Drill & Blast Eng Kontraktor Drill & Blast Eng PT. EBL Production PT. EBL Mine Engineering PT.EBL
No Dokumen :F/MNE/O3(0)
Daily Blasting Plan Tgl Efektif : 9 Sept 2021
Lokasi Peledakan Seam GuGl Lokasi Lokasi 1 Lokasi 2 Lokasi 3 Lokasi Lokasi 1 Lokasi 2 Lokasi 3 Target Ekspose Seam Batubara
Hari/Tanggal Peledakan 27/03/2022 Hole Diameter 200 200 Burden 6 6 6 Lokasi 1 Lokasi 2 Lokasi 3
Waktu Peledakan 13:00:00 PM ## Dept Hole 4.5 6.5 Spacing 7 7 7 Seam GuGl 0
Elv Act - Elv target 28 s/d 23.5 Total Hole 155 Stemming 3.3 4.7 0 Pola Peledakan (Tie-up Desaign )
Jarak ke Final Wall 6m Total Depth 698 0 Subdrill 0.5 0.5 0
Box CUT
Jarak ke Batubara 3m Anfo 24 45 Est Volume 29295 0 0
Explosive Request
PRIMER
Dayagel
Booster 155
Fuel 223
Anfo 3720
Dabex
Surface Delay
67ms :
109ms 62
176ms 93
In hole Delay
IHD 6000 ms 160
lw. 6m :
lw.9m :
Lead In Line 8
Electronic Detonator :
Stemming Block :