Professional Documents
Culture Documents
GRADE CONTROL
MINE DEPARTMENT
PT. INCO – GRADE CONTROL
Contribution
PLANNING GC: Inform proper equipment, ore distribution, and ore
characteristic
REVEGETATION
PT. INCO – GRADE CONTROL
MINERAL RESERVES:
CURRENT BASIC PRINCIPLE: Economic Cut off grade approach
East Block – 1.5% cog
-18”/-6” ore (commonly low olivine ore)
-1” ore – two types of designation
-1” high olivine ore
-1” low olivine ore
West Block – 1.6% cog
-1” ore – very high olivine ore
PT. INCO – GRADE CONTROL
Blending strategy
WEST BLOCK On specification for processing: EAST BLOCK –6” ORE
DEPTH (m): 1. Nickel > C.O.G ZONE:
0 Iron cap 2. Iron 17% - 19% Top soil
3. SM 2 – 2.3
4. Olivine < 22%
5. Moisture << Limonite
5
over
TOP ORE: burden
•High iron
10 •High SM
Limonite
ore
WEST BLOCK: EAST BLOCK
15
9High nickel 9Low nickel Saprolite
BLEND
9High iron 9Low iron Ore
9High SM ratio 9Low SM ratio
20 Blue Zone
BOTTOM ORE:
•Low iron Bedrock
•Low SM
PT. INCO – GRADE CONTROL
1 ORE QUALITY DATA FLOW
MINE FACE @WB MINE FACE @WB/EB ORE
2 MINING/STRIPPING 1 CLEAN UP
MAIN
MINE PRODUCTION
ASSAY RESULT INFORMED LABORATORY
BY RADIO
PT. INCO – GRADE CONTROL
HAND AUGER SAMPLING
Sampling to
check material
CHANNEL SAMPLING
GRAB SAMPLING
VISUAL RECOGNATION
PT. INCO – GRADE CONTROL
Mine face
grade control
activity
CONTROL SAMPLING PRODUCTION SAMPLING
Sample flow
PT. INCO – GRADE CONTROL
2KG SAMPLE
X-ray analysis
SAMPLE PREPARATION
BY TROMMELLING
MAIN LABORATORY