You are on page 1of 2
HAD SEBSerEen o) SQadMn OMADED BxFur By onprxwsd, ougenodrenioiny sous National Water Supply & Drainage Board OHROS CAS - OMEGA SmrdWED HEaBEED OMB | sain OSS - USSErdUy qaulmams Gr oAPCuras PLL KANDY NORTH PATHADOMBAIA INFEGIRARED WATER SUPALY PROJECT 6m / Telephone : (81 2192287 / 081 2500864 outed / Fax : 081 2492286 ea E-mail : kandynerthpivspgmail.com 00 eonaeeao, oosdam0 mea ate og 250804 Project Direcor’sOfie, Pa Palla Kondadeniya, Katogastota RONe. F RSCACKNPIWSR/OS~B (16112 y(2072-5e@ al 49" Oct 2022 Mr. Shi Zhifeng, Project Manager, M/s Sinohyydro Corporation Ltd, Hotel Sunrich, Hedeniya, Kandy. Dear Sir, KANDY NORTH - PATHADUMBARA INTEGRATED WATER SUPPLY PROJECT SUBJECT: REGARDING SIDE DRAINS ALONG THE INTAKE ROAD, DIVERSION OF THE DRAIN OFF TO THE LAND SLIDING AREA AND RESTORATION OF DAMAGED UTILITIES. At the area belongs to raw water main along the intake access road, we have observed that there is a land sliding area close to the road. Therefore in order to avoid water to directly enter to that area, itis essential to divert the water. Therefore itis expected to construct a drain with cover slabs (Use typical drawing for heavy duty structure) across the road in order to divert the water path off to the subjected land slide area (Refer Annex 01). Please note that the payments for this item is to be done as per the BOQ item 1.2.5, You are requested to fix the cover slabs for the drain which is being constructed along the intake road (As mentioned in BOQ item 1.2.5) as there is a possibility to collapse the soil into the drain. 3 Wehave informed you to restore/ rectify the damaged shifted properties and utilities at the end of the construction of RWM (Refer our letter RSC-C/ KNPIWSP/03-B/14951/' 2022-4861). Therefore we hereby remind you to restore damaged underground cable system of the lamp posts before doing permanent road reinstatement of RWM. Thank you. Yours faithfully, KANDY NORTH - PATHADUMBRA INTEGRA’ TED WATER SUPPLY PROJECT Eng. D V Medawatte PROJECT DIRECTOR Cc: Eng. WGS Munasinghe, CE/WTP. Enel: Annex 01 (pin mitoses aaa aaa ee amet EES a erie coe nee an a Head Otice ‘Telesone: Chain O11 -2634488 General M C1209 Fee ttee ——Densa4T/ 268996263403 ra Manager Hat ice 2635247 2635996 2664001 dwess = BRS dace og 06 exit ‘Telex: 21482 NWSDB.CE ini SGalleRoat__Ramalina, Si Lanka Fat: 263649 2637178 zag in omomarn crn oN EERE ements 1000 PLAIN END. PIPE PIECE PROPOSED RAW WATER MAIN DIPIPE 1200 225° BEND ) \ ELL25? BEND VERTICAL, 1200X1200 X1000 REDUCE L'y" JUNCTION. PROPOSED RAW WATER MAIN DIP 91000 “PROPOSED RAW WATER MAIN DIP 01000 PLAN VIEW - 01 EXISTING RAW WATER MAIN DIP @800 yer esa ui CROSSING TYPE 3A, =f CROSSING TYPE 3B PLAN, 90° BEND “OH RST BLOCK TRE PROPOSED RAW WATER MAIN elie Ni DIP 1200 EXISTING OVERFLOW AND Samay) 4 DIP 0600 KEY MAP - 02 /| oe] a h Sheet 02 of 01 Teeseane SESSA Lear = | Saas | & & DRAINAGE BOARD INTEGRATED WATER SUPPLY PROJECT | INTAKE AND RAW WATER MAIN Mfi| Aa = |aaee. eae ime Cs

You might also like