You are on page 1of 3

5.

2 Discharge Capacity of the Channels

Based from the existing Drainage Plan of Barangay Carmen, Cagayan De Oro City from
the Office of the City Engineers, we have obtained the specific details and specifications to
evaluate the drainage discharge capacity. From the plan, the height of the canal was obtained in
every station because it varies from station to station.

Using the Manning’s Equation:

where:

k is a unit conversion factor: k=1.49 for English units (feet and seconds).  k=1.0 for SI units
(meters and seconds).
A=Flow area of the pipe, culvert, or channel.
P=Wetted perimeter which is the portion of the circumference that is in contact with water.
Q=Discharge (flow rate).
S=Downward (longitudinal) slope of the culvert.
V=Average velocity in the pipe, culvert, or channel.

Table 5.4 Existing Rectangular Channels

Rectangular Channels
Drainage Height Width A P R S V Qt
Channel (m) (m) m2 (m) (m) (m/sec) 3
m /sec
RC-1 1.8 2.3 4.140 5.900 0.702 2.48 8.290 34.322
RC-2 3.8 1.35 5.130 8.950 0.573 1.5 5.634 28.902
RC-3 1.7 1.6 2.720 5.000 0.544 2.25 6.664 18.126
RC-4 1.7 1.55 2.635 4.950 0.532 1.25 4.896 12.900
RC-5 1.8 2 3.600 5.600 0.643 2.1 7.196 25.906
RC-6 1.8 1.3 2.340 4.900 0.478 1.25 4.554 10.656
RC-7 1.6 1.24 1.984 4.440 0.447 1.24 4.339 8.609
RC-8 1.7 1.24 2.108 4.640 0.454 1.7 5.137 10.829
RC-9 0.65 0.55 0.358 1.850 0.193 2 3.151 1.127
RC-10 0.6 1.3 0.780 2.500 0.312 2 4.337 3.383
RC-11 1.1 1.4 1.540 3.600 0.428 2 5.353 8.243
RC-12 1.6 1.4 2.240 4.600 0.487 2 5.836 13.072

Table 5.5 Existing Trapezoidal Channels

Trapezoidal Channels
Drainag Height Width-T Width- A P R S V Qt
e (m) (m) B (m) ¿ (m) (m) (m/sec) m3 /sec
Channel
TC-1 0.55 0.4 0.55 0.261 1.51 0.173 2 2.927 0.765
0
TC-2 1.05 1.05 1 1.076 3.15 0.342 2 4.607 4.959
1
TC-3 1 1.05 1 1.025 3.05 0.336 2 4.557 4.671
1

Table 5.6 Existing Circular Channels

Circular Channels
Drainage Ø A P R S V Qt
Channel (m) (¿) (m) (m) (m/sec) 3
m /sec
CC-1 0.9 0.636 2.826 0.225 2 3.488 2.218
CC-2 1.2 1.130 3.768 0.300 2 4.225 4.776

Table 5.7 Existing Riprap Channels

Riprap Channels
Drainage H B1 B2 A P R S V Q
Channel (m) (m) (m) ¿) (m) (m) (m/sec) m
3
( )
sec
RRC-1 0.7 0.8 0.6 0.490 2.214 0.221 2 4.768 5.149
RRC-2 0.8 1.4 1.3 1.080 3.003 0.360 2 4.768 5.149

You might also like