Djahid ZAIDI Commissioning Instrument

Juin 19th St, Ksar Bellezma,


Merouana; Batna; Algeria. Supervisor
Postal Code: 05047
Algeria

Mobile : +213 661 167 445 Summary of Skills:


 DCS and Instrumentation
Mail : djahid.zaidi@gmail.com
 HART Communicator,
 Calibration of instruments.
 Loop-checks and communication with DCS.
 Operator control room.
 Testing of DCS, Installation, start-up, pre-commissioning and commissioning
 INTOUCH Configuration

Professional Qualification
Year: 2005.
University: University HADJ LAKHDAR Electronic Department of BATNA.
Diploma: BAC + 5, Cycle Engineer Electronics, Option industrial Control.
Year: 2014.
University: University HADJ LAKHDAR Electronic Department of BATNA.
Diploma: BAC + 7, Cycle Magister Microelectronics, Option Integrated Circuit Design.
Professional Experience
Company Foraid Algerie For SPIE Oil and Gas Services.
From September 2013
To February 2014
Position Commissioning Instrument Supervisor.
JGC Gassi Touil Gas Processing Facilities Project in Algeria
The commissioning activities I have been charged with were covering the following scope:
 Provide the support during the Start-up activities with the final preparation to the introduction
of the feedstock into the CPF plant.
 Loop checking for each standalone instrument and control loop
 Calibration of alarms and providing preliminary set points
 Calibration and functionality checks for all trip settings,
 Functionality checks for the fire and gas system,
 Functionality checks for all instruments in each control loop,
 Functionality checks for all interlocking systems,
 Functionality checks for emergency shutdown systems.
Company Invensys System Algeria.
From April 2013
To August 2013
Position Project Application Engineer.
SYNGENTA Project (Monthey Switzerland)
Industry sector: Refining
Member of Syngenta Project team working on remote in Algiers which their responsibilities as follow:
- Displays animation and graphics configuration
- Scripts creation
- Test and validation of the displays
- Test and validation of the overlays.
- SFC sequences development
Training on the Eurotherm Programmable controller
Installation and troubleshooting of the system platform FCS 4.0 including IASeries 8.8 and InFusion
10.5
Building Process Displays with Wonderware InTouch WindowMaker
Configuring Process Displays With Wonderware InTouch WindowMaker
Raised technical queries on modifications for graphics and programs on SFC
Company SARPI Spa
From September 2012
To April 2013

Position Instrumentation QA/QC Engineer


Flare Gas Recovery Project (HBK Project)
Main tasks in this project were as follow:

 Perform inspections and tests as required by the discipline all Electrical & Instrumentation
installation activities at site
 Prepare inspection/test reports and maintain the QA/QC files related to assignment
 Assist with tracking and logging Non-Conformance Reports, Quality/Productivity
Improvement Reports.
 Implementation of quality plan for this project, which include inspection, testing and proper
documentation
 Ensure that all works complied with client/contractor issued (IFC) drawing, applicable
standards and specification.
 Installation, wiring and cable laying, termination, witnessing of insulation resistance test and
hipot test.
 Ensure that all related inspection and testing activities with regards to Environment, Health &
Safety procedures and maintenance rules are respected.
 Monitor the work performance to ensure the respect of work standards and project
specifications.
 Coordinate and assist construction to resolve any encountered problems related to inspection
and testing activities
 Initiate remedial or corrective action based on standard, code, and specification and verify the
closure of NCR.
 Inspect and witness the construction works as per their approved Inspection Test Plan.
 Ensure the effective coordination with the client related to inspection, testing activities and
documentation.
 Maintain all Quality Control Report.
 Control and monitoring of material flow to site, Controlling of drawing as per contract and
client requirement.
Company SARPI Spa
From September 2012
To April 2013

Position E&I Supervisor


Gathering System Construction at In Amenas
Responsible to manage field Electrical and Instrument installations, labor relations, productivity, manpower
planning, material and construction equipment planning, and adherence to work plan and schedule.
Member of a multi-functional execution project team responsible for planning, coordination, field
supervision and engineering input relating to all instrument equipment for CPF plant, Wells and manifolds.
Serve as day-to-day interface with the Area Construction Engineers, providing a focus on safety, quality,
and engineering queries.
Follow up all E&I tasks for Gathering System Construction at In Amenas Wells, Manifolds and CPF with
main tasks which mentioned below:
 Electrical and Instrument Cables pulling
 Instrument Installation and terminations including tubing
 Junction boxes Installation and terminations
 Cathodic protection
 Fiber Optic
Company SARPI Spa
From April 2011 to December 2011

Position Technical Engineer


Gathering System Construction at In Amenas
As a member of technical office in Gathering System Construction project with In Amenas gas (Sonatrach-
Britich Petrolum-Statoil Joint Venture) as client. The main tasks were:
 Conducting technical supervision over general construction works and accepting general
modifications from field supervisors.
 Controlling construction plans, drawings and schedules, scopes of work, terms and quality.
 Ensuring quality of applied materials, their compatibility with operational design drawings,
construction norms and regulations, technical specifications, HSE standards.
 Participating in reviewing and changing design concepts and raised it to client.
 Performing changes of construction materials and equipment when necessary by raising a technical
query to client.
Company SARPI Spa
From December 2008 to April 2011
Position Instrumentation Engineer
Hassi R’mel Boosting Phase II Project
As a member of the commissioning team I actively participated to the functional tests, performance tests and
start up of six compression stations of the BOOSTING Project (Phase-2) at Hassi R’Mel / Algeria.
Each station consists mainly of a turbo compressor unit and its related process auxiliaries:
Gas Turbine: Model Series MS-5002C from GE Oil & Gas;
Centrifugal Compressor: Type BCL-606A from Nuovo Pignone.
Control system: MARK-6 SPEEDTRONIC
The main tasks that I achieved are as follows:
 Loop check and commissioning of:
- Turbo compressor unit instrumentation
- Electric panels and switch gears from ABB / Nuovo Pignone vendors
- Fire & Gas Protection System from General Monitors
 Installation and configuration of Bentley Nevada 3500 RACK
 Configuration and acquisition of the process parameters on SYSTEM-1 of Bentley Nevada for the
unit’s operation data bank analysis.
 Installation and configuration of the CIMPLICITY and TOOLBOX software parameters.
 Configuration of the 5.5KV SHNEIDER electric panels using the SEPAM SFT2841 software.
 Follow up and assistance in programming the DCS logic of Foxboro’s control blocks
 Configuration of the circuit breakers from ABB
 Configuration of blocs and functions using CS3000 of YOKOGAWA
 Installation and calibration of various instruments such as Transmitters, Flow meters, Detectors…
 Follow up and verification of instrumentation works
 Preparation of Mechanical Completion files
 Preparation of the Reception Records with the owner Sonatrach
Computer Skills
 Office automation: Word, Excel, Power Point, MS Project.
 Programming languages: Assembler, Compiler C, VHDL.
 Softwares: MATLAB, Orcad, XILINX ISE, Eagle4.11, and AutoCAD, MARK VI and Control
System Toolbox of GE, CS3000 of YOKOGAWA, 3500 RACK of BENTLY NEVADA .
Languages
 FRENCH : Upper level (Speaking, writing and reading)
 ENGLISH: Intermediate and under improvement
 ARABIC: Mother tongue
Other Information
 Valid drive license B.
 Valid passport.
Interests & Leisure
 Sports: Jogging, chess and games of patience
 Interest for the novelties and technologies of data processing.
 Journeys
AVAILABILITY: One month notice
REFERENCES: On request

You might also like