1. OBJECT
1.1. PURPOSE
The purpose of this document is to provide guideline for the checks to be
performed for warranty inspection for Vacuum Skids of Air Cooled Condenser in
accordance with SEC specification reference Schedule C, Attachment BF-X-A.
1.2. ABBREVIATIONS
For project denominations and abbreviations see document:
HAIL2CC-00-Y-GMO-IDO-0003 Project denominations and abbreviations.
1.3. STANDARDS
For applicable codes and standards see document:
2. DESCRIPTION OF WORK:
The Purpose is to carry out the warranty inspection of the vacuum pumps of air cooled
condenser supplied by M/s. SPX. The function of these pumps is, the non–condensable
have to be evacuated from the condenser before steam can be introduced at start-up
(hogging process) and should be continuously removed during normal operation (holding
process).
For hogging purpose 3 x 50 % vacuum pumps (B0MAJ61 AP001, B0MAJ62 AP001 and
B0MAJ63 AP001) are provided. When “hogging”, the requirement is to lower the
pressure as quickly as possible. In this case two pumps are required to decrease from
atmospheric pressure to 338.6 mbar in 30 minutes.
During operation, air must also be extracted (holding operation). For holding, in normal
operation, one pump is required (e.g. B0MAJ61 AP001 and B0MAJ62 AP001 normally
stopped if B0MAJ63 AP001 has been selected). Each of those pumps is designed for
35.7 kg/h air ingress. Ideally the control should alternate the pump skids for holding
functions.
Document No. Date
CONVERSION OF HAIL- SIMPLE CYCLE
TO COMBINED CYCLE POWER PLANT HAIL2CC-00-Y-JDA-AT-0091 20/09/2021
Page: 02
WARRANTY INSPECTION PROCEDURE FOR VACUUM SKIDS
Rev.: 01
3. SCOPE OF WORK:
3.1. The Scope of Work is to carry out the Warranty Inspection for Vacuum Pumps Skids of
Air cooled condenser, such as:
1) Visual inspection of all pump parts
2) Check no leaks are present.
3) Visual Inspection of any defective of the equipment
4) Overall check of the control instruments and devices
5) Check the Storage water tank and sight glass
6) Check the pipes and valves, leaks,
7) check connecting elements.
Page: 03
WARRANTY INSPECTION PROCEDURE FOR VACUUM SKIDS
Rev.: 01
4. METHOD STATEMENT: The following steps are to take to carry out the warranty
inspection of the vacuum pumps of Air cooled condenser.
5. RISK ASSESMENT:
Common causes of violent rupture of a vacuum system component are blockage or
restriction of pump exhaust. To avoid hazards, following to be considered.
1) Ensure that exhaust blockages should not occur during operation, either because of
mechanical components (for example, valves or blanks) or because of process materials
or by-products depositing in pipelines, filters and other exhaust components, unless your
system has been designed to cope with it.
2) Ensure that the accidental over pressure of a deliberately closed and isolated vacuum
system should not occur.
Document No. Date
CONVERSION OF HAIL- SIMPLE CYCLE
TO COMBINED CYCLE POWER PLANT HAIL2CC-00-Y-JDA-AT-0091 20/09/2021
Page: 04
WARRANTY INSPECTION PROCEDURE FOR VACUUM SKIDS