Location Before WIP After Remark

Ball Mill CM 3:1 Unit

Vertical Tank no:


NSPMT 3793,YF/11/878

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
YF/11/878 VERTICAL TANK Ball Mill CM 3(912TK07)
3793

After Before
1 2 3 4 1 2 3 4
A A 8.5 8.5 8.4 8.4
B 8.37 8.22 8.31 8.28 B 8.4 8.1 8.1 8.3
C 8.26 8.26 8.19 8.36 C 8 8.1 8.1 8.2
D 7.76 7.92 7.86 7.81 D 7.9 8 7.8 7.8
Location Before WIP After Remark
Cement Material Feeding

Vertical Tank no:


NSPMT 3791,YF/11/970,
912TK06

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom

NSPMT
YF/11/970 VERTICAL TANK Fly Ash Silo Line 2 (912TK06)
3191

After Before
1 2 3 4 1 2 3 4
A 8.8 8.8 8.9 8.7 A 8.9 8.9 8.9 8.8
B 9 8.9 8.9 8.7 B 9.2 9.0 9 8.9
C 8.7 8.5 8.5 8.8 C 8.6 8.6 8.6 8.6
D 9.1 9.1 9.0 9.1 D 9.2 9.1 9.1 9.2
Location Before WIP After Remark
CM 4 : 1 Unit

NSPMT 4472, SP 0051/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0051/13 VERTICAL TANK CM4 (912TKH)
4472

After Before
1 2 3 4 1 2 3 4
A A 9.4 9.6 9.6 9.8
B 8.02 8.1 8.08 8.01 B 7.8 8.1 7.9 8.1
C 8.04 8.05 8.06 7.98 C 7.8 7.8 7.8 7.9
D 9.67 9.44 9.66 9.65 D 9.6 9.6 9.6 9.6
Location Before WIP After Remark
Cement Silo Line 2

NSPMT 4471, SP 0050/13

Corrosion
Shell Head Pressure Volume
Registration Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
No.
Tnom Tmin Tnom

NSPMT 4471 SP/0050/13 VERTICAL TANK Cement Silo Line 2 (Receiver)

After Before
1 2 3 4 1 2 3 4
A A 8.0 8.0 8.0 8.0
B 8.15 8.09 8.16 8.14 B 8.2 8.2 8.1 8.2
C 8.11 8.15 8.15 8.08 C 8.1 8.1 8.1 8.1
D 9.54 8.07 8.07 9.33 D 9.6 9.9 8.2 9.4
Location Before WIP After Remark

NSPMT 4474, sp 0054/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0054/13 VERTICAL TANK Cement Silo Line 2 (Receiver)
4474

After Before
1 2 3 4 1 2 3 4
A A 8.8 8.8 8.4 8.7
B 8.78 8.30 B 8.9 8.9 8.5 8.4
C 8.55 8.52 8.36 8.40 C 8.7 8.6 8.5 8.4
D 9.82 9.4 9.49 9.32 D 9.9 9.5 9.58 9.4
Location Before WIP After Remark
Compressor CM3:4 Unit

Vertical Tank No:


NSPMT 3794,YF/11/556,
912TK01

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
YF/11/556 VERTICAL TANK Compressor CM3 (912TK01)
3794

After Before
1 2 3 4 1 2 3 4
A A 8.4 8.3 8.9 9.2
B 8.68 8.40 8.60 8.70 B 8.2 7.9 8.0 8.3
C 8.56 8.48 8.42 8.58 C 8.2 8.3 8.3 8.2
D 9.11 9.18 9.63 9.56 D 9.3 9.2 9.0 9.0
Location Before WIP After Remark

Vertical Tank No:


NSPMT 3795,YF/11/557,
912TK02

Shell Head Corrosion Pressure Volume


(mm) (mm) (mm) (kpa) (m3)
Registrat
No. Serial No. Description Location
ion No.
Tnom Tmin Tnom

NSPMT
YF/11/557 VERTICAL TANK Compressor CM3 (912TK02)
3795

After Before
1 2 3 4 1 2 3 4
A A 9.2 9.1 9.2 9.2
B 8.43 8.48 8.67 8.44 B 8.3 8.3 8.2 8.3
C 8.42 8.62 8.78 8.55 C 8.3 8.3 8.8 8.3
D 9.41 8.84 8.82 9.69 D 9.2 9.3 9.3 9.2
Location Before WIP After Remark

Vertical Tank No:


NSPMT 3796,YF/11/500,
912TK03

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
YF/11/500 VERTICAL TANK Compressor CM3 (912TK03)
3796

After Before
1 2 3 4 1 2 3 4
A A 9.8 9.6 9.6 9.8
B 8.19 8.09 8.06 8.15 B 7.8 7.8 7.9 8.0
C 8.17 8.13 8.32 8.2 C 8.2 8.1 8 8.2
D 9.75 9.53 9.78 9.56 D 9.6 9.6 9.4 9.4
Location Before WIP After Remark

Vertical Tank No:


NSPMT 3797,YF/11/469,
912TK04

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
YF/11/469 VERTICAL TANK Compressor CM3 (912TK04)
3797

After Before
1 2 3 4 1 2 3 4
A A 9.4 9.5 9.4 9.2
B 8.78 8.30 B 8.2 8.2 8.1 8.1
C 8.55 8.52 8.36 8.40 C 8.2 8.3 8.2 8.2
D 9.82 9.40 9.49 9.32 D 9.2 9.4 9.3 9.3
Location Before WIP After Remark

NSPMT 4458,SP 0036/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0036/13 VERTICAL TANK Compressor CM4
4458

After Before
1 2 3 4 1 2 3 4
A A 8.6 8.5 8.1 8.3
B 8.10 8.09 8.21 8.20 B 7.9 7.9 7.9 8.1
C 8.14 8.14 8.29 8.18 C 7.9 7.9 8.2 7.9
D 8.84 8.93 8.34 9.18 D 8.7 8.5 8.5 8.8
Location Before WIP After Remark

NSPMT 4480,SP 0060/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0060/13 VERTICAL TANK Compressor CM4
4480

After Before
1 2 3 4 1 2 3 4
A A 10.6 10.5 10.5 10.8
B 9.07 9.17 9.14 10.12 B 8.8 9.0 9.1 8.8
C 9.06 9.06 9.12 9.16 C 8.9 9.0 8.9 8.9
D 10.82 10.70 10.60 10.64 D 10.4 10.4 10.4 10.6
Location Before WIP After Remark

NSPMT 4481,SP 0061/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0061/13 VERTICAL TANK Compressor CM4
4481

After Before
1 2 3 4 1 2 3 4
A A 10.6 10.5 10.5 10.8
B 9.09 9.28 9.14 10.12 B 8.8 9.0 9.1 8.8
C 9.18 9.15 9.22 9.16 C 8.9 9.0 8.9 8.9
D 10.73 10.63 10.60 10.64 D 10.4 10.4 10.4 10.6
Location Before WIP After Remark

NSPMT 4482,SP 0062/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0062/13 VERTICAL TANK Compressor CM4
4482

After Before
1 2 3 4 1 2 3 4
A A 10.2 10.1 10.2 10.2
B 9.05 9.09 9.08 9.05 B 9.0 9.1 9.0 8.9
C 9.06 9.05 9.29 9.06 C 8.8 8.9 8.9 9.1
D 10.48 10.25 10.46 10.51 D 10.5 10.4 10.3 10.5
Location Before WIP After Remark

NSPMT 4448,SP 0022/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0022/13 VERTICAL TANK Transfer Tower CM4
4448

After Before
1 2 3 4 1 2 3 4
A 6.01 6.56 5.89 5.90 A 6.0 5.9 6.2 5.7
B 6.18 6.32 6.30 6.45 B 6.0 6.1 6.1 6.1
C 6.28 6.35 6.19 6.25 C 6.0 6.0 6.1 6.0
D 6.57 6.51 6.45 5.98 D 6.3 6.1 6.0 5.8
Location Before WIP After Remark

Vertical Tank No:


NSPMT 1336,YF/05/193

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
YF/05/193 VERTICAL TANK Compressor Packing Line 1
1336

After Before
1 2 3 4 1 2 3 4
A 9.4 9.5 9.2 9.70 A 9.4 9.6 9.6 9.8
B 8.1 8.1 8.2 8.40 B 8.2 8.1 8.2 8.4
C 8.2 8.1 8.1 8.10 C 8.4 8.2 8.3 8.3
D 9.6 9.5 9.5 9.6 D 9.7 9.6 9.6 9.8
Location Before WIP After Remark

Vertical Tank No:


NSPMT 3790,YF12/204

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
YF12/204 VERTICAL TANK Cement Silo Line 1
3790

After Before
1 2 3 4 1 2 3 4
A 8.0 8.1 7.7 7.7 A 8.0 8.2 7.7 7.7
B 6.2 6.3 5.9 5.9 B 6.3 6.3 6.0 5.9
C 5.8 5.9 5.8 5.9 C 5.9 6.0 6.0 5.9
D 8.4 8.3 8.1 8.5 D 8.6 8.4 8.1 8.5
Location Before WIP After Remark
Compressor Packing Line 2
5 Unit
Vertical Tank No:
NSPMT 4453,SP/0031/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0031/13 VERTICAL TANK Compressor Packing Line 2
4453

After Before
1 2 3 4 1 2 3 4
A A 8.6 8.5 8.6 8.6
B 8.01 8.29 8.08 8.08 B 7.8 8.0 8.0 7.9
C 8.13 8.29 8.09 8.06 C 7.9 7.9 8.0 7.9
D 8.50 8.40 8.50 8.42 D 8.1 8.9 8.3 8.3
Location Before WIP After Remark

Vertical Tank No:


NSPMT 4454,SP/0032/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0032/13 VERTICAL TANK Compressor Packing Line 2
4454

After Before
1 2 3 4 1 2 3 4
A A 9.2 9.1 9.0 9.0
B 8.11 8.08 8.10 8.14 B 8.1 7.9 7.8 7.9
C 8.12 8.15 8.10 8.11 C 7.9 7.9 8.1 6.1
D 8.77 8.79 8.05 8.13 D 8.6 8.7 8.1 9.0
Location Before WIP After Remark

Vertical Tank No:


NSPMT 4455,SP/0033/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0033/13 VERTICAL TANK Compressor Packing Line 2
4455

After Before
1 2 3 4 1 2 3 4
A A 8.4 8.6 8.6 8.2
B 8.19 8.17 8.22 8.14 B 8.0 8.0 8.0 7.9
C 8.13 8.12 8.24 8.18 C 7.8 7.9 8.0 7.9
D 8.60 8.42 8.53 8.61 D 8.3 8.4 8.4 8.4
Location Before WIP After Remark

Vertical Tank No:


NSPMT 4456,SP/0034/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0034/13 VERTICAL TANK Compressor Packing Line 2
4456

After Before
1 2 3 4 1 2 3 4
A A 8.6 8.4 8.6 8.6
B 8.36 8.29 8.16 8.26 B 8.1 8.0 8.0 8.1
C 8.34 8.24 8.21 8.29 C 8.0 8.0 8.0 8.1
D 8.97 9.13 9.24 8.89 D 8.6 9.2 8.7 9.1
Location Before WIP After Remark

Vertical Tank No:


NSPMT 4466,SP/0030/13

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
SP/0030/13 VERTICAL TANK Compressor Packing Line 2
4466

After Before
1 2 3 4 1 2 3 4
A A 8.9 9.0 8.8 8.7
B 8.16 8.14 8.21 8.14 B 8.0 8.0 7.9 7.9
C 8.06 8.24 8.24 8.03 C 8.1 8.0 8.1 8.0
D 8.55 8.64 8.68 8.68 D 8.5 8.6 8.7 8.7
Location Before WIP After Remark
Fly Ash Silo Line 1 : 1 unit

Vertical Tank No:


NSPMT 3792,YF/11979/
912TK05

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
YF/11979 VERTICAL TANK Fly ash Silo Line 1 (912TK05)
3792

After Before
1 2 3 4 1 2 3 4
A 7.8 7.9 7.8 7.9 A 7.9 7.9 7.9 8.1
B 7.9 7.8 8.0 8.0 B 8.0 8.0 8.0 8.2
C 7.9 7.9 7.9 7.9 C 7.9 8.0 8.1 8.1
D 8.0 7.6 7.8 7.8 D 8.0 7.6 7.9 7.9
Location Before WIP After Remark

Vertical Tank No:


NSPMT 4461

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
4461

After Before
1 2 3 4 1 2 3 4
A A 8.7 8.6 8.6 8.6
B 8.39 8.21 8.15 8.17 B 8.5 8.4 8.2 8.2
C 8.43 8.15 8.32 8.19 C 8.5 8.3 8.3 8.4
D 8.68 8.39 8.61 8.10 D 8.8 8.5 8.7 8.3
Location Before WIP After Remark
Upgrade Mill Line 1:1 unit

Vertical Tank No:


NSPMT 3798,YF 12/514
911TK06

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
YF 12/514 Vertical Tank Upgraded Mill Line 1 (911TK06)
3798

After Before
1 2 3 4 1 2 3 4
A 7.9 7.6 7.7 7.5 A 7.8 7.7 7.8 7.6
B 7.9 7.8 7.7 7.7 B 8.1 7.9 7.8 7.8
C 7.4 7.4 7.3 7.5 C 7.5 7.4 7.4 7.6
D 7.7 7.4 7.5 7.5 D 7.8 7.5 7.6 7.6
Location Before WIP After Remark
Cement Mill

Vertical Tank No:


NSPMT 106441
MP2931 641BF1

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
MP 2931 Air Receiver Cement Mill (641BF1)
106441

After Before
1 2 3 4 1 2 3 4
A 9.81 9.9 10 10 A 9.8 9.8 10 10
B 9.3 9.1 9.0 9.1 B 9 9 9 8.9
C 9.8 9.7 9.75 9.9 C 9.9 9.7 9.7 9.8
D D
Location Before WIP After Remark
Cement Mill

Vertical Tank No:


NSPMT 106442
MP2932 642BF1

Corrosion
Shell Head Pressure Volume
Registrat Allowance
No. Serial No. Description Location (mm) (mm) (mm) (kpa) (m3)
ion No.
Tnom Tmin Tnom
NSPMT
MP 2932 Air Receiver Cement Mill (641BF1)
106442

After Before
1 2 3 4 1 2 3 4
A 10 10 10.1 10 A 9.9 10.20 10.2 10
B 10.10 9.9 9.5 9.3 B 10.2 10 9.0 9.2
C 9.9 9.7 10 9.2 C 9.9 9.8 10 9.1
D D