01 20/10/2021 SK FOR INFORMATION MH ALT

00 25/08/2021 SK FOR INFORMATION MH ALT

REV. DATE BY DESCRIPTION CHKD. CERT. APPD. TRANS. NO.

CONTRACT NO.: PROJECT:


CONVERSION OF HAIL-2 SIMPLE CYCLE TO
4400004078
COMBINED CYCLE POWER PLANT

DOCUMENT TITLE: DATE:


20/10/2021
WARRANTY INSPECTION PROCEDURE FOR VACUUM SKIDS SCALE:

COMPANY /ORIGINATOR PROJECT DOC. NO.: REV. SHT.

CONT.
HAIL2CC-00-Y-JDA-AT-0091 01

DISTRIBUTION CODE: SHEET No.: SIZE: SCALE:


MECHANICAL A4 N.T.S
FILE NAME:

TRANSMITTAL No.:
Document No. Date
CONVERSION OF HAIL- SIMPLE CYCLE
TO COMBINED CYCLE POWER PLANT HAIL2CC-00-Y-JDA-AT-0091 20/09/2021

Page: 01
WARRANTY INSPECTION PROCEDURE FOR VACUUM SKIDS
Rev.: 01

1. OBJECT
1.1. PURPOSE
The purpose of this document is to provide guideline for the checks to be
performed for warranty inspection for Vacuum Skids of Air Cooled Condenser in
accordance with SEC specification reference Schedule C, Attachment BF-X-A.

1.2. ABBREVIATIONS
For project denominations and abbreviations see document:
HAIL2CC-00-Y-GMO-IDO-0003 Project denominations and abbreviations.

1.3. STANDARDS
For applicable codes and standards see document:

HAIL2CC-00-Y -GNO-IDO-0002 Project design codes and standards.

2. DESCRIPTION OF WORK:

The Purpose is to carry out the warranty inspection of the vacuum pumps of air cooled
condenser supplied by M/s. SPX. The function of these pumps is, the non–condensable
have to be evacuated from the condenser before steam can be introduced at start-up
(hogging process) and should be continuously removed during normal operation (holding
process).
For hogging purpose 3 x 50 % vacuum pumps (B0MAJ61 AP001, B0MAJ62 AP001 and
B0MAJ63 AP001) are provided. When “hogging”, the requirement is to lower the
pressure as quickly as possible. In this case two pumps are required to decrease from
atmospheric pressure to 338.6 mbar in 30 minutes.
During operation, air must also be extracted (holding operation). For holding, in normal
operation, one pump is required (e.g. B0MAJ61 AP001 and B0MAJ62 AP001 normally
stopped if B0MAJ63 AP001 has been selected). Each of those pumps is designed for
35.7 kg/h air ingress. Ideally the control should alternate the pump skids for holding
functions.
Document No. Date
CONVERSION OF HAIL- SIMPLE CYCLE
TO COMBINED CYCLE POWER PLANT HAIL2CC-00-Y-JDA-AT-0091 20/09/2021

Page: 02
WARRANTY INSPECTION PROCEDURE FOR VACUUM SKIDS
Rev.: 01

3. SCOPE OF WORK:

3.1. The Scope of Work is to carry out the Warranty Inspection for Vacuum Pumps Skids of
Air cooled condenser, such as:
1) Visual inspection of all pump parts
2) Check no leaks are present.
3) Visual Inspection of any defective of the equipment
4) Overall check of the control instruments and devices
5) Check the Storage water tank and sight glass
6) Check the pipes and valves, leaks,
7) check connecting elements.

Note: Detailed Check list is attached in the Clause 6 of this document.


Document No. Date
CONVERSION OF HAIL- SIMPLE CYCLE
TO COMBINED CYCLE POWER PLANT HAIL2CC-00-Y-JDA-AT-0091 20/09/2021

Page: 03
WARRANTY INSPECTION PROCEDURE FOR VACUUM SKIDS
Rev.: 01

4. METHOD STATEMENT: The following steps are to take to carry out the warranty
inspection of the vacuum pumps of Air cooled condenser.

1. The calibrated instruments to be used to carry out the inspection.


2. The vacuum pumps/motors to be in safe operation mode.
3. All the gauges and transmitters to be checked.
4. Two vacuum pumps, out of the three are selected for hogging operation.
5. The cooling system of the two selected pumps is in operation (e.g. B0MAJ61/62 HE001
for hogging).
6. The water level in all the pump separators to be checked.
7. A distinction should be made between the following modes of operation that is Hogging,
vacuum operation and holding vacuum pump operation and the operation to be
checked.

5. RISK ASSESMENT:
Common causes of violent rupture of a vacuum system component are blockage or
restriction of pump exhaust. To avoid hazards, following to be considered.

1) Ensure that exhaust blockages should not occur during operation, either because of
mechanical components (for example, valves or blanks) or because of process materials
or by-products depositing in pipelines, filters and other exhaust components, unless your
system has been designed to cope with it.

2) Ensure that the accidental over pressure of a deliberately closed and isolated vacuum
system should not occur.
Document No. Date
CONVERSION OF HAIL- SIMPLE CYCLE
TO COMBINED CYCLE POWER PLANT HAIL2CC-00-Y-JDA-AT-0091 20/09/2021

Page: 04
WARRANTY INSPECTION PROCEDURE FOR VACUUM SKIDS
Rev.: 01

6. DETAILED CHECK LIST:

S. No DESCRIPTION REPORT NOTES


1 Visual inspection of all pump parts
2 Inspection of the motor/pump sound
3 Inspection of the motor grease
4 Inspection of the pump oil level
5 Visual inspection of the shaft seal
6 Visual inspection of mechanical seal for leak
7 Visual inspection of motor heater operation
8 Check no leaks are present.
9 Visual Inspection of any defective of the equipment
10 Overall check of the control instruments and devices
i) Check the gauges and it is fitting
ii) Check the instruments and it is fitting
11 Check the Storage water tank and sight glass
iv) Inspection of tank level
v) Visual inspection of seal water flow does not
exceed normal flow
12 Check the pipes and valves, leaks,
13 Inspect the motor visually and check security of hold
down fixing bolts
14 Check all temperatures devices.
15 Overall perform of all instruments and devices
16 check connecting elements
17 Carry out inspection for MOV valves and cable
entries
18 Visual inspection of MCC setting for pumps and
valves
19 Visual inspection of the pump motor overload
protection setting.
20 Check motor/pump sound during run time.
21 Check motor grease.
22 Visual inspection of the gauges and fittings
23 Check oil level
24 Visual inspection of the mechanical parts such as,
mechanical seals, etc.