DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

TABLE OF CONTENT
Section No Desctiption Page No

1 How to use this manual

2 Overall, Purpose

3 System Description

4 Equipment Schedule
5 Parts and identification and recommended spares

6 Place where spare parts may be obtained

7 Commissioning Data

8 Operation

9 Maintenance

10 Modification information

11 Disposal Instructions

12 Names, Addresses of Manufacturers and installation contractors

13 Index Plans and Drawings

14 Emergency information

15 Manufacturer Literature

16 Manufacturers Guarantees and warrantees


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

HOW TO USE THIS MANUAL


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

The User Manual contains all essential information for the user to make
full use of the information system. This manual includes a description
of the system functions and capabilities, contingencies and alternate
modes of operation, and step-by-step procedures for system access and
use.

This section provides a description of the purpose and scope of the User
Manual.

This section provides a brief overview of the system and its capabilities.

This section describes the purpose of the application system.

This section provides detailed, step-by-step system operating


instructions.

This section describes any Service or contractor help desk facility that
the user can contact for error resolution. Help desk telephone numbers
should be included.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

OVERAL PURPOSE
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

5.1 System Purpose:


The Purpose of the Irrigation system in providing adequate water
to the shrubs, ground covers, trees, in soft landscaping area.

5.2 System Scope:


The Scope of works are as follows,

1) Supply and installation of Rain bird solenoid valves, at existing


PPR pipes.
2) Supply and installation of inline drip tube as per the
requirement & the type of Landscape.
3) Supply & Installation of irrigation maxi control cables and the
required conduits and pull boxes, to connect the solenoid
valves to the irrigation controller rain bird.
4) Testing &commissioning of the irrigation Systems.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

SYSTEM DESCRIPTION
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

DESCRIPTION
Irrigation System Description
a. Overview of field irrigation system
1. The Source of irrigation is from the irrigation storage tank,
which is fed with TSE water from Dubai municipality source.
The supply line to the storage tank was done by others.
2. The Irrigation discharge line from the nearby portable water
point
3. Irrigation Mainline, per as built drawings. Isolation valve are
used to isolate flow of one. Solenoid Valve/valve control water
flow from mainline in to the laterals. The Operation of each
Solenoid valve is controlled through irrigation controller as per
irrigation schedule. The solenoid valves are connected to
irrigation controller through control wires,the cables such as
the power cable and control/station cables are installed in
separate conduit pipes.
4. Irrigation Water distribution system is consisted of following:

(a) Inline dripper tube for irrigation trees, shrubs and


ground covers, seasonal are installed as built installation
details.
Water Consumption:
The plant water requirements vary with season, e: g-the peak
water demands are during the hot season (5months-may to
September) and during moderately cool months these are
reduced from 25% to 40%. Irrigation Peak demands are considered
during the design process.

The Duration of the irrigation system is determined on the basis of


daily water requirements of the plants and evaporation rates. In
general, the following peak water requirements are taken in to
consideration.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Plant Type Daily Peak Water Requirements

Shrubs and ground Covers @ 12Litres per m2


More than 1 No. Shrub per m2
Shrubs 20-25liters per plant

Tress 100liters per Trees

Date palm 120-150litres per palm


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

EQUIPMENT SCHDULE
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Supplier’s Details:
S. No Description SUPPLIER
1 UPVC Pipes Cosmoplast
Brand:-
Model:-
Serial No:-
2 UPVC Fittings Cosmoplast
Brand:-
Model:-
Serial No:-
3 Solenoid Valve Meac
Brand:-
Model:-
Serial No:-
4 Gate Valve Al Gufaal Trading
Brand:-
Model:-
Serial No:-
5 Irrigation Controller Orient irrigation
Brand:-
Model:-
Serial No:-
7 Inline Drip Tube Meac
Brand:-
Model:-
Serial No:-

9 Drip Tube Fittings DIG


Brand:-
Model:-
Serial No:-
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

PARTS AND IDENTIFICATION AND RECOMMENDED


SPARES
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Note: - However, materials will be provided for maintenance


period of 12months.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

PLACE WHERE SPARE PARTS MAY BE OBTAINED


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Note: - However, materials will be provided for maintenance period


of 12months.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

COMMISIONING DATA
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

To be submitted separately.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

OPERATION
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

VALVE OPERATIONAL SCHEDULE

Operating time
Valve Total
Total Cycle 1 Cycle 2
Valve Valve Flow Flow Duration
Sequence No Station No Prog Flow
no Size Rate in Rate in Minutes
m³/Day
LPS LPS
From To From To

Drip

1 1 A DV1 1" 0.71 0.71 30 0.64 8.00 8.15 6.00 6.15

Drip

2 2 A DV2 1" 0.5 0.5 60 1.80 8.20 8.50 6.20 6.50

Total 90 2.44

Irrigation Duration/Day : 1 Hrs 30 Mins

Daily Peak Irrigation Requirement : 3 m3/day


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

MAINTENANCE
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Maintenance:

S.NO WORK DESCRIPTION PERIOD


Daily Weekly Monthly Yearly
1 Checking all over *
operation of system
2 Operation pressure of *
emitters
3 Leakage in drip system *
4 Checking the *
alignment of inline
drip tube
5 Checking of clogged *
and shrinkage in
dripline
6 Flushing of lateral and *
drip line
7 Checking the *
operation of solenoid
valve
8 Checking the solenoid *
valve diaphragm
9 Cleaning the solenoid *
valve
10 Cleaning the solenoid *
valve diaphragm
11 Cleaning the pull box *
12 Checking the *
irrigation program
13 Checking the *
compression fittings
to avoid leakages
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

14 Checking the joint of *


swirl tee
15 Checking the solenoid *
valves coil
16 Faulty solenoid coil *
replacement
17 Checking irrigation *
controller program
18 Replacement of *
clogged/faulty drip
line
19 Checking solenoid *
valve for any leakage
20 Visual inspection for *
proper functioning of
system
21 Check irrigation *
controller
22 Checking of joints *
23 Check the isolation *
valve for any leakage
24 Changing the faulty *
rubber washer of
isolation valves
25 Check the hand wheel *
of isolation valve
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Pipes and Fittings Maintenance Procedure:


Pipe Leakage: - excavate and locate pipe leakage- Cut and remove
leaking pipe and repair using new pipe and fittings as required.
Emitter /Dripper Pipes and Fittings maintenance Procedure:
Flush the dripper line when emitters are not operating
satisfactory.
If Flushing is not effective, replace the clogged length of the
dripper tube with new dripper tube of same Specifications.
Drip line Leakage: - Locate the leakage, cut and remove leaking
pipe, pipe and replace /repair as required.
Replace and clogged or partially clogged online PC emitters
(delivering less than 50% of the nominal flow) or any emitter over
flowing by more than 50%.
Solenoid Valve with Battery Operated:
 Check the Solenoid valve coil for proper functioning
 Check control cable wire connectors for conducting proper
signal
 Check the earthing strength of control cable
 Check the continuity of maxi cable.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

MODIFICATION INFORMATION
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Modifications:

Not Applicable-No Modification was done.

Description of the Major Company responsible for Date of


Repairs/Modifications repairs/modifications Repairs/
Modifications
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

DISPOSAL INSTRUCTIONS
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Disposal Instructions:
There are hazardous materials which require specific disposal,
however for general DM guidelines to wise waste management
please see below,

It is advantage to compile the register indicating the names of the


hazardous materials that require disposal. The disposal of
materials must be done as per rules & regulations of the U.A.E &
municipality.

In case of further advice, contacts to be established with:

DEPARTMENT OF ENVIRONMENT PROTECTION


DUBAI MUNICIPALITY
P.O BOX-67, DUBAI, UNITED ARAB EMIRATES.

 To contact Dubai municipality, please approach us through


the flowing details:

 Foe any inquiry or services, please call the free number in


contact center on 800900 around the clock.

The main telephone number: - +971 42215555


The main Fax number: +971 42246666
Email: -info@dm.gov.ae
Business Working hours: - 07:30Am to 02:30Pm from Monday to
Friday
Dubai Service Centers: - Al Karama, Al Manarah, Al tower, Hatta):
800900.

For further details DM Waste management technical Support


section to be contacted.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Dubai Municipality,
Waste management Department,
Technical Support and studies Section (TSSS)
Tel. No: - +971 42064297
Fax. No: - +971 47033548.
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

NAMES, ADDRESSES OF MANUFACTURERS AND


INSTALLATION CONTRACTORS
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

S. No Description SUPPLIER Installation


Contractor
1 UPVC Pipes Cosmoplast Premier Irrigation
Brand:- & Landscaping
Model:-
Serial No:-
2 UPVC Fittings Cosmoplast Premier Irrigation
Brand:- & Landscaping
Model:-
Serial No:-
3 Solenoid Valve Meac Premier Irrigation
Brand:- & Landscaping
Model:-
Serial No:-
4 Gate Valve AlGufaal Trading Premier Irrigation
Brand:- & Landscaping
Model:-
Serial No:-
5 Irrigation Orient irrigation Premier Irrigation
Controller & Landscaping
Brand:-
Model:-
Serial No:-
7 Inline Drip Meac Premier Irrigation
Tube & Landscaping
Brand:-
Model:-
Serial No:-
9 Drip Tube DIG Premier Irrigation
Fittings & Landscaping
Brand:-
Model:-
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Serial No:-

INDEX PLANS AND DRAWINGS


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

NOTE : To be submitted separately.


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

EMERGENCY INFORMATION
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

In case of Emergency:
L/S Contractor: Premier Irrigation and landscaping LLC
Contact Person: Mr. Bala
Address. Box-233610, Dubai, UAE,
Email Address: bala@ptsgroups.org
Telephone No: +971 42808995
Fax No: +971 55995088
In Case of Emergency: -
Main Contractor:
M/S SHANSXI CONSTRUCTION ENGINEERING GROUP
CORPORATION LTD,
Address: P. O. Box 212618|Dubai - UAE
Telephone No:04 577 6183
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

Project Contacts:

Role Organization Name Phone Number,


Fax

Main Contractor M/S SHANSXI P.O.Box-212618


CONSTRUCTION |Dubai – UAE
ENGINEERING Tel: 04 577 6183
GROUP
CORPORATION
LTD.

Installing Premier Irrigation and Tel:- 044 2808995


Contractor Details landscaping LLC Fax:- 0559950883

EMERGENCY INFORMATION
Emergency Information
Local Authorities
In case of Contact Telephone
Accident or incident Police 999
Fire Fire Brigade 997
Medical Emergency Ambulance/Police 998/999
Power Failure DEWA 991
Telephone Enquiry Etisalat 180/181
Du 800155
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

MANUFACTURER LITERATURE
DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

FLOMAX PUMP TRADING L.L.C


Po.Box: 77453,
Dubai, United Arab Emirates Tel:
+ 971 4 5539053
Fax: +971 4 5539042
Email: info@flomaxpumps.com

MATERIAL SPECIFICATION
PROJECT: 2B+G+11+ROOF RESIDENTIAL BUILDING, AFC048,AL FURJAN,DUBAI.

IRRIGATION BOOSTER PUMP SET (1D+1S)

Make : XYLEM GOULD’S

Type : VERTICAL MULTISTAGE

Flow rate : CM 3-5

Head : 40M

Model : MG71B-C-B-CMS1D

Casing : STAINLESS STEEL

Impeller : STAINLESS STEEL

Shaft : STAINLESS STEEL

Seal : MECHANICAL SEAL

Motor Rating : 0.75 KW

Enclosure : TEFC

Starter : DOL

No. of Poles : 2 POLE

Speed : 2700 RPM

Power Supply : 240 V / 1 PH / 50 Hz


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00

FLOMAX PUMP TRADING


AL QUOZ
U.A.E-77453 DUBAI
0523769649
NARESH@FLOMAXPUMPS.COM

Customer Date 8/16/2022


Contact Project
Phone number Project no.
Email

Technical Data
Operating data

Pumpe ty pe Single head pump Fluid Water


No. of pumps / Reserv e 1 / 0 Operating temperature t A °C 4
Nominal f low m³/h 5-3 pH-v alue at t A 7
Nominal head m 40 Density at t A kg/m³ 1000
Static head m 0 Kin. v iscosity at t A mm²/s 1.569
Inlet pressure bar 0 Vapor pressure at t A bar 1
Env ironmental temperature °C 50 Solids 0
Av ailable sy stem NPSH m 0 Altitude m 0

Pump data

Make Goulds Nominal m³/h 8.4 ( 8.4 )


Speed rpm 2700 Flow Max- m³/h 14
Number of st ages 5 Min- m³/h
Max. casing pressure bar Nominal m 49.9
Max. working pressure bar 5.9 Head at Qmax m 28.9
Head H(Q=0) m 60 at Qmin m 60
Weight kg 37 Shaf t power kW 1.7 ( 1.7 )
Max. mm 96 Max. shaf t power kW 1.8
Impeller R designed mm 96 Ef f iciency % 69.33
Min. mm 96 NPSH 3% m 1.4

Pump Materials Shaft Seal

Pump body Stainless steel / AISI 304 e-SV Mechanical seal Roten
Impeller Stainless steel / AISI 304 e-SV - Uniten (-30 / +120 °C)
Dif f user Stainless steel / AISI 304 1 - Rotating part Silicon Carbide
Outer sleev e Stainless steel / AISI 304 2 - Stationary part Resin impregnated carbon
Shaf t Stainless steel / AISI 304 3 - Elastomers EPDM
ADAPTER Cast iron 4 - Springs AISI 316
COUPLING Aluminium 5 - Other components AISI 316
SEAL HOUSING Stainless steel / AISI 304
Coupling protection Stainless steel / AISI 304
Shaf t sleev e and bushing Tungsten carbide
Fill / drain plugs Stainless steel / AISI 304
Tie rods Galv anized steel
Base Aluminium

Wear Ring Technopoly mer PPS

Motor data
Manuf acturer Goulds Electric v oltage 400 V Speed 2900 rpm Insulation class 155 (F)

Specif ic design IE3 Three phase surf ace motor (e-SV) Frame size 90 Colour RAL 5010

Ty pe PLM90B14/322 E3 (220-240/380-415V)

Rated power Electric current 2.2 kW 4.56 A


DOCUMENT NUMBER: AE-001-2-C005-CAA-102024 TITLE: O&M MANUAL FOR IRRIGATION SYSTEM REVISION: 00
DOCUMENT NUMBER: AE00-2-D001-CQA-106024 TITLE: FINISHING WORKS QUALITY REPORT REVISION: 00

MANUFATURERS GUARANTEES AND WARRANTIES


WEEKLY REPORT NO. 36 ( 26th May - 2nd June
DOCUMENT NUMBER: AE001-2-C005-CBB-102036 TITLE: REVISION: 00
2023) (Baseline Program)

Product Guarantees and Warranties:

To be submitted separately.