Horizontal Reference
Defining a starting point of the site related to the North / South direction, is one of the first steps
in setting up a coordination system.
http://www.wermac.org/documents/coordination_part1.html 1/3
8/19/2018 Piping Coordination Systems - Reference Points - Elevations - Plant North -
In principle, with a simple reliable compass the direction of the magnetic north can to be
determined. In the image below the true north is at 18°. As a draftsman would work with the true
north coordinates, he will immediately find out that each line from west to east and from north to
south at an angle of 18° must be drawn.
To avoid this, a Plant North will be determined. In the example below, the true north, 18° is
reversed, draftsmen and construction contractors will be grateful for it.
General there will be tried, to approach the true north-south coordinates as close as possible.
A rule is, that the angle between true north and Plant North can not exceed 45°. At 50°, for
example, the Plant North would be on the right side, so on the Eastern side of the image.
Vertical Reference
Before starting with any building, the site is leveled (graded), what means that the ground is
made as flat as practically possible. After leveling we talking about "finished grade", where the
highest graded point is termed "high point of finished grade".
This highest point of finished grade refers to an official reference point on which all vertical
measurements are related. In the Netherlands, for example, many vertical measurement are in
relation to the "Normaal Amsterdams Peil" (NAP). If the field compared to the NAP is 1 meter
higher, usually the reference point will not become a zero start of 1000 mm, but in this case a
zero start at zero(0).
On a isometric view of a pipe line elevations are indicated by EL.109665 or EL.99450 etc..
What is meant by this vertical dimensions ?
The first EL.109665 you can read as: centerline of pipe is 9665 mm above zero point
The second EL.99450 you can read as: centerline of pipe is 550 mm below zero point
Well, the vertical zero point in this case is 100 meters (100000 mm), and this has the advantage
that no negative (minus) values on drawings need to be applied.
http://www.wermac.org/documents/coordination_part1.html 2/3
8/19/2018 Piping Coordination Systems - Reference Points - Elevations - Plant North -
A combination of both signs, you see rarely nowadays on an isometric. Usually only the
Elevation symbol is applied. Why? There are many reasons to make no old-fashioned
isometrics.
Large-engineering companies can tell you why!