ins" Sexeessene | sess
AGE-SARWAR-HASAS (JV)
ASH-JV-GKHPP-2022/004
November 21, 2022
Executive Officer,
EDO, Peshawar
Project ABRAL KALAM HYDROPOWER PROJECT 88 MW PACKAGI
CIVIL WORKS
Subject: DISQUALIFICATION OF AGE-SARWAR-HASAS JV FOR PACKAG!
Ref: Request for Bids Works (after Pre-qualification dated November 1, 2022)
Our Letter ASH-JV-GKHPP-2022-03 dated October 11, 20:
PEDO Letter No, 3225-27/PEDO/PMO-KHRE/CE/GK-PQ1 dated October 10.
2022
4- Our Letter ASH-IV-GKHPP-2022-002 dated October 3, 2022
S- PEDO Letter No. 3199-201/PEDO/PMO-KHRE/CE/GK-PQI dated October 3,
2022
6- Our Letter ASH-JV-GKHPP-PKG-01-2021/001 dated December 30.
- PEDO Letter No. 3443-48/PMO-KHRE/Dir, P&C/PQD dated De
2021
S8- Application Submission Letter dated May 5, 2021
9- Invitation for Pre-Qualification dated November |, 2022
Respected Sir,
Our JV AGE-SARWAR-HASAS participated for Pre-qualification for Gabral Kalam
Hydropower (ssMW) Package-I (Reference No. PK-PEDO-211744-CW-REB). The Package-I
was comprised of Civil Works of Water Conveyance Structure (Weir, Diversion Structure,
Tunnel ete.) Access Roads and Bridges. Accordingly, Pre-qualification documents were
prepared in accordance with the Pre-qualification criteria for Joint Venture companies on May
5, 2021 i.e. on the last date of Submission of Application,
EVENT WISE CHRONOLOGICAL DEMONSTRATION
1- After submission of Application on May 5, 2021 referred at No. 8, the clarification was
sought by PEDO on December 27, 2021 pursuant to Sub-Clause 21.1 vide letter No. 7
referred above regarding General Construction Experience from 2009 until 2022 only
2- The requisite information with evidences was submitted through above referred letter
No. 6. In accordance with the quarry / clarification by PEDO the ‘ing documents for
the year 2009 to 2012 were provided. Wherein, our JV partner M/S HASAS proved that
‘their General Experience meets the Criteria of Twelve (12) years starting from January
1,209,
101 SE NO. 302, STREET NO. 01, RAWAL TOWN, ISLAMABAD
+92 51 2840507 - +92 S1 2841231AGE INSAAT VE ihRWAELE COMPANY. @® HASAS CONSTRUCTION
AGE-SARWAR-HASAS (JV)
3- No further cla
ation was sought aller the reply by our Joint Venture. However, we
-SARWAR-HASAS
jon pursuant to Sub-Clause 28.1 of ITA of PQD was
received letter No. 5 through which it was informed our JV AG!
have been disqualified and notif
issued.
4 The JV cordance with Sub-Clause 28.2 of ITA requested to provide the grounds for
disqualification vide Letter No. 4 above.
5- In response to our req
st to provide the grounds for disqualification, PEDO simply
No. 3 that one of JV Member (M/S HASAS) did not meet the
ments of “General Experience” specified _in Section — IIl_of PQ
informed vide Lett
mandatory nequil
Documents.
6 Although the mis:
ng documents of our JV Member M/S HASAS were provided for the
cars of 2009 to 2012 for General Experience even then vide our Letter No. 2 it
‘sted to waive minor deviation if any by following the Sub-Clause 25.1 of ITA
he Employer reserve the right to waive minor deviations from the qualification
if they do not materially affect the Technical Capability and Financial Resources
ofan Applicant to Perform the Contraet” (copy of Sub-Clause 25.1 attached),
7- Instead of entertaining our request or providing reply, the PEDO Floated the request for
Bids works on November 1, 2022 for the Pre-Qualitied Applicants referred at No. 01
above.
missing
was requ
REQUEST TO RESOLVE AND WAIVE MINOR DEVIATION (IF _SO) AS PER
It is carnestly requested to waive minor deviation in General Criteria (if officials of Pre-
Qualification Team consider deviation in General Experience) which do not affect the Technical
Capability of our JV, to Perform the Contract. It is not out of place to mention that Criteria set in
the PQ Documents was very hard especially specific construction and Contract Management
Experience including also Financial Criteria on which no quarry was raised by PEDO. We also
like to bring in your notice that no evaluation report with complete reasons has been provided to
the JV. We therefore, consider it appropriate for more reasonable competitive bidding that our
JV should be included in the process of Bidding by resolving the minor issues and till that time
the Bid process should be postponed.
Best Regards,
AGE-SARWAR-HASAS JV