Professional Documents
Culture Documents
PARAPET-A HEIGHT
800
WATER TANK WATER TANK
PARAPET-B HEIGHT
1655
855
TOP OF PANEL
1 SEE VERTICAL LOUVERS
INTERIOR CEILING HEIGHT
A-22
3000
2700
PLASWALL (TEXTURED PAINT FIN.)
COLOR: DAVIES MCS 0116 DUSTY WHITE
10655
8950
3000
2700
2950
1 HARDIFLEX WITH GROOVE
A-22 3/F FIN. FLOOR LN.
3/F BALCONY/HALLWAY FIN. FLR. LN.
INTERIOR CEILING HEIGHT
2950
HALLWAY FFL G/F FIN. FLOOR LN.
3
G/F BALCONY/HALLWAY FIN. FLR. LN.
600
750
550
2
1
FINISHED GRADE LN.
ROAD LN.
1 RIGHT-SIDE ELEVATION
A-11 SCALE: 1:100MTS.
IMPORTANT: DRAWN /
PREPARED BY THE OFFICE OF : CERTIFIED BY : PROJECT TITLE : APPROVED BY : UPDATED BY: SHEET CONTENTS : SHEET NO.
Drawings and specifications duly signed,
stamped or sealed as instrument of DATE :
service, are the property of the architect,
ARCHITECT
whether the object for which they are
made is executed or not. It shall be
unlawful for any person without the written
consent of the architect or author of the
PROPOSED : BUILDING 5
SALVACION HOMES INC.
CHECKED BY:
DATE :
A
D:\Pre Kadyo FILES\BnB\PHASE 2\AS BUILT\ARCH\salvacion logo_070913.jpeg
LA SALLE AVENUE CONDO RESIDENCES AS SHOWN
7 21
PRC REG. NO: TIN NO: said documents, to duplicate or to make
DESIGN & BUILD copies for use in repetition of the other
projects or buildings, whether executed OWNER / REPRESENTATIVE REVISIONS:
PTR NO. PLACE ISSUED: partly or in whole.
DATE ISSUED: RA 9266 - 17 Mar 2005 PD 1096 LOCATION: VICTORIA ST.,LA SALLE AVE., BRGY.ERORECO, BACOLOD CITY ADDRESS : DATE :