VلموقعVVاVVVلتسليح بVVديد اV( حVILLA + K.B.) 0 0.00
3 After concrete لخرسانةVVد اVعVVV( بVILLA + K.B.) 0 0.00
C Second Slab (First Floor slab) 0.00% 0
1 Columns العمدةVVا 0 0.00
2 Steel in site VلموقعVVاVVVلتسليح بVVديد اVح 0 0.00
3 After concrete لخرسانةVVد اVعVVVب 0 0.00
4 Parapet لسطحVVذروة ا 0 0.00
D compound wall 0.00% 0
1 Tie-beam- VيمVVVايبVVVت 0 0.00
2 Columns + blocks + coping beam - امالVلسور كVVا 0 0.00
E Block Work 0.00% 0
1 Block for Ground Floor الرضيVVلوك اVVV( بVILLA + K.B.) 0 0.00
2 Block for First Floor الولVVلوك اVVVب 0 0.00
F Elictrical Conduit 0 0.00
G Water Supply Pipes 0 0.00
H Plaster 0.00% 0
1 Internal plaster خليVالستر داVVVب 0 0.00
2 External Plaster + Parapet inside + Compound wall )املVارجي(كVالستر خVVVب 0 0.00
I M.E.P WORK 0.00% 0
1 PLUMPING 0 0.00
2 ELECTRIC 0 0.00
J WATER PROFING 0.00% 0
1 ROOF 0 0.00
2 WET AREA+FOOTING 0 0.00
K PAINTING WORK 0.00% 0
1 INTERNAL 0 0.00
2 EXTERNAL 0 0.00
L ALUMINUM WORK 0.00% 0
1 WINDOWS + DOORS 0 0.00
M FINISHING 0.00% 0
1 LIGHTING 0 0.00
2 GRANITE 0 0.00
3 MARBLE 0 0.00
4 FLOOR TIELS + Grouting + Gypsum Cover 0 0.00
5 WALL TIELS 0 0.00
6 WOODEN DOORS 0 0.00
7 SANATERES WEAR 0 0.00
8 KICHEN CABENT + DRESSING CABENT 0 0.00
Total Percentage 0.00% 0 0.00% 0.00 Total Amount
Amount this Payment 0.00
Less : Retention 5% 0.00
Less : Advance Payment 0.00
Less : Amount Certified till Date 0.00
Total Deduction 0.00
Net Amount of this Payment 0.00
CONTRACTOR CONSULTANT
PAYMENT NO. ( 1 )
Total Percentage
100.00% 1,445,000
Amount this Payment 101,150.00
Less : Retention 5% 5,057.50
Less : Advance Payment = (150,000 × 10,500.00
7.00%)
Less : Amount Certified till Date 0.00
Total Deduction 15,557.50
Net Amount of this Payment 85,592.50
CONTRACTOR
T NO. ( 1 )
5,000
DEMARCATION DATE :- 3/3/2014
5.00% 72,250.00
2.00% 28,900.00
CONSULTANT