You are on page 1of 47

CATATAN

NO. TGL KETERANGAN TTD

RO
W
RO
W
RO
W

PEMBERI TUGAS
RO
W
RO
W PEMERINTAHAN KABUPATEN SERANG

RO DINAS PERUMAHAN KAWASAN


W PERMUKIMAN DAN
RO TATA BANGUNAN
W

E
S
W

EP
II
NG GA
RO PA G
MRI H RA ME IN
W

- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL R. PANEL


± 0.00 - 0.02 - 0.02 - 0.02 - 0.02
KEGIATAN
± 0.00
TOILET TOILET TOILET
TOILET WANITA
WANITA PRIA PRIA
- 0.02 - 0.02 - 0.02 - 0.02

GEDUNG OPD 1 GEDUNG OPD 4


N
PANTRY
± 0.00 R. STAFF
± 0.00
R. STAFF
± 0.00
JANITOR N N JANITOR

R. STAFF
± 0.00
R. STAFF
± 0.00
PANTRY
± 0.00
N

PERENCANAAN, PEMBANGUNAN,
HALL
± 0.00
R. SERVER
± 0.00
HALL
± 0.00
HALL
± 0.00
R. SERVER
± 0.00
HALL
± 0.00 PENGAWASAN, DAN PEMANFAATAN
KORIDOR
± 0.00
KORIDOR
± 0.00
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
AREA PARKIR RODA EMPAT AREA PARKIR RODA EMPAT
R. RAPAT R. RAPAT R. RAPAT R. RAPAT
± 0.00 ± 0.00 ± 0.00 ± 0.00

PEKERJAAN
R. RAPAT R. RAPAT R. RAPAT R. RAPAT
± 0.00 ± 0.00 ± 0.00 ± 0.00

PEMBANGUNAN PUSAT PEMERINTAHAN


AREA PARKIR RODA EMPAT
R. RAPAT R. RAPAT
AREA PARKIR RODA EMPAT
KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1
R. PANEL R. PANEL - 0.02 - 0.02 - 0.02 - 0.02
- 0.02 - 0.02 - 0.02 - 0.02 ± 0.00
± 0.00
TOILET TOILET TOILET
TOILET WANITA
WANITA PRIA PRIA
- 0.02 - 0.02 - 0.02 - 0.02

GEDUNG OPD 2 GEDUNG OPD 5


N
PANTRY
± 0.00 R. STAFF R. STAFF R. STAFF
JANITOR N N JANITOR

R. STAFF R. STAFF R. STAFF


PANTRY
± 0.00
N

DIPERIKSA KOSULTAN PENGAWAS

9m2
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

R. SERVER HALL HALL R. SERVER HALL


HALL
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

.
KORIDOR KORIDOR

6
± 0.00 ± 0.00

2
208
AREA PARKIR RODA EMPAT AREA PARKIR RODA EMPAT
R. RAPAT R. RAPAT

L. 1666 M2 R.±RAPAT
0.00 R.±RAPAT
0.00 R.±RAPAT
0.00 R.±RAPAT
0.00

R.±RAPAT
0.00 0.00
R.±RAPAT
AREA PARKIR RODA EMPAT R.±RAPAT
0.00 R.±RAPAT
0.00
AREA PARKIR RODA EMPAT

M. INDRA GUNAWAN H, ST
KORIDOR
± 0.00 KORIDOR
± 0.00

R.±SERVER
0.00 0.00
±HALL ±HALL
0.00 R.±SERVER
0.00 ± 0.00
HALL
±HALL
0.00

R.± STAFF
0.00
GEDUNG OPD 3
R.±STAFF
0.00
GEDUNG OPD 6
R.±STAFF
0.00 R.±STAFF
0.00
Team Leader
± 0.00
PANTRY ± 0.00
PANTRY
JANITOR N JANITOR N
N N

DIBUAT/DIAJUKAN OLEH KONTAKTOR


-PRIA
0.02 - 0.02
WANITA
- 0.02
WANITA - PRIA
0.02 TOILET TOILET
TOILET TOILET

R.
± PANEL
0.00 R.± PANEL
0.00
- 0.02 - 0.02 - 0.02 - 0.02 - 0.02 - 0.02
- 0.02 - 0.02

MUJI RAHARJO
Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

SITE AREA BATAS LAHAN KEBUN DAN SAWAH AS BUILT DRAWING


SITE AREA BATAS LAHAN KEBUN DAN SAWAH
SKALA 1 : 1000
NO. GAMBAR : SWP-PPPKS-AS-AR-00-001
SKALA NO. LEMBAR TAHUN

1 : 1000 1 of 1 2021
CATATAN

NO. TGL KETERANGAN TTD

RO
W
RO
W
RO
W

PEMBERI TUGAS
RO
W
RO
W PEMERINTAHAN KABUPATEN SERANG

RO DINAS PERUMAHAN KAWASAN


W PERMUKIMAN DAN
RO TATA BANGUNAN
W

E
S
W

EP
II
NG GA
RO PA G
MRI H RA ME IN
W

KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

m2
.4 18
9
15
16

M. INDRA GUNAWAN H, ST
Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

MUJI RAHARJO
Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

SITE AREA LAHAN KEBUN AS BULIT DRAWING


SKALA 1 : 1000 SITE AREA LAHAN KEBUN

NO. GAMBAR : SWP-PPPKS-AS-AR-00-002


SKALA NO. LEMBAR TAHUN

1 : 1000 1 of 1 2021
CATATAN
N
E

W
S

RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W

W
RO
NO. TGL KETERANGAN TTD
1 02-07-21 REV 0
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W PEMBERI TUGAS
RO
W
RO
W PEMERINTAHAN KABUPATEN SERANG
RO

RO
W
DINAS PERUMAHAN KAWASAN
RO
W
PERMUKIMAN DAN
RO
W
TATA BANGUNAN
W
RO
W

E
S
W

EP
II
NG GA
RO PA G
W MRI H RA ME IN

RO
W
RO

RO
W
KEGIATAN
W
RO
W PERENCANAAN, PEMBANGUNAN,
RO
W PENGAWASAN, DAN PEMANFAATAN
W
BANGUNAN GEDUNG DAERAH
RO
KABUPATEN/KOTA
W
RO

W
RO
PEKERJAAN
W
RO

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

2
.5 2m
67 M. INDRA GUNAWAN H, ST
46 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

MUJI RAHARJO
Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

SITE PENGUKURAN SAWAH SHOP DRAWING


SKALA 1 : 1000 PENGUKURAN SAWAH

NO. GAMBAR : SWP-PPPKS-AS-AR-00-003


SKALA NO. LEMBAR TAHUN

1 : 1000 1 of 1 2021
CATATAN

NO. TGL KETERANGAN TTD


1 02-07-21 REV 0
RO
W
RO
W
RO
W

PEMBERI TUGAS
RO
W
RO
10.33 82.94 PEMERINTAHAN KABUPATEN SERANG
W 8.
05
RO DINAS PERUMAHAN KAWASAN
W PERMUKIMAN DAN
53
RO 48. TATA BANGUNAN
W

E
S
W

EP
II
NG GA
RO PA G
MRI H RA ME IN
W
75
6.

KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

130.08
DIPERIKSA KOSULTAN PENGAWAS
Pagar Proyek 568.8 m
111.22

M. INDRA GUNAWAN H, ST
Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR


7.

07
38

7.
156.00
MUJI RAHARJO
Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

SITE PAGAR PROYEK AS BUILT DRAWING


SKALA 1 : 1000 SITE PAGAR PROYEK

NO. GAMBAR : SWP-PPPKS-AS-AR-00-004


SKALA NO. LEMBAR TAHUN

1 : 1000 1 of 1 2021
CATATAN

RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W
RO
W

W
RO
NO. TGL KETERANGAN TTD
RO
W
P
502

1
.86
17.
RO
W

2
44
RO

8
31
W

63
35
9.2 N
594
RO 21
93
17.
W
O
569
RO
W
L 17.
07
RO
W
RO
17.6 M
594
W
RO
J 17.
620
W

17. K PEMBERI TUGAS


RO
W

642
H 17.
RO
W

654
17. PEMERINTAHAN KABUPATEN SERANG
RO
W
I
647
RO
F 17. DINAS PERUMAHAN KAWASAN
W

703
RO

17. PERMUKIMAN DAN


W

48 G 2
2.0 66
RO

17
W
36
D 17. TATA BANGUNAN

.9
21
93

44
80
RO

7.6
W

83
1 E

63
RO

705
W

E
17.

S
W

EP
II
RO B NG
PA
MRI H RA ME IN
G
GA

0
.66
W
4

0 17 C
.26

RO

689
W
76
17

1.
36
17.
83

21
93
RO
KEGIATAN
63

A 2
5

RO
W

.63
.61
17 1

17 PERENCANAAN, PEMBANGUNAN,
.14

RO
W
82
27

0.4
35 PENGAWASAN, DAN PEMANFAATAN
83

RO
W 21
63

93
45 BANGUNAN GEDUNG DAERAH
8.7
17.634

W 34
21
R. PANEL

RO
- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL - 0.02 - 0.02 - 0.02 - 0.02
± 0.00 ± 0.00

93 TOILET TOILET TOILET

KABUPATEN/KOTA
2

TOILET WANITA
WANITA PRIA PRIA
- 0.02 - 0.02 - 0.02 - 0.02

GEDUNG OPD 1 GEDUNG OPD 4


W N N

RO
N JANITOR N JANITOR
PANTRY
5

PANTRY
± 0.00 R. STAFF R. STAFF ± 0.00
R. STAFF R. STAFF
.69

± 0.00 ± 0.00 ± 0.00 ± 0.00


23

W
17.640

RO 6
PEKERJAAN
R. SERVER HALL HALL R. SERVER HALL
HALL

.07
83

± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

46
5

63
3

3
.96

21
RO
W 93 KORIDOR
20

KORIDOR
± 0.00 ± 0.00
83
63

AREA PARKIR RODA EMPAT


R. RAPAT R. RAPAT R. RAPAT R. RAPAT
AREA PARKIR RODA EMPAT PEMBANGUNAN PUSAT PEMERINTAHAN
± 0.00 ± 0.00

KABUPATEN SERANG (PUSPEMKAB)


± 0.00 ± 0.00
17.659
4

1 GEDUNG OPD BLOK B1


R. RAPAT R. RAPAT R. RAPAT R. RAPAT
± 0.00 ± 0.00 ± 0.00 ± 0.00
17.655

DIPERIKSA KOSULTAN PENGAWAS


5

R. RAPAT R. RAPAT
AREA PARKIR RODA EMPAT AREA PARKIR RODA EMPAT

- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL R. PANEL - 0.02 - 0.02 - 0.02 - 0.02
± 0.00
17.660

± 0.00
TOILET TOILET TOILET
TOILET WANITA
WANITA PRIA PRIA
- 0.02 - 0.02 - 0.02 - 0.02
6

GEDUNG OPD 2 N N
GEDUNG OPD 5 N
N JANITOR JANITOR
PANTRY
PANTRY
± 0.00 R. STAFF R. STAFF R. STAFF ± 0.00
R. STAFF R. STAFF R. STAFF
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

R. SERVER HALL HALL R. SERVER HALL


HALL
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00
17.712
7

KORIDOR KORIDOR
± 0.00 ± 0.00

AREA PARKIR RODA EMPAT AREA PARKIR RODA EMPAT


R. RAPAT R. RAPAT
17.778
8

L. 1666 M2 R.±RAPAT
0.00 R.±RAPAT
0.00 R.±RAPAT
0.00 0.00
R.±RAPAT

M. INDRA GUNAWAN H, ST
17.777

Team Leader
9

R.±RAPAT
0.00 R.±RAPAT
0.00
AREA PARKIR RODA EMPAT R.±RAPAT
0.00 R.±RAPAT
0.00
AREA PARKIR RODA EMPAT

KORIDOR
± 0.00 KORIDOR
± 0.00
DIBUAT/DIAJUKAN OLEH KONTAKTOR
17.777
10

0.00
R.±SERVER ±HALL
0.00 ±HALL
0.00 R.±SERVER
0.00 ± 0.00
HALL
±HALL
0.00

GEDUNG OPD 3 GEDUNG OPD 6

R.± STAFF
0.00 R.±STAFF
0.00 R.±STAFF
0.00 R.±STAFF
0.00
± 0.00
PANTRY ± 0.00
PANTRY
JANITOR N JANITOR N
N N
17.760

- 0.02
WANITA - PRIA
0.02 -PRIA
0.02 - 0.02
WANITA
TOILET TOILET TOILET
TOILET
11

R.± PANEL
0.00 R.± PANEL
0.00
- 0.02 - 0.02 - 0.02 - 0.02 - 0.02 - 0.02
- 0.02 - 0.02
41
5.5
17.740

25
12

8
63

4
.68
261
21 26
93 8.0
25
93
21 MUJI RAHARJO

.93
0 Project Manajer
61 20
5

12 7.5
.50

93
2 25
21
: -
57

93 ARSITEK
82
63

DRAFTER : -
3
7

.19
.68

JUDUL GAMBAR
36
30

82
82

63
63

SITE PENGUKURAN JALAN BETON AS BUILT DRAWING


PENGUKURAN JALAN BETON
SKALA 1 : 1000
NO. GAMBAR : SWP-PPPKS-SD-AR-00-005
SKALA NO. LEMBAR TAHUN

1 : 1000 1 of 1 2021
CATATAN

-D -C -B -A A B C D E F G H I J K L M N

-3

0
5
7

6
9
0

.33
.69

52
.93

.81
.05
.18

.57
2

1.4

50
23
05

14
97
88
.30

32

09
84
84
84

84

4
83
83

84
79

84

9.2
63
63
63

63
3

63
63

63
83

63
.42

45
63
70

8
63
83
63
31 7 7 1 8 5
2 52 .66
3
.67 54 .56 .58 .53 .59 .63
.66 7.5 17 17 7.6 7.6 17 17 17 17 17
17
-2
1 1 1 Z= Z= Z= Z=
Z= Z= Z= Z= Z= Z= Z=

94
01 00 99 .19
7 96 1.9
04 03 9.6 0.3 .79
8 1 6.5 30
05 8.8 4.2 32 5.0 32 5 31 30 21
33 33 21 32 21 31 21 21 93
3.4 21 21 93 21 93 21 93 93
06 34 93 93 93 93
8.0 21

08
93
93

29
34

43

1
5
21

4.6
9

2
5
2

9.0
.33
1

.85
.06

.7
6.9
93

58
.57

.97
.21
.82

.70

45

5
1
01
2.4

36
48

84
35

83

27
10
65

84
74

84
84

84
83

63
8

83

84
9

84
83

63
83

63
63

83

63

63
63

63

63
63
63

63

63
.68 7.6
27
17
.60
1
17
.68
1
17
.69
17
.71
2
17
.6 31
17
.68
7
17
.58
3
17
.63
5
17
.58
1
17
.68
2
17
.54
9 NO. TGL KETERANGAN TTD
-1

17 1 Z= Z= Z= Z= Z= Z= Z= Z= Z= Z=
Z= Z= Z=

23 2
30 25 0.7 6 .12 18
8.3 29 28 26 9.9 24 32 31 2.3 17 6
34 3.7 4.5 32 5.3 21 21 1 9 30 7.7 .11
9.1 93 .91 21

9
21 34 33 21 2 93 .52 29 3

7
29

28
13 93

78
33

.24
6

4
93 21 21 93 1 21

.00
30 21

1
5
21 2 31

1
.61
93 93 93

5
9

7
93

4
21

2
93

1.1
.22
.58

.9
93

.37
21

.73
.09

92
.85

32
.46

.34
93

50
93

78

05

44
61
34

4.4

84
23
96
70

87

84
43

52

83

84

38
83
83

63
84
83
83

83

41

63
83

83

63

63

6
63

63
6

X=
63
63
63

63

38

X=
63

63

X=
.70

X=

X=
X=

X=

X=
X=
X=

X=

6
X=

X=
25

X=
83
63
63

X=
7.6 2
21 .62
3 64 7 .65 .63
8
.68
4
.62
7 1 .61
7.7 17 74 31 7.6 .74 17 17 17 17 Z= 17
1 Z= 7.6 7.6 Z=
1 17 Z= Z= Z= Z= Z=
Z= Z=
1 Z=
1 6 Z= 4
.64 .56
17 3 17
Z= .92 Z=
17
1

Z=
- 0.02 - 0.02 R. PANEL R. PANEL - 0.02 - 0.02 - 0.02 - 0.02
- 0.02 - 0.02 ± 0.00 ± 0.00
4 8 7
.65 49 4 2 41 TOILET 40 3 .23
48 53 51
TOILET 8 TOILET 47 46 .84 TOILET 43 .64 8.0 WANITA 93.4 28
8.8 84
13 44
.0 9.4 .85
0
33
0.2 5 .64 PRIA 21
.0 6.4 31
1 PRIA 7.2 30
2
21
29 12 21 2 12
93
2 13 33 WANITA 34 21 32 13 31 21 - 0.02 21
30 21 93 32
- 90.02 93 93
21

48
Y= 32 1 - 0.02 32 21 93 93 Y= Y=

7
0
- 0.02 13 93 32 Y=

1
93 9 93 Y= 93 Y=

8
Y=

5
9

.52
.77
5
32 Y=

.74
9

62
Y=

34
Y= Y=

.6
Y=

84
Y=

2
Y=

.49

.40
.89
77
0

.25
9

.01
Y= GEDUNG OPD 4

27
.62
8.8
GEDUNG OPD 1

2.1

36
18
9.9

47
.10

.3
65

45
09
83

84
01
74
56

84
84
83
33
N

39
32
N

83

84
N

21

84
83
N JANITOR

63
JANITOR

84
83
83

63
63
63
38
PANTRY

38
38

63

63
83

63
63
PANTRY

X=
63
63
63

X=

X=
X=
6
± 0.00

6
6
R. STAFF R. STAFF

X=

X=
63

X=
± 0.00

X=
X=
R. STAFF

X=
R. STAFF

X=

X=
X=

X=
± 0.00 ± 0.00

X=
± 0.00 ± 0.00

11 11 .80
1
.77
4
.62
9 Z=
17
.66
6
HALL Z=
17
.7 1
17
.59
2
PEMBERI TUGAS
7.6 8 7.6 R. SERVER HALL 17 HALL R. SERVER 17 .61
9 17 Z=
1 HALL 98 .64 38 1 Z= Z= 17 Z= ± 0.00 4
Z= ± 0.00 17
.5 17 Z= 8 9 ± 0.00 ± 0.00 ± 0.00 ± 0.00
Z= .52
Z= 7.6 8.0 1
2

Z= 1 1 .88 17
Z= Z= 17 Z=
Z=

KORIDOR 70 31
2 .16
8
67 66 63 KORIDOR 2128
9.1
62
21
28
4.5
61
79
.9 60
7 5.3
5 9 PEMERINTAHAN KABUPATEN SERANG
73 1.3 9 21 7.5 2.9 65 3.7 ± 0.00=93 93 2 12
75 74 0.5 32 .76 30 30 8.3 29 Y= 21 93
2

90
± 0.00 93 21 21 21 Y

7
21 16 29 93

18
.7

68
3
.1 33 Y= Y=

4
39 93 93
4

.65
93

6
35

.41

.04
7
72 93 13 21 Y=

.38

5.2
21

.80
3 Y= Y=
.50

.92
13 Y=

.89
1

.0
Y= 32 93

.1
21

.14

.53
93 .9

.77
32 25
DINAS PERUMAHAN KAWASAN

.26
93 9 Y=

78

96

23
52
Y= Y=

14
25

40
9 13

40
Y=
16

31
60
Y=

43

87
32

69

83

83

84
34

83

84
83

38
9

84
83

84
83
Y=

83

83
83

63

63

63
83

63
63

63
6

63
63

63
63
63

63

X=
63

X=

X=

X=
63

X=
X=

X=

X=
X=

X=
X=
X=

X=
X=
X=
41 2 AREA PARKIR 64 RODA EMPAT .78
9 8 9 AREA PARKIR RODA EMPAT
PERMUKIMAN DAN
7.6 .62 7.6 .64 17 .67 .77 01
17 17 32 17 17 17
.7 72
Z=
TATA BANGUNAN
1 Z= 1 7.6 Z= Z= 9 1
Z= Z= Z= R.=1RAPAT R. RAPAT R. RAPAT R. RAPAT Z= .62 .70 17
.5
Z ± 0.00 ± 0.00 ± 0.00 17 17 Z=
± 0.00 5 Z= Z= .54
.85 17
3

66 17 Z=
1 8.1 Z=
Z=

91 7
.8 97 .2 95
.69
4
3 2 .8 90 .6 88 4 .08 8 6 .8 85
30 26 21 .09 .49 07 3.2 98 29 9.4 84 1 .48
0
13 13 13 17 12 21
3 1 30 21
2 21 21
28 21
2
.28
4 82 .08 66
32 32 93
2 13 13 93 32 93 93 93 93 80 5.6 71 12

3
2
2

9 Y=

0
Y=
9 Y= Y= 32 32 Y= Y=
9
Y= Y= 12 27 21 32

.05
Y=

E
.78

6
.81
2

S
0
9 9 21 93
3

32 9
24

7
Y=

.29

4
.68
Y= W

.44
.93
Y=

.66

EP
Y=

03
.90

9 93

.41
II

.32
.53
Y=

74
GA
20

91
3.0

Y=

.17
56

7
00
NG

6.2
18
82
29
11

47

83

27
.56
83

38

83
G
30

65
83

84

84
83
83
PA

43
83

MRI H RA ME IN

83

63

84
63

83

63

09
38

83
63

63

63
63
63

8
63

63

X=

63
X=

63

X=

84

63
6

63
X=

X=
X=
X=
X=
X=

X=
X=

63
X=
R. RAPAT R. RAPAT R. RAPAT R. RAPAT
± 0.00 ± 0.00 ± 0.00 ± 0.00
2 1 51 5
5 1 01 .67
8
56 .80 .72 7.8 .76 41
.53 .53 17 8 17 17 1 17 7 5 2
17 17 7.6 Z= .77 7.6
7 1 8.1 Z= Z= Z= Z= 7.7 .68 .61 .55
Z= Z= Z=
1 17 1 Z= Z=
1 17 17 17
Z= Z= Z= Z= Z=

KEGIATAN
4

92
1 7.9
Z=

6 10 09 07 06 04 03
.61
9
18 7 .81 3 R. RAPAT 12 11 9.8 5.2 0.6
R. 8RAPAT 6.0 6.8 2.2 02
.41 12 14 .61 28 8 27 5 RODA EMPAT 3212
6 26 7.6
32
13
26
21
32
2.0
31
7
32
13 AREA PARKIR 3RODA
30
8.2 EMPAT 13
03
12
99
.0
21
29
4.4
93
21 93
2 12
9 32
12
93
21 AREA PARKIR
71
.40 9 93
21
93
21
25
9 93 93
21 Y=
9 21 93
2 32 3 Y= Y= Y= Y= 12
Y= =9
Y= =9
PERENCANAAN, PEMBANGUNAN,
Y= 9 Y= 2
Y= Y Y 93

PENGAWASAN, DAN PEMANFAATAN

2
3
5
09

.60
8
2

.72
6
7

.84
.96
30

.08
.45
5
80

.81
.93
59

.2
8 59 91

.69
3

31
02

.04 .82 .69

22
8.3
23

.7 7.7

13
87

04
96
6.1

9
.0

17 17 17

2
18
33

84
.3

36
51
Z= Z=

84
Z=

34
8.4

Z= Z=
25

BANGUNAN GEDUNG DAERAH

84
83

84
7

83
07

31

83

4 2 29

83

63
8
83
.67 .63 .57

63
38
3

63
63

63
63
7.5

63
29

17
63

17 17
38

63
1

63
38

63

6
R. PANEL
R. PANEL - 0.02 - 0.02 Z= - 0.02
- 0.02 Z= Z= Z=

X=
38

X=
- 0.02 - 0.02 - 0.02 - 0.02

X=
X=
6

X=
± 0.00

X=
± 0.00
6

X=

X=
6

X=
5

X=

2 8 3 6 3 7 TOILET
.88 .90
KABUPATEN/KOTA
TOILET
.56 .65 .75 3 TOILET

3
TOILET
17 7.7 17 17 WANITA

.57
17 17 Z=
WANITA
Z=
1 Z= Z=
PRIA PRIA
Z= Z= - 0.02 - 0.02 - 0.02

60
- 0.02

83
38
.13
9 .5 7 .33
6
GEDUNG OPD 21294.735 34 9 GEDUNG
28 OPD 5 25 23

63
41 13 08 .93 9 0.1 2 30 .72 7.1 26 7.9 24 8.7
7.7 13 03 29 29 .91
7 .53 .93
1 6.3N 71 26 2.5 N
3.3

X=
31 13 32 N 13 1 21 N
85 27 JANITOR 12 21 26 25 25 24
21 9 32 9 32 9 32 32 93 17 JANITOR
12 80 21 93
2 93 21 32
PANTRY1
21 21
93 Y= Y= Y=
9 PANTRY Y= Y=
9 Y= Z= 32 12 93 93 9 93 93
9 93
2 Y= ± 0.00

8
Y= Y= Y= R. STAFF R. STAFF R. STAFF

5
± 0.00

1
R. STAFF R. STAFF Y=

.60
R. STAFF

6
.21
1

.85

29
2

8
9

± 0.00

.48
± 0.00

3
± 0.00

5
6
.70

± 0.00
.82

± 0.00

3
± 0.00
5
.57

2
2

1
.09

.36
.33

3.7
38

.24
0.4

.12
64

.00
PEKERJAAN

91
02

.97
93

83
11

83

00
29

37

09
32

18
83

27
34
83

38
2

63
83

55
63

4
3

38
38

84
8

84
63

84
8

38
38
63

X=
63
63

83
X=

63

X=
6

63

63
X=

63
6
6
X=
X=

X=
X=

X=

63
X=
X=

HALL

X=
HALL R. SERVER HALL HALL R. SERVER
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00
9 4 2
54 8 .76 .74 .81
9 7 .76 .89
5
.81
5 .78 17 17 17 4 9 4 2
.51 7.6
2
17 1 7.7 17 17 17 Z= Z= Z= .78 .61 .55 .55
17 1 Z= Z= Z= Z= .88 Z= 17 17 17 17
Z= Z= 17 Z= Z= Z= Z=
Z=
PEMBANGUNAN PUSAT PEMERINTAHAN
6

.8 34
17
KORIDOR Z= KORIDOR
± 0.00 ± 0.00
51
KABUPATEN SERANG (PUSPEMKAB)
50 49 6 4
59 53 7.4 2.8 8.2 48 .04
7 .44 .84
62 .26
1
.66
0
5.0 .45
7
56 55 54 2.0 26 26 25 49 24
4 39
4 9 9 0 .8 .2 6.6 27 21 21 21 3.6 2 21 21
2
08
.8 30 29 12 29 85 81 27 21 93 93 93 25 21 93 93
13 21 21 32 21 12 12 1 93 Y= Y= 21 93
32 93 93 9 93 32 32 32 Y= Y= 93
Y= 9
8

07
Y= Y= 9 9
4

85
9 Y= Y=

71
9

4
Y= Y=

49
.97

Y=
35

2
.61
.09

.85

.76
1 GEDUNG OPD BLOK B1
21

.0
9

6.8
1.3

9.1

9
0.2
.7

2.4

2
06

.39
9.2

3
98

15

.64
95
37
24

.52
3

38
35

6
36
3

4
83
82

83

83

83

22
8

38

8
83

83

04
38
8

13
8
82

63
63

63
63

63

63

63
63

84
6

63

63

84
6

84
63

X=

AREA PARKIR RODA EMPAT

X=
X=

X=

X=
X=

X=

X=

X=
X=

63
AREA PARKIR RODA EMPAT
X=

X=

63

63
X=

R. RAPAT R. RAPAT
4 7
3 .78 .67 84
DIPERIKSA KOSULTAN PENGAWAS
.74 2 2
18 69 55 .74
7 84 17 17 17 .62 .51 7.5
.58 7.7 7 83 7.7 7.7 .85
4 17 1 7.7 Z= Z= Z= 17 Z=
17 Z=
1
17 1 .78 7.8 1 1 7 Z= Z= Z=
Z= Z= 17 Z=1 Z= Z= Z =1
Z=
7

8
.73
17
Z=

75 67 66
7.7 0 9 68 .5 0.9
26 74 2 .37 .76 .1 35 23
83 0 8 76 21 3.1 73 .97 0.00 49 4 40 12 21
9 24 12 2 93
21
2 99
.9
29
5 .38
2
.78
1
12
86
.18
L. 1666 M2 12
81
.57
27
6.9
7 R.±RAPAT
0.00
21
27
2.3 R.±RAPAT
0.00
Y=
93
93
21
26
21
2 58
.5 R.±RAPAT
0.00
21
2 53 R.±RAPAT
93
21
2
93
21 9 32 93

70
Y=

84
93 90 21 93 93 93 Y=

48
21 32 32 Y=
1

93 Y=
77

12 Y= Y=

5
Y=

27
93
8

9 9

6.7
55

.2

3
.89
4

Y= Y=
.01

32 Y=
20

.40

0
.6
.49

Y=

.16
.13

8
2.3

82

.92
4.5
1.2

Y=

55

.79
34

.04
37
.6

73
3

1
0
30

32
84

08
3

36
29

38
31

38

39
83
2

17
00
83
38
83
8

84
82

38
8

6
38

8
63

84
63

63

84
63
6
63

X=

X=

63
63

63
63

X=

6
6

X=

63
X=

X=

63
X=
X=

X=
X=

X=
X=

.79 7 4 1
77 7 17 .72 44 7 .68 .59
7 15 .50
7.5 .56
4
.71 2 4 56
7.6
7 Z= .69
1 17 17
.7 .72 Z=
17 17 1 7.6 17
1 17 17 7.7 7.7 1 17 Z= Z= 17 Z= Z= Z=
Z= Z= Z= Z=
1
Z=
1 Z= 6 Z= Z=
8
8

1 7.6
Z=
R.±RAPAT 0.00
R.±RAPAT
AREA PARKIR RODA EMPAT
R.±RAPAT
0.00 0.00
R.±RAPAT 0.00
AREA PARKIR RODA EMPAT
94 93 91
7
5 04 3 1 0 9 98 7 9.6 5.0 90 88 .08
.10 6.5 .90 .30 .70 .09 63
.4 .89 95 24 24 92 5.8 1.2 6.6 22
91 8 81 77 72 68 12 58 54
.2 21 21 0.4 23 23 22 21
2
12 12 12 12 12 12 32 12 12 93 93 24 21 21 21 93
32 32 32 Y= 21 93 93

26
32 2 32 2 93
1

93 9 32 Y=

4
54

93 9 9 9

7
Y= 93
8

90

9 9
1

Y= Y= Y= 9

.80
Y=
7

Y= Y= Y=

61
.04
6

9.9
Y=

83
Y=
.01

4.4
6.6

3
.89

40
.77

3.2

7
19
8
3

6.5
7.6
68

.19
1
.16

5
80

5.5

5.4
30
88

4.3
35
97

83
33
83

83

8
7
82

13
42
38
82

83
8

39
82

63

83
38

40
63

63
83

63
63

84
83
6
63

63

8
63

X=

63
6

8
X=
X=

X=
63

X=

63
X=

X=

63
63
63
X=

X=

X=

X=

KORIDOR
± 0.00 KORIDOR
± 0.00

4 4 34 7 2
8 6 5 31 .64 9 .69 .69 .67 .69 7.6 .60 .59
.67 .71 27 .65 7.6 17 3 .65 17 17 17 17 1 17 17
17 17 7.7 17 Z=
1 Z= .79 17 Z= Z= Z= Z= Z= Z= Z=
Z= Z= Z=
1 Z= 6 17 Z=
.61 Z=
9

17
Z=
±HALL
0.00 R.±SERVER
0.00 ±HALL
0.00 ±HALL
0.00 R.±SERVER
0.00 ±HALL
0.00

26 25 4 23 .82
2 GEDUNG OPD 3 0 .61
9
.01
8 17 16 6.2
15
.61
3
GEDUNG OPD 6
7.0
12
2.4
11
7.8
10
21
3.2
09
M. INDRA GUNAWAN H, ST
9

7.6 .02 8.4 63 .22 54 5.4 23 31 22 22 21


.53

2.2 7 73 26 12 59 12 25
0
24 0.8 21 12 21 21 21 21
28 12 12 32 12 32 4 93 93

3
21 9 32
1 21 12 93 32 93 93
7

21 2
66

32 =9 32
32

.20
10

Y=
6

4
93 93 2
96

93 9 Y= R.±9STAFF
.41

93 9 93
Team Leader
9

7
.68

60
0.00 Y

.32
Y= Y= Y= R.±STAFF
.17

Y= Y= Y= 0.00 0.00
.05

39
Y=

6
2

Y= 0.00
0.9

R.±STAFF

.71
.8

R.± STAFF
6.4
4.2

64
67

82

.59
38

1.9
75

19

28

55
± 0.00

0.8
PANTRY
93

02

83
1

99
7.5

34

± 0.00
PANTRY

3.0
28
6

82

08
83

83

83

JANITOR

38
3
JANITOR N
X=

82

N
83

39
N

63

83
38

38
N
38

33
63

37

84
63

63

63

8
63

63

8
X=

63
6

63
6
6

8
X=

63
8

63
X=

X=

X=

X=

X=
X=

X=

63
X=

63
X=

- 0.02
WANITA - PRIA
0.02 -PRIA
0.02 - 0.02
WANITA
TOILET TOILET

DIBUAT/DIAJUKAN OLEH KONTAKTOR


TOILET TOILET

.69
3 .68 3 2 6 6 4 8 4
.58
10

.71
3 73 17 .65
9
.77 .71 .68 .69 .68 .64 .59 .58
17 .81 7.6 Z=
17 Z= .64
5
17 R.± PANEL 17 17 R.± PANEL
0.00 17 17 17 17 17 17 17
Z= 17 Z=
1
17 Z=
0.00
Z= Z= - 0.02 - 0.02 Z= Z= Z= Z= - 0.02
- 0.02 Z= Z= Z=
Z= - 0.02 - 0.02 Z=
- 0.02 - 0.02
.7 08
17
Z=

49 .14
5
.54
4 2 39 38 37 36 35 4 32 30
8 7 64 59 .34 .1 6.5 7.3 2.7 .13 3.5 4.3
27
7.9 .34 .74 12 12 .94
3 0 41
12
41 23 23
1.9
12
2 22 18 21
21 31 20
21 73 68 32 32 54 25 5.7 32 21 21 2 21 2 93 8.9 21
12 12 9 21 24 93 93 93 21 20 93
3

2
9
8

93 32 Y= Y= 12 93 1 93 93 21
45
0

32 Y= Y= Y=
23
.57

32

.60
.93

95
Y= 9 32 Y=
2

Y= 93
95

.33

88
16

Y= 9 9

6
9

80
Y=
5

9 Y=
1.8

8
0.7
6

9
Y=

.11

3.9
.20
7.4
88

59
9.6
61

.23
.0
0.8

.96

.35
06

8.4
4
24

5
82

83

95
82

0
5
9
27

83
83

86
7

32

83

77

84
31

36
82

83
82

63

63

83
63

63

63

83
83

63

83

63
8

8
63
63

63
63

X=

X=

63
X=

63

63
X=

X=

63
63

X=

63
X=
X=
X=

X=
X=

X=

8
6 4 .67 .57 4 94 1 9
.65 7 5 .56
11

.82
1 .80 5 17 3 .49 .76 .68
6
17 .56 .55 .54
17 17 .75 17 Z= .65 17 8 17 17 Z= 17 17 1 7.5 17 17
Z= Z= Z=
17 Z= 17 Z= .64 Z= Z= Z= Z= Z= Z= Z=
Z= 17
9 Z=
.66
17
Z=

6 60 57 53 1
69 68 67 .66 .46
3
62 61 7.6 59 8.4 56 55 54 0.0 .45
9.8 50 64 41 6.8 2.2 2 3.0 21 3.8 9.2 4.6 20 19
5
0 4.4 25 5.2 12 6.0 12 3 23 12 22 21 21 20 0 21 21
.07 26 21 25 9 32 4 32 12 21 93
2 21 93 21 21 12 93 93
69 21 21 12 93
6

2 93 93 2
1

93 Y= 93
2

93
15

2 9 Y= Y= 93
3

93 93

5
9
.33

2 Y=
8

Y=
.85

Y= 93
.97

21 Y= Y=

58
.09

.51
Y= Y=
.72

Y=
6.2

86

93
1

4
4
0.6
57

22

Y=
92

2.7
.00

.63

.39
83

.24

79
75

90
01

9.4
26
82

.1
82
82

3.8

83
2

55

81

99
83

83

37
8

46

83
38
63

63
63
63

83

25

63
83

83

83
63

63

83

36
65

83

63
6

7.7
X=

X=

9
X=
X=

63

07
X=

84
63

63
55 .61

63
1
X=

X=

63

8
1
.3

Z=
63

.95 .8

63
17 17
.6 17 .60
2 7.5
28

17 Z= Z= 1
Z= Z= 17 Z=
88
83

Z= 7.5
63

1
Z= 6
.66
17 2 25 9 8
12

Z= .68
7 62 .50
9
.83 .59 .52
2 17 1 7.5 17 17 17
.7 1 7.5 17 17
92 .38 Z= Z= Z= Z= Z= Z= Z= Z=
3
0.1 22
12
6
89 21
2 1 88 85 84 93 5 74
93 .59 0.9 87 79 78 76 7 73
6.3 2.5
MUJI RAHARJO
Y= 25 8 6 7.9 81 0 5.7 1.1 6.5
25
5
32
1 12
4
41
.7 7.1 23 12
2 8.7 4 .18 09
.5
20
4.9 0.3 19 19 18
21 9 32 12 12
3 21 2 21 21 21
2 21 20 21 21 21
93 Y= 9 32 32 93 93 21 21 93 93 21 93 93 93
Y= Y= 9 9 Y= 93 93 93
Y= Y=

Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

AS BUILT DRAWING
SITE GRID KORDINAT DAN ELEVASI

NO. GAMBAR : SWP-PPPKS-AS-00-04-006


SITE GRID KORDINAT DAN ELEVASI SKALA NO. LEMBAR TAHUN
SKALA 1 : 1000
1 : 1000 1 of 5 2021
CATATAN

-C
-C -B
-B -A
-A A B C D E F
-3 NO. TGL KETERANGAN TTD

0
.18
2

88
.30

83
79
3

63
83
.42

63
70
83
63
2 52 3
.66 7.5 .66
17 1 17
Z=

-2
Z= Z=

PEMBERI TUGAS

04 03 PEMERINTAHAN KABUPATEN SERANG


05 3 8.8 4.2
13 33
6 3.4 93
2
93
21
0 34 DINAS PERUMAHAN KAWASAN
8.0 93
21
34

3
5
21

.94

9
2

01
PERMUKIMAN DAN

.06
93

.57
.82

4.7
56
48

83
65
83
TATA BANGUNAN

7
83

83
83

83
63
63

63
63

63

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN
27 1 1
7.6
8 .6 .60 .68 .69
1 17 17 17 17
Z= Z= Z= Z= Z=

-1 5
PERENCANAAN, PEMBANGUNAN,
KEGIATAN

30 9 6 .92 24
8.3 .72 28 4.5
2
32
9
5.3 PENGAWASAN, DAN PEMANFAATAN
34 43 9.1 33 21 32
21 13

8
93 33 21 93 21

21
5
32

.97
21 93 93

9
4

2
.58
9 93 BANGUNAN GEDUNG DAERAH

.09
.46

.34

1.2

78
34

0
43

52

83
KABUPATEN/KOTA

37
83
83

83

3
8
38

63
63
06

=6
63
63

X=
X=
5.7

X
X=
X=

X=
32

PEKERJAAN
38 6
X=

21 3 4
7.7 .62 7 4 3 1 .66
=1 17 7.6 7.6 17
Z Z= 1 1 Z=
Z= Z= 46 PEMBANGUNAN PUSAT PEMERINTAHAN

1
.6
17 3
Z= .92
Z=
17 KABUPATEN SERANG (PUSPEMKAB)
- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL
± 0.00
1 GEDUNG OPD BLOK B1
54
8.6 53 45
1 4 9
48 TOILET 47 6
34 4.0 .TOILET 0 0.2 5.6 1.0 .44
93
21
32
13
4
2 13
39 WANITA
34.8
5
213
3
21
32
PRIA
- 0.02 21
32 13
16 DIPERIKSA KOSULTAN PENGAWAS
Y= - 0.02 13 93 93 32

1
93 93

8
=9 2 Y= 9

.74
Y= Y= Y=
4

93 Y=

.49
0

7
Y

.86
.98

Y=
5

.62

.37
GEDUNG OPD 1

47
.10

5
8
29

36
56

74
33

3
21

N N

38
JANITOR
83

8
83

83
38

63
83

PANTRY

6
63

63
=6

X=

X=
63

=6
± 0.00 R. STAFF R. STAFF
X=

X=
X
X=

X
± 0.00 ± 0.00

11 1
7.6 8 .61 R. SERVER HALL

2
1 HALL
.59
8 .64 8 17 89
Z= ± 0.00 17 17 .63 Z= ± 0.00 ± 0.00
Z= Z= 17 1 8.0 .88
1
Z= Z= 17
Z=

68
0 2.1 67 M. INDRA GUNAWAN H, ST
73
KORIDOR .37 9 21
31 7.5
5 74 0.5 21 .76 30
.77 5.1
± 0.00
21
3 16 93 21

8
83

39 33 Y= 3
04

7
2 93

.01
=9

40
33 21 .97 21

76
13 Team Leader
61

.89
Y=
5.3

32 21 3 3 Y
6.5

=9 5 =9

.1
93 2

52

9.7
=9 13
.2

Y Y

0
Y=
2

43
Y 2
31

34

36
93

3
83

36
Y=

38
83
38

83

8
63

38
63
DIBUAT/DIAJUKAN OLEH KONTAKTOR

6
63
6

63

X=
X=

6
X=

X=
X=

X=
X=

.64
1 .62
2 AREA PARKIR 64 RODA EMPAT
17 17 7.6 .64 32
Z= Z= Z=
1 17 7.6
Z= R.=1RAPAT R. RAPAT

3
Z ± 0.00 ± 0.00 5
.85
.16
6 17
18 Z=
Z=

7 95 4 1 0 8
.89 6.2 .69 3 2 .89 .29 .68
30 32 21 .09 .49 07 03 98
13 21 13 17 12 13 13 12
32 93 32 13 13 9 32 32 32
82

9 9 2 2 Y= 9 9
Y= Y= Y= 93 93 Y= Y=

96
60
03

17
24

Y= Y=
0.7

74
.2
.53
9.6
1.9

7.4
.0

56
32

5.1
03

38
2
31

34

83
8

83
83

36
63

83
38

38

63
63
63

38
MUJI RAHARJO
X=

63
6

X=
X=
X=

X=
X=

6
X=

X=
R. RAPAT
± 0.00
R. RAPAT
± 0.00
Project Manajer
7 8 6
35 .53
1 01 7.6 8 .15 ARSITEK : -
7.5 17 1 7.6 Z=
1 .77 .6 7 18
=1 Z= Z= 17 17 Z=
Z Z= Z=

4 6
Z=
17
.99
2

10
DRAFTER : -
JUDUL GAMBAR
19 18 .81 13 1 9.8
32
6.6 2.0 .41
7
12 8.2
14 3.6
R. RAPAT012 .41 28 AS BUILT DRAWING
93
21
93
21
32
21
31
7
9 32
13 AREA PARKIR 3RODA
21
30 EMPAT 21
30
32
12
99
.
93
2 12
94
Y=
93
21
SITE GRID KORDINAT DAN ELEVASI
Y= Y= 93 Y= 9 93 =9 Y=
Y= Y= Y= Y

NO. GAMBAR : SWP-PPPKS-AS-00-04-006


SITE GRID KORDINAT DAN ELEVASI SKALA NO. LEMBAR TAHUN
SKALA 1 : 1000
1 : 1000 2 of 5 2021
CATATAN

G
G H
H II JJ K
K LL M N
-3 NO. TGL KETERANGAN TTD

0
5
6
7
9

.33
.69
.81

2
.93
.05

.57

.45

50
23
14
05
97

32

41

9
84
84
84

.20
84
83

84

84

63
63
63
63
63

63

59
63

84
63
4 31 7 87 31 8 5
.66
3
.67 .65 7.6 7.5
6
7.5 7.5 .59 .63
17 17 17 1 17 17

-2
1 1 1 Z= Z=
Z= Z= Z= Z= Z= Z= Z=

PEMBERI TUGAS
4
01 99 7 96 .99 PEMERINTAHAN KABUPATEN SERANG
03 9.6 00 0.3
8 .19 6.5 30
1
4.2 32 5.0 32 .79 11 30 21
33 21 32 21 15 2 13 21 93
21 21 13 93 93
93 93 93 93 93
2 DINAS PERUMAHAN KAWASAN

8
3

.60
6

.09

1
PERMUKIMAN DAN

.72
2
15
.33

.85
.97
8

54
19
.45

.2

5
01

36

44

84
27
TATA BANGUNAN

10

4
92

84

38

84

63
84
84

63
83

63

63
63
63
63

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN
2 1 7 8 3 3 5 8 1 8 2 4 9
7.6
9
7.7
1 .63 .68 7.5 7.6 7.5 7.6 7.5
1 =1 17 17 =1 Z=
1
Z=
1
Z=
1
Z=
1
Z= Z= Z=

-1
Z Z

KEGIATAN

23 22
PERENCANAAN, PEMBANGUNAN,
0. 7 6.1 18
2 4
21
32 31 0 2.3 .71
7 16 PENGAWASAN, DAN PEMANFAATAN
5.3 93 21 1 19 13 97 3.1

9
32 93 2 .9 2

7
1.5 9

28
93 12

.24
06
4

21 12

.00
31 32 BANGUNAN GEDUNG DAERAH

1
1

13 32
5

93
7

.1
9

.37
21
5.6

2 9
.73
.85

92

32
93

50
93

41
4.4

84
23
40

KABUPATEN/KOTA
96
87

84
84
63
84
38
83
3

41

63
63
38

X=
63
6
63

38

X=
X=
X=
6

X=
X=
X=

=6
PEKERJAAN

X
3
47 5 8 84 2 7 7 .66 12
7.7 7.6 .63 7.6 7.6 =1 7.6
=1 Z=
1 17 1 1 Z =1
Z= Z= Z= Z PEMBANGUNAN PUSAT PEMERINTAHAN

1
Z 4
.56
23 17 KABUPATEN SERANG (PUSPEMKAB)
7.9 Z=
Z =1
R. PANEL - 0.02 - 0.02 - 0.02 - 0.02
1 GEDUNG OPD BLOK B1
± 0.00
8 7
44 42 4 1
44
0 .83 .23
8.0
TOILET
46 1.8
TOILET 43 2.6 WANITA 93. 8 84
31
6.4
21
31 PRIA
13
07
.2
21
30 21
29
32
12 93
21
28
9 32
12 DIPERIKSA KOSULTAN PENGAWAS
- 0.02 93 - 0.02

8
21 93 32 93 =9 Y= =

70

27
Y= Y

.64
93 Y= 9 =

05
1

Y
5

Y= Y
4

Y=
2

.89

8.7

6.5
.25

.13

.01

GEDUNG OPD 4

5.4
7
42
09

41

43
3

92

01

44
38

38
N
4

38

38
JANITOR
83

8
38
8

PANTRY

6
38

63
6

6
63

63

X=
6

X=

X=
R. STAFF ± 0.00
6

R. STAFF

X=
X=
X=

X=

X=

± 0.00 ± 0.00

.66
6 .71
17 17 2
.80
1 .7 74
.62
9 Z= Z= .59
17

2 17 HALL R. SERVER 17 9 HALL


Z= Z= .61 17 Z=
± 0.00 ± 0.00
=1
7 Z= ± 0.00 24
1 Z 7.5
.88 Z=
1
17
Z=

62 61
9.1 4.5 6 0 .35
9
M. INDRA GUNAWAN H, ST
.56
7 6
.76
3 KORIDOR 2128 28 9.9 75
7 2 .96 65 93 ± 0.00=93 21 27 12
30 30 8.3 12 93 21 32
Y=
90

21
4

1 Y 93 9
1

47
9
8

32 12 32 Y=

04
93 Team Leader
.65

26
.41

Y=
.16

=9
33

9
5.2

Y= Y= 2

3.0
93 Y

0.8
1.9
Y=
7.5
8

96

14
40
37

42

44
43
83

84
38

38
8

38
63

8
63

63
DIBUAT/DIAJUKAN OLEH KONTAKTOR
63
38

63
X=

6
X=

X=

X=
X=
6

X=
X=
X=

89
.67
8
.77
9 AREA PARKIR
01
RODA EMPAT
1 7.7 17 17 7.7 72
Z= Z= Z= 1 9 1 7.5

3
R. RAPAT R. RAPAT Z= .62 .70 1
± 0.00 ± 0.00 17 17 Z= 4
55 Z= Z= 7.5
1 7.8 Z=
1
Z=

88 87 6 85
8.6 4.0 .48 .8 0
9 29 28
9 84 84 81 .48
12 21 21
2
.68
2 .0 66
93
2 93 21 93 0.2 2 71 12
53

Y= 93 28 75
10

Y= Y= 21 32
9

Y= 12
46
32

21 93 9

24
4.0

.68

32
1.8

93 Y= Y=

3
.4
2.9

= =9

.20
Y

.3
Y
67
7

00

18
39

27
83

6
9.5
84

84
83

43
84
63

63

MUJI RAHARJO
63

63
3

40

8
63
X=

=6

X=

63
X=

8
X

63

R. RAPAT R. RAPAT Project Manajer


± 0.00 ± 0.00
02 1
.85
1 65
.15
6
1 7.8 17
.72 17 1 7.7
.74
1 7 5 2 ARSITEK : -
18 Z= Z= Z= Z= 17 .68 .61 .55
Z= 17 17 17

4
Z= Z= Z= Z= DRAFTER : -
JUDUL GAMBAR
0 09 07 6 04 03
.81 5.2 0.6 .00 6.8 2.2 02 AS BUILT DRAWING
89 8 R. 8RAPAT 76 6 26 7.6
12 2 12 12 32
12 AREA PARKIR 5 RODA EMPAT 3212 21 25
932 93 9 32 9 .40 9 93 21 SITE GRID KORDINAT DAN ELEVASI
Y= Y= Y= Y= 71 2 93
21
93

NO. GAMBAR : SWP-PPPKS-AS-00-04-006


SITE GRID KORDINAT DAN ELEVASI SKALA NO. LEMBAR TAHUN
SKALA 1 : 200
1 : 200 3 of 5 2021
-C -B -A A B C D E F CATATAN

52
6
7

95
.81
0

. 93
9

9. 4
3

.18
.04

.05
3

.6
.30

42
.42
18

33

36
51
16
Z=

25
07

83
83
98

38
83
83

83
83

63
63
82

6
63
63
R. PANEL

63
- 0.02 - 0.02

X=
- 0.02 - 0.02

63

X=
X=
63

X=
± 0.00

X=

X=
X=
X=
62 58 3 6 3 7
.75 .73 .88 .90 TOILET

73
TOILET
1 7.5 1 7.6 17 WANITA 17 17 17 PRIA
Z= Z= Z=

.5
Z= Z= Z= - 0.02

60
- 0.02

83
39 38 6 4
.5 3 7 3
GEDUNG OPD 2129 3 5 3

63
41 3.1 08 3.9 9.3 4.7 0.1 2
7.7 31 13 0 9 29 17 .53 .93
1

X=
21 32 N 13 12 21 7.9 JANITOR N 5
31 93 9 32 32 93
2 93 1 28 80
21 Y= Y= Y=
9 PANTRY Y=
9
Y= Y= Z= 21 12
93 93 32
Y= Y= 9

5
± 0.00 R. STAFF R. STAFF R. STAFF Y=

.21
01
2

58
9

3
6
± 0.00 ± 0.00

.82
± 0.00

.5 7

.09
.33
.7

38
0.4

2
02

.97
93

11

83

47
29
2
83
82

83
83

55
63

83
83
63
63

63
63

83
X=

63
63
X=
X=

X=

X=

63
X=
X=

=
HALL R. SERVER HALL

X
± 0.00 ± 0.00 ± 0.00
4 5 5
19 .62
7
7.7
6 .75 .89 .81
.5 17 17 17
Z=
17
Z=
17 Z=
1 Z= Z= Z= .88 NO. TGL KETERANGAN TTD

6
17
Z=
34
7.8
Z =1
KORIDOR
± 0.00
9 53
2 61 6 0 .05 .45
7 6 5 .65
4 2.0
.86 4.2 9.6 12
95 90 .85 .25 6 27
08 30 29 32 12 85 81 27 21
13 21 21 9 32 12 12 21 93
2 3 93 Y= 9 93
2
93
2 93 Y=

8
93 =9 Y= Y=

1
Y=

57
.97
Y= Y Y= Y=

2
5

.61

.37
.09
21

9
.73
5. 8

2.4
06
.2

33

51
98

24
31
89

83

34
83

83
82

83
38
82

63

38
63

63
63

63
6
63

X=

6
X=

X=
X=

X=
AREA PARKIR RODA EMPAT

X=
X=
X=

R. RAPAT
PEMBERI TUGAS
8 9 5
.58 .71 7 83 .76 .75 .85
4
17 17 8 .8 7 =1
7

7
Z= Z= 1 7.7 Z=
17 Z =1 Z Z=
17 PEMERINTAHAN KABUPATEN SERANG
Z= 8
.73
17
Z= DINAS PERUMAHAN KAWASAN
.77
5 PERMUKIMAN DAN
67 74
9.9
83 80 79 8 37
6
32
12
3.1 TATA BANGUNAN
12
9
29
5.3
82
.78
1
2 86
.1
L. 1666 M2 2 81
.5
27
6 .97 R.±RAPAT
0.00
21
27
2. R.±RAPAT
0.00
Y=
9
21
26

0
2 90 21 21 1 3
93 21 32 93 =9

.77
1
3 93

7
12

3
Y= 93 8 9 9 Y= Y

55

.89
34
Y= Y=

.37
32 Y=

.01
0

Y= .49

46
=9
2

.2

.1

37
4.6

02

E
29

S
3 W

83
11

EP
20
II
GA
29 NG

83
83

83
28

PA G

63
83
MRI H RA ME IN

83
38

63
63

63
38

X=
63

63
6

=
X=

X=
6

X=

X=

X
X=
X=

KEGIATAN
77 .79
64 1 4 5 6 7 7 17
7.5 7.5 7.7 7.7
2
7.7 7.6 Z=

8
=1 =1 1 1 1
Z=
1 PERENCANAAN, PEMBANGUNAN,
Z Z Z= Z= Z= 6
.68
17
Z= PENGAWASAN, DAN PEMANFAATAN
AREA PARKIR RODA EMPAT
R.±RAPAT
0.00 R.±RAPAT
0.00 BANGUNAN GEDUNG DAERAH
04 1 00 99 98 7 KABUPATEN/KOTA
05 03 .30 3.4 9 5
1.1 6 .5 1.9 77 2.7 8.0 6 8.8 4.2
9
29 28 28 12 27 26 12 25 25
21 21 21 32 3 21 21 32 21 21

1
3 9 3

4
93 93 93 9 =9 =9 Y= =9
8

0
93

.41
Y=

.65
Y= Y= Y=
97

6 Y Y
.01

.29
Y Y= PEKERJAAN

33
.77

8
8.8

24
6

.16
80

33
5.5
30
97

83
28
2

83

42
38

31
82
38

63
38

63

83
6

8
3
6

X=
X=

63
6

=6
X=

X=

63
PEMBANGUNAN PUSAT PEMERINTAHAN
X=

X=
X

X=
KORIDOR
± 0.00 KABUPATEN SERANG (PUSPEMKAB)
1 .64
4 1 GEDUNG OPD BLOK B1
.67
8 16 7 .65
5 .63 17 3
17 7.7 .72 17 17 Z= .79
1 17 Z=

9
Z= Z= Z= Z= 6 17
.61 Z=
17
Z= DIPERIKSA KOSULTAN PENGAWAS
±HALL
0.00 R.±SERVER
0.00 ±HALL
0.00

5 4 3 .82
2 GEDUNG OPD 3 0 4.6
19
18 17
.62
39

26 .02 .42 63 .22 25 0.0 5.4


2.2 77 73 68 12 59 21 25 24
6.5

28 2 12 12 12 32 12 93 21 21
7

1 32 2 9 2 Y=

9
32
32 93 93 93
6

93 3 Y= 93
.41
26

=9

.81

.68
9 Y= Y= Y=
.29

.17

Y= Y= .05 Y= R.± STAFF


0.00

0.9
Y R.± STAFF
0.00

67
38

75

19

28
84

93

02

31

7.5
± 0.00
PANTRY
6

82

83

83
JANITOR
X=

82

82

83
N

8
N

33
63

63

63

63
63

63

63

38
X=

X=

X=

X=
X=

X=

X=

=6 X
- 0.02
WANITA - PRIA
0.02
TOILET TOILET

3 3 .6 93 .68
.71 1 .67 17 17 .65
9
.77
17 7.8 17 Z= Z= 45 17 ± PANEL
R. 17
Z= Z =1 Z= - 0.02 - 0.02 1 7.6 Z= - 0.02 - 0.02
0.00
Z=

10
Z= 08
7.7 M. INDRA GUNAWAN H, ST
Z =1

Team Leader
4 5 4 4 3 9 3 8
49 48 4.1 9.5 42 1.1 6.5
7.9 3.3 47 12
6
12
5 3 0.3 41 4 3 DIBUAT/DIAJUKAN OLEH KONTAKTOR
12
7
27 8.7 32 2 .94 25 5.7 21
2
32
12
2 21 26 9 93 54 21 24 93
73

9
38

93 93 21 Y= Y= 12 0 93 21 Y= Y=
Y= 93
52

32 Y= 93
95

.33

8
16

Y=
8.5
1.9

09
Y= 9 Y=

6
Y=
7.4
9.6

4.0
0.8

.96
06

5.2
28
26

9
27

32
27

32
8
38

1
82

38
63

83
38

38
38

83
6

63

6
X=
X=

63
6

X=

6
6

63
X=
X=

X=
X=

X=

X=
8
6 54 .67 97
.82
1 .80 5 7.6 17 3
17 17 .75 1 Z= .65 7.4 8
17 Z= 17 1 .64

11 Z= Z= Z= Z= Z= 17
69 Z=
1 7.6
Z=

6 60
9 6 8
67 .66 .46
3 62 61 7.6
.46 9.8 50 .06
4
6.8 2.2 MUJI RAHARJO
70 64 25 5.2 12 46 12
41 3 23 21
22
9.0 2 21 25 32 2 2 12 1 93
21 21 9 32
36

93 93 32
51

Y= 21
72
5

26 93 93 Y=
3

9
29

Y= 93 Y= 8 9
Y=
.21

21 Y=
.09

Y= =
7.3

.60 Project Manajer


.8

Y=
3.9

86
93
1.7
92

Y=
66

75
25

10

9.4
28

0
82
82

82

83
38

83
8

1
63
63
63

83
25 ARSITEK : -
63

63
6

63

65
7.7
X=

X=
X=

9
X=

63
07
X=

55 4
X=

.61
X=
1
1 .58

8.3
.95 7.8 Z= 7.6 17 02
17 Z=
1 1 Z= 7.6 17 DRAFTER : -
Z= Z=

32
Z= Z=
1 88

12
7.5

8
63
1
Z=
.66
6 JUDUL GAMBAR
17
Z=
8 2
92 . 3
0.1 23
26 2 12 AS BUILT DRAWING
21 89 8 5 84 93
93 91 0.9 .38 7 .58 7.9
Y= 5.5 25 46 .78 86 32 22 .78
1
SITE GRID KORDINAT DAN ELEVASI
1 25 3 21 2 12 2 41 3 7.1 2 12 21 8
32 =9 93 21 12 93 93 21
9 Y Y= 3 93
2 Y= 21
Y= Y=
9 93
Y=
NO. GAMBAR : SWP-PPPKS-AS-00-04-006
SITE GRID KORDINAT DAN ELEVASI SKALA NO. LEMBAR TAHUN

SKALA 1 : 200
1 : 1000 4 of 5 2021
G H I J K L M N CATATAN

2
3
5
09

66

.60
88
52

.72
.84
0

.2
1

.9
9

.33

.0
8

9.4
.79

31
.82 .69 .75

22
13
87

04
96
17 17 17 17

84
78
36
Z= Z=

84
Z= Z=

84
83

84
83
5
4 2 9

63
83
8
.63 .57 .52

63
.67

63
63

63
63
63
17 17 17 17

63
Z= - 0.02
R. PANEL - 0.02 - 0.02 - 0.02 Z= Z= Z=

X=
X=

X=
± 0.00
TOILET TOILET
3

WANITA
.57

PRIA
- 0.02 - 0.02
60
83

29 7GEDUNG
.12
8 OPD 5 25 23
63

0 26
31 .33 1.7 26 2.5 7.9 N .32
4 8.7
X=

0.9 76 N JANITOR 27 21 26 25 53 24
8 12 21 93 21 32
PANTRY1 12 21
12 32 =93 93 9 2 93
32 =9 Y ± 0.00 93

8
9 Y R. STAFF R. STAFF R. STAFF
Y=
51

.60

6
9
± 0.00

.48
± 0.00 ± 0.00

5
.72
4.8

2
82

01
.36

.24

.12
91
73
36

83

7.0
00

09

18
83
83
8

63

2
84
63

84

84
63

84
63

63
X=

63

63
=

63
X=

X
HALL R. SERVER HALL
± 0.00 ± 0.00 ± 0.00
69 4 2
7. 7
88
=1
7.7 17
.74
17
.81
84 9 4 2 NO. TGL KETERANGAN TTD

6 =1 Z Z= Z= .7 .61 .55 .55


Z 17 17 17 17
.88 Z= Z= Z= Z=
17
Z=

KORIDOR
± 0.00
51 50 9 46 44
.05
3 7.4 2.8 .24 48 47 4.4 9.8
72 12
6
26 12
5 8
3.6 9.0 24 23
12 32 21 32 25 24 21 21
32 9 93 9 21 21 93 93
=9 Y= Y= Y= 93 93
Y

85

4
28
9

.00

.76
.24

6.8
.1

9
2
78

.39
95
69

.64
60

.52
38
83

83
83
83

22
04
38

13
63

63
63
63

84
84
=6

84
AREA PARKIR RODA EMPAT

X=

X=
X=
X=

63
63
X

63
R. RAPAT
PEMBERI TUGAS
43 84 7 7 2 84
7.7 7.6 22

7 .747 .78
4 7.7 1 1 7.6 .51 7.5 PEMERINTAHAN KABUPATEN SERANG
.85
4 17 7 =1 Z= Z= =1 17 1
17 Z= Z=
1 Z Z Z= Z=
Z=
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
67 66 TATA BANGUNAN
0 69 68 5.5 0.9
74 .37 0.1 3 23
.1 7 3 2
.97 0.00 49 4.7 12
4 12 93
21
63 8.5 R.±RAPAT
0.00 53 R.±RAPAT 12 24 2 32
21
2
12
5 2 93
2 21 93 9
93 32 21 Y= 93

84
93 Y=
8

Y= Y=
9 Y=

E
5
.64

S
2.2
W

EP
II

20
.40
.52

GA

.16
NG

8
41
G
5

PA

.79
MRI H RA ME IN

38

8.9
35

73
64

0.0
1
38

39

17
40
8

83
3

0
63

38

=6

84
84

8
63

63

63
X=

63
63
X=

X=

KEGIATAN
.79 4

8
7 4 7 15 1
17 .72 .74 7 .68 .59 7.6 .50 PERENCANAAN, PEMBANGUNAN,
Z= .69
1 17 17 .72 Z=
17 17 1 17
17 Z= Z= 17 Z= Z= Z=
Z= Z= PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
R.±RAPAT
0.00 R.±RAPAT
0.00
AREA PARKIR RODA EMPAT KABUPATEN/KOTA
.6 94 9 3
91 8 87
49 5.0 90 .68 2.0
.29
5 2 4 .49
2 5.8 1.2 26 22
54 21 12 40 23 23 2 21
12 93 9 32 12 21 21 21 93 PEKERJAAN
Y= 93 93 93
6

2 Y= 32
4
7

.92

93 =9
.80

61
.04

3
Y= Y

0
8

7
9
59

6.5

.44
68

7.6

.19
.31
51

8
3

5
38

13
4
38

83
38

39
83

40
PEMBANGUNAN PUSAT PEMERINTAHAN
6

84
6

63
6

8
X=

63

8
X=
X=

63

63
63
KABUPATEN SERANG (PUSPEMKAB)
KORIDOR
± 0.00
1 GEDUNG OPD BLOK B1
74 34 7 2
9 .60 .59

9 93 .6 59 7.6 7.6
9 .6 .69 17
.6 17 17
17 =1 1 17 17 Z= Z=
.7 Z Z= Z= Z= Z=
Z=
17 Z= DIPERIKSA KOSULTAN PENGAWAS
±HALL
0.00 R.±SERVER
0.00 ±HALL
0.00

5 GEDUNG OPD 6 1 2
.41
1
.81
0
3.2
09
17 6 .21 .613 7.0 22 17 21
5.4 .81 36 31 22 12 2 21
12
4
24
0 12 12 21 2 21 93
32 93 93
03

2 1 9 32 93
6

24

93 32 Y= R.±9STAFF

7
4.2
.44

9 60
Y= 0.00 R.±STAFF
0.00

9
Y=

6
.71
5.3

.83
2

9
1.9
36
46

± 0.00
.08

PANTRY

8.5
99
35

90
38

JANITOR
3

8
N N
73

0
83
38

83

84
6
63

8
83

63
X=
6

63

63

63
X=

X=

63

-PRIA
0.02 - 0.02
WANITA
TOILET TOILET

.71 83 2 6
.64
6
.59
4
.58
8 84
.77 7.6 .69 .68 .5

10 17 17 R.± PANEL 1 17 17 17 17 17 17
Z= 0.00 Z= Z= Z= Z= - 0.02
- 0.02 Z= Z= Z=
Z= - 0.02 - 0.02 M. INDRA GUNAWAN H, ST
Team Leader

38 37 36 35 3.5
32 0 DIBUAT/DIAJUKAN OLEH KONTAKTOR
6.5 1.9 7.3 2.7 34 31 .33
23 23 12
2 22 8.1 21
21
8.9 20
4
21 1 2 21 21 93 0 21
3 32 93 93 21 12 93
2

=9 93
45

9 Y= 2
3

.60

5
Y Y= 93
.72

16

.99
80
1.8

8
9
9

.23
.35

5.1
8.4
0

35

03
4

35
83

86
77

9
38

84
36
38

83
63

83
83
6

63
38
6

63
X=
X=

63
63
X=

11 .76 86 .57 5 4
.59
4
.54
1 69
8 17 7.6 17 .56 .55 17 17 17
.5
.64 Z= 1 Z= 17 17 Z= Z= Z=
17 Z= Z= Z=
Z=

60 9 7 55 .05
3 51 MUJI RAHARJO
7.6 .05 .45 5 6
9.2 54 0 .4
22 23 18 3.8 20 4.6 20 1 95
21 12 12 21 20 21 21
Y=
93 93
2
=9
32
93
21 93
21
32
1 93
5 93 Project Manajer
Y= Y 9
58

.51
6
01

94
44

.63
2.7
9

90
.12

.0

9.3
: -
.2

.87

ARSITEK
7

81

83
55
37

83

39
63
34

83

63
83
83

DRAFTER : -
63

8
83
8

63
63

63
63

63

63

JUDUL GAMBAR
6
.66
17 62 09 32 5 9
.52
8
87 .59

12
Z= 7.6 7.5 7.5 7.8 .7 7.52 17 17
82 1 1 1 1 17 1
Z= Z= AS BUILT DRAWING
3 .3 Z= Z= Z= Z= Z= Z=
22
21 SITE GRID KORDINAT DAN ELEVASI
93 5 74 3
80 79 78 76 .77 .57
81 9.5 4.9 0.3 5 1.1 6
18
.7 4.1 20 20 20 19 19 18
2 21 21 21 21 21 21 21
21 21 93 93 93 93 93 93
93 93 NO. GAMBAR : SWP-PPPKS-AS-00-04-006
SKALA NO. LEMBAR TAHUN
SITE GRID KORDINAT DAN ELEVASI
SKALA 1 : 200 1 : 1000 5 of 5 2021
CATATAN

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635
6.45 m2 NO. TGL KETERANGAN TTD

+ 17.00

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
17.535 17.139

17.562 17.362

17.519 17.361

17.58 17.509

17.577 17.551

17.635 17.713

0+060 -B-10 17.635 17.686

0+070 -B-11 17.635 17.916

0+080 -B-12 17.635 17.791


Elevasi PERMUKIMAN DAN
Tanah Eksisting TATA BANGUNAN
Elevasi

E
S
W

EP
II
Top Urugan NG
PA
MRI H RA ME IN
G
GA
0+000 -B-4

0+010 -B-5

0+020 -B-6

0+030 -B-7

0+040 -B-8

0+050 -B-9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION -B
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635

40.93m2 M. INDRA GUNAWAN H, ST


+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00

Datum ± 15.00
17.635 17.549

17.611 17.383

17.635 17.088

17.601 16.948

17.635 17.083

17.635 17.109

17.635 17.159

17.627 17.286

17.635 17.441

0+090 -A-10 17.635 17.399

0+100 -A-11 17.635 17.391

0+110 -A-12 17.635 17.531


Elevasi
Tanah Eksisting
MUJI RAHARJO
Elevasi Project Manajer
Top Urugan
ARSITEK : -
DRAFTER : -
0+000 -A-1

0+010 -A-2

0+020 -A-3

0+030 -A-4

0+040 -A-5

0+050 -A-6

0+060 -A-7

0+070 -A-8

0+080 -A-9

As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak
CROSS SECTION TIMBUNAN

NO. GAMBAR : SWP-PPPKS-AS-00-04-007


CROSS SECTION -A SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 1 of 8 2021
CATATAN

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI

NO. TGL KETERANGAN TTD


60.60 m2
+ 17.00

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
17.635 17.701

17.598 17.076

17.622 16.921

17.635 16.931

17.635 17.031

17.635 16.966

17.635 17.099

17.635 17.181

17.635 17.231

17.635 17.451
Elevasi

17.594 16.92

17.635 16.92
PERMUKIMAN DAN
Tanah Eksisting TATA BANGUNAN
Elevasi

E
S
W

EP
Top Urugan II
NG
PA
MRI H RA ME IN
G
GA

0+090 A-10

0+100 A-11

0+110 A-12
0+000 A-1

0+010 A-2

0+020 A-3

0+030 A-4

0+040 A-5

0+050 A-6

0+060 A-7

0+070 A-8

0+080 A-9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION A
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI

67.96 m2 M. INDRA GUNAWAN H, ST


+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00

Datum ± 15.00
0+000 B- -1 17.635 17.563

17.635 17.608

17.635 16.973

17.635 17.509

17.635 16.882

17.635 16.891

17.635 16.882

17.635 16.896

17.635 16.884

17.635 16.816

0+100 B- 10 17.635 17.071

0+110 B- 11 17.635 17.046

0+120 B- 12 17.619 17.301


Elevasi
Tanah Eksisting
MUJI RAHARJO
Elevasi Project Manajer
Top Urugan
ARSITEK : -
DRAFTER : -
0+010 B- 1

0+020 B- 2

0+030 B- 3

0+040 B- 4

0+050 B- 5

0+060 B- 6

0+070 B- 7

0+080 B- 8

0+090 B- 9

As Grid JUDUL GAMBAR

Sta/Jarak AS BUILT DRAWING


CROSS SECTION TIMBUNAN

NO. GAMBAR : SWP-PPPKS-AS-00-04-007


CROSS SECTION B SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 2 of 8 2021
CATATAN

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635
NO. TGL KETERANGAN TTD
81.77m2
+ 17.00

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
0+000 D- -2 17.635 17.071

0+010 D- -1 17.601 17.491

17.635 17.531

17.611 17.479

17.632 16.799

17.635 16.709

17.635 16.746

17.635 16.848

17.635 16.901

17.635 16.826

17.635 16.831

0+110 D- 10 17.635 16.831

0+120 D- 11 17.497 16.971

0+130 D- 12 17.584 16.991


Elevasi PERMUKIMAN DAN
Tanah Eksisting TATA BANGUNAN
Elevasi

E
S
W

EP
II
Top Urugan NG
PA
MRI H RA ME IN
G
GA
0+020 D- 1

0+030 D- 2

0+040 D- 3

0+050 D- 4

0+060 D- 5

0+070 D- 6

0+080 D- 7

0+090 D- 8

0+100 D- 9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION D
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635

M. INDRA GUNAWAN H, ST
91.40 m2
+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00

Datum ± 15.00
0+000 E- -2 17.552 17.291

0+010 E- -1 17.635 17.243

17.635 17.201

17.635 17.211

17.635 16.793

17.635 16.738

17.635 16.758

17.635 16.888

17.635 16.861

17.635 16.886

17.616 16.936

0+110 E- 10 17.635 16.886

0+120 E- 11 17.635 16.843

0+130 E- 12 17.588 16.351


Elevasi
Tanah Eksisting
MUJI RAHARJO
Elevasi Project Manajer
Top Urugan
ARSITEK : -
DRAFTER : -
0+020 E- 1

0+030 E- 2

0+040 E- 3

0+050 E- 4

0+060 E- 5

0+070 E- 6

0+080 E- 7

0+090 E- 8

0+100 E- 9

As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak
CROSS SECTION TIMBUNAN

NO. GAMBAR : SWP-PPPKS-AS-00-04-007


CROSS SECTION E SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 3 of 8 2021
CATATAN

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635
NO. TGL KETERANGAN TTD

91.40 m2
+ 17.00

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
0+000 E- -2 17.552 17.291

0+010 E- -1 17.635 17.243

17.635 17.201

17.635 17.211

17.635 16.793

17.635 16.738

17.635 16.758

17.635 16.888

17.635 16.861

17.635 16.886

17.616 16.936

0+110 E- 10 17.635 16.886

0+120 E- 11 17.635 16.843

0+130 E- 12 17.588 16.351


Elevasi PERMUKIMAN DAN
Tanah Eksisting TATA BANGUNAN
Elevasi

E
S
W

EP
II
GA
Top Urugan NG
PA
MRI H RA ME IN
G
0+020 E- 1

0+030 E- 2

0+040 E- 3

0+050 E- 4

0+060 E- 5

0+070 E- 6

0+080 E- 7

0+090 E- 8

0+100 E- 9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION E
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635

M. INDRA GUNAWAN H, ST
101.46 m2
+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00

Datum ± 15.00
17.635 17.169

17.635 16.996

17.635 17.044

17.635 17.082

17.635 16.891

17.635 16.733

17.635 16.819

17.635 16.841

17.635 16.844

17.635 16.841

17.635 16.741

0+110 F- 10 17.635 16.816

0+120 F- 11 17.635 16.761


Elevasi

0+130 F- 12 17.635 16.23


Tanah Eksisting MUJI RAHARJO
Elevasi Project Manajer
Top Urugan ARSITEK : -
DRAFTER : -
0+000 F- -2

0+010 F- -1

0+020 F- 1

0+030 F- 2

0+040 F- 3

0+050 F- 4

0+060 F- 5

0+070 F- 6

0+080 F- 7

0+090 F- 8

0+100 F- 9

As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak CROSS SECTION TIMBUNAN

NO. GAMBAR : SWP-PPPKS-AS-00-04-007


CROSS SECTION F SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 4 of 8 2021
CATATAN

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635
NO. TGL KETERANGAN TTD

107.21 m2
+ 17.00

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
0+000 G- -2 17.635 17.143

0+010 G- -1 17.635 17.031

17.635 17.019

17.635 16.949

17.635 16.831

17.635 16.786

17.635 16.796

17.635 16.766

17.635 16.676

17.635 16.766

0+110 G- 10 17.635 16.736

0+120 G- 11 17.635 16.681

0+130 G- 12 17.635 16.251


Elevasi PERMUKIMAN DAN

17.635 16.8
Tanah Eksisting TATA BANGUNAN
Elevasi

E
S
W

EP
II
GA
Top Urugan NG
PA
MRI H RA ME IN
G
0+020 G- 1

0+030 G- 2

0+040 G- 3

0+050 G- 4

0+060 G- 5

0+070 G- 6

0+080 G- 7

0+090 G- 8

0+100 G- 9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION G
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635

126.54 m2 M. INDRA GUNAWAN H, ST


+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00

Datum ± 15.00
0+000 H- -2 17.635 17.039

0+010 H- -1 17.631 16.701

17.635 16.637

17.635 16.733

17.635 16.769

17.635 16.753

17.635 16.703

17.635 16.691

17.635 16.673

17.635 16.761

17.635 16.621

0+110 H- 10 17.635 16.581

0+130 H- 12 17.562 16.232


Elevasi

0+120 H- 11 17.635 16.32


Tanah Eksisting
MUJI RAHARJO
Elevasi Project Manajer
Top Urugan ARSITEK : -
DRAFTER : -
0+020 H- 1

0+030 H- 2

0+040 H- 3

0+050 H- 4

0+060 H- 5

0+070 H- 6

0+080 H- 7

0+090 H- 8

0+100 H- 9

As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak CROSS SECTION TIMBUNAN

NO. GAMBAR : SWP-PPPKS-AS-00-04-007


CROSS SECTION H SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 5 of 8 2021
CATATAN

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635
NO. TGL KETERANGAN TTD

+ 17.00 140.91 m2

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
17.631 16.961

17.635 16.648

17.619 16.664

17.635 16.668

17.635 16.671

17.635 16.608

17.635 16.596

17.635 16.588

17.635 16.531

17.635 16.611

17.635 16.133

17.57 16.212

17.509 16.126
Elevasi
17.635 16.57

PERMUKIMAN DAN
Tanah Eksisting
TATA BANGUNAN
Elevasi

E
S
Top Urugan W

EP
II
NG GA
PA G
MRI H RA ME IN

0+110 I- 10

0+120 I- 11

0+130 I- 12
0+000 I- -2

0+010 I- -1

As Grid
0+020 I- 1

0+030 I- 2

0+040 I- 3

0+050 I- 4

0+060 I- 5

0+070 I- 6

0+080 I- 7

0+090 I- 8

0+100 I- 9
KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION I
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635

M. INDRA GUNAWAN H, ST
+ 17.00 Team Leader
162.12 m2
DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00

Datum ± 15.00
17.567 16.829

17.583 16.574

17.635 16.564

17.629 16.545

17.635 16.584

17.635 16.259

17.635 16.421

17.635 16.431

17.635 16.431

17.635 16.466

0+110 J- 10 17.635 16.034

0+120 J- 11 17.565 16.025

0+130 J- 12 17.635 16.102


Elevasi
17.635 16.14

Tanah Eksisting
MUJI RAHARJO
Elevasi Project Manajer
Top Urugan
ARSITEK : -
DRAFTER : -
0+000 J- -2

0+010 J- -1

0+020 J- 1

0+030 J- 2

0+040 J- 3

0+050 J- 4

0+060 J- 5

0+070 J- 6

0+080 J- 7

0+090 J- 8

0+100 J- 9

As Grid
JUDUL GAMBAR

Sta/Jarak AS BUILT DRAWING


CROSS SECTION TIMBUNAN

NO. GAMBAR : SWP-PPPKS-AS-00-04-007


CROSS SECTION J SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 6 of 8 2021
CATATAN

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635
NO. TGL KETERANGAN TTD

+ 17.00 188.36m2

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
0+000 K- -2 17.587 16.819

0+010 K- -1 17.635 16.573

17.627 16.551

17.635 16.466

17.629 16.369

17.635 15.876

17.635 15.874

17.635 15.934

17.635 16.142

17.635 16.171

17.635 16.078

0+110 K- 10 17.635 15.953

0+120 K- 11 17.554 15.931

0+130 K- 12 17.635 16.009


Elevasi PERMUKIMAN DAN
Tanah Eksisting TATA BANGUNAN
Elevasi

E
S
W

EP
II
Top Urugan NG
PA
MRI H RA ME IN
G
GA
0+020 K- 1

0+030 K- 2

0+040 K- 3

0+050 K- 4

0+060 K- 5

0+070 K- 6

0+080 K- 7

0+090 K- 8

0+100 K- 9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION K
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635

M. INDRA GUNAWAN H, ST
+ 17.00 Team Leader
197.46 m2 DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00

Datum ± 15.00
17.531 16.866

17.581 16.488

17.635 16.408

17.635 16.348

17.635 16.386

17.635 15.751

17.63 15.738

17.619 15.916

17.597 15.935

17.634 15.933

0+110 L- 10 17.594 15.923

0+120 L- 11 17.594 15.872

0+130 L- 12 17.425 15.926


Elevasi
17.622 16.11

Tanah Eksisting
MUJI RAHARJO
Elevasi Project Manajer
Top Urugan
ARSITEK : -
DRAFTER : -
0+000 L- -2

0+010 L- -1

0+020 L- 1

0+030 L- 2

0+040 L- 3

0+050 L- 4

0+060 L- 5

0+070 L- 6

0+080 L- 7

0+090 L- 8

0+100 L- 9

As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak
CROSS SECTION TIMBUNAN

NO. GAMBAR : SWP-PPPKS-AS-00-04-007


CROSS SECTION L SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 7 of 8 2021
CATATAN

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635
NO. TGL KETERANGAN TTD

+ 17.00
204.42 m2

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
0+000 M- -2 17.532 16.671

0+010 M- -1 17.635 16.301

17.612 16.226

17.592 16.376

17.572 16.014

17.552 15.736

17.572 15.718

17.554 15.878

17.512 16.045

17.615 15.927

17.607 15.907

0+110 M- 10 17.588 15.863

0+120 M- 11 17.541 15.829

0+130 M- 12 17.599 15.926


Elevasi
PERMUKIMAN DAN
Tanah Eksisting
TATA BANGUNAN
Elevasi

E
S
Top Urugan W

EP
II
NG GA
PA G
MRI H RA ME IN
0+020 M- 1

0+030 M- 2

0+040 M- 3

0+050 M- 4

0+060 M- 5

0+070 M- 6

0+080 M- 7

0+090 M- 8

0+100 M- 9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION M
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

TOP RENCANA URUGAN


HASIL JOINT SURVEY TIMBUNAN
+ 18.00 EKSISTING TANAH ASLI
Top Elv. + 17.635

M. INDRA GUNAWAN H, ST
+ 17.00 Team Leader
226.92 m2
DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00

Datum ± 15.00
0+000 N- -2 17.635 16.581

0+010 N- -1 17.549 15.663

17.564 15.701

17.524 15.691

17.54 15.601

17.615 15.718

17.529 15.702

17.552 15.842

17.584 16.021

17.501 15.915

17.592 15.902

0+110 N- 10 17.584 15.845

0+120 N- 11 17.569 15.815

0+130 N- 12 17.528 15.911


Elevasi
Tanah Eksisting
MUJI RAHARJO
Elevasi Project Manajer
Top Urugan
ARSITEK : -
DRAFTER : -
0+020 N- 1

0+030 N- 2

0+040 N- 3

0+050 N- 4

0+060 N- 5

0+070 N- 6

0+080 N- 7

0+090 N- 8

0+100 N- 9

As Grid
JUDUL GAMBAR

Sta/Jarak AS BUILT DRAWING


CROSS SECTION TIMBUNAN

NO. GAMBAR : SWP-PPPKS-AS-00-04-007


CROSS SECTION N SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 8 of 8 2021
CATATAN

+ 18.00

NO. TGL KETERANGAN TTD

+ 17.00

1.99 m2

+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00 DINAS PERUMAHAN KAWASAN

0+120 E- 11 16.843 16.843

0+130 E- 12 16.351 16.751


Elevasi PERMUKIMAN DAN
Tanah Eksisting TATA BANGUNAN

Elevasi

E
S
W

EP
II
NG GA
PA G
Dasar Galian MRI H RA ME IN

As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION E
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 18.00

M. INDRA GUNAWAN H, ST

+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR


1.99 m2

+ 16.00

Datum ± 15.00
0+120 F- 11 16.761 16.761

Elevasi
0+130 F- 12 16.23 16.63

Tanah Eksisting MUJI RAHARJO


Project Manajer
Elevasi
Dasar Galian ARSITEK : -
DRAFTER : -
As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak CROSS SECTION GALIAN SAWAH

NO. GAMBAR : SWP-PPPKS-SD-AR-00-008


CROSS SECTION F SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 1 of 5 2021
CATATAN

NO. TGL KETERANGAN TTD


+ 17.00

2 m2

+ 16.00

PEMBERI TUGAS

Datum ± 15.00 PEMERINTAHAN KABUPATEN SERANG

0+120 G- 11 16.681 16.609

0+130 G- 12 16.251 16.651


Elevasi DINAS PERUMAHAN KAWASAN
Tanah Eksisting PERMUKIMAN DAN
TATA BANGUNAN
Elevasi
Dasar Galian

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

As Grid
KEGIATAN

Sta/Jarak PERENCANAAN, PEMBANGUNAN,


PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION G
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

M. INDRA GUNAWAN H, ST
+ 17.00
Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR


5.68 m2
+ 16.00

Datum ± 15.00
16.621 16.632

0+110 H- 10 16.581 16.632

0+120 H- 11 16.32 16.632

0+130 H- 12 16.232 16.632

Elevasi
Tanah Eksisting
MUJI RAHARJO
Elevasi
Project Manajer
Dasar Galian
ARSITEK : -
DRAFTER : -
0+100 H- 9

As Grid
JUDUL GAMBAR

Sta/Jarak AS BUILT DRAWING


CROSS SECTION GALIAN SAWAH

NO. GAMBAR : SWP-PPPKS-SD-AR-00-008


CROSS SECTION H SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 2 of 5 2021
CATATAN

NO. TGL KETERANGAN TTD

+ 17.00

8.72 m2
+ 16.00

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN

16.133 16.526

16.212 16.526

16.126 16.526
Elevasi
PERMUKIMAN DAN
Tanah Eksisting
TATA BANGUNAN
Elevasi

E
S
W

EP
Dasar Galian II
NG
PA
MRI H RA ME IN
G
GA

0+110 I- 10

0+120 I- 11

0+130 I- 12
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION I
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

M. INDRA GUNAWAN H, ST
+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

8.72 m2
+ 16.00

Datum ± 15.00
16.611 16.611

0+110 J- 10 16.133 16.526

0+120 J- 11 16.212 16.526

0+130 J- 12 16.126 16.526

Elevasi
Tanah Eksisting MUJI RAHARJO
Elevasi Project Manajer
Dasar Galian ARSITEK : -
DRAFTER : -
0+100 J- 9

As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak CROSS SECTION GALIAN SAWAH

NO. GAMBAR : SWP-PPPKS-SD-AR-00-008


CROSS SECTION J SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 3 of 5 2021
CATATAN

+ 19.00

+ 18.00

NO. TGL KETERANGAN TTD

+ 17.00

+ 16.00 35.34 m2

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN
16.369 16.409

15.876 16.409

15.874 16.409

15.934 16.409

16.142 16.409

16.171 16.409

16.078 16.409

0+110 K- 10 15.953 16.409

0+120 K- 11 15.931 16.409

0+130 K- 12 16.009 16.409


Elevasi PERMUKIMAN DAN
Tanah Eksisting TATA BANGUNAN
Elevasi

E
S
W

EP
II
GA
Dasar Galian NG
PA
MRI H RA ME IN
G
0+040 K- 3

0+050 K- 4

0+060 K- 5

0+070 K- 6

0+080 K- 7

0+090 K- 8

0+100 K- 9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION K
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

+ 18.00

M. INDRA GUNAWAN H, ST
+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00 36.02 m2

Datum ± 15.00
16.386 16.386

15.751 16.326

15.738 16.326

15.916 16.326

16.11 16.326

15.935 16.326

15.933 16.326

0+110 L- 10 15.923 16.326

0+120 L- 11 15.872 16.326

0+130 L- 12 15.926 16.326


Elevasi
Tanah Eksisting
MUJI RAHARJO
Elevasi Project Manajer
Top Urugan : -
ARSITEK
DRAFTER : -
0+040 L- 3

0+050 L- 4

0+060 L- 5

0+070 L- 6

0+080 L- 7

0+090 L- 8

0+100 L- 9

As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak
CROSS SECTION GALIAN SAWAH

NO. GAMBAR : SWP-PPPKS-SD-AR-00-008


CROSS SECTION L SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 4 of 5 2021
CATATAN

+ 19.00

+ 18.00

NO. TGL KETERANGAN TTD

+ 17.00

+ 16.00 41.95 m2

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


Datum ± 15.00
DINAS PERUMAHAN KAWASAN

16.014 16.325

15.736 16.325

15.718 16.325

15.878 16.325

16.045 16.325

15.927 16.325

15.907 16.325

0+110 M- 10 15.863 16.325

0+120 M- 11 15.829 16.325

0+130 M- 12 15.926 16.325


Elevasi PERMUKIMAN DAN
Tanah Eksisting TATA BANGUNAN

Elevasi

E
S
W

EP
II
NG GA
Top Urugan PA
MRI H RA ME IN
G
0+040 M- 3

0+050 M- 4

0+060 M- 5

0+070 M- 6

0+080 M- 7

0+090 M- 8

0+100 M- 9
As Grid KEGIATAN

PERENCANAAN, PEMBANGUNAN,
Sta/Jarak PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
CROSS SECTION M
SKALA H = 1 : 100, V = 1 : 1000
PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 19.00

+ 18.00

M. INDRA GUNAWAN H, ST
+ 17.00 Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

+ 16.00 43.53

Datum ± 15.00
15.601 16.310

15.718 16.310

15.702 16.310

15.842 16.310

16.021 16.310

15.915 16.310

15.902 16.310

0+110 N- 10 15.845 16.310

0+120 N- 11 15.815 16.310

0+130 N- 12 15.911 16.310


Elevasi
Tanah Eksisting MUJI RAHARJO
Elevasi Project Manajer
Top Urugan ARSITEK : -
DRAFTER : -
0+040 N- 3

0+050 N- 4

0+060 N- 5

0+070 N- 6

0+080 N- 7

0+090 N- 8

0+100 N- 9

As Grid JUDUL GAMBAR

AS BUILT DRAWING
Sta/Jarak CROSS SECTION GALIAN SAWAH

NO. GAMBAR : SWP-PPPKS-SD-AR-00-008


CROSS SECTION N SKALA NO. LEMBAR TAHUN
SKALA H = 1 : 100, V = 1 : 1000 V= 1 : 1000
H= 1 : 100 5 of 5 2021
CATATAN

- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL


± 0.00
R. PANEL
± 0.00
- 0.02 - 0.02 - 0.02 - 0.02 NO. TGL KETERANGAN TTD
TOILET TOILET TOILET
TOILET WANITA
WANITA PRIA PRIA
- 0.02 - 0.02 - 0.02 - 0.02

GEDUNG OPD 1 N N
GEDUNG OPD 4 N
N JANITOR JANITOR
PANTRY
PANTRY
± 0.00 R. STAFF R. STAFF ± 0.00
R. STAFF R. STAFF
± 0.00 ± 0.00 ± 0.00 ± 0.00

HALL R. SERVER HALL HALL R. SERVER HALL


± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

KORIDOR KORIDOR
± 0.00 ± 0.00

AREA PARKIR RODA EMPAT


AREA PARKIR RODA EMPAT
R. RAPAT
± 0.00
R. RAPAT
± 0.00
R. RAPAT
± 0.00
R. RAPAT
± 0.00
PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


DINAS PERUMAHAN KAWASAN
R. RAPAT
± 0.00
R. RAPAT
± 0.00
R. RAPAT
± 0.00
R. RAPAT
± 0.00
PERMUKIMAN DAN
TATA BANGUNAN

E
S
R. RAPAT R. RAPAT W

EP
II
AREA PARKIR RODA EMPAT AREA PARKIR RODA EMPAT NG
G
GA
PA
MRI H RA ME IN

- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL


± 0.00
R. PANEL
± 0.00
- 0.02 - 0.02 - 0.02 - 0.02
KEGIATAN
TOILET TOILET TOILET
TOILET WANITA
WANITA PRIA PRIA
- 0.02 - 0.02 - 0.02

N
- 0.02

GEDUNG OPD 2 JANITOR N N JANITOR


GEDUNG OPD 5 N
PERENCANAAN, PEMBANGUNAN,
PANTRY
PANTRY
± 0.00 R. STAFF
± 0.00
R. STAFF
± 0.00
R. STAFF
± 0.00
R. STAFF
± 0.00
R. STAFF
± 0.00
R. STAFF
± 0.00
± 0.00
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
R. SERVER HALL HALL R. SERVER HALL

KABUPATEN/KOTA
HALL
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00
± 0.00

KORIDOR KORIDOR
± 0.00 ± 0.00
PEKERJAAN

AREA PARKIR RODA EMPAT AREA PARKIR RODA EMPAT PEMBANGUNAN PUSAT PEMERINTAHAN
R. RAPAT R. RAPAT
KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

L. 1666 M2 R.±RAPAT
0.00 R.±RAPAT
0.00 R.±RAPAT
0.00 R.±RAPAT
0.00

DIPERIKSA KOSULTAN PENGAWAS

R.±RAPAT
0.00 R.±RAPAT
0.00
AREA PARKIR RODA EMPAT R.±RAPAT
0.00 R.±RAPAT
0.00
AREA PARKIR RODA EMPAT

KORIDOR
± 0.00 KORIDOR
± 0.00

R.±SERVER
0.00 ±HALL
0.00 ±HALL
0.00 R.±SERVER
0.00 ±HALL
0.00
±HALL
0.00

GEDUNG OPD 3 GEDUNG OPD 6

± 0.00
PANTRY
R.± STAFF
0.00 R.± STAFF
0.00 R.±STAFF
0.00 R.±STAFF
0.00
± 0.00
PANTRY
M. INDRA GUNAWAN H, ST
JANITOR N JANITOR N
N N

- 0.02
WANITA - PRIA
0.02 -PRIA
0.02 - 0.02
WANITA
Team Leader
TOILET TOILET TOILET
TOILET

R.± PANEL R.± PANEL


0.00

DIBUAT/DIAJUKAN OLEH KONTAKTOR


0.00 - 0.02 - 0.02 - 0.02 - 0.02
- 0.02 - 0.02 - 0.02 - 0.02
GROUND TANK
- 2.20

MUJI RAHARJO
Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

SITE JARINGAN SALURAN BOX CULVERT 60 x 60 AS BUILT DRAWING


JARINGAN SALURAN
SKALA 1 : 1000
BOX CULVERT 80 x 80 (UTILITAS) NO. GAMBAR : SWP-PPPKS-SD-AR-00-010
SKALA NO. LEMBAR TAHUN
U-DITCH 40 x 40
1 : 1000 1 of 1 2021
CATATAN

- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL

R. ARSIP R. KABID R. KABID R. ARSIP


TOILET TOILET
WANITA PRIA
- 0.02 - 0.02

N JANITOR N
PANTRY

BIDANG PENGADAAN,

Jalur 1
PEMBERHENTIAN &
BIDANG MUTASI,
INFORMASI
PROMOSI & EVALUASI
KEPEGAWAIAN ASN
KINERJA ASN
NO. TGL KETERANGAN TTD
HALL R. SERVER HALL

KORIDOR

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
TATA BANGUNAN
R. RAPAT R. RAPAT

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

Jalur 1
KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
R. ARSIP
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

M. INDRA GUNAWAN H, ST
Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR


19.00

18.00

17.00
U-ditch 40x40
16.00
Box Culvert 60x60 Mainhole 60x150
Datum ± 15.00
18.665

0+010 16.790 16.940 17.540 18.665


0+010.5 16.810 16.960 17.560 18.665

0+011.2 17.349 17.479 17.879 18.665

0+020.7517.419 17.549 17.949 18.665

18.665

0+075 17.674 17.804 18.204 18.665


Elv. Finish Bangunan
17.12

18.1
Elv. Atas Saluran
0+000 16.360 16.52

17.7
Elv. Bawah Saluran
MUJI RAHARJO

0+054.7517.57
Elv. Pasir Urug Project Manajer

Sta/Jarak ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

AS BUILT DRAWING
POTONGAN MEMANJANG SALURAN

LONG SECTION JALUR 1 NO. GAMBAR : SWP-PPPKS-SD-AR-00-011


SKALA 1 : 150 SKALA NO. LEMBAR TAHUN

1 : 150 1 of 8 2021
CATATAN

Rabat Beton 7 cm
Pasir Urug 5 cm
Pas. Batu Kali 120
NO. TGL KETERANGAN TTD
U-ditch 20

10
Kansteen

26
30
76

PEMBERI TUGAS
57

PEMERINTAHAN KABUPATEN SERANG


DINAS PERUMAHAN KAWASAN

20
PERMUKIMAN DAN
TATA BANGUNAN
30

E
S
W

EP
II
GA
40 NG
PA
MRI H RA ME IN
G

54
KEGIATAN

PERENCANAAN, PEMBANGUNAN,
POTONGAN JALUR 1 HULU PENGAWASAN, DAN PEMANFAATAN
SKALA 1 : 25 BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

Rabat Beton 7 cm DIPERIKSA KOSULTAN PENGAWAS

Pasir Urug 5 cm
Pas. Batu Kali 120

U-ditch 20

Beton

10
Kansteen
26

M. INDRA GUNAWAN H, ST
Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR


30

33
109

90

36

MUJI RAHARJO
Project Manajer
40 30
ARSITEK : -
54 DRAFTER : -
POTONGAN JALUR 1 HILIR JUDUL GAMBAR
SKALA 1 : 25
AS BUILT DRAWING
POTONGAN SALURAN

NO. GAMBAR : SWP-PPPKS-SD-AR-00-011


SKALA NO. LEMBAR TAHUN

1 : 25 2 of 8 2021
CATATAN

- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL

R. ARSIP R. KABID R. KABID R. ARSIP


TOILET TOILET
WANITA PRIA
- 0.02 - 0.02

N JANITOR N
PANTRY

BIDANG PENGADAAN,
PEMBERHENTIAN &
BIDANG MUTASI,
INFORMASI
PROMOSI & EVALUASI
KEPEGAWAIAN ASN
KINERJA ASN
NO. TGL KETERANGAN TTD
HALL R. SERVER HALL

KORIDOR

Jalur 2
PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
TATA BANGUNAN
R. RAPAT R. RAPAT

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
R. ARSIP
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

M. INDRA GUNAWAN H, ST
19.00 Team Leader

18.00 DIBUAT/DIAJUKAN OLEH KONTAKTOR


107

17.00
U-ditch 40x40
16.00
Box Culvert 60x60 Mainhole 60x150
Datum ± 15.00
18.665

0+010 16.790 16.940 17.540 18.665


0+010.5 16.810 16.960 17.560 18.665

0+011.2 17.544 17.674 18.074 18.665

0+020 17.572 17.702 18.102 18.665

0+030 17.604 17.734 18.134 18.665

0+040 17.635 17.765 18.165 18.665

0+049 17.664 17.794 18.194 18.665


Elv. Finish Paving
17.12

Elv. Atas Saluran


MUJI RAHARJO
Project Manajer
0+000 16.360 16.52

Elv. Bawah Saluran


ARSITEK : -
DRAFTER : -
Elv. Pasir Urug
JUDUL GAMBAR

Sta/Jarak AS BUILT DRAWING


POTONGAN MEMANJANG SALURAN

LONG SECTION JALUR 2 NO. GAMBAR : SWP-PPPKS-SD-AR-00-011


SKALA 1 : 150 SKALA NO. LEMBAR TAHUN

1 : 150 3 of 8 2021
CATATAN

Rabat Beton 7 cm
Pasir Urug 5 cm
120 Pas. Batu Kali
20 U-ditch NO. TGL KETERANGAN TTD

10

26
Selasar

30

76
57
PEMBERI TUGAS

20
PEMERINTAHAN KABUPATEN SERANG
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
30 TATA BANGUNAN
40

E
S
W

EP
II
NG GA
54 PA
MRI H RA ME IN
G

100
KEGIATAN

PERENCANAAN, PEMBANGUNAN,
POTONGAN JALUR 2 HULU PENGAWASAN, DAN PEMANFAATAN
SKALA 1 : 25 BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS


Rabat Beton 7 cm
Pasir Urug 5 cm
120 Pas. Batu Kali
20 U-ditch
Beton
10

M. INDRA GUNAWAN H, ST
26

Selasar Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

30
14

87
68
23
5

MUJI RAHARJO
40 Project Manajer
54
ARSITEK : -
100

DRAFTER : -
POTONGAN JALUR 2 HILIR JUDUL GAMBAR
SKALA 1 : 25
AS BUILT DRAWING
POTONGAN SALURAN

NO. GAMBAR : SWP-PPPKS-SD-AR-00-011


SKALA NO. LEMBAR TAHUN

1 : 25 4 of 8 2021
CATATAN

Jalur 3
NO. TGL KETERANGAN TTD
- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL

R. ARSIP R. KABID R. KABID R. ARSIP


TOILET TOILET
WANITA PRIA
- 0.02 - 0.02

N JANITOR N
PANTRY

BIDANG PENGADAAN,
PEMBERHENTIAN &
BIDANG MUTASI, PEMBERI TUGAS
INFORMASI
PROMOSI & EVALUASI
KEPEGAWAIAN ASN
KINERJA ASN
PEMERINTAHAN KABUPATEN SERANG
HALL R. SERVER HALL
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
TATA BANGUNAN

KORIDOR

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

R. RAPAT R. RAPAT PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

R. ARSIP

19.00 M. INDRA GUNAWAN H, ST


Team Leader
18.00
DIBUAT/DIAJUKAN OLEH KONTAKTOR
17.00
U-ditch 40x40
16.00
Box Culvert 60x60 Mainhole 60x135
Datum ± 15.00
0+000 16.810 16.930 17.530 18.665

0+010 16.903 17.022 17.623 18.665

0+020 17.388 17.115 17.715 18.665

0+020.9 17.404 17.124 17.724 18.665

17.604 17.724 18.124 18.665


0+021.7 17.544 17.664 18.064 18.665

Elv. Finish Paving

Elv. Atas Saluran


MUJI RAHARJO
Elv. Bawah Saluran Project Manajer
ARSITEK : -
Elv. Pasir Urug DRAFTER : -
JUDUL GAMBAR

0+046
Sta/Jarak AS BUILT DRAWING
POTONGAN MEMANJANG SALURAN

LONG SECTION JALUR 3 NO. GAMBAR : SWP-PPPKS-SD-AR-00-011


SKALA 1 : 150 SKALA NO. LEMBAR TAHUN

1 : 150 5 of 8 2021
CATATAN

Rabat Beton 7 cm
Pasir Urug 5 cm
Pas. Batu Kali 120 NO. TGL KETERANGAN TTD
U-ditch 20

10
Kansteen

26
30
PEMBERI TUGAS
76

57

PEMERINTAHAN KABUPATEN SERANG


DINAS PERUMAHAN KAWASAN

5 20
PERMUKIMAN DAN
TATA BANGUNAN

30

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN
40
54 KEGIATAN

PERENCANAAN, PEMBANGUNAN,
POTONGAN JALUR 3 HULU PENGAWASAN, DAN PEMANFAATAN
SKALA 1 : 25 BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

Rabat Beton 7 cm
Pasir Urug 5 cm
Pas. Batu Kali 120

U-ditch 20

Beton M. INDRA GUNAWAN H, ST

10
Kansteen Team Leader
26

DIBUAT/DIAJUKAN OLEH KONTAKTOR


30

14
90

71

29
5

MUJI RAHARJO
30 Project Manajer
40
ARSITEK : -
54 DRAFTER : -
POTONGAN JALUR 3 HILIR JUDUL GAMBAR
SKALA 1 : 25
AS BUILT DRAWING
POTONGAN SALURAN

NO. GAMBAR : SWP-PPPKS-SD-AR-00-011


SKALA NO. LEMBAR TAHUN

1 : 25 6 of 8 2021
CATATAN

Jalur 4

NO. TGL KETERANGAN TTD


- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL

R. ARSIP R. KABID R. KABID R. ARSIP


TOILET TOILET
WANITA PRIA
- 0.02 - 0.02

N JANITOR N
PANTRY

BIDANG PENGADAAN,
PEMBERHENTIAN &
BIDANG MUTASI, PEMBERI TUGAS
INFORMASI
PROMOSI & EVALUASI
KEPEGAWAIAN ASN
KINERJA ASN
PEMERINTAHAN KABUPATEN SERANG
HALL R. SERVER HALL
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
TATA BANGUNAN

KORIDOR

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

R. RAPAT R. RAPAT PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

R. ARSIP

19.00

18.00 M. INDRA GUNAWAN H, ST


Team Leader
17.00
DIBUAT/DIAJUKAN OLEH KONTAKTOR
U-ditch 40x40
16.00
Box Culvert 60x60 Mainhole 60x150
Datum ± 15.00

0+039 17.664 17.794 18.194 18.665


18.665

0+010 16.790 16.940 17.540 18.665


0+010.5 16.810 16.960 17.560 18.665

18.665

0+014.9517.534 17.664 18.064 18.665

Elv. Finish Gedung


17.12

17.87

Elv. Atas Saluran

MUJI RAHARJO
0+000 16.360 16.52

17.47

Elv. Bawah Saluran Project Manajer


ARSITEK : -
0+011.2 17.34

Elv. Pasir Urug DRAFTER : -


JUDUL GAMBAR

Sta/Jarak AS BUILT DRAWING


POTONGAN MEMANJANG SALURAN

LONG SECTION JALUR 4 NO. GAMBAR : SWP-PPPKS-SD-AR-00-007


SKALA 1 : 150 SKALA NO. LEMBAR TAHUN

1 : 150 7 of 8 2021
CATATAN

Rabat Beton 7 cm
Pasir Urug 5 cm
Pas. Batu Kali 120 NO. TGL KETERANGAN TTD

U-ditch 20

10
Kansteen

26
PEMBERI TUGAS
30
76

57

PEMERINTAHAN KABUPATEN SERANG


DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN

5 20
TATA BANGUNAN

E
S
W

EP
II
GA
30 NG
PA
MRI H RA ME IN
G

40
54 KEGIATAN

PERENCANAAN, PEMBANGUNAN,
POTONGAN JALUR 4 HULU PENGAWASAN, DAN PEMANFAATAN
SKALA 1 : 25 BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

Rabat Beton 7 cm
Pasir Urug 5 cm
Pas. Batu Kali 120

U-ditch 20

Beton M. INDRA GUNAWAN H, ST

10
Team Leader
Kansteen
26

DIBUAT/DIAJUKAN OLEH KONTAKTOR


30

33
109

90

36

MUJI RAHARJO
Project Manajer
5

ARSITEK : -
DRAFTER : -
POTONGAN JALUR 4 HILIR 40 30 JUDUL GAMBAR
SKALA 1 : 25
54 AS BUILT DRAWING
POTONGAN SALURAN

NO. GAMBAR : SWP-PPPKS-SD-AR-00-011


SKALA NO. LEMBAR TAHUN

1 : 25 8 of 8 2021
N
E

CATATAN
W
S

NO. TGL KETERANGAN TTD


1

1
.55
3
.24

61
40

3
38
36

83
3.2 4

6
.19 PEMBERI TUGAS
63
33 22
21 13
93 2
93 79
1 7.4 PEMERINTAHAN KABUPATEN SERANG
.44 =1
17 Z
Z= DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
TATA BANGUNAN
10.000 24.000

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH

16.000
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)

41
7.7
1 GEDUNG OPD BLOK B1

35
7
.14

8
06

63
213 DIPERIKSA KOSULTAN PENGAWAS
93

4.000

3
.79
16
Z=
M. INDRA GUNAWAN H, ST
Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR

MUJI RAHARJO
Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

AS BUILT DRAWING
PLAN TITIK SONDIR

NO. GAMBAR : SWP-PPPKS-SD-AR-00-013


SITE TITIK SONDIR SKALA NO. LEMBAR TAHUN
SKALA 1 : 200
1 : 200 1 of 1 2021
CATATAN

KETERANGAN : NO. TGL KETERANGAN TTD


0
STA 0+030 STA 0+020 STA 0+010 STA 0+000
LUAS AREA AGREGAT B = 2376.9784 m2.
STA 0+04
0
STA 0+05
0
STA 0+06
0
STA 0+07
STA 0+080

- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL R. PANEL


- 0.02 - 0.02 - 0.02 - 0.02
± 0.00 ± 0.00

TOILET TOILET TOILET TOILET


WANITA PRIA PRIA WANITA
- 0.02 - 0.02 - 0.02 - 0.02

N
GEDUNG OPD 1 N N
GEDUNG OPD 4 N
JANITOR JANITOR
PANTRY PANTRY
± 0.00 R. STAFF R. STAFF R. STAFF R. STAFF ± 0.00

STA 0+090 ± 0.00 ± 0.00 ± 0.00 ± 0.00

PEMBERI TUGAS
HALL R. SERVER HALL HALL R. SERVER HALL
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

KORIDOR KORIDOR
PEMERINTAHAN KABUPATEN SERANG
± 0.00 ± 0.00

DINAS PERUMAHAN KAWASAN


STA 0+100
AREA PARKIR RODA EMPAT AREA PARKIR RODA EMPAT PERMUKIMAN DAN
R. RAPAT R. RAPAT R. RAPAT R. RAPAT
± 0.00 ± 0.00 ± 0.00 ± 0.00
TATA BANGUNAN

E
S
W

EP
II
STA 0+010 A STA 0+000 A NG GA
STA 0+110 STA 0+020 A PA
MRI H RA ME IN
G
R. RAPAT R. RAPAT R. RAPAT R. RAPAT
± 0.00 ± 0.00 ± 0.00 ± 0.00

STA 0+027.93 A

AREA PARKIR RODA EMPAT


R. RAPAT R. RAPAT
AREA PARKIR RODA EMPAT
KEGIATAN
STA 0+120 PERENCANAAN, PEMBANGUNAN,
- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL
± 0.00
R. PANEL
± 0.00
- 0.02 - 0.02 - 0.02 - 0.02 PENGAWASAN, DAN PEMANFAATAN
TOILET TOILET TOILET TOILET

BANGUNAN GEDUNG DAERAH


WANITA PRIA PRIA WANITA
- 0.02 - 0.02 - 0.02 - 0.02

N
GEDUNG OPD 2 N N
GEDUNG OPD 5 N
JANITOR JANITOR
PANTRY
± 0.00 R. STAFF
± 0.00
R. STAFF
± 0.00
R. STAFF
± 0.00
R. STAFF
± 0.00
R. STAFF
± 0.00
R. STAFF
± 0.00
PANTRY
± 0.00
KABUPATEN/KOTA
STA 0+130 HALL R. SERVER HALL HALL R. SERVER HALL
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

PEKERJAAN
KORIDOR KORIDOR
± 0.00 ± 0.00

PEMBANGUNAN PUSAT PEMERINTAHAN


STA 0+140 AREA PARKIR RODA EMPAT
R. RAPAT R. RAPAT
AREA PARKIR RODA EMPAT
KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

L. 1666 M2
DIPERIKSA KOSULTAN PENGAWAS
R.±RAPAT
0.00 R.±RAPAT
0.00 R. ±RAPAT
0.00 R.±RAPAT
0.00

STA 0+150

R.±RAPAT
0.00 R.±RAPAT
0.00 R.±RAPAT
0.00 R.±RAPAT
0.00
AREA PARKIR RODA EMPAT AREA PARKIR RODA EMPAT

STA 0+160 KORIDOR


± 0.00 KORIDOR
± 0.00

±HALL
0.00 R.±SERVER
0.00 ±HALL
0.00 ±HALL
0.00 R. ±
SERVER
0.00 ±HALL
0.00

GEDUNG OPD 3 GEDUNG OPD 6


STA 0+167
R.±STAFF
0.00 R.±STAFF
0.00 R.±STAFF
0.00 R.±STAFF
0.00
PANTRY
± 0.00 PANTRY
± 0.00
N JANITOR N N JANITOR N

- 0.02
WANITA - PRIA
0.02 -PRIA
0.02 - 0.02
WANITA
TOILET TOILET TOILET TOILET

- 0.02 - 0.02 - 0.02 - 0.02


R.±PANEL
0.00 R.±PANEL
0.00
- 0.02 - 0.02 - 0.02 - 0.02 M. INDRA GUNAWAN H, ST
Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR


GROUND TANK

GROUND TANK
- 2.20

- 2.20
MUJI RAHARJO
Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR
SITE RENCANA AGREGAT B AS BUILT DRAWING
SKALA 1 : 1000 SITE RENCANA AGREGAT B

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 1000 1 of 14 2021
CATATAN

NO. TGL KETERANGAN TTD

PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
TATA BANGUNAN

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
STA 0+010 STA 0+000
STA 0+030 STA 0+020 BANGUNAN GEDUNG DAERAH
40 KABUPATEN/KOTA
STA 0+0
50
STA 0+0 PEKERJAAN
60
STA 0+0 PEMBANGUNAN PUSAT PEMERINTAHAN
70
STA 0+0
KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

STA 0+080 DIPERIKSA KOSULTAN PENGAWAS

- 0.02 - 0.02 - 0.02 - 0.02 R. PANEL R. PANEL - 0.02 - 0.02


± 0.00 ± 0.00

TOILET TOILET TOILET


WANITA PRIA PRIA
- 0.02 - 0.02 - 0.02

N
GEDUNG OPD 1 N N
JANITOR JANITOR
PANTRY
± 0.00 R. STAFF R. STAFF
STA 0+090 ± 0.00 ± 0.00
M. INDRA GUNAWAN H, ST
Team Leader
HALL R. SERVER HALL HALL R. SERVER
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 DIBUAT/DIAJUKAN OLEH KONTAKTOR

SITE RENCANA AGREGAT B MUJI RAHARJO


SKALA 1 : 250 Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR

AS BUILT DRAWING
SITE RENCANA AGREGAT B

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 250 2 of 14 2021
± 0.00 R. STAFF R. STAFF
STA 0+090 ± 0.00 ± 0.00 CATATAN

HALL R. SERVER HALL


± 0.00 ± 0.00 ± 0.00

KORIDOR
± 0.00

STA 0+100
AREA PARKIR RODA EMPAT
R. RAPAT R. RAPAT
± 0.00 ± 0.00
NO. TGL KETERANGAN TTD

STA 0+000 A
STA 0+110 STA 0+020 A STA 0+010 A
R. RAPAT R. RAPAT
± 0.00 ± 0.00

STA 0+027.93 A PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


DINAS PERUMAHAN KAWASAN
AREA PARKIR RODA EMPAT
R. RAPAT PERMUKIMAN DAN
TATA BANGUNAN

E
S
W

EP
II
NG GA

STA 0+120 PA G
MRI H RA ME IN

R. PANEL
KEGIATAN
- 0.02 - 0.02 - 0.02 - 0.02
± 0.00

TOILET
WANITA
TOILET
PRIA
PERENCANAAN, PEMBANGUNAN,
- 0.02 - 0.02 PENGAWASAN, DAN PEMANFAATAN
GEDUNG OPD 2 BANGUNAN GEDUNG DAERAH
N N
PANTRY
JANITOR
KABUPATEN/KOTA
± 0.00 R. STAFF R. STAFF R. STAFF
± 0.00 ± 0.00 ± 0.00

PEKERJAAN
STA 0+130 HALL HALL
± 0.00
R. SERVER
± 0.00 ± 0.00 PEMBANGUNAN PUSAT PEMERINTAHAN
KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1
KORIDOR
± 0.00 DIPERIKSA KOSULTAN PENGAWAS

STA 0+140 AREA PARKIR RODA EMPAT


R. RAPAT

M. INDRA GUNAWAN H, ST
Team Leader
L. 1666 M2 R.±RAPAT
0.00 R.±RAPAT
0.00

DIBUAT/DIAJUKAN OLEH KONTAKTOR

STA 0+150

R.±RAPAT
0.00 R.±RAPAT
0.00
AREA PARKIR RODA EMPAT

MUJI RAHARJO
Project Manajer
STA 0+160 ARSITEK : -
KORIDOR
± 0.00
DRAFTER : -
JUDUL GAMBAR
SITE RENCANA AGREGAT B ±HALL
0.00 R.±SERVER
0.00 ±HALL
0.00 AS BUILT DRAWING
SKALA 1 : 250 SITE RENCANA AGREGAT B
GEDUNG OPD 3
STA 0+167 NO. GAMBAR : SWP-PPPKS-AS-ST-04-014
R.±STAFF
0.00 R.±STAFF
0.00
± 0.00
PANTRY
JANITOR
SKALA NO. LEMBAR TAHUN
N N

1 : 250 3 of 14 2021
- 0.02
WANITA - PRIA
0.02
TOILET TOILET
CATATAN

+ 17.635
TOP RENCANA URUGAN
NO. TGL KETERANGAN TTD
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :2.914 m2 PEMBERI TUGAS
DATUM + 15.00
PEMERINTAHAN KABUPATEN SERANG

17.631 17.837

17.799

17.774 17.821
17.654 17.74

ELEVASI DINAS PERUMAHAN KAWASAN


AGREGAT B PERMUKIMAN DAN
TATA BANGUNAN

17.65
ELEVASI

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN
JOINT SURVEY URUGAN
0+004.56 KEGIATAN

0+009.91

0+0017.6
0+000

STA/JARAK PERENCANAAN, PEMBANGUNAN,


PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

STA 0+000 PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
M. INDRA GUNAWAN H, ST
JOINT SURVEY AGREGAT B
Team Leader
16.00
DIBUAT/DIAJUKAN OLEH KONTAKTOR
Agregat B :1.935 m2
DATUM + 15.00
17.722

17.700 17.834

17.740 17.918
17.720 17.806

ELEVASI
AGREGAT B
17.67

ELEVASI
JOINT SURVEY URUGAN
MUJI RAHARJO
0+007.18

0+0017.6
0+0012.4

Project Manajer
0+000

STA/JARAK ARSITEK : -
DRAFTER : -
JUDUL GAMBAR
CROSS SECTION AGREGAT B
STA 0+010 SKALA 1 : 100
AS BUILT DRAWING
CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 4 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B NO. TGL KETERANGAN TTD

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :2.426 m2
DATUM + 15.00
PEMBERI TUGAS

17.687 17.905
17.676 17.836

17.880 17.904
17.663 17.79

ELEVASI
PEMERINTAHAN KABUPATEN SERANG
AGREGAT B
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
ELEVASI TATA BANGUNAN
JOINT SURVEY URUGAN

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

0+008.78
0+004.78

0+0017.8
0+000

STA/JARAK KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
STA 0+020 KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00 M. INDRA GUNAWAN H, ST
Team Leader
Agregat B :3.008 m2
DATUM + 15.00 DIBUAT/DIAJUKAN OLEH KONTAKTOR
17.658 17.804
17.552 17.759

17.626 17.843

17.650 17.772
ELEVASI
AGREGAT B

ELEVASI
JOINT SURVEY URUGAN
0+0011.7
0+006.86

0+0017

MUJI RAHARJO
0+000

STA/JARAK Project Manajer


ARSITEK : -
DRAFTER : -

STA 0+030 CROSS SECTION AGREGAT B


JUDUL GAMBAR

AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 5 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885 NO. TGL KETERANGAN TTD
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :7.956 m2
DATUM + 15.00
17.737 17.535

17.554 17.616

17.475 17.606

17.484 17.679
ELEVASI
AGREGAT B PEMBERI TUGAS

ELEVASI PEMERINTAHAN KABUPATEN SERANG


JOINT SURVEY URUGAN DINAS PERUMAHAN KAWASAN
0+006.35
PERMUKIMAN DAN

0+020.81

0+032.41
TATA BANGUNAN
0+000

STA/JARAK

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

STA 0+040
KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS


+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :8.385 m2
DATUM + 15.00
M. INDRA GUNAWAN H, ST
17.541 17.713

17.554 17.719

17.527 17.746

17.627 17.816

17.175 17.762

17.525 17.871
ELEVASI
AGREGAT B Team Leader

ELEVASI
DIBUAT/DIAJUKAN OLEH KONTAKTOR
TOP URUGAN
0+016.47

0+020.84

0+025.91

0+029.99
0+005.5
0+000

STA/JARAK

STA 0+050
MUJI RAHARJO
Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR
CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 6 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
NO. TGL KETERANGAN TTD
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :1.336 m2 PEMBERI TUGAS
DATUM + 15.00
17.680 17.894

17.677 17.772

17.674 17.787
PEMERINTAHAN KABUPATEN SERANG
ELEVASI
DINAS PERUMAHAN KAWASAN
AGREGAT B PERMUKIMAN DAN
TATA BANGUNAN
ELEVASI

E
S
W

EP
II
GA
JOINT SURVEY URUGAN NG
PA
MRI H RA ME IN
G

0+005.52
KEGIATAN

0+010.1
0+000

STA/JARAK
PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
STA 0+060 PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B M. INDRA GUNAWAN H, ST
16.00 Team Leader
Agregat B :0.904 m2 DIBUAT/DIAJUKAN OLEH KONTAKTOR
DATUM + 15.00
17.632 17.711

17.619 17.732

17.606 17.783

ELEVASI
AGREGAT B

ELEVASI
JOINT SURVEY URUGAN
0+003.68

0+007.49

MUJI RAHARJO
0+000

STA/JARAK Project Manajer


ARSITEK : -
DRAFTER : -
JUDUL GAMBAR
STA 0+070 CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 7 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B NO. TGL KETERANGAN TTD
JOINT SURVEY URUGAN
17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :0.642 m2
DATUM + 15.00
PEMBERI TUGAS
17.721 17.884

17.694 17.778

17.672 17.856
ELEVASI
AGREGAT B PEMERINTAHAN KABUPATEN SERANG
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
ELEVASI TATA BANGUNAN
JOINT SURVEY URUGAN

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN
0+002.78

0+004.99
0+000

STA/JARAK KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
STA 0+080 BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS


+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
M. INDRA GUNAWAN H, ST
Agregat B :0.827 m2 Team Leader
DATUM + 15.00
DIBUAT/DIAJUKAN OLEH KONTAKTOR
17.611 17.743

17.607 17.715

17.602 17.775

ELEVASI
AGREGAT B

ELEVASI
JOINT SURVEY URUGAN
0+006.28
0+000

0+003

STA/JARAK MUJI RAHARJO


Project Manajer
ARSITEK : -

STA 0+090 DRAFTER : -


JUDUL GAMBAR
CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 8 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00 NO. TGL KETERANGAN TTD
JOINT SURVEY AGREGAT B
16.00
Agregat B :0.323 m2
DATUM + 15.00

17.635 17.691

17.700 30.496
17.641 17.64
ELEVASI
AGREGAT B
PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG


ELEVASI
TOP URUGAN DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
TATA BANGUNAN
0+003.48

0+006.98
0+000

STA/JARAK

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

KEGIATAN
STA 0+100 PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1
+ 17.635
TOP RENCANA URUGAN
DIPERIKSA KOSULTAN PENGAWAS
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :1.200 m2
DATUM + 15.00
M. INDRA GUNAWAN H, ST
17.531 17.646

17.653 17.664

17.594 17.767

ELEVASI Team Leader


AGREGAT B
DIBUAT/DIAJUKAN OLEH KONTAKTOR

ELEVASI
TOP URUGAN
0+009.91
0+000

0+005

STA/JARAK

MUJI RAHARJO

STA 0+110 ARSITEK : -


Project Manajer

DRAFTER : -
JUDUL GAMBAR
CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 9 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B NO. TGL KETERANGAN TTD
JOINT SURVEY URUGAN
17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :0.729 m2
DATUM + 15.00
PEMBERI TUGAS
17.658 17.783

17.688 17.803

17.721 17.808
ELEVASI
AGREGAT B PEMERINTAHAN KABUPATEN SERANG
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
ELEVASI TATA BANGUNAN
JOINT SURVEY URUGAN

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN
0+003.1

0+006.5
0+000

STA/JARAK KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN

STA 0+120 BANGUNAN GEDUNG DAERAH


KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS


+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
M. INDRA GUNAWAN H, ST
Agregat B :1.249 m2 Team Leader
DATUM + 15.00
DIBUAT/DIAJUKAN OLEH KONTAKTOR
17.627 17.885

17.667 17.822

17.718 17.873

ELEVASI
AGREGAT B

ELEVASI
JOINT SURVEY URUGAN
0+006.8
0+000

0+003

STA/JARAK MUJI RAHARJO


Project Manajer
ARSITEK : -

STA 0+130 DRAFTER : -


JUDUL GAMBAR
CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 10 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN NO. TGL KETERANGAN TTD


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :0.606 m2
DATUM + 15.00
17.718 17.838

17.744 17.826

17.764 17.838
ELEVASI
AGREGAT B PEMBERI TUGAS

PEMERINTAHAN KABUPATEN SERANG

ELEVASI DINAS PERUMAHAN KAWASAN


JOINT SURVEY URUGAN PERMUKIMAN DAN
TATA BANGUNAN

0+003.69

0+006.64

E
S
W

EP
II
0+000

NG GA
G
STA/JARAK PA
MRI H RA ME IN

KEGIATAN

PERENCANAAN, PEMBANGUNAN,
STA 0+140 PENGAWASAN, DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1
+ 17.635 DIPERIKSA KOSULTAN PENGAWAS
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :1.477 m2
DATUM + 15.00 M. INDRA GUNAWAN H, ST
Team Leader
17.564 17.813

17.606 17.828

17.659 17.876

ELEVASI
DIBUAT/DIAJUKAN OLEH KONTAKTOR
AGREGAT B

ELEVASI
JOINT SURVEY URUGAN
0+002.92

0+006.53
0+000

STA/JARAK
MUJI RAHARJO
Project Manajer

STA 0+150 ARSITEK


DRAFTER
: -
: -
JUDUL GAMBAR
CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 11 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B
NO. TGL KETERANGAN TTD
JOINT SURVEY URUGAN
17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :1.046 m2
DATUM + 15.00
17.716 17.885

17.720 17.885

17.723 17.867
PEMBERI TUGAS
ELEVASI
AGREGAT B PEMERINTAHAN KABUPATEN SERANG
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
ELEVASI TATA BANGUNAN
JOINT SURVEY URUGAN

E
S
W

EP
II
NG GA
0+003.61

0+006.45
PA G
MRI H RA ME IN
0+000

STA/JARAK
KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
STA 0+160 BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1

DIPERIKSA KOSULTAN PENGAWAS


+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
M. INDRA GUNAWAN H, ST
Agregat B :1.263 m2 Team Leader
DATUM + 15.00
DIBUAT/DIAJUKAN OLEH KONTAKTOR
17.673 17.885

17.677 17.883

17.685 17.885

ELEVASI
AGREGAT B

ELEVASI
JOINT SURVEY URUGAN
0+002.32

0+006.12
0+000

STA/JARAK
MUJI RAHARJO
Project Manajer
ARSITEK : -
STA 0+167.56 DRAFTER : -
JUDUL GAMBAR
CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 12 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885 NO. TGL KETERANGAN TTD
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :3.341 m2
DATUM + 15.00
PEMBERI TUGAS
17.611 17.759

17.641 17.885

17.668 17.873
17.622 17.74

17.660 17.81
ELEVASI
PEMERINTAHAN KABUPATEN SERANG
AGREGAT B
DINAS PERUMAHAN KAWASAN
PERMUKIMAN DAN
ELEVASI TATA BANGUNAN
JOINT SURVEY URUGAN

E
S
W

EP
II
NG GA
PA G
MRI H RA ME IN

0+012.34

0+017.34

0+019.34
0+000

0+005
STA/JARAK
KEGIATAN

PERENCANAAN, PEMBANGUNAN,
PENGAWASAN, DAN PEMANFAATAN
STA 0+000 A BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1
+ 17.635
TOP RENCANA URUGAN DIPERIKSA KOSULTAN PENGAWAS
+ 17.885
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :3.647 m2
DATUM + 15.00
M. INDRA GUNAWAN H, ST
17.638 17.866

17.640 17.816

17.708 17.872

17.786 17.918
ELEVASI Team Leader
AGREGAT B
DIBUAT/DIAJUKAN OLEH KONTAKTOR

ELEVASI
JOINT SURVEY URUGAN
0+007.79

0+017.79

0+020.61
0+000

STA/JARAK

MUJI RAHARJO
STA 0+010 A Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR
CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 13 of 14 2021
CATATAN

+ 17.635
TOP RENCANA URUGAN
+ 17.885
18.00 TOP RENCANA AGREGAT BNO. TGL KETERANGAN TTD
JOINT SURVEY URUGAN
17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :3.214 m2
DATUM + 15.00
17.648 17.803

17.660 17.806

17.668 17.801

17.689 17.848
PEMBERI TUGAS
ELEVASI
AGREGAT B PEMERINTAHAN KABUPATEN SERANG
DINAS PERUMAHAN KAWASAN
ELEVASI PERMUKIMAN DAN
JOINT SURVEY URUGAN TATA BANGUNAN

E
S
W

EP
II
NG GA

0+007.5

0+012.7

0+021.7
PA G
MRI H RA ME IN
0+000

STA/JARAK
KEGIATAN

PERENCANAAN, PEMBANGUNAN,

STA 0+020 A PENGAWASAN, DAN PEMANFAATAN


BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA

PEKERJAAN

PEMBANGUNAN PUSAT PEMERINTAHAN


KABUPATEN SERANG (PUSPEMKAB)
1 GEDUNG OPD BLOK B1
+ 17.635
TOP RENCANA URUGAN
+ 17.885 DIPERIKSA KOSULTAN PENGAWAS
18.00 TOP RENCANA AGREGAT B

JOINT SURVEY URUGAN


17.00
JOINT SURVEY AGREGAT B
16.00
Agregat B :4.286 m2
DATUM + 15.00
17.598 17.889

17.615 17.866

17.617 17.767

17.605 17.786

17.595 17.808
M. INDRA GUNAWAN H, ST
ELEVASI
AGREGAT B Team Leader

DIBUAT/DIAJUKAN OLEH KONTAKTOR


ELEVASI
JOINT SURVEY URUGAN
0+006.98

0+011.93

0+016.34

0+019.79
0+000

STA/JARAK

STA 0+027.93 A MUJI RAHARJO


Project Manajer
ARSITEK : -
DRAFTER : -
JUDUL GAMBAR
CROSS SECTION AGREGAT B AS BUILT DRAWING
SKALA 1 : 100 CROSS SECTION

NO. GAMBAR : SWP-PPPKS-AS-ST-04-014


SKALA NO. LEMBAR TAHUN

1 : 100 14 of 14 2021

You might also like