Substation
Bay/Panel
Equipment Serial No
j. Buchholz relay.
k. Check online Gas Analyzer with
Moisture Analyzer (if applicable)
Check Leak testing with pressure for liquid-
immersed transformers (tightness test). Tank
22.
pressure under rated conditions shall not
exceed 2 atmosphere (203 kPa).
Check that the oil sampling devices are
23.
reachable from ground level.
Check oil level indicator has a diameter of
the dial is about 210mm. The dial markings
show 25ºC level as well as the high and low
24.
oil levels. Check the indicator is provided
with low and high level alarm and trip
contacts.
Check Bushings are fitted with oil level
25. gauges, which can be easily read from
ground level.
Bleed trapped air at the bushing turrets and
tank top. Before energization, it should be
26. confirmed that the air has been released
from all the air pockets provided in the
Transformer.
a. Check Winding Temperature Indicator
has dark face dial with light markings and
hand reset maximum indicating pointer.
The dial marking is 0 to 160°C with ±1.5%
accuracy.
b. Four (4) individually adjustable sets of
micro switch type contacts shall be
available for the control of fans/pumps,
27. alarm and trip functions. The contacts for
the control of fans and pumps shall be
wired to available terminal points for
future use.
c. The sensing element shall be supplied by
CTs installed on the central phase of the
winding.
d. Check it is mounted in outdoor cabinet.
a. Check Oil Temperature Indicator has dark
face dial with light markings. The dial
28.
marking is 0 to 160ºC with ±1.5%
accuracy.
NATIONAL GRID
trip)
f. Pressure Relief Device (alarm/ trip) as
per design.
g. Rapid Pressure (Rise) Relay as per
manufacturer testing procedure (if
applicable).
h. Online insulating oil dissolved gas and
moisture monitoring system.
i. Humidity/thermo meters for the heater of
the local panel are at correct settings
Oil Test
Prior to energization, CONTRACTOR shall
submit test report for insulation samples
tested in an approved independent lab. The
report shall contain at least the following
test results:-
a. Color
b. Moisture Content
c. Dielectric Strength (Break Down
Voltage)
i) (2.5 mm Gap) for unprocessed oil
and for OLTC oil
ii) (1 mm gap) for oil in main tank
d. Dielectric Dissipation Factor Test
(DDF)
e. Acidity
f. Density at 20 ºC
20. g. Interfacial Tension IFT
h. Dissolved Gas in Oil Analysis DGA
i. (Dielectric Dissipation Factor,
Resistivity, Sediment and / or
Perceptible Sludge).
j. For transformer with Cellulosic
insulating material, perform total
Sulphur contents and corrosive sulphur
detection test as per ASTM D1275
method B.
k. PCB ppm level of the oil
Another oil samples shall be given to
National Grid SA laboratory (if available and
as per Maintenance Department
energization Requirement) through Project
Department.
Contractor shall provide test report to CSD
for review and acceptance before
NATIONAL GRID
energization.
A main tank, OLTC and Cable Boxes
insulation and Conservator oil sample for
dissolved gas analysis shall be taken
21.
immediately prior to first energizing a power
transformer and another sample three days
after continuous operation.
Measurement of zero-sequence
22.
impedance(s)
Measure the Insulation resistance of control
wires (a minimum of 500 V (dc) one
23. minute). Check number of cores and
number of strands as per field requirement
and specification.
24. Magnetic balance test.
Check online gas analyzer device:
a. Check readings of each fault gas as per
data schedule
25. b. Check alarms of fault Gases and its
settings
c. Check the online DGA monitor is
integrated with SAS