WORK SCOPE: BUKSU CASISANG ANNEX LOCATION: Casisang, Malaybalay City
DATE CREATED:   TIME STARTED:
PREPARED BY:   TIME ENDED:
Risk Risk
Hazard Identification Risk Analysis Risk Control Risk After control apply
Category Category
Severit Risk Type of Risk Type of
Methodology Hazard Hazard Effect Likelihood Control Measure Likelihood Severity
y Rating Risk Rating Risk
SAMPLE: Preparation Carrying of Back pain 4 3 12 Mediu unacceptable buddy system, machines, 2 2 4 low acceptable
of Materials heavy loads m trolley with tie off
    Fall of material 4 3 12 Mediu unacceptable proper grip, tie off, safety 3 2 6 low acceptable
to foot or legs m shoes, leg support
 BukSU Toxic 5 4  20 High   unacceptable Find a suitable and safe  2 1  2  low  Acceptable
Chemical place to transfer the
Storage/Hazardous structure and eventually
Vault was located just have the stored
a few meters away chemicals transported by
from the constructed a registered HW
Senior HS Building in Transporter to a
Annex Campus A and registered TSD Facility
right just besides the
road. Exposure to Poisoning,
Toxic/ difficulty
Currently, the Hazardous breathing, burns,  5  4  20 High   unacceptable  Repair the enclosed  2  1 2  low  Acceptable
enclosed protection of Chemicals  etc.  protection and reprimand
the Hazardous Vault is     the contractor not to let
not in good condition its workers use the
because people can structure as a bunkhouse
access it inside. It was
even made as a
bunkhouse of some
construction workers
Bukidnon State University
City of Malaybalay, Bukidnon 8700
Tel (088) 221-2237; Loc 411; Telefax (088) 13-2717
www.bsc.edu.ph.;rhondellparaiso@gmail.com

DISASTER RISK REDUCTION & MANAGEMENT UNIT


HAZARD IDENTIFICATION, RISK ASSESSMENT AND CONTROL
WORK SCOPE: BUKSU CASISANG ANNEX LOCATION: Casisang, Malaybalay City
DATE CREATED:   TIME STARTED:
PREPARED BY:   TIME ENDED:
Risk Risk
Hazard Identification Risk Analysis Risk Control Risk After control apply
Category Category
Severit Risk Type of Risk Type of
Methodology Hazard Hazard Effect Likelihood Control Measure Likelihood Severity
y Rating Risk Rating Risk
                           

                         

 
                         

 
                         

You might also like