Registered Post/ Mail
FING SOR, ye sare stered Post/ Mail
GOI, Ministry of Home Affairs
8ota yeaa Perri, eat Wer ze
SHQ KNI BSF
(cafPraiPra) errett)
(Engineering Branch)
No. Enge/CPWD/SH-KNI/2022/ 16 99,4) _ 4% Dated, the DB oe
To,
Chief Engineer
‘Indo Bangladesh Border Zone-1
CPWD, Niman Bhawan
Matigara Siliguri-734010
‘Sub:- PAYMENT OF OUTSTANDING ELECTRICITY BI ROW BOI ee
‘THE PERIOD OF CONSTRUCTION/BEFORE. ER TO BSF
Kindly refer to this HQ letter No. Engg/CPWD/SHQ KNJ/2021/21745-49 dated 13” Dee
2022 and your DO letter No. 23(PM)/SE (P&A)/2021/52 dated 02 March 2021
2. Its again informed that outstanding electricity bill of ROW BOPS are still pending for more than
three years which was required to be paid by CPWD. as outstanding bills pertain to the construction period
and prior to take over of the BOP.
3. West Bengal electricity board (WBSEDCL) is pressing hard for the payment of the outstanding
bills. Notices regarding electricity disconnection are being reccived from WBSEDCL due to non-payment
‘of outstanding bills. Battalions will pay electricity bills from the time when the BOPs have been taken over
only after clearance of the outstanding bills by CPWD for the duration of construction period / before
takeover of the BOPs
4, The details of pending bills are enclosed as appendix ~ ‘A? which have to be paid by CPWD and
has already been mentioned in above referred DO letter also.
5. In view of above, it is requested to kindly expedite payment of outstanding bill to avoid
disconnection of electricity supply.
shee
Encl: As above (1K Walde)
a ‘Commandant (Ops)
For DIG SHQ BSF KNI
Copy to:
FTR HQ BSF NB For info with request to approach CE, IBBZ-1, for paymentouT:
STANDING BILL DETAILS oF ROW BOPS WHICH
HAVE 1
cPwp ‘0 BE PAID BY
oe ease
SiNo | BOP iiDaisates "
Date of] Amount | Cycle of | Renaiy
tanking | to be paid | bill
ir —_.over by CPWD.
1) Bina —
TBR | 12.0419" (146982.00 | Monthy | Pacing smcsyors ——]
2 a 93.06.21 807091.00 | Monthly | Pending since 2021
3. pe 07.01.20 | 230983.00 | Monthly | Pending since 2020 ~
jn
4 | Bekarmani ] 70.01.20] 173289.00 | Monthly | Pending since 2020
in
: ZI
3._| Pariyal 17.08.20 | 30452.00 | Monthly | Pending since 2020
2Bn —
6. | Qualigach 10.01.20 | 190101.00 | Monthly | Pending since 2020
72Bn
7. | Mannagar 14.10.19 | 189364.00 | Monthly | Pending since 2019
72Bn_
& | Karzigach 02.11.19 | 328483.00 | Monthly | Pending since 2019
94 Bn
9 |Shyamgach | 02.11.19 | 303803.00 | Monthly | Pending since 2019
94 Bn
10._| Ambari ¥7.01-20 | 191948.00 | Monthly | Pending since 2020
152 Bn
1 i 28.10.19 | T03013.00 | Monthly — | Pending since 2019
152Bn =,
12} Paneki 3O0I0E.1I | 138602.00 | Monthly | Pending since 2019
152.Bn
‘ andant(Elest)
Asisiant Com nang