35C Braincode Engineering 8,685.90 86.45 5,931.69 6,300.42 368.73 2,754.21 306.02 3,443.54
36B Romasha Engineers 8,351.00 51.76 7,156.96 7,641.95 484.99 1,194.04 132.67 1,568.95
House Connections
Total Scope Daily Progress (05/12/22) Cummulative Progress Balance
DMA Contractors
Stage 1 Stage 2 Stage 1 Stage 2 Stage 1 Stage 2 Stage 1 Stage 2
20A Sierra Constrcution 87 87 0 0 7 0 80 87
33A Subasinghe Contractors 1440 1440 0 0 0 0 1440 1440
Braincode Engineering
35A 1253 1253 0 0 0 0 1253 1253
Subasinghe Contractors
35B Edward & Christine 1121 1211 0 0 0 0 1121 1121
35C Braincode Engineering 1345 1345 18 0 49 0 1296 1345
36B Romasha Engineers 1211 1211 1 0 40 0 1171 1211