You are on page 1of 2

HVAC-WC-003 (RO B SWGR)

HVAC Department for Ras Al Khair Desalination Plant

Model
Equipment: Chilled Water Pump TP 80-340/4 KKS NO: 80SAB04AP001-003
No.
Every 2 Weeks Routine Maintenance Location RO B SWGR Date:

Pump 1 Pump 2 Pump 3


Checkpoint (80SAB04AP001) (80SAB04AP002) (80SAB04AP003) Remarks
Motor Operation Status

Noise Common
Suction
Water Pressure
Discharge

Suction
Valve Condition
Discharge

Pump Leakage

Piping Condition

Pump Body Condition


Additional Comment:

Checked By: T &I: Section Engineer


HVAC-WC-003 (RO B SWGR)

Govintharaju Lebid Marcelo

You might also like