TOTAL PRICE
NO. DISCRIPTION UNIT
(IDR)
PEKERJAAN MEKANIKAL
1. FRUIT RECEIPTING STATION 1 Lot 5,245,000,000.00
2. STERILIZER STATION 1 Lot 15,031,623,300.00
3. THRESHING STATION 1 Lot 4,750,809,947.00
4. PRESS STATION 1 Lot 7,326,847,339.15
5. CLARIFICATION STATION 1 Lot 8,506,000,000.00
6. OIL STORAGE STATION 1 Lot 5,916,000,000.00
7. DEPERICARPER STATION 1 Lot 1,766,000,000.00
8. KERNEL STATION 1 Lot 8,045,749,873.00
9. BOILER STATION 1 Lot 16,678,369,591.43
10. POWER HOUSE 1 Lot 6,245,000,000.00
11. RAW WATER TEATMENT PLANT 1 Lot 2,605,104,024.38
12. BOILER FEED WATER TREATMENT PLANT 1 Lot 2,338,000,000.00
13. EFFLUENT TREATMENT PLANT 1 Lot 321,000,000.00
14. PIPINGS AND INSULATION WORK 1 Lot 3,170,000,000.00
15. FIRE FIGHTING EQUIPMENT 1 Lot 345,000,000.00
16. ELECTRICAL WORKS 1 Lot 5,630,000,000.00
17. OTHER 1 Lot 5,840,000,000.00
TOTAL MECHANICAL & ELECTRICAL WORK Rp 99,760,504,074.96
CIVIL WORKS 1 Lot Rp 53,724,535,000.00
PRICE (IDR.)
Local Portion Total Local Portion
NO. DESCRIPTION UNIT
Excl. Tax Excl. Tax
(IDR.) (IDR.)
1 2 3 4 5 3x5 :
2. STERILIZER STATION
2.01. Horizontal Sterilizer Dia. 2.7m x 26 m c/w Safety Valve, Inlet/Exhaust/Condensate Valve 3 Unit 3,450,000,000.00 10,350,000,000.00
a. Conveyor Inside System C/W Inlet Door Dia. 1.2 m 3 Lot 468,000,000.00 1,404,000,000.00
2.02. Sterilized Fruit Discharge Hopper 3 Unit 20,541,100.00 61,623,300.00
2.03. Hydraulic Fruit Feeding Hopper c/w Sliding Hopper 3 Set 150,000,000.00 450,000,000.00
2.04. Blowdown and Blow Off for sterilizer 1 Unit 335,000,000.00 335,000,000.00
2.05. Sterilizer Control Valve c/w Compressor 3 set 220,000,000.00 660,000,000.00
2.06. Condensate Pit c/w Pompa 4 unit 1 Set 152,000,000.00 152,000,000.00
2.07. Sterilizer Structure and Catwalk (For 4 units) 1 Unit 498,000,000.00 498,000,000.00
2.08. Auto Feeder Scarper # 3 m x 8 m 1 Unit 495,000,000.00 495,000,000.00
a. Gearmotor 11 kW 1 Unit 86,000,000.00 86,000,000.00
2.09. Sterilized Fruit Bunch Conveyor #1.2m 1 Unit 410,000,000.00 410,000,000.00
a. Gearmotor 18.5 kW 1 Unit 130,000,000.00 130,000,000.00
Sub Jumlah 15,031,623,300.00
3. THRESHING STATION
3.01. Inclined Fruit Bunch Scraper Conveyor #1.2m 1 Unit 490,000,000.00 490,000,000.00
a. Gearbox + Electromotor 22 kW 1 Lot 180,000,000.00 180,000,000.00
3.02. Chute Sterilized Fruit Bunch Conveyor 2 unit 28,554,973.50 57,109,947.00
3.03. Thresher Cap. 30 T and Re Thresher Cap. 30 T 2 Unit 390,000,000.00 780,000,000.00
a. Gearbox + Electromotor 11 kW 2 Lot 145,000,000.00 290,000,000.00
3.04. Conveyor Under Thresher C/W Gearmotor 5.5 kW 50 rpm 2 Unit 166,000,000.00 332,000,000.00
3.05. Fruit Bottom Cross conveyor C/W Gearmotor 7.5 kW 50 rpm 1 unit 233,000,000.00 233,000,000.00
3.06. MPD (Mass Passed Digester) # 1 m C/W Gearmotor 18.5 kW 12 rpm 1 unit 870,000,000.00 870,000,000.00
3.07. Fruit Distribution / Top Cross Conveyor 1 unit 238,000,000.00 238,000,000.00
3.08. Fruit Recycling Chute 1 unit 48,700,000.00 48,700,000.00
3.09. Horizontal Empty Bunch Conveyor C/W Gearmotor 11 kW 24 rpm 1 Unit 272,000,000.00 272,000,000.00
3.10. Inclined Empty Bunch Conveyor to Excess Area C/W Gearmotor 15 kW 24 rpm 1 Unit 680,000,000.00 680,000,000.00
3.11. Recycle Fruit Conveyor to ReThresher C/W Gearmotor 11 kW 24 rpm 1 unit 280,000,000.00 280,000,000.00
Sub Jumlah 4,750,809,947.00
4. PRESS STATION
4.01. Digester Unjacketed, Cap. 4.000 ltr (GS/VG/Wang Yuen) 4 unit 520,000,000.00 2,080,000,000.00
4.02. Screw Press Cap. 15 - 17 ton TBS/jam (GS/VG/Wang Yuen) 4 unit 760,000,000.00 3,040,000,000.00
4.03. Crude Oil Gutter 1 unit 137,847,339.15 137,847,339.15
4.04. Sand Trap Tank Cap. 7 m3 2 unit 109,000,000.00 218,000,000.00
4.05. Rotary Vibrating Screen Cap. 30 ton Crude oil/jam Double Type (Vibromax/Tapis) 2 unit 156,000,000.00 312,000,000.00
4.06. Crude Oil Pump Cap. 40 m3/Hr Head 35 m (MTP/KSB) 4 unit 65,000,000.00 260,000,000.00
4.07. Crude Oil Tank Cap.20 m3 Model Rectangular 3 section 1 unit 220,000,000.00 220,000,000.00
4.08. Hot Water Tank Cap. 7 m3 1 Unit 86,000,000.00 86,000,000.00
4.09. Press Structure Platform (for 4 units press and digester) 1 unit 898,000,000.00 898,000,000.00
4.10. Vibrating Screen Support Structure (for 2 units Vibrating) 1 unit 75,000,000.00 75,000,000.00
Sub Jumlah 7,326,847,339.15
5. CLARIFICATION STATION
5.01. Continuous Settling Tank Cap. 160 m3 (SUS304 Bottom) 1 unit 1,340,000,000.00 1,340,000,000.00
a. Gearmotor 4kW 300 rpm + Gearbox 3 rpm Final Output 1 Lot 86,000,000.00 86,000,000.00
5.02. M.S Pure Oil Tank Cap. 35 m3 1 unit 239,000,000.00 239,000,000.00
5.03. SS 304 Sludge Tank Cap. 35 m3 (SUS304) 1 unit 695,000,000.00 695,000,000.00
5.04. SS 304 Sludge Feed Tank Cap. 4 m3 (SUS304) 1 unit 145,000,000.00 145,000,000.00
5.05. Desander Pumps Cap. 35m3/hr Head 50 m (MTP/KSB) 2 unit 58,000,000.00 116,000,000.00
5.06. Desander Equipment Cap. 45T FFB/Hr (MTP/Alfa Laval) 2 set 120,000,000.00 240,000,000.00
5.07. ReClaimed Oil Tank Cap. 2 m3 + Sludge Drain Tank Cap. 2 m3 1 Set 54,000,000.00 54,000,000.00
5.08. Vibrating Screen Single Type (Vibromax/Tapis) 1 unit 156,000,000.00 156,000,000.00
5.09. ReClaimed Oil Pump Cap. 25m3/Hr Head 35 m (MTP/KSB) 2 unit 52,000,000.00 104,000,000.00
5.10. Sludge Pump to Fat Pit Cap. 30 m3/Hr Head 25 m (MTP/KSB) 2 unit 58,000,000.00 116,000,000.00
5.11. Heavy Phase Liquid Transfer Pump Cap. 45 m3/hour Head 40m (MTP/KSB) 2 unit 67,000,000.00 134,000,000.00
5.12. Heavy Phase Discharge Line [ 6 inch sch 12.5 x 60,000 mm] 1 lot 145,000,000.00 145,000,000.00
5.13. Vacuum Oil Dryer Cap. 15 ton dried oil/hour 1 unit 185,000,000.00 185,000,000.00
5.14. Dried Oil Pump Cap. 15 m3/hour (SIHI/SPECK) 2 unit 96,000,000.00 192,000,000.00
5.15. Vacuum Pump (SIHI/SPECK) 1 unit 120,000,000.00 120,000,000.00
5.16. Hot Well Tank Cap. 1 m3 1 unit 45,000,000.00 45,000,000.00
5.17. Hot Well Pump Cap. 10 m3/hour (MTP/KSB) 2 unit 35,000,000.00 70,000,000.00
5.18. Oil Room Platform & Structure 1 lot 490,000,000.00 490,000,000.00
5.19. Decanter Cap. 45 Tons Tbs/jam 1 unit 2,800,000,000.00 2,800,000,000.00
a. Solid Conveyor Dia. 350 mm C/W Gearmtoro 4 kW 50 rpm (SUS304) 1 unit 115,000,000.00 115,000,000.00
b. Solid Hopper 1 unit 102,000,000.00 102,000,000.00
5.20. Fat Pit Cap. 120 m3 (Round Model) 1 unit 480,000,000.00 480,000,000.00
5.21. Connecting Platform to Thresher and Kernel Station 1 Set 235,000,000.00 235,000,000.00
5.22 Oil Pump Cap. 20 m3/Hr Head 25 m (MTP/KSB) 2 unit 51,000,000.00 102,000,000.00
Sub Jumlah 8,506,000,000.00
7. DEPERICARPER STATION
7.01. Cake Breaker Conveyor No. 1 C/W Gearmotor 22 kW 55 rpm 1 Unit 624,000,000.00 624,000,000.00
7.02. Depericarper & Ducting 1 Unit 304,000,000.00 304,000,000.00
7.03. Nut Polishing Drum dia. 1.350 mm x 6.000 mm 1 Unit 120,000,000.00 120,000,000.00
7.04. Fibre Cyclone c/w Steel Support Structure 1 Lot 468,000,000.00 468,000,000.00
7.05. Fibre Cyclone ID fan kapasitas 52.000 m3/jam, SP 205 mm wg (Phoenix/Novenco) 1 Unit 140,000,000.00 140,000,000.00
7.06. Fibre cyclone Air Lock dia. 800 C/W Gearmotor 7.5 kW 50 rpm 1 Unit 110,000,000.00 110,000,000.00
Sub Jumlah 1,766,000,000.00
9. BOILER HOUSE
9.01. Shell Hopper 1 Unit 230,000,000.00 230,000,000.00
9.02. Shell and Fibre Conveyor #760 mm C/W Gearmotor 15 kW 24 rpm 1 Unit 690,000,000.00 690,000,000.00
9.03. Distribution Boiler fuel Conveyor Dia. 700 mm 1 Unit 468,000,000.00 468,000,000.00
9.04. Return Fuel Conveyor Dia. 700 mm 1 Unit 455,000,000.00 455,000,000.00
9.05. Boiler Operation Platform 1 Lot 131,369,591.43 131,369,591.43
9.06. Steam Boiler Cap. 35 Ton 30 Barg Saturated Steam (Atmindo/Boilermech) 1 Unit 14,324,000,000.00 14,324,000,000.00
9.07. Recycle Fuel Conveyor #760 mm (Model S) C/W Gearmotor 15 kW 24 rpm 1 Unit 380,000,000.00 380,000,000.00
Sub Jumlah 16,678,369,591.43
17. Other
(i) Engineering Design & Drawings 1 lot - -
(ii) Premininaries (Temporary housing, water, electric, security and tools) 1 lot 570,000,000.00 570,000,000.00
(iii) Mobilisation & Demobilisation 1 lot 1,460,000,000.00 1,460,000,000.00
(iv) Engineering & Supervisor 1 lot 600,000,000.00 600,000,000.00
(v) Insurance 1 lot 350,000,000.00 350,000,000.00
(vi) Testing & Comissioning 1 lot 650,000,000.00 650,000,000.00
(vii) Trainning Operator 1 lot 250,000,000.00 250,000,000.00
(viii) Workshop Tools (Krisbow/China) 1 Lot 1,050,000,000.00 1,050,000,000.00
(ix) Laboratory Equipment (Supply by Owner) 1 Lot 680,000,000.00 680,000,000.00
(x) Lubication and Oil (Pertamina Brand) 1 Lot 230,000,000.00 230,000,000.00
Sub Jumlah 5,840,000,000.00
Quantity
NO. DESCRIPTION UNIT PRICE TOTAL
Total Unit Volume Satuan
(IDR) (IDR)
1 2 3 4 5 6 7 5x7x3:
A PRIMMENILARY WORKS
A.1 - Demob dan Mobilisasi 1 Lot 375,000,000.00 375,000,000.00
A.2 - Temporary Barak, Store and Direksi Kit 1 Lot 485,000,000.00 485,000,000.00
A.3 - Asuransi Tenaga Kerja 1 Lot 60,000,000.00 60,000,000.00
A.4 - Design Drawing Project 1 Lot - -
A.5 - Pailing Work (Spun Pile Dia. 250mm K500) 1 Lot 4,600,000,000.00 4,600,000,000.00
A.6 - Pekerjaan Cut and Fill Pabrik 1 Lot 4,350,000,000.00 4,350,000,000.00
B CIVIL WORKS
B.1 FACTORY BUILDING
B.1.a - Foundation Padestal & Sloof Main Building Process 1 Lot 98.00 M3 6,505,102.04 637,500,000.00
B.1.b - Floor & Selasar Main Buliding Process K250 1 Lot 535.00 M3 2,654,205.61 1,420,000,000.00
B.1.c - Ceramic Tile ( Power House, Clarification & BWT) 1 Lot 288.00 M2 1,225,388.89 352,912,000.00
B.1.d - Drainage Main Building Process 1 Lot 438.00 M' 1,077,625.57 472,000,000.00
B.1.e Steel Structure Building -
B.1.e.1 - Main Building Process Size : 28 x 108 x 15 Mtr + Building Boiler Water Treatment Plant 1 Lot 215,000.00 Kg 21,802.33 4,687,500,000.00
B.1.e.2 - Main Building Sterilizer Size : 26 x 36 x 12 Mtr 1 Lot 77,000.00 Kg 23,532.47 1,812,000,000.00
B.1.f - Roofing and Claiding -
B.1.f.1 - Roofing Main Building 0,45 Mm + Nok Rabung 1 Lot 7,731.10 M2 134,418.13 1,039,200,000.00
B.1.f.2 - Claiding Main Building 0,35 Mm + Cladding Fiberglass + Flashing 1 Lot 4,572.22 M2 136,476.25 624,000,000.00
B.1.g - Concrete Road K250 1 Lot 1,415.00 M3 4,290,459.36 6,071,000,000.00
B.1.h - Concrete Apron K250 Tebal 20 cm (M8x2) 1 Lot 408.00 M3 3,922,058.82 1,600,200,000.00
B.1.i - Drainage Road 1 Lot 811.00 M' 1,429,839.70 1,159,600,000.00
B.1.j - Gate & Fence -
B.1.k - Gate 1 Lot 20.00 M 3,629,400.00 72,588,000.00
B.1.k.1 - Fence 1 Lot 1,031.00 M 856,159.07 882,700,000.00
B.1.k.2 - Brickwall Partitions 1 Lot 288.00 M2 1,565,104.17 450,750,000.00
B.1.l - Painting 1 Lot 292,000.00 Kg 2,736.99 799,200,000.00
B.1.m - Turfing 1 Lot 5,052.00 M2 41,052.06 207,395,000.00
B.5 HOUSING
B.5.a - Manager House - 80 m2 1 Unit 1.00 bh 216,000,000.00 216,000,000.00
B.3.b - Assistant House G2 - 54 m2 3 Lot 1.00 bh 286,200,000.00 858,600,000.00
- Mandor House G2 - 45 m2 3 Lot 1.00 bh 238,500,000.00 715,500,000.00
- Staff House G6 - 37 m2 7 Lot 1.00 bh 577,200,000.00 4,040,400,000.00
- Guest House - 120 m2 with 4 Rooms 1 Unit 1.00 bh 348,000,000.00 348,000,000.00
- Kantin - 20 m2 2 Unit 1.00 bh 50,000,000.00 100,000,000.00
- Klinik - 120 m2 1 Unit 1.00 bh 312,000,000.00 312,000,000.00
TOTAL B1 + B2 + B3 + B4 53,724,535,000.00
TOTAL CIVIL WORKS
By.Widi
0822 8591 6770
PMKS PT. BANGKIT PUTRA PERKASA GRUP
TECHNICAL SPECIFICATIONS MECHANICAL, ELECTRICAL & CIVIL
WORKS PALM OIL MILL CAPACITY : 45 TON FFB/HR
The Avery Load Cell type road weighbridge shall have the following
specifications:
Specification :
Storage :
- The sides plate would be 6mm thick m.s plate and braced
with 50 x 50 x 5 angle.
- The hopper decking is formed from 6 mm thick mild steel
plate with middle 3000 mm section of 50 x 50 x 6 mm m.s
tee bars with 10mm gap between each other.
- The bay are emptied by gravity into FFB conveyor when
individual sliding door is opened.
1
- Anti-Spillage side plates to reduce spillage of loose fruit
shall be installed.
- Each sliding door is opened by a hydraulic cylinder of
75mm bore diameter installed at the bottom of the door.
The control for the door shall be through hydraulic
directional control valves which in turn are fed by an
electrical driven hydraulic pump.
- One (1) hydraulic powerpacks would be supplied
Eaton/Premier/ Rexroth Brand.
- The pump driven by 5.5 Hp electrical motor.
- The control valves are grouped in pairs of two (2) to allow
easy operation and repair.
- The door control valve will be installed along the platform
close to the door to allow good visual control.
- An operating platform would be constructed along the full
length of the FFB conveyor.
- The operating platform would be covered with grating. 1
¼” dia. black steel pipe handrailing shall be provided.
Specification :
Length : Approx. 61 m
Construction : - The top and bottom carrier frame shall be fabricated from
150mm x 75mm x 24 kg/m RSC with 9 thick by 75mm wide ms
flats chain liner. The entire frames shall be rigidly braced
vertically and diagonally with 75 mm x 75
mm x 6 mm ms. angles. The whole conveyor and platform
shall be supported by frame structure suitably braced and
2
strutted by ms angles. Proper access staircase and
expanded metal walkway shall be provided.
Conveyor chain shall be with 50.000 lbf. The head and tail
shaft shall be of 100mm dia EN 19 shafts. The plumber
block bearings for head shaft and take up bearing for tail
shaft shall be of NTN make. Scraper bars of 65 mm NB
schedule 40 pipes shall be bolted through the hollow pin
conveyor chain using HT bolts and nuts.
Specification :
Length : Approx. 40 m
Construction : - The top and bottom carrier frame shall be fabricated from
150mm x 75mm x 24 kg/m RSC with 9 thick by 75mm wide ms
flats chain liner. The entire frames shall be rigidly braced
vertically and diagonally with 75 mm x 75
mm x 6 mm ms. angles. The whole conveyor and platform
shall be supported by frame structure suitably braced and
strutted by ms angles. Proper access staircase and
expanded metal walkway shall be provided.
Conveyor chain shall be with 50.000 lbf. The head and tail
shaft shall be of 100mm dia EN 19 shafts. The plumber
block bearings for head shaft and take up bearing for tail
3
shaft shall be of NTN make. Scraper bars of 65 mm NB
schedule 40 pipes shall be bolted through the hollow pin
conveyor chain using HT bolts and nuts.
Specification :
Length : Approx. 25 m
Construction : - The top and bottom carrier frame shall be fabricated from
150mm x 75mm x 24 kg/m RSC with 9 thick by 75mm wide ms
flats chain liner. The entire frames shall be rigidly braced
vertically and diagonally with 75 mm x 75
mm x 6 mm ms. angles. The whole conveyor and platform
shall be supported by frame structure suitably braced and
strutted by ms angles. Proper access staircase and
expanded metal walkway shall be provided.
Conveyor chain shall be with 50.000 lbf. The head and tail
shaft shall be of 100mm dia EN 19 shafts. The plumber
block bearings for head shaft and take up bearing for tail
shaft shall be of NTN make. Scraper bars of 65 mm NB
schedule 40 pipes shall be bolted through the hollow pin
conveyor chain using HT bolts and nuts.
4
The drive shall consist of a 15KW geared motor via
transmission sprocket and chain. The final speed of
conveyor shall be 8 rpm
2. Sterilizer Station
Dimensi : ∅ 2.7 m x 26 m.
8" PN 16 and Butter Fly Valve with Double Acting fail save spring
return diaphragm actuator dengan manual override.
: 1 (One) unit Steam outlet valve ∅
8" Butterfly Type and double acting fail
save spring return diaphragm actuator
dengan manual override.
5
: 1 (One) unit B a l l V a l v e C ondensate
∅
Specification :
support
Specification :
Brand : Eaton/Premier/Rexroth
6
2.04. Blowdown and Blow Off For Sterilizer
Construction :
Control : The PLC base control system for Time Based Sterilizer
System to Sterilized the Fruit and control to Control Valve Inlet/ Exhaust/ and
Condensate Valve with Pneumatic System and the PLC make “Siemens” and
Panel Touch Screen included to monitor the process.
Had a security for every position as authorized approver for the programme
Dimension : 4x3x2m
Specification :
7
Capacity : 30 m3/hr
Total Head : 25 m
Construction :
Specification :
For access to sterilizer inlet valve, exhaust valve and discharge auger conveyor
drive.
One set sterilizer catwalk complete with handrail and stair on both sides shall
be provided .
The catwalk shall span over 4 sterilizers for operation of inlet doors during FFB
feeding, outlet valve, exhaust valve during sterilized fruit discharge and
maintenance of control valves and for the installation of sterilizer control system
panel and hydraulic power unit .
Specification :
Length : 10 m
8
Capacity : 45 ton FFB/hr
Construction : - The top and bottom carrier frame shall be fabricated from
150mm x 75mm x 24 kg/m RSC with 9 thick by 75mm wide ms
flats chain liner. The entire frames shall be rigidly braced
vertically and diagonally with 75 mm x 75
mm x 6 mm ms. angles. The whole conveyor and platform
shall be supported by frame structure suitably braced and
strutted by ms angles. Proper access staircase and
expanded metal walkway shall be provided.
Conveyor chain shall be with 50.000 lbf. The head and tail
shaft shall be of 100mm dia EN 19 shafts. The plumber
block bearings for head shaft and take up bearing for tail
shaft shall be of NTN make. Scraper bars of 65 mm NB
schedule 40 pipes shall be bolted through the hollow pin
conveyor chain using HT bolts and nuts.
To convey fruit bunches from Sterilizer output and bring to Auto Feeder
Conveyor.
Specification :
Quantity : One (1) unit
Type : Scrapper bar, twin chain
Width : 1200 mm width
Length : Approx. 23 m
Drive Unit : Driven by 15 kW geared motor through sprocket and
chain drive to ensure uniform feeding of bunches to the
thresher.
9
A remote start/stop button control for the drive shall be provided.
The fruit bunch scrapper conveyor shall convey the fruit bunches from the auto
feeder to the thresher at the rate of not less than 45 tons FFB/hr.
The estimated length of the fruit bunch scrapper conveyor is 23,000 mm. The
conveyor chain shall be 6” pitch with a design strength of 50,000 lbs scrapper
bars shall be fabricated from NB 75mm sch. 40 pipes. The shaft must be at
least 100 mm diameter with material EN19.
A remote start/stop button control the drive shall be provided at the press
platform easy access for maintenance of the inclined bunch feeder shall be
provided.
10
3. Threshing Station
To convey fruit bunches from auto feeder the horizontal fruit distribution
conveyor.
Specification :
Quantity : One (1) unit
Type : Scrapper bar, twin chain
Width : 1200 mm width
Length : Approx. 24 m
Drive Unit : Driven by 22 kW geared motor through sprocket and
chain drive to ensure uniform feeding of bunches to the
thresher.
The fruit bunch scrapper conveyor shall convey the fruit bunches from the auto
feeder to the thresher at the rate of not less than 45 tons FFB/hr.
The estimated length of the fruit bunch scrapper conveyor is 24,000 mm. The
conveyor chain shall be 6” pitch with a design strength of 50,000 lbs scrapper
bars shall be fabricated from NB 65mm sch. 40 pipes. The shaft must be at
least 100 mm diameter with material EN19.
A remote start/stop button control the drive shall be provided at the press
platform easy access for maintenance of the inclined bunch feeder shall be
provided.
To convey fruit bunches from inclined fruit bunch scrapper conveyor to the
thresher
Specification :
Quantity : Three (3) unit
Type : Chute
Material : MS Plate # 6 mm
11
3.03. Thresher Cap. 45 T and Re-Thresher Cap. 45T
Description :
12
3.05. Fruit Bottom Cross Fruit Conveyor
To receiver and convey threshed fruit from conveyor under thresher to fruit
elevator.
Quantity : One (1) unit
Capacity : 45 tons FFB/hr
Description :
- Diameter : 700 mm x 15 m
- Shell : 6mm thick ms plate
- Wear Liner : 6 mm thick ms plate
- End plate : 9 m thick ms plate
- Screw bearing : 6 mm thick ms plate
- Hanger bearing : 2500 mm c/c
- Shaft : NB 80 mm sch 80 pipe
Drive : 7.5 KW geared motor 39 RPM direct coupled with flexible coupling to
conveyor shaft
To receive and convey threshed fruit from bottom cross fruit conveyor to the
digester top cross feed conveyor.
Specification :
Quantity : One (1) unit
Type : Scrapper bar, twin chain
Width : 1000 mm width
Length : Approx. 29 m
Drive Unit : Driven by 18.5 kW geared motor through sprocket and
chain drive to ensure uniform feeding of bunches to the
thresher.
The fruit bunch scrapper conveyor shall convey the fruit bunches from the auto
feeder to the thresher at the rate of not less than 45 tons FFB/hr.
The estimated length of the fruit bunch scrapper conveyor is 29,000 mm. The
conveyor chain shall be 6” pitch with a design strength of 50,000 lbs scrapper
bars shall be fabricated from NB 65mm sch. 40 pipes. The shaft must be at
least 100 mm diameter with material EN19.
A remote start/stop button control the drive shall be provided at the press
platform easy access for maintenance of the inclined bunch feeder shall be
provided.
13
3.07. Fruit Distributing / Top Cross Feed Conveyor
To receive fruit from fruit elevator and convey the fruit to digester feed conveyor
for feeding into the digestors.
Quantity : One (1) unit
Capacity : 45 TONS FFB/hr
Description : - Diameter : 700 mm
- Length : Approx. 15.5 m
- Shell : 6mm thick ms plate
- Wear Liner : 6mm thick ms plate
- End plate : 9mm thick ms plate
- Screw Ribbon : 6mm thick ms plate
- Hanger bearing : 2500 mm c/c
- Shaft : NB 80 mm sch 80 pipe
- Drive: 11 kW geared motor 39 RPM direct coupled with flexible coupling
to conveyor shaft
The fruit recycling chute shall receive excess fruit overflowing from the digestor
feed conveyor and return the excess fruit to bottom fruit transfer conveyor as
shown in layout drawing.
To receive empty bunches from thresher and convey the empty bunches to
inclined empty bunch conveyor
Quantity : One (1) unit
Capacity : 15 tons Empty bunches/hr
Description : -Width : Approx 760 mm
-Length : Approx 18 m
-Chain : 4 inch pitch Chain 25.000 lbs
-Body : 6mm mild steel plate with angle and channel
-Tray : 4.5 mm thick ms plates
-Drive : 5.5 kW geared motor, final rpm is 12 rpm at unit
To receive empty bunches from thresher and convey the empty bunches to Re
Thresher and Will be used as Thresher if the Main Thresher problem/failed.
Quantity : One (1) unit
Capacity : 15 tons Empty bunches/hr
Description : -Width : Approx 760 mm
-Length : Approx 18 m
-Chain : 4 inch pitch Chain 25.000 lbs
-Body : 6mm mild steel plate with angle and channel
-Tray : 4.5 mm thick ms plates
-Drive : 7.5 kW geared motor, final rpm is
12 rpm at unit
15
4. Pressing Station
To provide buffer for crude oil from the crude oil gutter and to allow sand in
crude oil to settle.
Description :
The 6 mm thk MS Plate Steel sand trap tanks shall be installed under the press
structure to receive the crude oil from the crude oil gutter. The tank acts as a
bufer tank for the sand in the crude oil to settle. The sand shall be removed
from the discharge nozzle at the bottom of the tank.
The crude oil overflow from the sand trap tank is directed to the vibrating
screen for separation of any solids/fibre carry over.
To screen out coarse reject such as fibre dirt etc carry over from sand trap tank
with capacity of 45 T.FFB/hr.
The solids from the vibrating screen shall be disharged into the sludge solid
waste conveyor for recycling.
17
4.06. Crude Oil Pumps
To transfer crude oil from crude oil tank under press station to continuous
clarification tank in the clarification station.
Specification :
Make :
Quantity : Four (4) units
Capacity : 45 m3/hr
Total Head : 35 m
Pump Speed : 1400 rpm
Construction :
Material Code : Stainless steel wet end
Water Box : Mech Seal
Unit Drive : 5.5 Kw, electric motor through pulley and V.belts
Accessories : Level switch control
To receive and provide buffer for crude oil from crude oil vibrating screen.
Description :
Type rectangular with three compartments
The tank compartments shall have suitable drain valve for periodic drainage
of sand and slude during operation and for emptying of tank during cleaning.
The sludge shall be drained into the sludge drain in the clarification system.
Description :
The process hot water tank shall be supplied complete with adequate steam
heating sparge pipes to raise and maintain the temperature of the hot water to
betweeen 90 deg – 95 deg C. A float valve to control water inlet and an
overflow pipe shall be provided. A 4” dial face thermomater shall be fitted to
the tank to indicate the water temperature. It shall be insulated with rockwool
and cladded with G22 aluminium sheet.
18
4.09. Press Structure Platform
To provide support for the installation of screw presses, digesters crude oil
gutter, conveyors and cake breaker conveyors.
Quantity : One set suitable for (4) four sets of presses and digesters.
Construction :
Support Column 150 x 150 x 23 kg/m UC braced with angle
Beams 200 x 75 x 23.8 kg/m channel for installation of presses and digesters
and conveyors.
Platform 4.5 mm thick chequered plates c/w pipe handrailings provide at both
press and digesters level.
Interconnecting walkway provided to threshing station.
Construction :
- Support Column 150 x 150 x 23 kg/m UC braced with angle
- Beams 200 x 75 x 23.8 kg/m channel for installation of installation of
vibrating
screen.
- Platform 4.5 mm thick chequered plates c/w pipe handrailings.
- Access ladder shall be provided.
19
5. Clarification Station
To continuosly receive crude oil from buffer tank while skimming out pure oil
through adjustable skimmer and discharging under flow sludge via bottom pipe.
Specification :
Quantity : One (1) unit
Type : Cylindrical section conical bottom.
Capacity : 160 m3.
Complete : Oil Distribution Tank/Buffer tank Cap. 2 m3
Construction :
- Self standing design
- Shell tank fabricated from 12/10/8/6mm thick MS Plate and at top edge
stiffened with 100mm m.s channel of all welded construction.
- Conical bottom fabricated from 12mm thick MS Plate and liner Stainless
Steel 304 Plate #4mm.
- Tank support fabricated from 300 x 300 x 46 kg/m U Column
- Fitted with 4.5mm thick m.s chequered plate cover and inspection hole with
lid.
- Provided with a stirrer of stainless steel driven by 5.5 Hp 3 rpm geared
motor. (Owner Supply)
- Provided with one set of closed and one set of open steam heating coil 2”
dia. Of stainless steel, schedule 20 pipe seamless at 3 kg/cm2 pressure to
make up oil temperature between 90 – 95 c degree c/w valves.
- Provided with oil and sludge adjustable skimmer discharge the oil into pure
oil tank and sludge into sludge tank.
- The sludge riser of steam pipe 12” dia. Would be at external and leads to an
off take compartment.
- Lagged externally at side and bottom with 50mm thick rockwool and
covered with G22 aluminium sheets 0.8 mm thickness.
- Provided with level indicator and sight glass.
- Provided with 4” dia drain valve.
- The drain from the tank would be discharge into sludge drain tank.
- Interconnecting walkways to sludge tank and pure oil tank.
Dimension : 5.2 m dia x 7500 mm height of Cylindrical
approx.
Accessories : A 6” dia dial face temperature gauge.
20
5.02. MS Pure Oil Tank
To act as buffer between clarification tank and oil purifier.
To heat and maintain oil approx. 80 degree C.
Construction :
- Cyclindrical with conical bottom from mild steel plates.
- Supply with closed steam heating coil to heat up and maintain oil
temperature at approx. 80 degree C
- Steam coil Dia. 1.5 inch from material SUS304 Sch. 20 seamless
- The tank shall be insulated with 50 mm thick rockwool c/w G22 aluminium
cladding with 0.8 m Thickness.
To receive and provide buffer for sludge from sludge precleaner before
distributing to the sludge centrifuges.
Quantity : One (1) unit
Capacity : 4 m3
Construction :
- Retangular tank fabricated from 4.5mm thick
SUS304 Plate.
21
- Supply with steam ejector to heat up and maintain
sludge temperature >80 deg.C.
- The overflow from the tank bottom shall be directed
to the sludge tank.
To transfer sludge from sludge tank to centrifuge feed sludge buffer tank via
sludge precleaner.
Specification :
Make :
Quantity : Two (2) units
Capacity : 35 m3/hr
Total Head : 50 m
Pump Speed : 1530 rpm
Construction :
Material Code : Stainless steel wet end
Water Box : Mech Seal
Unit Drive : 11 Hp, electric motor through pulley and V. Belts
The desanding cyclone with a capacity of not less than 30 m3/hr shall be
constructed of highly wear resistant material (Ceramic or Teflon).
It shall be supplied complete with a sand box, a sight glass and drain
valves.
And the control panel complete with butterfly valve + actuator system
Provisions shall be made for continous operation of the precleaner during
draining of the sand box.
22
5.07. Reclaimed Oil Tank Cap. 2m3 + Sludge Drain Tank Cap. 2m3
To receive light oil from sludge centrifuge and sludge drain tank skimmer pipe
and provide to continuous settling tank.
To screen out coarse reject such as fibre dirt etc carry over from sludge tank
and steriliser condensate.
Size – 1500 mm single deck design with 30 mesh screen. The solids from
the vibrating screen shall be discharged into the sludge solid waste
conveyor for recycling.
To transfer recovered oil from reclaimed oil tank to continuous settling tank.
Specification :
Make :
Quantity : Two (2) units
Capacity : 25 m3/hr
Total Head : 35m
Pump Speed : 1300rpm
Construction :
Material Code : Stainless steel wet end
Water Box : Mech Seal
Unit Drive : 7.5 Kw, elecric motor through pulley and V. Belts
Accessories : Level switch control
23
5.10. Sludge Pump to Fat Pit Cap. 30 m3/Hr
Specification :
Make :
Quantity : Two (2) units
Capacity : 30 m3/hr
Total Head : 25m
Pump Speed : 1300rpm
Construction :
Material Code : Stainless steel wet end
Water Box : Mech Seal
Unit Drive : 7.5 Kw, elecric motor through pulley and V. Belts
Accessories : Level switch control
Specification :
Make :
Quantity : Two (2) units
Capacity : 40 m3/hr
Total Head : 20m
Pump Speed : 1300rpm
Construction :
Material Code : Stainless steel wet end
Water Box : Mech Seal
Unit Drive : 7.5 Kw, elecric motor through pulley and V. Belts
Accessories : Level switch control
Specification :
Make : HDPE Pipe PN10 Dia. 6inch
Quantity : 60 metres approx.
Construction :
Material Code : MS Plate
Accessories : Over flow to clarification drain
25
5.17. Hot Well Pump
Transfer water from hot well tank to the hot water tank on top of the press
platform.
Specification :
Quantity : Two(2) Units
Brand :
Capacity : 10 m3/hr
Total Head : 20 m
Pump Speed : 1300 rpm
Construction :
Material Code : CI/CI
Water Box : Mechanical Seal
Unit Drive : 3 HP, electric motor through pulley and
V.belts
Accessories : Level switch control
To process the sludge and separate the oil and heavy phase and water.
Quantity : One (1) unit
Capacity : 14.000 Liters
Bowl Speed : 4000 rpm
Motor :20HP
Voltage : 380-410 Volt
Brand : Alfa Laval/ Westfalia
To receive sludge from clarification station after the sludge separator and
condensate steriliser drain.
To maintain sludge temperature for oil fat pit
Quantity : One (1) unit
Capacity : 120 m3
Model : Round Model
Material : MS Plate 8/6 mm c/w angle and ms channel steel
Construction :
26
Circular type with oil overflow trough and oil skimming oil
Supply with open steam heating coil and hot water supply to heat up and
maintain sludge temperature for effective oil recovery.
Oil recovered shall be collected on the recovered oil chamber to be recycled to
crude oil tank.
The drain from the bottom shall be directed to sludge heavy phase to transfer to
effluent pond.
The Two Units must be cover by the roof and structure
Specification :
Make :
Quantity : Two (2) units
Capacity : 20 m3/hr
Total Head : 25m
Pump Speed : 1300rpm
Construction :
Material Code : Stainless steel wet end
Water Box : Mech Seal
Unit Drive : 7.5 Kw, elecric motor through pulley and V. Belts
Accessories : Level switch control
27
6. Oil Despatch Station
The tank bottom plates shall be of 10 mm thick mild steel plates. The shell
plate shall be of 10mm thick for the bottom two courses and 9/8 and 6mm thick
for the top three courses. The roof plate shall be of 4.5 mm thick mild steel
plates support by suitably reinforced mild steel truss.
The Tank must be installed Mixer for 1 unit per Unit (Specification will
be arrange by Owner)
The tank bottom plates shall be of 10 mm thick mild steel plates. The shell
plate shall be of 10mm thick for the bottom two courses and 9/8 and 6mm thick
for the top three courses. The roof plate shall be of 4.5 mm thick mild steel
plates support by suitably reinforced mild steel truss.
The Tank must be installed Mixer for 1 unit per Unit (Specification will
be arrange by Owner)
Access stairways to tank roof shall be provided rather at 2000 Tons Tank
or 1000 Tons Tank
28
6.02. Oil Despatch Pump
Specification :
Make :
Quantity : Two (2) units
Capacity : 120 tons/hr
Total Head : 15 m
Pump Speed : 1200 rpm
Construction :
Material Code : CI casing and impeller/SS shaft
Water Box : Mech Seal
Unit Drive : 15 Kw, electric motor through pulley and V.belts
One dispatch oil shed shall be constructed under the civil scope of work. The
shed is to provide shelter for the 2 Truck Tankers during oil loading
operation. Provide the Header system to arrange the circulation of CPO to
Tanks and Despatch Pump.
29
7. Depericarping Station
Circular casing.
- A catwalk or maintenance platform would be provided along entire length of
the cake breaker conveyor c/w ladder, 1 1/4” dia black steel hand-rail pipes.
- Provided with removable cover made from wire mesh for ventilation and
aeration along its entire length.
30
7.02. Depericarper & Ducting
Specification :
Quantity : One (1) unit
Type : Induced draught of vertical column
Capacity : 45 ton FFB/hr
- Fabricated from 6mm thick m.s. plate
- Cross section of the velocity box can be adjusted to vary the air velocity
by means of a sliding back plate
- Fitted with perpex sheet inspection 400mm x 400mm.
- Structure fabricated from 100 x 100 x 10 m.s. angle bar.
Dimension :
- 600mm x 800/1000mm cross section of column x 4000mm Height approx.
Specification :
Quantity : One ( 1) unit
Type : Shaft Rotary drum
Speed : 16 rpm
Capacity : 9 tonnes nut/hour
Construction : Fabricated from 9mm thick m.s. plate of welded
Construction
- Fitted with internal baffle plate of 9mm thick m.s. plate and Lifting bar
- Cast iron double roller support, self alignment complete With bearing
and frame
- Drum would be perforated with suitable sizes to drop the Nut into a
nut transport system
- Larger particles such as stones, bunch stalk would be Overflow from end
of the polishing drum
31
7.05. Fiber Cyclone c/w. Steel Support Structure
Quantity : 1 lot
Capacity : 45 Tons FFB per hour
Construction :
The fiber cyclone of the induced draught type shall have a capacity of 45
tons FFB/hr. The cyclone shall be fabricated from 8mm thick ms plate. The
inlet whirling section shall be provided with renewable wear plate liner,
suitable manhole should be provided in the lower section cyclone for
access and also for clearing of chokage.
The fibre from the cyclone shall be dischargers into the fiber/shell
conveyor located beneath the cyclone.
Specification :
Quantity : One (1) unit
Type : Rotary
Capacity : 8 tons fiber per hour
Construction :
- Size 800 mm diameter and 600mm width
- Casing fabricated from m.s. plates
- Rotor of seven segments fabricated from m.s. plate welded to rotor shaft
- Rotor shaft bearing would be flange type, fitted to end plates
- Suitable flanges at inlet and outlet for easy connection.
Unit drive :
- 5,5 kW geared motor cw transmission chain and sprockets.
32
8. Kernel Recovery Station
To receive wet nut from nut polishing drum and recycle nut from winnower
column and convey the nut to wet nut elevator.
Specification :
Full flight screw conveyor
Circular section casing at 1,5m section before entrance to secondary
Depericarper column.
- Diameter : 400 mm
- Length : Approx 16000 mm
- Shell plate : 6mm ms plate
- Wear Plate : 6mm ms Plate
- Screw ribbon : 6mm ms plate
- Hanger bearing : < 2500 mm spacing
- Dirve : 4 KW Geared motor
Type : Induced
a) Vertical Column
Quantity : One (1) unit
33
a) F A N
To receive and convey Nut from Nut Auger Conveyor to Nut Grading Drum.
The Nut elevator shall receive the Nut. Gearmotor must coupled with Sprocket
and Chain RS100 double for flexsible alignment.
Construction :
The grading drum shall be fabricated from detachable mild steel screen
Plates. The screen perforations shall be selected to evenly distribute the
nuts into three sizes of comparable quantity.
The drum shaft shall be 100 mm dia EN 16 shafts. The shaft shall
be extended at the inlet end for a small section of screw conveyors
to facilitate feeding of nuts into the drum.
The drum shall be driven by a 4 K W geared motor to give a final
drum speed of approx 15 rpm.
35
8.04. Nut Feeder – Vibrating Feeders c/w magnetic trap
Description :
- The rotor and ripple plate shall be of wear resistant material.
- Brand : PMT or Equivalent
- Model :SCM–6T
- Motor : 10 HP, 1080 Rpm
Description :
The ripple mills shall be driven by a 7,5 kW electric motor. It shall receive nuts
from the magnetic vibrating feeder. The ripple mills shall be suitably supported
on steel structure together with the feeders and conveyors. Suitable
maintenance platform shall be provided. Sampling points for crackec mixture
shall also be provided. The cracked mixture from the ripple mills shall be
discharged into the cracked mixture conveyor.
To receive cracked mixture from ripple mills and convey the cracked mixture
to cracked mixture elevator.
Specification :
- Full flight screw conveyor
- Diameter : 400 mm
- Length : Approx 6000 mm
36
- Shell plate : 6 mm ms plate
- Wear plate : 5 mm ms plate
- Screw ribbon : 6 mm ms plate
- Hanger bearing : <2500 mm spacing
- Drive : 3 KW Geared motor
To pneumatically separate palm shell from cracked mixture to convey dry shell
to shell hopper and discharge whole and broken kernel to cracked mixture
grading screen and second winnower column.
Quantity : One (1) unit
Capacity : Approx. 9000 kg cracked mixture per hour
Specification :
Column & Ducting
Column and ducting shall be fabricated from 6 mm thick ms plates. Adjustable
velocity box with bearing roller for the tuning of kernel separation. Perplex sheet
shall be provided on both sides of the column.
Description :
The cracked mixture winnower no 1 shall receive cracked mixture from the
cracked mixture elevator. It allow full kernel and un cracked nuts to drop out
whilst the light shell and fiber particles are lifted away and deposited into the
shell hopper or shell/fiber conveyor. The pneumatic winnower column shall be
fitted with a adjustable damper to vary the air velocity in order to fine tune/
minimize the kernel loss in the light particles.
37
Cyclone
To separate and discharge through airlock the dry shell and dirt from the
cracked mixture separation column.
Quantity : One (1) unit
Capacity : 5000 kg dry shell per hour
Construction :
- The induced draught type cyclone shall be fabricated from 6 mm thick ms
plate
- 6 mm thick ms renewable wear liner shall be provided at inlet section to the
cyclone.
- Manhole shall be provided in the cone section for the inspection and access
for clearing of chokage.
- Support platform for cyclone and fan shall be provided.
Air Lock
To minimize/ prevent air leakage at cracked mixture cyclone No 1 to discharge
dry shell mixture into shell hopper
Specification :
Quantity : One (1) unit
Type : Rotary
Capacity : 6 tons cracked mixture per hour
Construction :
- Size 400 mm diameter and 390 mm width
- Casing fabricated from m.s. plates
- Rotor six segments fabricated from m.s. plate welded to rotor shaft
- Rotor shaft bearing would be flange type, fitted to end plates
- Suitable flanges at inlet and outlet for easy connection.
Unit drive :
3 kW geared motor c/w transmission chain and Sprockets.
To induce air draught for the separation of shell from kernel through the
winnower column.
Specification :
Quantity : One (1) unit
Type : Induced draught
Made : Phoenix equivalent
Capacity : 23000 cu.m/hr
Static pressure : 200 mm w.g
Fan speed : 1540 rpm
Unit drive : 22 KW electric motor through pulley and V. belts
38
8.10. Split Air Lock to Winnower No. 1
Specification :
Quantity : One (1) unit
Type : Rotary
Capacity : 6 tons cracked mixture per hour
Construction :
- Size 400 mm diameter and 390 mm width
- Casing fabricated from m.s. plates
- Rotor six segments fabricated from m.s. plate welded to rotor shaft
- Rotor shaft bearing would be flange type, fitted to end plates
- Suitable flanges at inlet and outlet for easy connection.
Specification :
Quantity : One (1) unit
Type : Rotary
Capacity : 6 tons cracked mixture per hour
Construction :
- Size 400 mm diameter and 390 mm width
- Casing fabricated from m.s. plates
- Rotor six segments fabricated from m.s. plate welded to rotor shaft
- Rotor shaft bearing would be flange type, fitted to end plates
- Suitable flanges at inlet and outlet for easy connection.
39
8.12 Cracked Mixture Winnower No. 2,
Column, Ducting, Cyclone & Air Lock
To pneumatically separate palm shell from cracked mixture to convey dry shell
to shell hopper and discharge whole and broken kernel to cracked mixture
grading screen and second winnower column.
Quantity : One (1) unit
Capacity : Approx. 9000 kg cracked mixture per hour
Specification :
Column & Ducting
Column and ducting shall be fabricated from 6 mm thick ms plates. Adjustable
velocity box with bearing roller for the tuning of kernel separation. Perplex sheet
shall be provided on both sides of the column.
Description :
The cracked mixture winnower no 1 shall receive cracked mixture from the
cracked mixture elevator. It allow full kernel and un cracked nuts to drop out
whilst the light shell and fiber particles are lifted away and deposited into the
shell hopper or shell/fiber conveyor. The pneumatic winnower column shall be
fitted with a adjustable damper to vary the air velocity in order to fine tune/
minimize the kernel loss in the light particles.
Cyclone
To separate and discharge through airlock the dry shell and dirt from the
cracked mixture separation column.
Quantity : One (1) unit
Capacity : 4000 kg dry shell per hour
Construction :
- The induced draught type cyclone shall be fabricated from 6 mm thick ms
plate
- 6 mm thick ms renewable wear liner shall be provided at inlet section to the
cyclone.
- Manhole shall be provided in the cone section for the inspection and access
for clearing of chokage.
- Support platform for cyclone and fann shall be provided.
Air Lock
To minimize/ prevent air leakage at cracked mixture cyclone No 1 to discharge
dry shell mixture into shell hopper
Specification :
Quantity : Two (2) units
Type : Rotary
Capacity : 6 tons cracked mixture per hour
Construction :
- Size 400 mm diameter and 390 mm width
- Casing fabricated from m.s. plates
- Rotor six segments fabricated from m.s. plate welded to rotor shaft
- Rotor shaft bearing would be flange type, fitted to end plates
- Suitable flanges at inlet and outlet for easy connection.
Unit drive :
3 KW geared motor c/w transmission chain and Sprockets.
40
8. 13. Cracked Mixture Winnower No. 2 Fan
1. Tank :
- Fabricated from 6mm thick m.s plate construction.
- Tank would be of two compartment having tapered bottom with a
perforated baffle plate in between.
- Provision for feed water pipe and overflow box c/w down pipe.
- Fitted with hand hole at bottom near each pump.
- Fitted with flange for inlet and outlet pump
- Cat walk and access ladder above clay bath and cross beam for
maintenance would be provided
- Fitted with discharge chutes for kernel and shell of perforated screens
each c/w water collecting tray and pipe.
2. Cyclone :
- One (1) cyclones for recovery or kernel and shell.
- Casing fabricated from 5 mm ms plate of welded construction c/w flange
of bolt connection
- Fitted with diameter 4”, 0- 4 kg/cm2 pressure gauge c/w stop cocks
Unit drive : Driven by 1.5 Kw geared motor via transmission sprocket and
chain
3. Pump
To receive wet kernel from clay bath and LTDS columns and convey the kernel
to pneumatic kernel transport system.
Quantity : Two (2) units
Capacity : 6000 kg kernel/hr each
To receive and feed wet kernel from LTDS system and clay bath into the wet
kernel distribution conveyor.
Quantity : One (1) unit
Capacity : 8000 kg wet kernel/hr
Description :
- Type : Single chain bucket design
- Width : Approx. 500 mm
- Length : Approx. 13 m
- Chain : 4 inch pitch Chain with 24000 lbf (Supply by
Owner)
- Body : 4 mm mild steel plate with angle
- Bucket : 5 mm thick m.s plates @ 600 m spacing
- Drive : 4 KW geared motor
42
8.17. Top Wet Kernel Distribution Conveyor
To receive wet kernel from wet kernel elevator and convey/ distribute the wet
kernel to kernel dryer silos.
To provide holding time/buffer for the drying of wet kernel before bagging.
Quantity : Two (2) units
Capacity : 40 m3 effective volume each
Specification :
- Cylindrical design with provision for hot air
distribution and venting.
- Silos shall be fabricated from 6 mm thick ms plates
- 2 (Two) sets heater (Supply by Owner) per silo complete steam trap system
with ball float model
- One phoenix heater fan (Supply by Owner) per silo – 22,000 m3/hr @ 150
mm wg
- Both heater and fans are installed at ground for
easy access for maintenance.
- Temperature control valve to indicator shall be provided at lower level.
- Walkway provided on top of silos for operation.
Specifications :
Quantity : One (1) unit
Type : Blower
Made : Phoenix equivalent
Capacity : 5500 cu,m/hr
Statistic pressure : 660 mm w.g
Fan speed : 2900 rpm
Unit drive : 17.5 kW electric motor through pulley and V.
belts
To separate and discharge dry kernel to dry kernel distribution conveyor on top
of kernel bulk silos.
Quantity : One (1) unit
Capacity : 8000 kg dry kernel per hour
Construction :
- The blower cyclone shall be fabricated from 6 mm thick ms plate
- Support platform fro cyclone and fan shall be provided.
44
8.23. Kernel Distribution Conveyor On Top of Kernel Bulk Silo
Quantity : 2 Units
Type : Cylindrical silos on eight (8) support column
Capacity : 225 tons Kernel each x 2 – 450 tons
Construction :
- The steel structure supporting column fabricated from WF beams. The
silos shall be supported on rigidly braced support trusses fabricated from
UC.
- The wall plate would be 8mm thick m.s. plate and the hopper bottom from
10mm m.s. plate suitably stiffended
- The outlet chute with horizontal sliding door type c/w gear and chain
operated
- The height of chute from floor level is 3.5 meter
- The roofs covered by 4.5 mm thick m.s. plate
- Provided with staircase and monkey ladder installed at inside of every
section of bin
- Above the bin would be install the 800mm wide catwalk along the bin
beside the distribution conveyor
Dimension : - 6000 mm dia x 18000 mm x 15000 m ht
− The steel structure constructed from angle bar and joint with channel.
− The platform, catwalk, walkway covered with 5mm thick m.s chequered
plate c/w hand rail 1 ¼” dia. pipe hand rail.
45
8.26. Pneumatic Shell Transport
To transport the wet shell from clay bath to shell hopper pneumatically.
Quantity : One (1) lot
Capacity : 4500 kg shell per hour
Specification : NB 150 mm black B pipe.
Description :
The pneumatic shell induced transport system shall receive wet shell from the
clay bath wet separation. It shall convey the shell to the shell hopper. The
transport ducting shall be 150 mm diameter black B pipe and the square
section bend shall be fabricated from mild steel plates.
46
9. Boiler House
It shall be supported from the cracked mixture cyclones and the shell cyclones
support structure.
The buttom of the hopper shall be fitted with two discharge outlets;
one to discharge the shell into the fiber/ shell conveyor under item (1) and other
into vehicle parked underneath it.
To receive fiber from fiber cyclone and shell from shell hopper and convey the
fuel to cross boiler fuel conveyor.
Quantity : One (1) unit.
Capacity : 15 tons fiber and shell/hr
Description : - Type : Scrapper type
- Width : Approx. 760 mm
- Chain : 4 inch pitch Prime Chain with 24000 lbs
- Body : 6mm mild steel plate with angle and channel
- Tray : 4.5 mm thick ms plates
- Drive : 7.5 KW geared motor (Supply by Owner)
9.05. Steam Boiler Cap. 35T Saturated Steam with Pressure 30 bar --
See the Boilermech/Atmindo Specification at attachment
To generate electrical power for mill startup standby electrical power supply
To generate electrical power for mill lighting for mill and housing when no
operation in process
49
10.06. Back Pressure Vessel Receiver [One (1) unit]
Description :
The back pressure vessel of 1160mm dia. X 7.2 m long shall be provided to
receive the steam from the turbine. From this steam receiver, low pressure
steam is distributed to the sterilizers and processing plant.
The vessel shall comply with the Indonesian Safety Regulations and shall be
designed for a working pressure of 3.1 kg/cm2.
Stop valves, steam traps and full bore relief valve shall be provided by othes.
The relief valve should be capable of releasing not less than 30,000 kg/hr of
steam at 3.1 kg/cm2.
50
10.08. Turbine Water Recycling Tank c/w pump
Make :
Model : Self Priming Pump
Capacity : 60 m3/hr each unit
Total Head : 60 meter
Motor H.P : 30 kW
Speed : 1450 rpm
A/C Supply : 380 V/3 phase/50 cycle
51
11.03. Clarifier Tank
One (1) unit clarifier of 160 cu m suitable for the capacity of 90 m3/hr shall be
supplied. The clarifier shall be vertical flow sludge blanket type with sludge
adjustable floc concentrator, blanket control, de-sludging and water sampling
system.
Specification :
Capacity : 60m3/hr
Brand :
Total Head : 40 m
Pump Speed : 1450rpm
Construction :
Material code : CI/CI/SS
Water Box : Gland Packing
Unit Drive : 11 kW, electric motor through pulley and V. belts
52
11.06. Pressure Sand Filter
Two units pressure sand filter with a total capacity of 70 m3/hr (35 m3/hr each)
shall receive clarified water from the clarified water tank via pumps.
One unit treated water tank of 60m3 and one unit 20m3 untreated water for
domestic supply shall be installed on the common elevated structure to
provided constant head and a buffer for raw water from main intake pump
before entering the water clarifier. Water for mill washing and maintenance
shall be drawn from this tank o reduce chemical usage for treating raw water.
The outlet must used the Header to distribute the water to process and other
places
One (1) set Chemical mixing facilities including tanks and fitting suitable for the
capacity of 60 m3/hr water shall be provided.
Raw water from the raw water pump house shall be delivered to the raw water
treatment plant house at the mill compound (Est. max 285 m distance) via a
200mm O/D HDPE pipe line.
The HDPE pipe line shall be laid in earth trenches with a minimum depth of 500
mm.
53
11.10. Raw Water Flow meter
One (1) unit orifice type flow meter c/w indicator shall be installed at the raw
water pump house for the measurement of the raw water delivery rate.
One (1) lot valves including foot valves, pump suction and discharge gate
valves and check valves shall be provided.
One lot interconnecting piping and valves shall be provided between the
various equipment supplied above.
All interconnecting pipe work shall be of galvanized iron pipe and the pipe from
the pumps to the overhead gravity tank shall be suitable for a flow rate of
60m3/hr
54
12. Boiler Feed Water Treatment Plant
Two (2) units water centrifugal pump set with capacity and delivery pressure to
suit the softener but not less than the following shall be supplied :
Total Head : 25 m
kg/cm2 Accessories
The Softener Unit shall be complete with regeneration tanks, face piping and
valve, interconnecting pipe works all of suitable materials, ejectors, flow meter,
water, regeneration inlet distributions and under-drain system
One (1) unit of softened feed water tank of SUS304 plate construction. It shall
have a capacity of 90m3.
The tank consist of Steam Coil pipe for heating the water to an operation
temperature 80 deg. C.
It shall be provided with cover, water level gauge, fittings and float valve.
55
12.04. Feed Water Transfer Pump
Two (2)units of transfer pump sets of centrifugal type shall be supplied for
transferring feed water softened water tank to elevated Thermal Dearator water
tank, one for operation and the other on standby. The pumps are to be close
coupled with TEFC squirrel cage motor of 380V/3/50 Hz electric supply.
One (1) unit of Thermal Dearator with Capacity of 35 m3/hr shall be provided.
The dearator shall include the water inlet control valve with internal float,
overflow traps, sentinel relief valve, thermometer, water and steam pressure
inlet pressure gauges and fittings to cover full water level travel, high and low
alarm switches.
And should install at level 9 m at least to prevent the air trap at pumps
One duplex type chemical metering pump to be supplied and installed for
dosing of chemicals into the boiler feed water. The supply shall be complete
with necessary tank, tubing and fittings.
All interconnecting piping, valves and fittings for the boiler water treatment plant
shall be supplied.
The main inlet pipeline from the overhead tank at the water treatment plant to
the boiler house shall be supplied and installed by others. The interconnecting
piping material between the softener pump sets, the deaerator overflow pipe
and pipings to and from the boiler feed water pumps shall be provided.
56
13. Effluent Treatment Plant
One(1) lot 4” diameter HDPE pipes complete with isolating ball valves and
fitting is provided in the supply.
Specification :
Quantity : Two (2) units
Brand :
Capacity : 80m3/hr
Total Head : 10 m
Pump Speed : 1450 rpm
Construction :
Material Code : SS wet end
Water Box : Mech. Seal
Unit Drive : 7.5 kW, electric motor through pulley and V. Belts.
57
14. Piping and Insulation Works
One complete set of piping, valves and fittings for high pressure and low
pressure team, condensate ,hot/cold water.
Note :
Raw Water used HDPE PN10 from River
Cold water used Galvanised Medium Pipe
Crude oil must used the Stainless Steel Pipe Sch.10
Clean/Sludge oil used Stainless Steel Pipe Sch. 10
Except the Transfer Pump of CPO to Daily Tank and Storage Tanks used
Steam Pipe Sch. 40 with Pipe Track system and must have a 2 inch return Pipe
to Clarification Station.
Steam Coil for Tanks must Stainless Steel Pipe Seamless Sch. 20
Thermal insulation of steam pipes, condensate pipes and relevant tanks are
included. All insulated pipes shall be wrapped over with aluminium sheets of
about 22 S.W.G.
(i) Complete piping system within the mill building for steam, hot water, cold
water, crude oil ,clean
Oil, sludge, air supply, factory washing downpipes and isolating valves.
This shall include steam
Pipe from the boiler main outlet valve to the main steam header of not less
than 250mm dia.
Blow down pipes from boiler drum and headers blow down valves to boiler
blow down chamber,
Auxiliary steam pipe to turbine driven feed pump, cooling water piping for
the boiler furnace
Grates, fan bearings, furnace walls etc, and water sampling cooler and
piping between deaerator
Boiler feed pumps and boilers. Steam pipe from main steam header to
turbo generator and the
The later to the Back Pressure Vessel and from the Back Pressure Vessel
to the dearator in the
Boiler house and instrument air piping to deaerator steam control valve
are included.
A 12mm dia. drain valve and pipe shall be provided just before the
deaerator steam inlet valve.
All interconnection piping for water, steam, crude oil, oil, sludge effluent,
condensate between
The mill buildings, oil storage tanks, condensate tank, sludge oil recovery
tanks, effluent
Treatment plant, etc shall be provided. Piping for oil, sludge, effluent water
and steam
Connecting the mill buildings to the oil storage.
(ii) One cold water supply line of 150mm dia. from water tower to factory
building for process
Requirement.
58
One 100mm dia. ring main from which suitable downpipes are tapped off
for factory cleaning
And fighting small fires not less than 8 downpipes shall be provided at
strategic locations in the mill
(iv) Oil delivery pipe not less than 76mm dia. from clarification station to oil
storage tanks including
Isolating valve. The pipe will be connected to the inlet flange at the top of
the tank.
Suitable drain should be provided to drain this pipeline to prevent
congealing of oil.
(v) Despatch oil pipe from the outlet valve of storage tanks to the oil dispatch
pump shall not be Smaller than 100mm dia.
A return oil pipe of not less than 76mm dia. Shall be provided to the
clarification station from
The oil storage tanks for recycling of oil at the tank bottoms.
General Specification
All steam, condensate, process water, cold water, crude oil, clean oil, sludge,
air and other piping and all
Necessary insulation shall be supplied.
The following types of pipes shall be used for the service specified :
All globe valves, gate valves, non return valves, safety valves, steam pipe
expansion units, vibration eleminator, steam pressure reducing valves, steam
traps, strainers, sight glasses, automatic air vents and any other fittings shall be
included. All valves used on 21kg/cm2 steam lines be of cast steel and in the
case of smaller valves 40mm and blow bronze. Valves used on low pressure
steam pipes 3 kg/cm2 may be of cast iron and bronze valve shall not be used
where it comes into contact with crude oil or sludge.
All pipes shall be adequately support and shall not be allowed to sag. Steam
pipes shall be provided with fixed and moving points. At the moving point, the
pipe shall be allowed to slide on account of expansion or contraction. Steel
Tubes and Tube.
Steel tubes and socked fitting for process and cold water services shall be
galvanized and shall conform with B.S. 1378 medium tubes and tubular painted
with a blue band.
They shall be of heavy quality with a red band for burial in the ground. Screwed
connections shall be used and pipe threads shall be of B.S. 21 tapered threads.
59
Those used for steam and condensate services shall be B.S. 806 and B.S.3601
seamless carbon steel pipes of Grade 22 or API schedule 40 and suitable for a
working pressure of 21 kg/cm2.They shall be un-galvanized and jointed by
welding. Oil pipes shall be un galvanized black steel tubes. Those of diameter
150 mm and below shall conform to BS 1387 of heavy quality plain ended and
painted with a read band. Those of diameter is excess of 150 mm shall conform
to BS3601 plain ended and 9.5 mm in thickness. Jointing shall be by welding.
Connections to valve and fittings shall be by means of bolted flanges. These
flanges shall be suitable for welding to the pipes to be connected.
Jointing Pipes
Steam Lines
Welded steel tubes shall be used for steam pipes and the utmost care
shall be exercised to ensure that there shall be no sag in any part of
section of pipe.
Horizontal steam lines shall be drained at all points where water
condensation may collect. before a vertical rise or bend or at a dead end;
the water of condensation being drained into the condensate line .
Drainage shall be accomplised by using a full sized downward projecting
branch of a tee piece draining into a suitable steam trap c/w strainer check
valve and sight glass.
60
All steam supply lines to equipment shall be provided with a bypass c/w
isolating valves, strainer and other accessories so that no shutting down of
the plant will be necessary during servicing.
Pipe Hangers
Pipe hangers shall be of 40mm x 5mm thick m.s flat of shapes and length
as required with fish tails built solidly into supporting concrete brickwork at
the specified intervals. For steam pipes to 100mm diameter and above
hangers shall have provision for expansion and contraction.
Where pipes may rise or fall during expansion, spring hangers shall be
used and these shall be of a design that will give practically constant
support throughout.
Expansion units
Expansion unit shall be used on all steam lines where required.
For horizontal pipes runs, these shall be the lyre loops or double – offset
expansion bends shall be place where a straight run of pipes exceeds 50
meters long. They shall be placed horizontally wherever possible, but
when placed other than horizontally on a steam line, a drain shall be
provided on the upstream side.
Sight Glasses
These shall be of approved make, single window type with brass body,
glass window and asbestos washers and shall be capable of withstanding
up to 3.5 kg/cm2 back pressure.
Strainers
All strainers used shall be of adequate filtering area.
Those used before steam traps or incorporated into steam traps shall
have stainless steel screen with 1mm perforations, screwed type.
The strainers used at feed water pump supply lines to boilers shall be the
basket type having a 60 mesh stainless steel screen of not less than 0.4
sq.m. filtering area.
Strainers shall be installed with isolating valves so that the strainers can
be cleaned without draining the system.
61
Steam Traps
Those used at places where condensate is not lifted shall be Miyasaki
/Spirac/Gestra type screwed with built-in strainer, or equivalent, capable of
withstanding pressure of up to 21 kg/cm2 and temperature of up to 315
degree C. Where the pressure is less than 0.6 kg/cm2,float type or
equivalent shall be used.
Ball Valves
Ball valves for use in cold water tanks shall be BELL or equivalent type.
Check Valves
These for use other than on oil lines shall be BELL‟S bronze check valves
Class 250 series A to BS 1953:1964 lift type or equivalent.
Reducing Valves
Where required these shall be ARI pressure regulators or equivalent,
sized to give the various steam flow at rated pressure.
62
Painting to Pipes and Fittings
All exposed and un insulated pipes and fittings and galvanized surfaces
except where those in copper or bronze. shall be painted with two coats of
calcium plumbate followed by two coats of gloss paint. All paints shall be
of best quality to the approval of the Engineer.
63
15. Fire Fighting Equipment
(ii) Two asbestos blankets and two pairs off asbestos gloves for the power
house.
(iii) Two CO2 type extinguishers for the generator room plus eight distributed
throughout the mill and one for each other building where electrical
equipment is installed.
Fire hydrant connected to 100mm dia. pipes shall be installed at interval not
exceeding 5om with a min of six hydrants at strategic location outside the mill
buildings. Each hydrant complete with suitable valve and quick-coupling and
50m fire hose of 76mm dia with nozzle shall be connected to the 150mm water
main in the mill buildings.
Suitable 40mm bore wash down hose valves with total lengths of 100m of
Canvas industrial hose will be provided to deal with small fires, as well as for
cleaning factory equipment and floors. Not less than eight hose down points
tapped from process water main shall be provided.
64
16. Electrical Works
The electrical installation for the mill shall generally comply with the Indonesian
Electrical Authority Regulations and Standards.
(i) Switchboard
The main switchboard shall provide for 1 x 1500 kW steam turbo
alternator and two 750 kW diesel generator which should be suitable for
parallel operation with one another.
All combined fused switch units shall comply with BS and shall provide
double break, quick make and break actions, parallel moving silver plate
contacts, and fully shrouded fixed contacts. They shall be of the flush
mounting type, totally enclosed and thermally rated for these conditions.
Provision shall be made on the unit to indicate clearly whether the switch
is in the “ON” or “OFF” position. All circuit breakers or other switching
devices shall have the circuit designations located on the front cover of
each cell, in Bahasa Indonesia.
Name plates shall have clearly legible and uniform engraved black
lettering on a white background.
65
(ii) Power Distributing, Control Cables and Transformers
The details of the size and types of cables shall comply with the
Indonesian Electrical Authority‟s requirement.
Where the cables rise above the floor level steel pipe guards shall be
provided.
Power distribution cables and wirings should also be provided for the
sterilizer condensate pumps, sludge oil recovery tank, oil and sludge
pumps, office and laboratory building, water treatment plant, raw water
pump station, sludge effluent treatment plant, etc. with the exception of
the domestic power distribution lines. All the necessary electrical wiring,
switches, panels, starters, etc. and office/laboratory and store/workshop
buildings shall be included in the supply.
Provision shall be allow for cable sizes and isolating switches of not less
than the following for:
In addition to the above one 30 Amp 3 phase welding socket outlet shall
be provided in the threshing/Pressing motor Control Centre complete
with socket plug top.
The cable from the isolating switch at main switch board outgoing panel
to the Boiler House Motor Control Centre shall be sized for one steam
boiler. Separate supply shall be provided for the boiler feed water
treatment plant.
66
(iv) Motors
Intensity of illumination over the whole of the working area within the
building shall be not less than 150 lumens/m2.
Area lighting for the sterilizer rail track and loading ramp shall be by
250W color corrected mercury street lanterns mounted 8m high steel
poles of reducing diameters, each lamp individually fused and the unit
and control gear housed in a weatherproof switch compartment.
For the marshalling yard, mill compound, water tower tank and other
open space within the fencing of the mill, spot lights, bulk heads and
mercury-vapour light fittings shall be provided for illumination of not less
than 20 lumens/m2 of the working area.
67
(vii) Scope of Supply
1) Main Switcboard
1 - Synchronizing Scope
2 - 0-500V Voltmeter
2 - Frequency Meter
3 - Panel fuse units c/w HRC fuse links
2 - Synchronizing lamps
1 - Synchronizing selector switch
1 - Busbars voltage On/Off switch
69
1. 7 One (1) compartment for Street Lighting DB comprising of:-
1 -
30A SPN MCB
1 -
40A 2 pole current ELCB
4 -
10A SPN MCBs
1 -
30A Contactor
1 - 30A SPN Changeover Switch
1 - Time Switch
To supply & install one (1) unit wall mounted type control
centre c/w internal wiring connection comprising:-
To supply & install one (1) unit wall mounted type motor
control centre c/w internal wiring connection
comprising:
70
2 R,Y,B phase indicating light 3 pcs
3 MCB 1 pole 6 Amp For Fuse Indicator Light 3 pcs
4 VSS Voltmeter 0 - 500 Volt 1 set
5 ASS Ammeter 0 - 200 Amp 1 set
6 CT200/5A 3 pcs
Out Going To :
1 O/G MCB 16 Amp 3 pole To Automatic Programmer 1 pcs 1 Set
For Sterilizer
2 Condensate Pit Pump no. 1 (A / M) 2 set 5,5 DOL
3 Condensate Pit Pump no. 2 (A/M)
4 Auto Feeder Scraver + Rem 1 set 11 S-D
5 Sterilizer Fruit Conveyor + Rem 1 set 18,5 "
6 Hydroulic Pump no. 1 & - 2 For Sterilizer Top Door + 2 set 5,5 DOL
Rem
7 Hydroulic Pump no. 2 For Sterilizer Bottom Door +
Rem
8 Sterilizer Bunch Conveyor + Rem 1 set 22 S-D
9 Compressor For Pneumatic System + Rem 1 set 11 "
10 Auger Conveyor no. 1 1 set 18,5 "
11 Auger Conveyor no. 2 1 set 18,5 "
12 Auger Conveyor no. 3 1 set 18,5 "
13 Auger Conveyor no. 4 1 set 18,5 "
14 Spare - 1 + Rem 1 set 22 "
15 O/G To. MCB 1 pole 16 Amp For Lighting Station 1 set
16 O/G MCB 1 pole 16 Amp To Socket Outlet 3 Pin 2P + 1 set
E
17 O/G MCB 3 pole 32 Amp To Socket Outlet 4 Pin 3 P + 1 set
E
18 Box Panel Free Standing + Busbar + Wiring + Mimic 1 lot
Diagram + Accesoris
To supply & install one (1) unit floor standing motor control
centre c/w internal wiring connection comprising:-
THRESSING ST.
6 CT600/5A 3 pcs
71
Out Going To :
1 Inclined Fruit Bunch Scrapper Conveyor + Rem 1 set 22 S/D
72
Out Going To :
1 O/G 200 Amp To Digester & Screw Press + Power 1 set
Pack no. 1
2 O/G 200 Amp To Digester & Screw Press + Power 1 set
Pack no. 2
3 O/G 200 Amp To Digester & Screw Press + Power 1 set
Pack no. 3
4 O/G 200 Amp To Digester & Screw Press + Power 1 set
Pack no. 4
5 O/G 200 Amp To Digester & Screw Press + Power 1 set
Pack no. 5 (Spare - 1)
6 O/G 200 Amp To Digester & Screw Press + Power 1 set
Pack no. 6 Spare - 2)
7 Cruide Oil Pump no. 1 (A/M) 1 set 5,5 DOL
8 Cruide Oil Pump no. 2 (A/M) 1 set 5,5 "
9 Rotary Vibrating Screen no. 1 + Rem 1 set 3 "
10 Rotary Vibrating Screen no. 2 + Rem 1 set 3 "
11 Rotary Vibrating Screen no. 3 + Rem 1 set 3 "
12 Rotary Vibrating Screen no. 4 + Rem 1 set 3 "
13 Digester Feed Conveyor + Rem 1 set 5,5 "
14 Digester Cross Feed Conveyor + Rem 1 set 7,5 S-D
15 Spare - 1 + Rem 1 set 7,5 "
16 Spare - 2 + Rem 1 set 5,5 DOL
17 O/G MCB 1 pole 16 Amp To. Power Socket Station 1 pcs
18 O/G MCB 1 pole 16 Amp To. Power Lighting 1 pcs
Station
19 O/G MCB 3 pole 32 Amp To Power Socket Outlet 1 set
3P+E
20 O/G MCB 1 pole 16 Amp To Power Socket Outlet 1 set
2P+E
21 Box Panel Free Standing + Busbar + Wiring + 1 lot
Mimic Diagram + Accesoris
To supply & install one (1) unit floor standing motor control
centre c/w internal wiring connection comprising:-
73
1 Screen Solid Sludge Conveyor + Rem 1 set 3 DOL
2 Sludge Separator - 1 + Rem 1 set 30 S-D
3 Sludge Separator - 2 + Rem 1 set 30 "
4 Sludge Separator - 3 + Rem 1 set 30 "
5 Desander Pump -1 (A / M) 1 set 11 "
6 Desander Pump -2 (A / M) 1 set 11 "
7 Vibrating Screen Single Deck + Rem 1 set 3 DOL
8 Reclaymed Oil Pump - 1 (A / M) 1 set 7,5 S-D
9 Reclaymed Oil Pump - 2 (A / M) 1 set 7,5 "
10 Sludge Pump to Fat Fit - 1 ( A / M) 1 set 7,5 "
11 Sludge Pump to Fat Fit - 2 ( A / M) 1 set 7,5 "
12 Heavy Phase Liquid Transfer Pump - 1 (A / M) 1 set 7,5 "
13 Heavy Phase Liquid Transfer Pump - 2 (A / M) 1 set 7,5 "
14 Dried Oil Pump + Rem 1 set 11 "
15 Vacuum Pump + Rem 1 set 11 "
16 Hot Well Pump - 1 (A / M) 1 pcs 2,2 DOL
17 Hot Well Pump - 2 (A / M) 1 pcs 2,2 "
18 Spare - 1 + Rem 1 set 30 S-D
19 Spare - 2 + Rem 1 set 11 "
20 O/G MCCB 3 pole 100 Amp To. Sludge & Condensate 1 pcs
Oil Recovery MCC
21 O/G MCB 1 pole 16 Amp To. Power Socket Station 1 pcs
22 O/G MCB 1 pole 16 Amp To. Power Lighting Station 1 pcs
23 O/G MCB 3 pole 32 Amp To Power Socket Outlet 3P + 1 set
E
24 O/G MCB 1 pole 16 Amp To Power Socket Outlet 2P + 1 set
E
25 Box Panel Free Standing + Busbar + Wiring + Mimic 1 lot
Diagram + Accesoris
To supply & install one (1) unit floor standing motor control
centre c/w internal wiring connection comprising:-
To supply & install one (1) unit floor standing motor control
centre c/w internal wiring connection comprising:-
No. Nama Panel Jumlah Daya Starter
(KW)
KERNEL RECOVERY ST
6 CT600/5A 3 pcs
Out Going To :
75
3 Nut Elevator + Rem 1 set 11 S/D
76
21 Agitator For Claybath + Rem 1 set 1,5 DOL
77
39 Box Panel Free Standing + Busbar + Wiring + 1 lot
Mimic Diagram + Accesoris
To supply & install one (1) unit floor standing motor control
centre c/w internal wiring connection comprising:-
To supply & install one (1) unit wall mounted type motor
control centre c/w internal wiring connection comprising:-
78
2.10 Workshop
To supply & install one (1) unit wall mounted type motor
control centre c/w internal wiring connection comprising:-
To supply & install one (1) unit wall mounted type motor
control centre c/w internal wiring connection comprising:-
79
11 Spare - 1 + Rem 1 set 30 "
12 Spare - 2 + Rem 1 set 15 "
13 O/G To. MCB 1 pole 10 Amp For Lighting Room 1 set
14 O/G MCB 3 pole 32 Amp To Socket Outlet 3P + 1 set
E
15 O/G MCB 1 pole 16 Amp To Socket Outlet 2P + 1 set
E
16 Box Panel Free Standing + Busbar + Wiring +
Mimic Diagram + Accesoris
To supply & install one (1) unit wall mounted type motor
control centre c/w internal wiring connection comprising:-
To supply & install one (1) unit wall mounted type motor
control centre c/w internal wiring connection comprising:-
80
5 O/G To. MCCB 3 pole 50 Amp Compressor For 1 set "
Pneumatic System
6 O/G MCB 1 pole 16 Amp For Automation PLC 4 pcs
System
7 O/G To. MCB 1 pole 10 Amp For Lighting 1 set
8 O/G MCB 1 pole 16 Amp To Socket Outlet 2P + E 1 set
9 O/G To. MCB 3 pole To. Socket Outlet 3P + E 1 set
10 Box Panel + Busbar + Wiring + Accesoris 1 lot
To supply & install one (1) unit wall mounted type DB c/w
internal wiring connection comprising:-
To supply & install one (1) unit wall mounted type DB c/w
internal wiring connection comprising:-
To supply & install one (1) unit wall mounted type DB c/w
internal wiring connection comprising:-
To supply & install one (1) unit wall mounted type DB c/w
internal wiring connection comprising:-
81
To supply & install one (1) unit wall mounted type DB c/w
internal wiring connection comprising:-
To supply & install one (1) unit wall mounted type DB c/w
internal wiring connection comprising:-
‘The Cable size of the list below is just for indication and
must be change as the load or power change from the
list below)’
5.5 HP DigesterCrossFeedConveyorusing
1x3Cx2.5mm2
7.5 HP Digester Feed Conveyor using 2x3Cx5mm2
3 HP Crude Oil and Sludge Vibrating Screen using
1x3Cx2.5mm2
7.5 HP Crude Oil Pump using 1x3Cx2.5mm2
40 HP Screw Press No. 1, 2, 3 & 4 using 2x3Cx16mm2
40 HP Digester No. 1, 2, 3 & 4 using 2x3Cx16mm2
2 HP Hydraulic pumps No. 1, 2, 3 & 4 using
1x3Cx2.5mm2
4.8Boiler House
86
5) Factory Lighting (Uses the LED Lamp for Whole mill and
Road as Eqivalent to the list below)
5. 1 Sterilizer Station
5. 4 Clarification Station
5. 5 Boiler House
5. 6 Power House
5. 11 Fruit Reception
5. 12 Compound Lightings
6) Overhead Liner
88
7) Earthing System
8) Lighting Protection
1 Set 75 metres radius non radio active lighting preventor unit c/w
1” x 1/8 copper tape and earth electrode and chambers.
89
LIST OF LABORATORIUM EQUIPMENT
The laboratory would be provided with all furnishing, fittings and equipment to
treat and analyze all factory products, domestic and boiler feed water
samples and factory effluent samples.
The following is the minimum list of the equipment would be supplied and
installed by Contractor
ITEM NO.OF
NO. DESCRIPTION MODEL/TYPE SIZE UNITS
A. EQUIPMENT/GLASSWARE
1. Electric Weigher Sartonius A 200S Max. 200 gm 1
2. Self0indicating Balance Sartorius 1002 0.1-500 gr. 1
3. Top Pan Balance Scale 1 kg Cap. 50 kg 1
4. Weigh Set 238 Ohaus & 214 – USA 1 mg – 200 gr 1 Set
0.5 kg – 5 kg
ITEM NO.OF
NO. DESCRIPTION MODEL/TYPE SIZE UNITS
5. Soxhlet Exraction Thermostatically controlled 230 V- 6 x 150W 2 Set
electric heating-mantle for 250 ml
flask c/w Support Roods Boss Heads
and Clamps for holding condenser
glass
6. Extractors Quick fit: Socket = 40/38 100 ml 18
Cone = 29/32
7. Condensor Quick fit Socket = 40/38 18
8. Flat Bottom Flask Quick fit socket = 29/32 250 ml 24
9. Hexane Distillation Set Electromantle 1000 ml 1
a. Isopad Isomantle Socket and Cones 24/29 1
b. Condensor Socket 24/29
c. Delivery Adaptor
1
d. Plain Steel Head Socket 14/23
Thermometer Condenser & Cone 24/29 1
Flask.
e. Round Bottom Flask Socket 24/29 1000 ml
1
10. VFA Distillation Set
a. Leibing Condenser NS 39/32 500 ml 1
b. Flat Bottom Flash NS 39/32
c. Still Head Two (2)-Cone For
1
Steam NS 39/32
d. Distillation Condenser NS 39/23
e. Receiver Adaptor NS 29/32 1
(Palaintbent) 1
B CHEMICALS
1. KOH Pellets MERCK Art. 5033 1000 gr/bt 2 bt
2. Potassium Hydrogen Phthalate MERCK Art. 4874 500 gr/bt 2 bt
3. Phenolphthalein Powder MERCK Art. 7233 100 gr/bt 1 bt
4. Methyl Orange Powder MERCK Art 1322 100 gr/bt 1 bt
5. Iso Propyl Alcohol A.R. Grade 96% 2.5 l/bt 2 bt
6. Hexane Commercial Grade 250 l/bt 1
drum
7. Concentrated Sulphuric Acid A.R. Grade 95-97 % 5 l/bt 2 bt
8. Acetic Acid, Glacial UNIVAR UN 2789 2.5 l/bt 1 bt
9. NaOH Pelletes 1 kg/bt 1 kg
10. Cotton Wool 4 kg
11. Ammonium Molybdake Powder UNIVAR (81-83 %) 10 g/100 cc 500 g/bt 1 bt
H2O
12. Ethanol UNIVAR 95 % pure 2.5 l/bt 1
C SPARES
Heating Mantle For Soxhle 150 Watt 6
Extraction Electrothermal
92
LIST OF WORKSHOP EQUIPMENT
The factory workshop will be equipped with equipment required for the
maintenance and repair of the works would be supplied and installed by
Contractor.
All necessary hand tools, special tools and gauges to include spanner,
wrenches, screw drives, hammers, calipers, surface gauges, vices, hacksaw,
scribers, bevels, internal and external micrometer gauges, straight edges,
surface plates, rules, “V” blocks, dial gauges, screw pitch gauges and sets of
taps and dies, etc.
All necessary lifting equipment including slings, ropes and tackles, jacks and
crowbars.
1 Avometer
1 Meggar
93
2 Tong tester or Clamp meter
2 Electric drill with bench stand (13 mm)
2 Dual scale voltmeter
2 Set of conduit pipe threading stocks and dies
2 Soldering irons, electric