You are on page 1of 1

Ocean Jade Shipping Rev. No.

: 1
Date : 1st Jan. 14

NAV CHECKLISTS Pre. by : SOT


App. by : DPA

NAV CL 13a SQUAT CALCULATION Page 1 of 1

Vessel: Golden Example Displ Loaded: 17,000 (current) Length: 120 Loaded Draft: 9.6 max
Date: 1-Mar-10 Displ Ballast: 8,000 (max) Breadth: 20 Ballast Draft: 5 calc

Squat Loaded Speed Squat Ballast


Squat in meters

Squat in meters
Squat Loaded Squat Ballast
4 Confined Open knots Confined Open
4
3.78 0 0 0 0 0
3.5
0.06 0.03 2 0.05 0.03 3.5 3.41
3 2.89
0.24 0.12 4 0.21 0.11 3
0.53 0.27 6 0.48 0.24 2.61
2.5 2.5
0.94 0.47 8 0.85 0.43
2.13
2 1.89 1.48 0.74 10 1.33 0.67 2 1.92
2.13 1.06 12 1.92 0.96 1.71
1.5 1.48 1.45 1.5
2.89 1.45 14 2.61 1.31 1.33 1.31
1 1.06 1
0.94 3.78 1.89 16 3.41 1.71 0.96
0.74 0.85
0.53 0.67
0.5 0.47 0.5 0.48 0.43
0.27 0.24
00
0.12 Calculated Cb (loaded) = 0.7378 00 0 0.11
0 2 4 6
Speed in8Knots 10 12 14Port:16 = 0 2 4 6
Speed in8Knots10 12 14 16

Calculated Cb (ballast) = 0.6667

Cb = Ñ Ñ = Displacement
LxBxD V = Speed in knots
water level
L = Length between perpendiculars
Tide Squat in Confined waters B = Extreme Breadth underwater
datum
level 2 x Cb x V2 D = Mean draft corresponding to the Displacement
draft
100 Cb =
The Cb may be entered manually at M20 & M22 if
known on board.
Charted Depth
Squat in Open waters Confined Water: Depth of water less than 2 x Draft
variable factors
C b x V2
100 Open Water: Depth of water greater than 2 x Draft

static under keel


clearance dynamic under keel
clearance OOW Sign ______________ Master Sign: _____________________
Sea bottom

Note: Only yellow cells are to be entered with correct data manually - all other cells and diagram contain suitable formular.

The completed checklist shall be attached to NAV CL 13b - "UKC Calculation".