GENERAL NOTES: ROOF: ROLLER / PANEL LIFT DOOR HEAD JOINERY:

- Waterproofing membranes for external above ground use shall


- All gutters and downpipes shall be in accordance with NCC Part 3.5.2 & comply with BCA Vol 2 - Part 3.8.1.3 HEIGHT CLEARANCE:
- These drawings are to be read in conjunction with all other Linens, P'trys and broom cupb'ds:
AS/NZS3500.3
documents, schedules, specifications, engineering reports and
- Wet area setdown to upper floor unless noted otherwise. - 2100mm high door or 2430mm ceiling with full height door - - 2430 ceilings: Laminated linen cupb'ds and p'trys are to be
plans. If any discrepancies occur or documents missing, contact
1980mm nom. total clearance 2280mm high with 4 x shelves unless noted otherwise.
site supervisor prior to commencement of any work. - NO floor traps to ALL wet areas as overflows to all plumbing Intermediate support shall be provided where required.
STAIRS: fixtures used unless otherwise noted - 2400mm high door or 2730mm ceiling with full height door -
- The structure shall be constructed in strict accordance with all
2280mm nom. total clearance - 2580 ceilings: Laminated linen cupb'ds and p'trys are to be
current and relevant Australian standards. All contractors shall be - All stairs to have a balustrade height of 1000mm with a 125mm
familiar with the relevant standards and the building code of max gap between balusters and handrails @ 865mm high.
CLADDING / LININGS: - Lift off hinges are to be provided where toilet pan is located
2400mm high with 4 x shelves unless noted otherwise.
Australia prior to commencement of any work. Intermediate support shall be provided where required.
within 1200mm of the door hinge.
- All handrails to staircases to be installed in accordance with NCC - All roof, wall and floor claddings shall be installed in accordance
- All measurements are not to be scaled. Written dimensions will with manufacturers details and specifications. - 2730 ceilings: Laminated linen cupb'ds and p'trys are to be
Vol 2 - 3.9.2.4 - Exhaust fans are to be supplied to wet areas where no natural 2400mm high with 4 x shelves unless noted otherwise.
take precedence over scale. If dimensions are missing or needing ventilation is provided discharging to atmosphere where noted.
- Refer to current engineering report and plans for location and Intermediate support shall be provided where required.
clarification, contractors are to verify prior to commencement of - Non slip finish to treads.
any work. details of all control joints.
- Refer to selections documentation for extent of wall and floor - Laminated corner p'trys are to be 1020mm sq. Refer above for
- Stairs trimmers shall be provided to all staircases for fixing of tiling. If any discrepancies occur, contact site supervisor prior to heights and shelf requirements.
- All dimensions shown on plans are to frame work and finished handrails. Trimmers are to be located 250mm in from all stair - Fire retardant sealant shall be provided to control joints for walls
commencement of any work.
floor levels excluding external windows and doors. Dimensions landings and from the start of every stair flight. Remainder shall be located on boundaries.
- Broom cupb'ds are to be constructed as above except 1 shelf @
are nominal and are subject to change if required. evenly spaced with not exceeding 600mm - Tiled hobs are to be provided to all showers unless noted
- Where rendered brickwork occurs, cement render finish with 3 1800mm AFL will be provide with a slot unless noted otherwise.
(REFER TO DETAIL BELOW) otherwise.
coat Acrylic is to be provided unless noted otherwise (RETAIL)
250 250 250 250 Overhead cupb'ds:
SITE: - Tiled ledge to bath to be provided unless shown otherwise.
- Where rendered brickwork occurs, cement render painted finish is

eq 250
to be provided unless noted otherwise (INVESTOR + H&L) - 2430 ceilings: Overhead cupb'ds are to be 680mm high x
- All site set out dimensions shall be checked and verified prior to 300mm deep with 1 x shelf unless noted otherwise.
commencement of any work. - Where rendered AAC occurs, 3 coat Acrylic render finish is to be WET AREA LEGEND:
provided unless noted otherwise (RETAIL) - 2580 ceilings: Overhead cupb'ds are to be 800mm high x

250 eq
- Refer to civil engineering report and plans for Finished Floor 300mm deep with 2 x shelves unless noted otherwise.
TR: Towel rail as specified at 1000mm AFL unless noted
Levels, Paving Levels, Retaining wall location and details, - Where rendered AAC occurs, 2 coat Acrylic render finish is to be otherwise
Stormwater details, any excavation and/or filling required. provided unless noted otherwise (INVESTOR + H&L) - 2730 ceilings: Overhead cupb'ds are to be 800mm high x
eq eq 300mm deep with 2 x shelves unless noted otherwise.
TRH: Toilet roll holder as specified at 750mm AFL unless noted
Timber frame floor joists (RETAIL): - Where rendered lightweight cladding occurs, 3 coat Acrylic render otherwise
finish is to be provided unless noted otherwise (RETAIL) - Fridge dimension shown in plans are nominal, excludes lining &
SLAB: skirting. All fridge size to be confirmed at selections appointment
- 2430 ceilings: 16 risers @ 175.63 mm high (max. 190mm + HTR: Hand towel ring/rail as specified at 1400mm AFL unless
tolerance) - Where rendered lightweight cladding occurs, Cement render noted otherwise
Exposed Concrete Slabs painted finish is to be provided unless noted otherwise (INVESTOR
15 treads @ 250mm. 2R+G ( 351.26 + 250 = 601.26 ) Kitchen bench:
-The integrity of a concrete slab free from chips, scratches, + H&L)
NCC Code (Part 3.9.1 & 3.9.2) 700 max. 550 min RH: Robe hook as specified at 1800mm AFL unless noted
paint, etc cannot be guaranteed during construction. It is otherwise
recommended that all external slabs have a tiled finish or to - Where a 12.0m straight run of plasterboard ceiling occurs, a - Where a laminated kitchen bench length is over 3.6m, a bench
- 2580 ceilings: 16 risers @ 185 mm high (max. 190mm + joint is required.
be poured separately close to handover (subject to extra tolerance) control joint shall be provided in accordance with manufacturers SS: Shower shelf as specified at 1400mm AFL unless noted
cost) if a raw finish is desired. 15 treads @ 250mm. 2R+G ( 370 + 250 = 620 ) details. otherwise - Where a stone kitchen bench length is over 3.0m and a width of
NCC Code (Part 3.9.1 & 3.9.2) 700 max. 550 min. 1.4m, a bench joint is required.
- Slab setout plan is to be read in conjunction with current
engineering report and plans. If any discrepancies occur or - 2730 ceilings: 17 risers @ 182.94 mm high (max. 190mm + WINDOWS AND DOORS: - Kitchen bench overhang shall be 300mm unless noted
documents missing, contact site supervisor prior to tolerance) ELECTRICAL: otherwise.
commencement of any work. 16 treads @ 250mm. 2R+G ( 365.88 + 250 = 615.88 ) - Refer to window and door schedule for exact sizes. If any
NCC Code (Part 3.9.1 & 3.9.2) 700 max. 550 min. discrepancies occur, contact site supervisor prior to - Self contained smoke alarm shall comply with AS3786 and be
- All utility drawers (if selected) shall be 185mm high unless noted
- Concrete slab on ground to have 75mm exposed edge to top of commencement of any work. connected to the consumer mains power. If more than one
otherwise.
paving unless noted otherwise. Steel frame floor joists (RETAIL): smoke detector is provided, they must be interconnected. BCA
-All external doors are recommended to swing inwards. Swinging part 3.7.2.2
- Where a kitchen window sill is at 905mm AFL, benchtop is to
- Collar protections shall be provided to all service penetrations - 2430 ceilings: 16 risers @ 181.25mm high (max. 190mm + doors outwards may void warranty requirements and create run past the timber / steel frame to finish under window frame
unless noted otherwise. tolerance) waterproofing and weathering issues. - All light switches are to be located at 1050mm AFL unless
unless noted otherwise.
15 treads @ 250mm. 2R+G ( 362.5 + 250 = 612.5 ) noted otherwise
- Homeguard to perimeter shall be provided if specified. NCC Code (Part 3.9.1 & 3.9.2) 700 max. 550 min - All glazing to be in accordance with AS 1288 Laundry Inset trough:
- AC, Security and HWS panels are to be located at 1400mm
- 2580 ceilings: 16 risers @ 190.62 mm high (max. 190mm + - All bedroom awning windows to upper floor to have a restricted AFL unless noted otherwise
- Termite protection in accordance with NCC Part 3.1.3 - 700mm wide x 900mm high laminated cupb'd with inset trough
tolerance) opening of 100mm to comply with NCC requirements (Section as specified.
15 treads @ 250mm. 2R+G ( 381.24 + 250 = 631.24 ) 3.9.2.5) except where leading to a balcony. - All internal wall mounted batten lights are to be located at
- All locations of service penetrations shall be confirmed prior to
NCC Code (Part 3.9.1 & 3.9.2) 700 max. 550 min. 2100mm AFL unless noted otherwise
commencement of any work. - Benchtop only to remainder unless shown otherwise.
- 2430 ceilings: All window head heights to be at eaves level. All
- 2730 ceilings: 17 risers @ 188.23 mm high (max. 190mm doors to have timber trim above for dwellings consisting of - GPO's not located above benchtops are to be at 300mm and Vanities:
- Where a dwelling is built on boundary, a stormwater sleeve is to
tolerance) brickwork unless noted otherwise. 1200mm AFL unless noted otherwise
be provided. Refer to engineering plans for details.
16 treads @ 250mm. 2R+G ( 376.46 + 250 = 626.46 ) - Vanities with either standard basins or semi-inset basins shall
NCC Code (Part 3.9.1 & 3.9.2) 700 max. 550 min. - 2580 ceilings: All window head heights to be at eaves level. All - GPO's located above benchtops are to be at 1050mm AFL be 900mm high with 1 x shelf unless noted otherwise.
-Where the gas supply runs through strip footing a conduit of unless noted otherwise
windows to front elevation shall be at 2150mm head height with
50mm diameter must be provided at a depth of 450mm
brickwork and lintel above for dwellings consisting of brickwork - Vanities with above counter basins shall be 900mm high to top
unless noted otherwise. All doors to have timber trim above for - TV, data, HDMI, internal gas points and Foxtel points are to be
- Slab rebates shall be 25mm unless noted otherwise. WET AREA: of basin with 1 x shelf unless noted otherwise.
dwellings consisting of brickwork unless noted otherwise. at 300mm AFL unless noted otherwise

- Setdowns to porches, alfresco's and verandahs shall be 25mm - All wet areas shall to be constructed in accordance with the NCC - All wall hung vanities to have concealed waste as standard.
- 2730 ceilings: All windows shall be at 2150mm head height with - All GPO's to wet areas excluding l'drys are to be located at (subject to proposed framing layout)
unless noted otherwise. Volume 2, SA Variation SA3.8.1.2 lightweight infill above for dwellings consisting of brickwork unless 1050mm AFL unless noted otherwise

- All external above ground membranes shall be complying with


noted otherwise. All windows to front elevation shall be at 2150mm CONSTRUCTION PLANS
head height with brickwork and lintel above for dwellings consisting - All external water proof GPO's are to be located at 1200mm
FRAMING: AS 4654 Parts 1 & 2. of brickwork unless noted otherwise. All doors to have lightweight AFL unless noted otherwise
infill above for dwellings consisting of brickwork unless noted PLEASE SIGN HERE: ..............................
- Wall, floor and roof framing shall be designed in accordance with otherwise. - Double GPO and water point to be provided in cupboard of
manufacturers details and specifications. inset trough for washing machine unless noted otherwise. DATE: .......................................................
DESIGN SHEET TITLE PROPOSED RESIDENCE FOR: 1: 100
- All niche sizes are internal frame dimensions only. No allowance McLaren 239 - Metro Modified General Notes Living 183.03 SCALE
SHEET NO. 1 of 8
has been made for wall linings or tiling. AMENDMENT DATE
A. T. Zauch
Garage 36.98 JOB NO. 17697
WORKING DRAWINGS (JT) 18.10.17
- Termite protection in accordance with NCC Part 3.1.3 Window change to Bed 1 / Porch pier note updated (JT) 10.01.18
Porch 2.94 Lot 12 Victoria Road DRAWN TR
Alfresco 16.69 DATE 2/3/18
CONSTRUCTION PLANS (TR) 2/3/18 387 - 391 South Rd,
- Protective coating for structural steel to be provided in moderate MILE END SOUTH SA 5031
MOUNT BARKER ISSUE NO. 4
Phone: (08) 8354 7800
and extreme environments in accordance with the tables 3.4.4.2 THE STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT EDITION OF NATIONAL CONSTRUCTION
Fax: (08) 8234 6099 CODE. FIGURED DIMENSIONS SHALL TAKE PREFERENCE OVER SCALED DRAWINGS. WHERE SITE CONDITIONS DO
(Structural Steel Members) of the BCA A.B.N. 70 065 466 337 NOT REFLECT THE INTENT SHOWN IN THE DRAWINGS OR WHERE SITE MEASUREMENTS CONFLICT WITH DIMENSIONS,
B.Lic. BLD 113681 LEVELS OR NOTATION SHOWN SEEK CLARIFICATION BEFORE COMMENCEMENT. THIS PLANS REMAINS THE
EXCLUSIVE PROPERTY OF RIVERGUM HOMES AND ARE PROTECTED BY COPYRIGHT LAWS. LEGAL ACTION WILL BE
Web: rivergumhomes.com.au Total 239.64 TAKEN AGAINST ANY INFRINGEMENT WHETHER IT BE IN PART OR IN FULL, UNLESS WRITTEN PERMISSION IS GIVEN.
Windspeed = N2(33m/s) 3120 1490 1810 1490 3610 1920 7910 2040
NOTE: All internal doors
240 1430 90 5800 350 to be 2400mm high
Bushfire Zone = Refer to Elevations
240 4310 240 240 1830 90 1430 90

Brick Veneer Construction 240 8820 2930 Kit. 90


NOTE: Close coupled NOTE: Inset basin to AIR CONDITIONER
toilets throughout both vanity with 900mm -Builder to supply & install ducted
reverse cycle air-conditioner (layout
Lift off hinges to Pwd 240 11850 90 height benchtops as per manufacturer's specification)

2000
240 4310 90 1310 90 1930 90 1420 90 8420 240
Torrens Title CONSTRUCTION PLANS
350 2770 1690 350
PLEASE SIGN HERE: ..............................

Br. cup'd DATE: .......................................................


Scale 1:100

240

240

590
960

WIP

1470
240

240

240
350
1070

600
300
240

90
2330

4810
5790
Garage

3190
4800
5350

7310
Living Meals Kit.
5260
3610

Alfresco
350
4200

6260
100
2320

90 950 90

11500 o/all
100

550

850
460
670

350 1090 350


90 1300 90 90

90

90

90 1340 90
370

700
240

Porch
90 1000 90

Entry

1790
90 1370

720350 70 990
Pwd
950

1760

450
1700

240

350
90
300
890

L'dry

600
600

600
90
90

90 1000 90

2000
WIR
950

850 590 850


5190

1200
Lounge Bed 1
3710

3710
3620

3840
3320

1170
Bed 3 Bed 2 Bath

90
Bed 4
2920
1450

1830

1620
Ens
950

830
240

240

240

240

240

240

240
1160

900 1620

250 400 250 210 1200 210


240 2510 90 1000 90 1900 90 1000 90 1000 90 1910 90 990 90 920 90

400 1130

400 1130
240 3600 90 2990 90 3000 90 1910 180 3400 180 3110 90 3580 240
NOTE: Skirtings tacked on to entry,

2730
lounge, kitchen, WIP, Meals, living, 4790 1450 1550 1450 1190 1210 1070 2410 2990 610 4070
Hallway & Linen. Builders carpenter

1200

1200
22790 600
& painter to return after flooring is
intalled to to fix skirting and paint 23390 o/all

Bath. Niche Ens. Niche


Scale 1:100 Scale 1:100
Energy Compliance 100
Items supplied & installed by Builder: Floor Plan
2
-R6.0 insulation to ceilings excluding Garages, Carports, Porchs,
Alfrescos & Verandahs
-R6.0 insulation to Garage ceilings or any other ceiling with 10mm
recessed edge water resistant plasterboard
-R2.5HP insulation to external walls excluding Garage external walls
-Seals to all side of external doors & windows
-Seal exhaust fans to entire dwelling
-Double Glazed as shown on plan
Bushfire Zone = BAL 12.5
Items to be supplied and installed by builder if applicable:

Galv post/column shoes to be min. 75mm clearance to ground


Hinged external doors must be solid core with minimum thickness of 35mm. Flush
Panel Solid Core Door rating 1 2045x820x38mm
Upgrade from fibreglass screens to Aluminium door screens
Upgrade from fibreglass screens to Aluminium to window screens
windows less than 400mm above a horizontal surface to be metal and have 4mm
thick toughened glass * Where double glazing is used then only the external face of
glass needs to comply & all external fixtures must be metal
Door frames must be bush fire resistant timber (Blackbutt or Merbau)
Roller door up to 3m wide - nylon brush

450
Roller door 3 - 5.6m wide - nylon brush
External doors to be fitted with weather strips
Vents & weepholes to be protected with corrosion resistant bronze wire mesh spark
guards
Roof of verandah, carport & awning roof which form part of the main roof must
meet all the requirements of the main roof

2730
Verandah, carport & awning roof NOT forming part of the main roof must be lined
with fibre cement sheeting minimum thickness 6mm
All roof cappings & flashings to be scribed out
Sarking to entire roof area including verandahs under main roof
Gables must be fully sarked
Eave penetrations must be non-combustible and sealed to prevent gaps greater
than 3mm . No lights to eaves
Roof lights including shafts to be sealed at roof penetration to prevent gaps greater
than 3mm
Solatube skylight range to be used to meet requirements
Roof lights installed in roofs where pitch is less than 18 degrees can not be used
Elevation 1
Brivis AD66 series evaporative cooler to be used to comply with bushfire CONSTRUCTION PLANS
requirements. Upgrade from standard (non bushfire) air con
All components must be non-combustible and sealed at roof penetration to prevent
gaps greater than 3mm PLEASE SIGN HERE: ..............................
Sealed exhaust fans
Sealed IXL exhaust fan DATE: .......................................................
Roof Spinways
Openings in roof ventilators fitted with bronze mesh ember guards (EG whirly bird)
Openings in vent pipes to be fitted with bronze mesh ember guards
Above ground, exposed water and gas supply pipes must be metal (copper)

Elevation 2

NOTE:
-Control joints as per Engineer's
specification for Brickwork only DESIGN SHEET TITLE PROPOSED RESIDENCE FOR: 1: 100
McLaren 239 - Metro Modified Elevations Living 183.03 SCALE
SHEET NO. 3 of 8
AMENDMENT DATE
A. T. Zauch
Garage 36.98 JOB NO. 17697
WORKING DRAWINGS (JT) 18.10.17
Window change to Bed 1 / Porch pier note updated (JT) 10.01.18
Porch 2.94 Lot 12 Victoria Road DRAWN TR
Alfresco 16.69 DATE 2/3/18
CONSTRUCTION PLANS (TR) 2/3/18 387 - 391 South Rd,
NOTE: MILE END SOUTH SA 5031
MOUNT BARKER ISSUE NO. 4
ALL WINDOW HEAD HEIGHTS TO BE AT Phone: (08) 8354 7800
THE STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT EDITION OF NATIONAL CONSTRUCTION
EAVES LEVEL. Fax: (08) 8234 6099 CODE. FIGURED DIMENSIONS SHALL TAKE PREFERENCE OVER SCALED DRAWINGS. WHERE SITE CONDITIONS DO
A.B.N. 70 065 466 337 NOT REFLECT THE INTENT SHOWN IN THE DRAWINGS OR WHERE SITE MEASUREMENTS CONFLICT WITH DIMENSIONS,
ALL DOORS TO HAVE TIMBER TRIM ABOVE B.Lic. BLD 113681 LEVELS OR NOTATION SHOWN SEEK CLARIFICATION BEFORE COMMENCEMENT. THIS PLANS REMAINS THE
EXCLUSIVE PROPERTY OF RIVERGUM HOMES AND ARE PROTECTED BY COPYRIGHT LAWS. LEGAL ACTION WILL BE
UNLESS OTHERWISE NOTED. Web: rivergumhomes.com.au Total 239.64 TAKEN AGAINST ANY INFRINGEMENT WHETHER IT BE IN PART OR IN FULL, UNLESS WRITTEN PERMISSION IS GIVEN.
2730
CONSTRUCTION PLANS
PLEASE SIGN HERE: ..............................

DATE: .......................................................

Elevation 3

Elevation 4

NOTE:
-Control joints as per Engineer's
specification for Brickwork only DESIGN SHEET TITLE PROPOSED RESIDENCE FOR: 1: 100
McLaren 239 - Metro Modified Elevations Living 183.03 SCALE
SHEET NO. 4 of 8
AMENDMENT DATE
A. T. Zauch
Garage 36.98 JOB NO. 17697
WORKING DRAWINGS (JT) 18.10.17
Window change to Bed 1 / Porch pier note updated (JT) 10.01.18
Porch 2.94 Lot 12 Victoria Road DRAWN TR
Alfresco 16.69 DATE 2/3/18
NOTE: CONSTRUCTION PLANS (TR) 2/3/18 387 - 391 South Rd,
MILE END SOUTH SA 5031
MOUNT BARKER ISSUE NO. 4
ALL WINDOW HEAD HEIGHTS TO BE AT Phone: (08) 8354 7800
THE STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT EDITION OF NATIONAL CONSTRUCTION
EAVES LEVEL. Fax: (08) 8234 6099 CODE. FIGURED DIMENSIONS SHALL TAKE PREFERENCE OVER SCALED DRAWINGS. WHERE SITE CONDITIONS DO
A.B.N. 70 065 466 337 NOT REFLECT THE INTENT SHOWN IN THE DRAWINGS OR WHERE SITE MEASUREMENTS CONFLICT WITH DIMENSIONS,
ALL DOORS TO HAVE TIMBER TRIM ABOVE B.Lic. BLD 113681 LEVELS OR NOTATION SHOWN SEEK CLARIFICATION BEFORE COMMENCEMENT. THIS PLANS REMAINS THE
UNLESS OTHERWISE NOTED. EXCLUSIVE PROPERTY OF RIVERGUM HOMES AND ARE PROTECTED BY COPYRIGHT LAWS. LEGAL ACTION WILL BE
Web: rivergumhomes.com.au Total 239.64 TAKEN AGAINST ANY INFRINGEMENT WHETHER IT BE IN PART OR IN FULL, UNLESS WRITTEN PERMISSION IS GIVEN.
Smart wiring for NBN ready homes NOTE: Power for septic to be
- Includes fibre optic feed in conduit, patch panel,
double GPO, 1 x telephone point and 1 x data point
provided by builder. Location
(Cat 6) (Fibre optic connection, PCD, PSU and NTD to be confirmed on site
units by NBN co.) Telstra Copper wire connection by
Telstra if NBN fibre not yet avaliable.
NOTE: Photovoltaic
Prewire by builder

LEGEND
* Single Phase Power
light switch television point ceiling fan
HDMI point
Batten light point
gas point ceiling fan with light
CONSTRUCTION PLANS
Oyster light point

Pendent light point exhaust fan


PLEASE SIGN HERE: ..............................
downlight with 3 in 1 tastic 2 lamp Alarm System
thermal shield
External siren DATE: .......................................................
3 in 1 tastic 4 lamp
flood light & strobe light
waterproof
Node 3 phone point,
Sensor
fluorescent light Single GPO above
flood light with sensor shelf for alarm system
telephone point
single power point Internal siren DESIGN SHEET TITLE PROPOSED RESIDENCE FOR: 1: 100
Network termination
McLaren 239 - Metro Modified Electrical Plan Living 183.03 SCALE
SHEET NO. 5 of 8
double power point device enclosure Code panel
AMENDMENT DATE
A. T. Zauch
Garage 36.98 JOB NO. 17697
Alarm sensor
WORKING DRAWINGS (JT) 18.10.17
single power point
telephone/data point
Window change to Bed 1 / Porch pier note updated (JT) 10.01.18
Porch 2.94 Lot 12 Victoria Road DRAWN TR
Alfresco 16.69 DATE 2/3/18
self contained smoke alarm shall comply CONSTRUCTION PLANS (TR) 2/3/18 387 - 391 South Rd,
double power point data point
with AS 3786 and be connected to the MILE END SOUTH SA 5031
MOUNT BARKER ISSUE NO. 4
consumer mains power. If more than one Phone: (08) 8354 7800
THE STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT EDITION OF NATIONAL CONSTRUCTION
Recessed wall light television/foxtel point smoke detector must be interconnected Fax: (08) 8234 6099 CODE. FIGURED DIMENSIONS SHALL TAKE PREFERENCE OVER SCALED DRAWINGS. WHERE SITE CONDITIONS DO
A.B.N. 70 065 466 337 NOT REFLECT THE INTENT SHOWN IN THE DRAWINGS OR WHERE SITE MEASUREMENTS CONFLICT WITH DIMENSIONS,
wall mounted batten light Vanity wall light B.Lic. BLD 113681 LEVELS OR NOTATION SHOWN SEEK CLARIFICATION BEFORE COMMENCEMENT. THIS PLANS REMAINS THE
EXCLUSIVE PROPERTY OF RIVERGUM HOMES AND ARE PROTECTED BY COPYRIGHT LAWS. LEGAL ACTION WILL BE
wall mounted light fitting Movement Sensor with overide Web: rivergumhomes.com.au Total 239.64 TAKEN AGAINST ANY INFRINGEMENT WHETHER IT BE IN PART OR IN FULL, UNLESS WRITTEN PERMISSION IS GIVEN.
CONSTRUCTION PLANS NOTE: 20mm thick stone
benchtops to kitchen
PLEASE SIGN HERE: ..............................
1470 90 3190 90 950
DATE: ....................................................... NOTE: Soft close
to all drawers

300

700
1430
300
1

1430
2

90
3

1830

900
600 1200 1800 1200

2730
700

700

1820
eq eq 185

450
900

Elevation 3
Elevation 4 Elevation 2 Elevation 1

DESIGN SHEET TITLE PROPOSED RESIDENCE FOR: 1: 50


McLaren 239 - Metro Modified Kitchen elevations Living 183.03 SCALE
SHEET NO. 6 of 8
AMENDMENT DATE
A. T. Zauch
Garage 36.98 JOB NO. 17697
WORKING DRAWINGS (JT) 18.10.17
Window change to Bed 1 / Porch pier note updated (JT) 10.01.18
Porch 2.94 Lot 12 Victoria Road DRAWN TR
Alfresco 16.69 DATE 2/3/18
CONSTRUCTION PLANS (TR) 2/3/18 387 - 391 South Rd,
MILE END SOUTH SA 5031
MOUNT BARKER ISSUE NO. 4
Phone: (08) 8354 7800
THE STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT EDITION OF NATIONAL CONSTRUCTION
Fax: (08) 8234 6099 CODE. FIGURED DIMENSIONS SHALL TAKE PREFERENCE OVER SCALED DRAWINGS. WHERE SITE CONDITIONS DO
A.B.N. 70 065 466 337 NOT REFLECT THE INTENT SHOWN IN THE DRAWINGS OR WHERE SITE MEASUREMENTS CONFLICT WITH DIMENSIONS,
B.Lic. BLD 113681 LEVELS OR NOTATION SHOWN SEEK CLARIFICATION BEFORE COMMENCEMENT. THIS PLANS REMAINS THE
EXCLUSIVE PROPERTY OF RIVERGUM HOMES AND ARE PROTECTED BY COPYRIGHT LAWS. LEGAL ACTION WILL BE
Web: rivergumhomes.com.au Total 239.64 TAKEN AGAINST ANY INFRINGEMENT WHETHER IT BE IN PART OR IN FULL, UNLESS WRITTEN PERMISSION IS GIVEN.