Mechanical Quick Start Guide
Positioning
Choose a position that will ensure a full pipe. Choose a position that will minimize flow distortion.
5X 1X
12345
12345
12345 12345
12345 12345
2X 1X
12345
12345
12
34
5X 1X
5
12
34
5
Not Ideal:
12345
sediment on the
5
results from
Electrode moved from
unimpeded electrodes top by rotating meter
electrodes can affect
accuracy
Possible
Electrodes free from sediment
sediment build-up build-up
Grounding
Metal Pipe Plastic Pipe
Meter Flange Equalization Lug
Gasket Grounding Ring Grounding Ring
Pipe Flange Gaskets Gaskets
Equalization Lug Lockwasher
Flange Plate
Plastic Plastic
Pipe Pipe
Ground Clamp
(Exothermically weld when
corrosion is a concern)
Meter
Flange Pipe Earth
Flange
#6, #8, or #12 AWG Stranded 8’ Ground Rod
Metal Pipe Gaskets Metal Pipe Copper Ground Wire < 5’
• Do not weld or flame cut within 10’ of meter. Heat will • Bolts must be tightened evenly. Do not over tighten one side
damage electronics and liner. (Heat will void warranty.) to fill a gap.
• Install provided full face gaskets. Failure to install gaskets • Improper sealing of cables or cable glands will void warranty.
will void warranty.
• Install security seal during installation if regulations require.
• Tube must be completely aligned with adjoining flanges.
• Backup batteries are not intended as a primary power source.
• Ensure proper grounding.
Refer to the Electrical Quick Start Guide or the complete instruction manual for details on wiring.