DATA SHEET
FOR
CATHODIC PROTECTION
TRANSFORMER RECTIFIER (TR) UNIT
ANNEXURE - I
PURCHASER'S DATA FOR CPTR UNIT
1 Type Floor mounted , Indoor – IP 42 AC Operated
Transformer Rectifier Unit for Impressed Current CP
System
2 Cooling Natural Air cooling (AN)
3 Quantity As per Scope of work
4 Input Power Supply As per Scope of work
20 Site conditions:
0°-50°C (max.)
(i) Ambient Temperature
24 Alarm & Indication a) T/R UNIT ON/OFF (AC Supply ON) – Visible.
(Indication Lamp shall be b) Reference 1 lowest –Visual
Cluster LED type) Reference 2 lowest – Visual
Reference 3 lowest – Visual
ANNEXURE – I A
Note- Various Settings of CP unit for Zn ref electrode will be differ from conventional Cu-
Cuso4 ref electrode, Bidder shall submit the data sheet of the CP unit for approval before
manufacturing of CP unit considering the Constant conversion factor of -1.1v to CuSO4.
MECON LIMITED STANDARD DATA SHEET
REGD. OFF: RANCHI
834002 ELECTRICAL SECTION, DELHI
ANNEXURE-II
ACCEPTABLE MAKES FOR COMPONENTS
S.No. Material Make
(List of suppliers for solid-state devices shall be furnished by the vendor for Owner’s approval).
-x-x-x-
CONTRACTOR CLIENT: M/S HPCL
QUALITY ASSURANCE PLAN PROJECT: BARMER- PALANPUR
FOR PIPELINE PROJECT
TEMPORARY CATHODIC (BPPL) SECTION-I &
PROTECTION SECTION-II
1. QAP shall be submitted for each of the equipment separately with break up Code Description Code Description Code Description DOCUMENTS:
of assembly/sub-assembly & part/component or for group of equipment
having same specification. 1. Visual 12. Routine test as per relevant IS 23. Short time rating D1. Approved GA drawings
2. Use numerical codes as indicated for extent of inspection & tests and 2. Dimensional other standard 24. Operational & functional D2. Approved single line/
submission of test certificates & documents. Additional codes & description 3. Fitment & Alignment 13. Type test as per relevant IS/ check schematic diagram
for extent of inspection & tests may be added as applicable for the plant and 4. Physical Test (Sample) other standard 25. Over Speed Test D3. Approved
equipment 5. Chemical Test (Sample)
3. Separate identification number with quantity for equipment shall be (Review of test report only) 14. Impulse Test 26. Flame Proof Test data sheet
indicated wherever equipment having same specifications belonging to 6. Ultrasonic Test 15. Partial Discharge Test 27. Clearance and creepage D4. Approved bill of materials
different facilities are grouped together. 7. Magnetic Particle Test (MPT) 16. Heat run risc test\tempr. Distance D5. Unpriced P.O. copy
4. Weight in tonnes (T) must be indicated under column 5 for each item. 8. Radiography Test 17. Enclosure Protection Test 28. Acceptance Test D6. Calibration Certificate
Estimated weights may be indicated wherever actual weights are not 9. Dye Penetration Test 18. Calibration 29. Material test of all measuring
available. instruments and gauges
ABBREVIATIONS USED : 10. Measurement of IR Value 19. Noise & Vibration 30. Coating Thickness (MMO Anode), Resistivity (MMO
a) Before HV Test 20. Test certificates for bought out Anode) & comsumption rate (For Mg, Zn & Zn Ribbon
CONTR : CONTRACTOR b) After HV Test components Anode only review of Test report)
11. High Voltage test/Dielectric 21. Tank Pressure Test / Pressure 31. Contact Resistance anode to cable Joint
MFR : MANUFACTURER test Test 32. Destructive testing
22. Paint shade verification & 33. Test Station Connection Scheme check, Name plate
Thichness check and terminal check
34. Chemical Composition & Open Circuit Potential (For Zn
Ribbon Anode, Review of Test report only)
EQUIPMENT DETAILS INSPECTION AND TESTS Test Certificates Acceptance REMARKS /
Sl. Description (With equipment Indentificatuin Quantity Manufacturer’s Expected schedule of Raw Material and inprocess stage Final Inspection/Test by & documents to Criteria SAMPLING
No. heading, place of use, and No. Name and Address Final Inspection inspection be submitted to Standards /IS/ PLAN
Breif Specifications) No/M T MFR CONTR MECON/ MFR CONTR/ MECON/ MECON BS/ASME/
TPI TPI OWNER Norms and
Documents
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1. CP Cables (1Cx6Sqmm, IW Meters 1,2,29 - - 1,2,28 1,2,28 1,2,28 D1, D2, D3, D4, I.S., Approved
1Cx10 Sqmm, 1Cx25Sqmm D5, D6, 20, 13 Data Sheet &
& 1Cx35Sqmm) Specifications
2. Test Stations (Big & Small IW Nos. 1,2,29 - - 1,2,3,4, 1,2,3,4, 1,2,3,4, D1, D2, D3, D4, I.S., Approved
Type) 22,33 22,33 22,33 D5, D6, 20, 13 Data Sheet &
Specifications
3. Sacrificial Mg & Zn Anodes IW Nos. 1,2,29 - - 1,2,4, 5, 1,2,4, 5, 1,2,4, 5, D1, D2, D3, D4, I.S., Approved * on 1%
30, 32* 30, 32* 30, 32* D5, D6, 20, 13 Data Sheet &
Specifications of total
nos. of
anodes
4. Spark Gap Arrestor (100 IW Nos. 1,2,29 - - 1,2,12 - - Manufacturer Approved Data
kA) test certificates Sheet &
& Compliance Specifications
Report
6. External ER Probe IW Set 1,2,29 - - 1,2,12 - - D1, D3, D4, D5, Approved Data *on one no.
D6, 20,12,13 Sheet & of each
Specifications
type
7. CTSU (Computerised Test IW Nos. 1,2,29 - - 1,2,3,12 1,2,3,12 1,2,3,12 D1, D3, D4, D5, Approved Data
Station Unit) & CTSU 22,24 22,2 22,24 D6, 20,12,13 Sheet &
Reader Specifications
9. TR/CPPSM UNIT I Set 1,2,3, 24, - - 1,2,3,12, 1,2,3,12, 1,2,3,12, D1, D2, D3, D4, I.S., Approved 16 Hr Heat
27,28 *16,22,23 *16, 22, *16, 22, D5, D6, 20 ,12,13 Data Sheet & Run Test on
one no of each
24,27,28 23,24,27 23,24,27 Specifications type unit
10. MMO Anodes I Nos. 1,2,4, 29, - - 1,2,4, 29, 1,2,4, 29, 1,2,4, 29, D1, D2, D3, D4, I.S., Approved
31 31 31 31 D5, D6, 20, 13 Data Sheet &
Specifications
11. CTSU (Computerised Test IW Nos. 1,2,3 - - 1,2,3, 1,2,3, 1,2,3, D1, D3, D4, D5, Approved Data
Station Unit), Central 22,24,33 22,24,33 22,24,33 D6, 20,12,13 Sheet &
Monitoring server & CTSU Specifications
Reader
12. Anode Junction Box & IW Nos. 1,2,3,4, - - 1,2,3,4, 1,2,3,4, 1,2,3,4, D1, D3, D4, D5, Approved Data *on one no.
Cathode Junction Box 22, 29 17*,22, 17*,22, 17*,22, 33 D6, 20,12,13 Sheet & of each
33 33 Specifications
type-
Report
review
only