You are on page 1of 13
eo fo 1804/0-1V (0PS)IBBFISB Fii2020) 4Y12. -)— \ eget ers er. OT Ge "south Bengal Frontier. Border Secunty Force Headquarters, ‘ ; ay (Qperations Branch) Plot No.IVIE/, Action area-i, E, New Town, Kolkata -700161 Tele No. 03322-29624419 " Cee) dated 13'Soct'2022 To SJ set Engineer (IBBZ-l) CPW. 2" Floor, Nirman Bhawan Paribahan Nagar, Matigara, Siliguri Distt- Darjeeling (West Bengal) - 734010 Ph- 0363-2571752 Sub. RECTIFICATION OF OBSERVATIONS / SHORTCOMINGS RAISED BY THE BOARD OF OFFICERS Kindly refer to Sector HQ BSF Malda letter no. 21854-59 dated 14.10.2022 and letter no. 21854-59 dated 14.10.2022 (copy enclosed) 2. {tis to inform you that Composite BOP Nadirkhana, Gopalnagar & Lodhia of 70 Bn BSF under SHQ BSF Malda was constructed in the year 2021 and was’ provisionally taken over by BSF subject {o rectification of shoricqmings / defects raised by board of officers during joint inspection with CPWD officials. Despite repeated reminders, no action has been taken 0 far for rectification of defects. 3. Similarly, IRFP installed in BOP Kumari & Bomberia of 08 Bn BSF under SHO BSF Krishnanagar (provisional handingjtaking of BOPs done on 14.02.22) got defective. Troops are facing acute problems due to contaminated water at said BOPs. 4. In addition to above, it is also brought to your kind notice that handingitaking over of Composite 8OP Tarali-| of 112 Bn BSF under Kolkata Sector could not be done on 25/05/2022 due to non-providing of electric connection and water supply at the aforementioned BOP. Besides, there are many observations such as cracks on wall, uprooting of black top from road inside the BOP. drainage problem arises in newly constructed BOPs which needs to be rectified by the CPWD. 5. _ Presently 42 Composite BOPs have been taken over as of now and number of observations raised by board of officers during handingjtaking of BOPs. CPWD has been apprised of the observations with request to rectify the same at the earliest but in many cases, rectiications yet to be done. 6 Therefore, you are requested to direct the concemed quarter to rectify the shortcomings / defects as soon as possible, so that formal handing / taking of said Composite BOPs could be done. 7. An early action in this regard will be highly appreciated. Copy to (i) FHQ (Ops Dte) (ii) ADG (Border) CPWD (ii) DIG SHO Maida Government of India Ministry of Home Affairs Sector Headquarter BSF Krishnanagar (gp (Engineering Branch) No. Engg/SHQ KNRyCivil CPWD/22/ (93S 6-59 Dated, the |2-oet209 alkene . Executive Engineer CPWD, Border fencing Division-V, ———— P.O ~ Krishnanager, Nawadwip Ghat Road, 3 Distt- Nadia (W.B) Pin:- 741101 | S ay Defects in Iron Purifier/Iron Removal Palnt Installed at Composite BOP Kumari & & Bomnberia of 08 Bp 1 BSF under SHO BSF Krishnanagar, Kindly ref this HQ Letter No, 3474-76 dated 16 March 2022. 2, Construction of 509 Border out Post (BOPs) for BSF along the IBB and the IPB SH: C/O 129 BOPs in west Bengal Sector, (50 Nos BOPs) SW:- C/O 03 Nos Platoon Level BOPs for BSF along IB in right of way in iBBR of West Bengal at (1) Bonberia, (2) Hazrakhal & (3) Kumari including internal Electrical Installation i/C Compound lights & service connection to Buildings. 3. _ Its inform you that, the provisional handing/taking of above BOPs works completed on did q 14/02/2022. The IRFP inst.lled in said BOPs got defective troops are facing acute problems, due to z contaminated water at BOP Kumari & BOP Bomberia of 08 Bn BSF under SHQ BSF krishnanager. 4, Therefore, keeping in view of above, itis requested to kindly look into the matter personally and approach to'concerned! firm for repair of IRFP at the earliest at said BOPs of 08 Bn BSF under SHQ BSF Krishaanagar. 5. Anearly action in this regard may kindly be highly appreciated ford\er. Aw a mts (Ex. Umesh Kumar Singh) Asstt Comdt (Elect) For DIG BSF Krishzanaget Z Government of India Ministry of Home Affairs hi Border Security Force / S ip Headquarter Sector Malda PO : Narayanpur, Dist : Maida (W.B) Pin - 732 141. No. Engg/SHQ-ig/2022/ 21 2SW\~ S| ose ow ro a To, The Suprintending Engineer, Border Fencing Circle =I11 18BZ-1 Central Public Work Department, CossimBazar, Murshidabad (West Bengal) Pin Code -742102 Sub: - RECTIFICATION OF OBSERVATIONS/ SHORTCOMINGS RAISED BY THE BOARD OF OFFICER AT COMPOSITE BOP NADIRKHANA, GOPALNAGAR & LODIA OF 70 BN BSF It is inform that the BOPs under reference constructed/completed in the year_2021, was provisionally taken over by the BSF subject to rectification of shortcomings/observations raised by Soara of officers during joint inspection with CPWD officiais and in this context copy of board proceeding provisional handing/taking of composite BOPs under reference with enclosure of defects Rad already be forwarded to your office. a 2. itis worth mentioning that despite of repeated gentle reminders and requests, no action has bees taken for the rectification of defects which should be required to be attended ‘on priority basis otherwise the condition the structures will definitely degrade with due passage of time. Moreover as a result, cracks are found developed on boundary wall of BOP Nadirkhana. 3. You are requested to direct concern quarter to attend the issues on priority basis under intimatio this HQ so that formal handing/taking of the Composite BOPs under reference can}ie done positively g For DIG SHQ BSF Malda Enel: - Copy of board proceeding alongwith shortcomings Copy to;- 1. Executive Engineer, __& Forinfo & N/A Please Central Public Work Department, ‘ ne Malda Central Division No 259/229 Uma Ray Sa 4. Proceeding of 2, Assembled on BOARD PROCEEDINGS A board of officers — aap 4” By order of 5. For the purpose of BOP Nadirkhana 70 8n BSF DIG SHO BSF Maida vide Order No.Engg/MLD /HT-CPwo/2021/12204-12 did 07" July’ 2034 Handing/Taking overcharge newly constructed buildings of Composite BOP Nadirkhana ‘in AOR of 24 Bn BSF under SHQ BSF Malda from CPWO Referenes to Technical Committee approval Reference to HLEC Approval _ Vide TC No. 35 Agenda Item No. [hi 21.05.2015 Ton | Vide HLEC No. 29" Supplementary Agenda item No. 1 (Copy enclosed) deted 23th May 2015. Reference to AABES. “DGWIBFRIZQ/HLECI2014-15/244 07/07/2014 S,_Composition of the Board :- Presiaing Office: Member 7 ‘Shvi H Henzafal Simte, Commandant (Ops) $40 BSF Malda ShriV 8 Dubey, DC 76 Bn BSF Member 2 Member 3 (Assocdated Members from Shri P C Sau, AE(Elect), CPWD Maca 7 Purstiafl to the above order the board of Officers assembled at BOP Nadirkhana arcs to ‘out physical inspection of the border assets offered for taking over by CPWO = Board of officers along wih rep of construction agency physically checkeciirs: composite BOP and compared with inventories provided'by the construction agency @ The defects/shont comings noticed by the Board ‘of Officers on 30-07-2021 are as unde: SING “Observations Civic SIDE __sroperly closed and. vy Grouting and fini 1 (Type-A} E vii) _| Mosquito hooks. wii) | Grouting and )__ [In MT Garage r is aan Water outlet not provided in. jor room “TG door of Magzine required-to re : may TKSid & COMH soak forepat | SM & COMH aro not Remaras len Barrack Barrack we -: pa i é -2- a i ig Mash door shutters got banal for which shutter are nol propery ose gaz + jad replacement in SO's accommodatior a -| Mosquito hooks: af Net fixed in $O's accommodation Pay Cloth hanger are required fixing in bathroom \) | Towel rails are required fringe rand w ginhand washing area {Waste pipes are not Properly fixed in urinals and required to replacehepat | ~~ ite Synthetic enamel paint not.done on SCI pipes and required painting of ail SCI pipes and fittings SIDE i) | Switch ooard not fitted properly at corner bunker i) Top post light pole of gate not paintad proper —_| Junction box at outside wall of 46 men JB not fixed proper) Lv) 17 No of ceting fan not working in 16 men JBKGA ~~ {No tube light not fitted in Jawan BK 1No Exhaust fan & 02 Nos Tube light are not working in toilet 16 Amp Socket of 16 men JBK not fitted properly _-Cable layout diagram is nol provided. {items are not properly mentioned in inventory list { Earthing are not mentioned in inventon { Call bell point is not fitted in sentry post Earthing pits have not made properiy. | Single phase preventers are not provided in electrical panel for safely of monom {Main swiiches not marked for distributions of supply on electric panels . ‘ Test report of all earthing not provided which need urgently. Earth wire is not connected with Door ‘of DB box. J Electrical tay out plan of Campus. building not provided with inventory. | Electrical lay out plan of electrical panels are not provided. in addition to above defects/short co CIVIL SIDE i) The drainage cracked nearer outlet for which rain water not a completely drain off and required to repair. i) _ Suitable hole is requited to be provided in existing drain to drain out of rain wator fcom road. lil) Surplus materials and garbage are dumped near BOP elements required clesn all savanna materials from campus, ivy The rain water stagnated at various places of main drainage due fo growth of vegetation aod required cleaning. v) The windows on sentry post are not properly opened and required arrangement is to be provides for proper opening of window shutters, vi) In garage one more coat of distemper is Touching and fini quired i= ‘as under - required. va panel, main switcner gear ich is very essential for condemnatior at later stage, Electrical wiring an Main electrical co 02 Nos electric G ~ gf 10. Following documents have been taken over from the construction with this proceedings: 1) Copy of Sanction order i) Copy of HLEC iil) Copy of Technical Committee iv) Copy of AA&ES V) Copy of detailed Estimate vi) Brief description of the elements vii) Designs and drawing of -composite BOP vii) Inventory lst of civil & electrical works 1x) History sheet of 0G Sets/water pumps, AC/Fan etc x) Log book of DG Sets / water pumps etc. xi) Building fitness certificate xi) Copy of detailed approved estimate(Civil& Elect) 11. Following documents / items not handed over by the construction agency i) Original land documents along with four sets of Photo copies duly laminated. il) Details of compensation of land paid to revenue Deptt/Land owners. iii) Warranty book of DG Sets / water pumps, AC/Fan etc | Iv) Maintenance of too! kit (Elect) f ¥) Layout of CIBOPs Cables etc. vi) Main CircuivPanel boards vii) Maintenance 12, Recommendation of the Board, Board recommends that the Composite BOP Nadirthana may be provisionally teken over from CPWD subject to rectification of defects/observations/shortcomings by the construction agency within one month from the drawl of proceedings and to provide all the dacuments which have not been provides st fat. Board of officers has obtained written under taking from Shri Kali Krishna Ghosh, A= (Civil) and Sandip China, AE (Elect), Engineer of construction agency that the defects/shoricomings/observations w vagency and sam: be rectified preferably within one month but not later than pe days from the date of draal of boar proceedings. nS x Presiding Officer : ghee lal Sime, Commandant (Ops) SHQ SSF Maida) 1 lle aes Member- Member ee | APROVEDNOT-APPROVED T.4-31 DEPUTY INSPECTOR GENERAL SHQ BSF MALDA

You might also like