eo
fo 1804/0-1V (0PS)IBBFISB Fii2020) 4Y12. -)—
\ eget ers er. OT Ge
"south Bengal Frontier. Border Secunty Force
Headquarters, ‘ ; ay
(Qperations Branch)
Plot No.IVIE/, Action area-i, E,
New Town, Kolkata -700161
Tele No. 03322-29624419 "
Cee) dated 13'Soct'2022
To
SJ set Engineer (IBBZ-l)
CPW. 2" Floor, Nirman Bhawan
Paribahan Nagar, Matigara, Siliguri
Distt- Darjeeling (West Bengal) - 734010
Ph- 0363-2571752
Sub. RECTIFICATION OF OBSERVATIONS / SHORTCOMINGS RAISED BY THE BOARD OF
OFFICERS
Kindly refer to Sector HQ BSF Malda letter no. 21854-59 dated 14.10.2022 and letter no.
21854-59 dated 14.10.2022 (copy enclosed)
2. {tis to inform you that Composite BOP Nadirkhana, Gopalnagar & Lodhia of 70 Bn BSF under
SHQ BSF Malda was constructed in the year 2021 and was’ provisionally taken over by BSF subject
{o rectification of shoricqmings / defects raised by board of officers during joint inspection with CPWD
officials. Despite repeated reminders, no action has been taken 0 far for rectification of defects.
3. Similarly, IRFP installed in BOP Kumari & Bomberia of 08 Bn BSF under SHO BSF
Krishnanagar (provisional handingjtaking of BOPs done on 14.02.22) got defective. Troops are facing
acute problems due to contaminated water at said BOPs.
4. In addition to above, it is also brought to your kind notice that handingitaking over of
Composite 8OP Tarali-| of 112 Bn BSF under Kolkata Sector could not be done on 25/05/2022 due to
non-providing of electric connection and water supply at the aforementioned BOP. Besides, there are
many observations such as cracks on wall, uprooting of black top from road inside the BOP. drainage
problem arises in newly constructed BOPs which needs to be rectified by the CPWD.
5. _ Presently 42 Composite BOPs have been taken over as of now and number of observations
raised by board of officers during handingjtaking of BOPs. CPWD has been apprised of the
observations with request to rectify the same at the earliest but in many cases, rectiications yet to be
done.
6 Therefore, you are requested to direct the concemed quarter to rectify the shortcomings /
defects as soon as possible, so that formal handing / taking of said Composite BOPs could be done.
7. An early action in this regard will be highly appreciated.
Copy to
(i) FHQ (Ops Dte)
(ii) ADG (Border) CPWD
(ii) DIG SHO MaidaGovernment of India
Ministry of Home Affairs
Sector Headquarter BSF Krishnanagar (gp
(Engineering Branch)
No. Engg/SHQ KNRyCivil CPWD/22/ (93S 6-59 Dated, the |2-oet209
alkene .
Executive Engineer CPWD,
Border fencing Division-V, ————
P.O ~ Krishnanager,
Nawadwip Ghat Road,
3
Distt- Nadia (W.B) Pin:- 741101 |
S
ay Defects in Iron Purifier/Iron Removal Palnt Installed at Composite BOP Kumari &
& Bomnberia of 08 Bp
1 BSF under SHO BSF Krishnanagar,
Kindly ref this HQ Letter No, 3474-76 dated 16 March 2022.
2, Construction of 509 Border out Post (BOPs) for BSF along the IBB and the IPB SH: C/O
129 BOPs in west Bengal Sector, (50 Nos BOPs) SW:- C/O 03 Nos Platoon Level BOPs for BSF
along IB in right of way in iBBR of West Bengal at (1) Bonberia, (2) Hazrakhal & (3) Kumari
including internal Electrical Installation i/C Compound lights & service connection to Buildings.
3. _ Its inform you that, the provisional handing/taking of above BOPs works completed on did q
14/02/2022. The IRFP inst.lled in said BOPs got defective troops are facing acute problems, due to z
contaminated water at BOP Kumari & BOP Bomberia of 08 Bn BSF under SHQ BSF krishnanager.
4, Therefore, keeping in view of above, itis requested to kindly look into the matter personally
and approach to'concerned! firm for repair of IRFP at the earliest at said BOPs of 08 Bn BSF under
SHQ BSF Krishaanagar.
5. Anearly action in this regard may kindly be highly appreciated ford\er.
Aw a
mts
(Ex. Umesh Kumar Singh)
Asstt Comdt (Elect)
For DIG BSF KrishzanagetZ
Government of India
Ministry of Home Affairs
hi Border Security Force
/
S ip Headquarter Sector Malda
PO : Narayanpur, Dist : Maida (W.B)
Pin - 732 141.
No. Engg/SHQ-ig/2022/ 21 2SW\~ S| ose ow ro a
To,
The Suprintending Engineer,
Border Fencing Circle =I11 18BZ-1
Central Public Work Department,
CossimBazar, Murshidabad
(West Bengal) Pin Code -742102
Sub: - RECTIFICATION OF OBSERVATIONS/ SHORTCOMINGS RAISED BY THE BOARD OF
OFFICER AT COMPOSITE BOP NADIRKHANA, GOPALNAGAR & LODIA OF 70 BN BSF
It is inform that the BOPs under reference constructed/completed in the year_2021, was
provisionally taken over by the BSF subject to rectification of shortcomings/observations raised by Soara
of officers during joint inspection with CPWD officiais and in this context copy of board proceeding
provisional handing/taking of composite BOPs under reference with enclosure of defects Rad already be
forwarded to your office. a
2. itis worth mentioning that despite of repeated gentle reminders and requests, no action has bees
taken for the rectification of defects which should be required to be attended ‘on priority basis otherwise
the condition the structures will definitely degrade with due passage of time. Moreover as a result, cracks
are found developed on boundary wall of BOP Nadirkhana.
3. You are requested to direct concern quarter to attend the issues on priority basis under intimatio
this HQ so that formal handing/taking of the Composite BOPs under reference can}ie done positively
g
For DIG SHQ BSF Malda
Enel: - Copy of board proceeding alongwith shortcomings
Copy to;-
1. Executive Engineer, __& Forinfo & N/A Please
Central Public Work Department, ‘ ne
Malda Central Division No
259/229 Uma Ray Sa4. Proceeding of
2, Assembled on
BOARD PROCEEDINGS
A board of officers —
aap
4” By order of
5. For the purpose of
BOP Nadirkhana 70 8n BSF
DIG SHO BSF Maida vide Order
No.Engg/MLD /HT-CPwo/2021/12204-12
did 07" July’ 2034
Handing/Taking overcharge newly
constructed buildings of Composite BOP
Nadirkhana ‘in AOR of 24 Bn BSF under
SHQ BSF Malda from CPWO
Referenes to Technical Committee approval
Reference to HLEC Approval _
Vide TC No. 35 Agenda Item No. [hi
21.05.2015
Ton
| Vide HLEC No. 29" Supplementary Agenda
item No. 1 (Copy enclosed) deted 23th
May 2015.
Reference to AABES.
“DGWIBFRIZQ/HLECI2014-15/244
07/07/2014
S,_Composition of the Board :-
Presiaing Office:
Member 7
‘Shvi H Henzafal Simte, Commandant (Ops) $40
BSF Malda
ShriV 8 Dubey, DC 76 Bn BSF
Member 2
Member 3
(Assocdated Members from
Shri P C Sau, AE(Elect), CPWD Maca
7 Purstiafl to the above order the board of Officers assembled at BOP Nadirkhana arcs to
‘out physical inspection of the border assets offered for taking over by CPWO
= Board of officers along wih rep of construction agency physically checkeciirs:
composite BOP and compared with inventories provided'by the construction agency
@ The defects/shont comings noticed by the Board ‘of Officers on 30-07-2021 are as unde:
SING “Observations
Civic SIDE
__sroperly closed and.
vy Grouting and fini
1 (Type-A} E
vii) _| Mosquito hooks.
wii) | Grouting and
)__ [In MT Garage r is aan
Water outlet not provided in. jor room
“TG door of Magzine required-to re : may
TKSid & COMH soak forepat |
SM & COMH aro not
Remaras
len Barrack
Barrackwe
-:
pa
i
é
-2-
a
i ig Mash door shutters got banal for which shutter are nol propery ose gaz
+ jad replacement in SO's accommodatior
a -| Mosquito hooks: af Net fixed in $O's accommodation
Pay Cloth hanger are required fixing in bathroom
\) | Towel rails are required fringe rand w ginhand washing area
{Waste pipes are not Properly fixed in urinals and required to replacehepat | ~~
ite Synthetic enamel paint not.done on SCI pipes and required painting of ail
SCI pipes and fittings
SIDE
i) | Switch ooard not fitted properly at corner bunker
i) Top post light pole of gate not paintad proper
—_| Junction box at outside wall of 46 men JB not fixed proper)
Lv) 17 No of ceting fan not working in 16 men JBKGA
~~ {No tube light not fitted in Jawan BK
1No Exhaust fan & 02 Nos Tube light are not working in toilet
16 Amp Socket of 16 men JBK not fitted properly
_-Cable layout diagram is nol provided.
{items are not properly mentioned in inventory list
{ Earthing are not mentioned in inventon
{ Call bell point is not fitted in sentry post
Earthing pits have not made properiy.
| Single phase preventers are not provided in electrical panel for safely of monom
{Main swiiches not marked for distributions of supply on electric panels .
‘ Test report of all earthing not provided which need urgently.
Earth wire is not connected with Door ‘of DB box.
J Electrical tay out plan of Campus. building not provided with inventory.
| Electrical lay out plan of electrical panels are not provided.
in addition to above defects/short co
CIVIL SIDE
i) The drainage cracked nearer outlet for which rain water not a completely drain off and required to
repair.
i) _ Suitable hole is requited to be provided in existing drain to drain out of rain wator fcom road.
lil) Surplus materials and garbage are dumped near BOP elements required clesn all savanna
materials from campus,
ivy The rain water stagnated at various places of main drainage due fo growth of vegetation aod
required cleaning.
v) The windows on sentry post are not properly opened and required arrangement is to be provides
for proper opening of window shutters,
vi) In garage one more coat of distemper is
Touching and fini quired
i=
‘as under -
required.
va
panel, main switcner gear
ich is very essential for condemnatior
at later stage,
Electrical wiring an
Main electrical co
02 Nos electric G~ gf 10. Following documents have been taken over from the construction
with this proceedings:
1) Copy of Sanction order
i) Copy of HLEC
iil) Copy of Technical Committee
iv) Copy of AA&ES
V) Copy of detailed Estimate
vi) Brief description of the elements
vii) Designs and drawing of -composite BOP
vii) Inventory lst of civil & electrical works
1x) History sheet of 0G Sets/water pumps, AC/Fan etc
x) Log book of DG Sets / water pumps etc.
xi) Building fitness certificate
xi) Copy of detailed approved estimate(Civil& Elect)
11. Following documents / items not handed over by the construction agency
i) Original land documents along with four sets of Photo copies duly laminated.
il) Details of compensation of land paid to revenue Deptt/Land owners.
iii) Warranty book of DG Sets / water pumps, AC/Fan etc
| Iv) Maintenance of too! kit (Elect) f
¥) Layout of CIBOPs Cables etc.
vi) Main CircuivPanel boards
vii) Maintenance
12, Recommendation of the Board,
Board recommends that the Composite BOP Nadirthana may be provisionally teken over from
CPWD subject to rectification of defects/observations/shortcomings by the construction agency within one
month from the drawl of proceedings and to provide all the dacuments which have not been provides st
fat. Board of officers has obtained written under taking from Shri Kali Krishna Ghosh, A= (Civil) and
Sandip China, AE (Elect), Engineer of construction agency that the defects/shoricomings/observations w
vagency and sam:
be rectified preferably within one month but not later than pe days from the date of draal of boar
proceedings. nS x
Presiding Officer : ghee
lal Sime, Commandant (Ops) SHQ SSF Maida)
1 lle aes
Member-
Memberee
| APROVEDNOT-APPROVED
T.4-31
DEPUTY INSPECTOR GENERAL
SHQ BSF MALDA