You are on page 1of 33

USI-RFA 021-METHOD STATEMENT

REQUEST FOR APPROVAL


OF PILE STATIC LOAD TEST

PROJECT: TRIBE HOTEL PHNOME PENH

PROJECT ID:

OWNER : CONTRACTOR
UY SING INVESTMENT
#36E0, Street 07, Sangkat Nirot, Khan Chbar Ampov
Phnom Penh, Cambodia

DOCUMENT SUBMITTAL:

Shop Drawings Calculation Notes Master Works Schedule

9 Method Statement Variation Order (VO) Other

APPROVAL
Items DESCRIPTIONS Qty
Yes No
1 METHOD STATEMENT OF PILE STATIC LOAD TEST 1
2
3

Submitted by : LANG LYHENG SIGNATURE & DATE : 04-07-2019

Reviewed by: SARIEM PANHA SIGNATURE & DATE : 04-07-2019

Received by: Soratat Dusitrojanawong SIGNATURE & DATE : 13-07-2019

MAIN CONTRACTOR Review, Comment and Approval CLIENT Review, Comment and Approval

No further comments

REMARKS:
PLEASE FIND THE DETAILED DOCUMENTS IN SECOND PAGES

UY SING INVESTMENT
1 of 1
Soratat D.

From: agenttommy.tommy@gmail.com
Sent: 13 July 2019 10:28
To: soratat.d@gmail.com
Subject: FW: Tribe PP - Load Testing for Pilot Pile

 
 
From: Faun Israsena | S+A <faun@santhaya.com>  
Sent: Friday, July 5, 2019 4:53 PM 
To: 'Soratat D.' <soratat.d@gmail.com> 
Cc: 'Adva Morgenshtern | S+A' <adva@santhaya.com>; agenttommy.tommy@gmail.com; lattlavannkh@gmail.com; 
dusit.w1964@gmail.com; chanin@hmdasia.com; 'Deaw' <deaw@hmdasia.com>; r_tanakarn@yahoo.com; Nattapon 
Wangsittikul <wangsittikul@gmail.com> 
Subject: RE: Tribe PP ‐ Load Testing for Pilot Pile 
 
Dear Khun Soratat,

No particular comments krub – agreed to proceed.

Kind regards,

Faun Israsena Na Ayudhya


DPLG. Arch.
Managing Director
Associate

This email is from Santhaya + Associates Limited.


The contents, comments and views herein contained or expressed are those of the individual sender, and do not necessarily reflect those of Santhaya + Associates Limited, its subsidiaries, affiliates or associates.
The contents of this email and any attachments are confidential and intended solely for the use of the individual or entity to whom they are addressed..
They may not be disclosed to or used by or copied in any way by anyone other than the intended recipient. If this email is received in error, please notify Santhaya + Associates Limited and delete it from your system.
Please note that neither Santhaya + Associates Limited nor the sender accepts any responsibility for viruses and it is your responsibility to scan or otherwise check this email and any attachments.
Please consider the environment before printing this e-mail.

From: Soratat D. <soratat.d@gmail.com>  
Sent: 04 July 2019 14:12 
To: 'Faun Israsena | S+A' <faun@santhaya.com>; r_tanakarn@yahoo.com 
Cc: 'Adva Morgenshtern | S+A' <adva@santhaya.com>; agenttommy.tommy@gmail.com; lattlavannkh@gmail.com; 
dusit.w1964@gmail.com; chanin@hmdasia.com; 'Deaw' <deaw@hmdasia.com> 
Subject: Tribe PP ‐ Load Testing for Pilot Pile 
Importance: High 
 
Dear Khun Faun / Khun Ratt

For the Load Testing of Pilot Pile, please support to review the proposed Method Statement from the Piling Contractor (Uy
Sing) in attachment, if it is according to the required engineering design, specifications and standard, hence let us know
with your comment krub.

They would propose to do the Testing Load at 600 tons, which is 2 times of the design load, 300 tons. Our Pilot Pile is not
part of the actual building piles and the Load Testing is now planned on the period of 19-22 July.

1
Any other queries, kindly let us know.

Best Regards,

สรฑัต ดุสิตโรจนวงศ์
Soratat Dusitrojanawong | Project Manager | Thailand 
112 Soi Prapinij, Suanplu Road, Thung Mahamek 
Sathorn, Bangkok 10120, Thailand 
T:  + 66 (0) 2679 4050 
M: + 66 (0) 81 837 0404 
Email: soratat.d@gmail.com 
Go GREEN…Print LESS ! 

From: Lyheng Lang [mailto:lyheng.lang@uysing.com]  
Sent: 04 July 2019 11:18 
To: 'Soratat D.' <soratat.d@gmail.com>; agenttommy.tommy@gmail.com 
Cc: panha.sariem@uysing.com; lattlavannkh@gmail.com; dusit.w1964@gmail.com; hing@hmdasia.com; 
engbou.tea@uysing.com 
Subject: RFA‐020‐COMPANY PROFILE DG E&C Co.,LTD‐2019.07.04, RFA‐021‐METHOD STATEMENT OF PILE STATIC 
LOAD TEST‐2019.07.04 
 
Dear Sir :  
 
We would like to submit the submittal for approval as follows:  
 
1. LIST OF SUBMITTAL‐2019.07.04 
2. RFA‐020‐COMPANY PROFILE DG E&C Co.,LTD‐2019.07.04 
3. RFA‐021‐METHOD STATEMENT OF PILE STATIC LOAD TEST‐2019.07.04 
 
Kindly find in the attachment.  
 
Best Regards  
 
Lang Ly Heng 
 

2
Static Pile Load Test

វធីសា សពិេសោធន៍ គឹះេដោយបនកេថរ


METHOD STATEMENT FOR STATIC LOAD TEST
Listen to the Earth,Conquer the Height
េ ះគេ ង/ Project : IBIS PROJECT

ទី ំងគេ ង/ Location : ទីកងភំេពញ PHNOM PENH

The Owner The Designer The Main Contractor The Testing

Page 1
Static Pile Load Test

ភំេពញ ៃថទី03/07/2019

តិ / CONTENT
---oOo---
A. ពិេ ធន៍ គឹះេ បបនុកេថរ / STATIC LOAD TEST .............................................

1. ឧេទស ម/ INTRODUCTION..............................................................................

2. ឧបករណ៍ពិេ ធន៍ / TESTING EQUIPMENT ....................................................

3. ដំេណរ របនុកពិេ ធន៍ / PROCEDURES FOR LOADING ..............................

4. ដំេណរ រ ម នសំរត
ុ /
PROCEDURES FOR MEASURING PILE MOVEMENT ............................................
5. រ យ រណ៍ពិេ ធន៍ / TEST REPORT ............................................................

6. សុវតិ ព រ រ/ SAFETY REQUIREMENTS ....................................................


B. APPENDIX ...........................................................................................................
- រ យ រណ៏កត់ សំរត
ុ / DATA RECORD OF
PILE HEAD SETTLEMENT ...................................................................................
- បង់លំអិតែន រពិេ ធន៏/ORGANIZATION
FOR LOADING AND UNLOADING EQUIPMENTS ...........................................
- បង់ស ប់េធពិេ ធន៏/DRAWING FOR STATIC LOAD TEST .........................

- តំេឡងស រ ពិេ ធន៏/ EQUIPMENT SETTING


FOR STATIC LOAD TEST .....................................................................................
A. ពិេ ធន៍ គឹះេ បបនុកេថរ / STATIC LOAD TEST

1. ឧេទស ម/ INTRODUCTION

1.1 េ ល រណ៍ពិេ ធន៍/ Test purpose

រពិេ ធន៍បនុកេថរគឺ រពិេ ធន៍រកក ំង ទបនុករបស់សសរ គឹះ មល័ក

ខ័ណដី ែដល ក់ ក់ ងវ ិធី សពិេ ធន៍េផ ងៗេទ តេដម ីយកមក សិក រគំេ ង

ចំេ ះ រពិេ ធន៍េនះគឺ ចអនុវតន៍ ន ប់ប សំណង់ ចំេ ះ រពិេ ធន៍

ស័យនិងេពលេវ និង រចំ យ ចំេ ះ រសិក រនិង ងសង់ េ លេ ពិេ ធន៍

- គឺកំណត់ក ំង ទបនុករបស់ គឹះេដម ីសិក រគំេ ង

- ឬេធ ឯក រស ប់ កំណត់បនុករបស់អកសិក រ
Static load tests provide the best means of determining pile capacity and, if properly

Page 2
Static Pile Load Test
designed, implemented and evaluated, should pay for themselves on most projects. Depending
on availability of time and on cost considerations, the load testing program may be included
either in the design or in the construction phase. The purpose of pile load testing can be:
- To develop criteria to be used for the design and installation of the pile foundation, or
- To prove the adequacy of the pile-soil system for the proposed pile design load.

វ ិធី សេនះែន ំពីដំេណរ រពិេ ធន៍របស់ គឹះសងត់របស់សំណង់“IBIS

PROJECT ”. ទី ំង ភំេពញ េ លេ របស់ពិេ ធន៍បនុកេថរកុង រ នេនះ

គឺកំណត់ក ំង ទបនុកធំបំផុត

របស់សសរ គឹះ មល័កខ័ណដី (ឲ កំរ ិតសំរត


ុ ធំបំផុត 10%D(mm)ៃនមុខ ត់ គឹះ)
This statement presents the procedures of Jacking pile test for “IBIS PROJECT )”.
Location: Phnom Penh. The purpose of the static load test is to verify the ultimate bearing
capacity of piles and barrette (to the settlement =10% of the pile diameter or 10% B is short
side of rectangular barrette)
1.2 មូល ន គឹះកុង រអនុវតន៍/ Basic of preparation

-េសចកី តវ រ របស់ ស់ គេ ងត មវឲ ពិេ ធន៍ បនុកេថរចំេ ះ គឹះសំណង់

-េសចកី តវ រែផកបេចកេទស និងឯក រឬក៏ បង់ ែដល ស់គេ ង តវឲ េធ

ពិេ ធន៍ មសង់ រ


-Proposal of Employer for Piles Under Static Axial Compressive Load of piles test for
Proposed
- Technical requirements, documents and drawings provided by the Employer
-ASTM D1143 – 07 Piles - Standard Test Method for Piles Under Static Axial Compressive
Load
-BS 8004-1986 Code of Practice for Foundations

1.3 េសចកីលំអិតអំពី គឹះពិេ ធន៍ / Detail of test piles

គឹះពិេ ធន៍គឺ គឹះខូង.ទី ំងនិងបនុ កពិេ ធន៍ធំបំផុត មអក បឹក កំណត់ឲ

ឬ ស់គេ ងអកកំណត់ េសចកីលំអិតកុង ង 1.


The test piles are BORDE PILE . The location and test load are decided by the Designer,
Consultant or Employer. The details of test piles are shown in Table 1.

ង 1 (Table 1) - េសចកីលំអិត គឹះពិេ ធន៍ / (Specifications of Test Piles)

Length (m)
No. Pile ID Diameter (mm) Design load (Ton) testing load (Ton)
1 PSLT D800 300 35m 600

Page 3
Static Pile Load Test

1.4 ដំ ក់និងដំេណរ រពិេ ធន៍ / The testing procedure is as follows

- ជំ នទី 1/ Step 1: ស តៃផដីជុំវ ិញ គឹះពិេ ធន៍ / Making platform around the testing
pile
- ជំ នទី 2/ Step 2: េធឲ ៃផ គឹះេសរនិង ក់ក ល គឹះេ យ /sika grout/ Making surface
of the pile head smooth by sika grout
- ជំ នទី 3/ Step 3: ក់ែខ ម តកុងបរ ិេវនពិេ ធន៍ / Protecting the pile testing
area
- ជំ នទី 4/ Step 4: ក់កំណល់ / Installing the support bearing concrete blocks

- ជំ នទី 5/ Step 5: ក់កំណល់ែដក បក លសសរ គឹះ និងេលក ល Jack ឲ ចំផិត

គឹះពិេ ធន៍ / Centering the steel plate hydraulic jacks load cells on the pile head

- ជំ នទី 6/ Step 6: ក់ឬដំេឡងធឹមេម / Installing main beam

- ជំ នទី 7/ Step 7: ដំេឡងធឹមរង ពីេលធឹមេម និង ដំេឡងដុំេបតុងពីេល / Installing cross


beams and alternately placed concrete blocks for reaction. Installing concrete blocks
- ជំ នទី 8/ Step 8: ដំេឡងធឹម ទ ឡិ សំរង
ុ / Installing reference beams and apparatus
measuring movement
- ជំ នទី 9/ Step 9: ដំេណរ រពិេ ធន៍ / Starting pile testing

- ជំ នទី 10/ Step 10: ប ប់ រពិេ ធន៍ រុះេរ  និងេ ះយកស រេ ទុក/ Removing the
kentledge system
- ជំ នទី 11/ Step 11: ប ប់ រពិេ ធន៍ ដឹកជ ូ ន ឥ ៉ ន និងស តៃផដី/ Restoring the
pile testing area
- ជំ នទី 12/ Step 12: េធរ យ រណ៍ពិេ ធន៍ ជូនអកេ ៉ រ ឫក៏ ស់គំេ ង / Report
the pile testing result to client The Engineer and Owner
+េ ប ស់ ៉ សុីនសួចរបស់ Robot 50 េ ន / Using crane 50T

2. ឧបករណ៍ពិេ ធន៍ / TESTING EQUIPMENT

ឧបករណ៍ពិេ ធន៍រម
ួ ន បពន័ បនុក បពន័ បតិកមបនុក និង បពន័ ម ននិង

កត់ សំរត

The test equipment consists of apparatus for applying load, reaction system and system of
settlement measurement.

Page 4
Static Pile Load Test

2.1 បពន័បេងតបនុក / Apparatus for applying load

បពន័បេងតបនុ ក រូម នគឺ Jack ែដលដំេណរ រេ យ បពន័ ៉ សុីនប៊ូមេ បង

ែតមួយនិង ឡិ កំណត់ក ំង បពន័បេងតបនុក ងេ ម េ ប ស់ស ប់

ពិេ ធន៍
The apparatus for applying load consists of hydraulic jack operated under a hydraulic
pump with pressure gauge. The following apparatus for applying load will be used in the test

- 02 Jack នក ំង 800 T/ Jack (02 hydraulic jacks for, capacity 800 T for each)

- ៉ សុីនប៊ូមេ បងមួយេ គ ង នសម ពបេងតក ំង(Hydraulic pump, maximum

pressure) 10.000 psi

- ឡិ ស់ក ំងចំនួនមួយ (Pressure gauge, measurement range) 0-60 Mpa

មុនេពលពិេ ធន៍ ប ឯក រប ក់ពីគុណ ពឬបេចកេទស របស់ Jack និង

ឡិ រក ំង តវ បគល់ឲ េ អក បឹក រនិង ស់គេ ង


Before testing, the inspection and calibration certificates of the hydraulic jack and pressure
gauge will be submitted to the Consultant and the Owner.

2.2 បពន័ បតិកមក ង


ំ / Reaction system

បពន័ បតិកមក ំងរួម នប ធឹម និង ដុំេបតុង

The reaction system contains test beam, loading frame and kentledge. The loading frame
is constructed by a system of cross beams. The kentledge with concrete blocks placed safely on
the loading frame, with test beam is formed as reaction system of the apparatus for applying
load.

x គឹះ Pile Static Load Test (Disegn Load=300 tons)

- េ បដុំេបតុង ស ប់េធ បនុកពិេ ធន៍ 600x1.2=720tons /Use Concrete blocks

600x1.2=720tons tons

- ធឹមេម / Test beam (600x1600x12000): 1 beams

- ធឹមរង/croos beam (300x900x12000mm):18beams

Page 5
Static Pile Load Test

ជំ ៊ នទី 1: តំេឡងបនុក 25% ឲ ដល់ 300tons ចំេ ះខូបទី1 (Setting upto load 25%

kentledge 300tons carrying out the First cycle)

ជំ ៊ នទី 2: បនតំេឡងបនុក 50%ៃនបនុកអនុ តិសិក របស់ខូប 2 ដល់100%

ែនបនុកសិក រនិងតំេឡង10%បនប ប់ រហូតដល់បនុកែដល នកំណត់ 600tons

(Continuing test up to load 50% of design load and 100% of desing load of Second cycle,
and 10% of the at the same time setting up and testing according to the loading procedure
600tons )

2.3 បពន័ ម នសំរត


ុ / Apparatus for measuring movement

បពន័ ម នសំរត
ុ រួម ន4 ឡិ ស់សំរត
ុ េ យ ប់និងេ ធឹម 2 ចំេ ះធឹម

េនះ តវ ន ប់ឲ នលំនឹង ធឹមេនះេធ ៉ង កុំឲ នលំ ស់ទី មដីនិង លូត

េ យ រកំេ ។ េ ប 4 ឡិ ែដល នកំរ ិតលូតធំបំផុត 100mm និងកំរ ិតលំេអ ង

0.01mm េដម ី ស់សង់សំរត


ុ ។
The system of settlement measurement consists of by 4 dial gauges placed firmly on the two
stable reference beams. The reference beams should be stably installed to ensure no influence
of soil movement or deformation of equipment. The 4 dial gauges with maximum stroke 100
mm accuracy 0.01 mm will be used for measuring settlement of pile head.

មុនេពលពិេ ធន៍ ប ឯក រប ក់ពីគុណ ពរបស់ ឡិ ឲេ អក បឹក

គេ ងឬ ស់គេ ង។
Before testing, the inspection and calibration certificates of the dial gauges will be
submitted to the Owner and Consultant.

2.4 រ ម នធឹមទំរ ឡិ / Movement monitoring of the references beam

េ ប ៉ សុីន ែលល េដម ី ម នធឹមទំរ ឡិ ចំេ ះ ៉ សុីន តវ ក់ឲ យពី

ទី ំង គឹះពិេ ធន៍ / A leveling machine is also used to monitor the stability of the references
beam and placed in outside of the loading area
3. ដំេណរ រដំេឡងនិងថយបនុ ក / PROCEDURES FOR LOADING

ង 2. ដំេណរ រដំេឡងនិងថយបនុក /Table 2. Loading and Unloading Procedures for


Pile

Page 6
LOAD TEST - PRESSURE
Project IBIS PROJECT
Location Phnom Penh
Pile Name Pile Static Load Test
Design Load 3000 kN
Tested Load 6000 kN
The Maintained Load Test Procedure for Compression will be used as follows
200% of the Designed Load ASTM D1143 -07
2
%Design Load Load (kN) Pressure (kgf/cm ) Time of holding Readings

5% 150.0 5.21 Checking Equipment – 10’ Zero


Cycle
0% 0.0 0.00 Reading determination is initial
25% 750.0 24.62 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
50% 1500.0 48.37 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
Loading

75% 2250.0 72.12 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
100% 3000.0 95.88 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
125% 3750.0 119.63 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
150% 4500.0 143.38 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
175% 5250.0 167.14 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
Test Load

5,10 and 20min, then every 20min for 2hr,


200% 6000.0 190.89 12hr,till the settlement rate ≤ 0.25 mm/hour and ≤24 hours every 1hr for 10hr , then every 2hr

175% 5250.0 167.14 1 hours every 20min


150% 4500.0 143.38 1 hours every 20min
125% 3750.0 119.63 1 hours every 20min
Unloading

100% 3000.0 95.88 1 hours every 20min


75% 2250.0 72.12 1 hours every 20min
50% 1500.0 48.37 1 hours every 20min
25% 750.0 24.62 1 hours every 20min

0% 0.0 0.00 2hr,till the settlement rate ≤ 0.25 mm/hour and ≤12 hour every 20min
Static Pile Load Test

4. ដំេណរ រ ម នសំរត
ុ / PROCEDURES FOR MEASURING PILE MOVEMENT

កុងេពលដំេណរ រសំ ំបនុក តៃមែដល តវកត់ របស់ពិេ ធន៍ នដូច ងេ ម


/ In the process of holding, test data will be read at the time as follows
កំរ ិតបនុក/ Load level Frequency of Monitoring
េពលមុននិងេ យតំេឡងនិងថយបនុក/ Before &
immediately after applying a load increment - decrement
ទី ទី5 ទី ទី10 ទី ទី20 និង20 ទីមងៗ

ប ប់េទ ត 30 / 5,10 and 20min, then every 20min


តំេឡងបនុក – ថយបនុក/
Load increment - decrement 20 ទីមងចំេ ះ 30 ប ប់/20 min once for next 30min

1េ ៉ ងមងចំេ ះ 12េ ៉ ងប ប់/ 1hr for next 12hr

2េ ៉ ងមងចំេ ះ >12េ ៉ ងប ប់/ 2h once for next >


12hr

* រពិេ ធន៍ តវ នប ប់នូវេពលែដល/The testing was considered finished when

-ដំេណរ រពិេ ធន៍េធ តវ មវ ិធី សែដល នកំណត់/Complete testing procedures

as the Method statement (is approved)

-សសរ គឹះ តវ នបំ ញឫដល់កំរ ិតអនុ តិ /The piles so tested shall be deemed to have

failed or reached the ultimate load capacity of the pile

*សសរ គឹះ តវ នបំ ញេពល/ The piles so tested shall be deemed to have failed if

-សំរត
ុ សរុបរបស់ក លសសរ គឹះេលសពី 15%D(mm) មសង់ រ េមរ ិច ំង និង

10%D(mm) មសង់ រ អឺរប ៉ុ / Total pile head settlement exceeded (15%(mm) ASTM )10%

testing pile diameter or 10% short side of rectangular barrette(BS 8004-1986)

- សសរ គឹះ តវ សតចុះ ៉ ងេល នែដល បនុកមិនេកន/ The piles sunk sudden &

uncontrolled

- សសរ គឹះ តវ នផុះែបក / Pile material is broken

Page 9
Static Pile Load Test

5.. រ យ រណ៍ពិេ ធន៍ / TEST REPORT

រ យ រណ៍ពិេ ធន៍ តវ ន បគល់ឲ ចំនួន 4 ៃថប ប់ពីេ ធន៍រច


ួ រួម ន / The

report will be submitted within 4 working days of the completion of the test, which include

- េ ះ និងទី ំងគំេ ង / Projec location

- ល់គំេ ង អក បឹក កមហ៊ុនេ ៉ រ ងសង់ គឹះនិង កមហ៊ុនពិេ ធន៍ / The

Owner The Engineering The Contractor Testing company

- ឯក រ គឹះពិេ ធន៍ / Test piles information

- លទផលពិេ ធន៍ / Test result

- សនិ ននិងអនុ ស/ Conclusions and recommendations

-កុងរ យ រណ៍លទផលពិេ ធន៍ តវេរ ប ប់ មពីររេប ប គឺ ម ងនិង ភិច

/ The test results shall presented in two forms, tabular form and graphical form.

ម ង/ Tabular form

ប តៃម បនុក េថរះេវ សំរត


ុ តវ នកត់ កុងេពលពិេ ធន៍ ដូចកុង

ងគំរួ ងេ ម “តៃមពិេ ធន៍ ” និង “សរុបលទផលពិេ ធន៍ ”

The data including readings of load, time and settlement taken and recorded
during testing for tested pile shall be presented in "Pile Load Test Record" and “Summarised
Test Results”.

ភិច/ Graphical form

ពីតៃមពិេ ធន៍ ប បនិង ភិច ងេ ម តវ នបេងតេឡង / From the test

data, the following curves shall be established

x ភិច បនុក-សំរត
ុ (Load - Settlement Curve)

x ភិច សំរត
ុ -រយះេពល (Settlement - Time Curve)

x ភិច បនុ ក-សំរត


ុ -រយះេពល (Load - Settlement - Time Curve)

Page 10
Static Pile Load Test

6. សុវតិ ព រ រ / SAFETY REQUIREMENTS

េដម ីឲ នសុវតិ ព រ ដូច នអគីភ័យ និងកងក់ បរ ិ ន កុងេពលពិេ ធន៍

កុង រ ន តវអនុវតន៍ដូច ងេ ម

- អក ន រកិច មចូលកុងទី ំងពិេ ធន៍

- ប ស រសំណង់ ដីភក់ េ បង ... តវសំ តឲ ត

- តវ នវ ិធី ស រ រស រនិងឧបករណ៍ េពល នេភ ងនិងខ ល់ និងកំេ

- ដូយ សប់េ បង បពន័ទុយេ បង និងរូបីេនឫដំណរ តវេផ ង ត់ឲ នច ស់ ស់

និងសំ តឲ ន ត េហយ តវេ ះដូររបស់ែដលខូច

- រសួចថនិ ងស រ តវ ន រ បង បយ័តខស់

- តវ នវ ិធី ស ៉ង នសុវតិ ពេពលតំេឡងឧបករណ៍ និងរុះេរ មិនឲ េ ពី

េ មដងសួចឫរបស់ែដលសួច
The following safety rules are in addition to general safety requirements applicable to
construction operations
- No entry to test site for unauthorized people
- All building waste, mud, oil… on test area should be cleaned
- It is necessary to have protection method for test equipment from rain, sun shine
- Hydraulic jacks, pump, system of hydraulic hoses, valves and connectors should
periodically checked and cleaned. Replace timely the damaged parts
- The mobilisation and de-mobilisation of kentledge and test equipment should safety, do
not block public traffic
- Should have safety method for installation of kentledge. People stay under crane and in
operation area of crane

Page 11
Static Pile Load Test

Reading & Recording data in the procedure of testing pile

Page 12
Static Pile Load Test

B. APPENDIX

-រ យ រណ៏កត់ សំរត
ុ /DATA RECORD OF PILE HEAD SETTLEMENT

-បង់លំអិតែន រពិេ ធន៏ /ORGANIZATION FOR LOADING AND UNLOADING


EQUIPMENTS
-បង់ស ប់េធពិេ ធន៏ /DRAWING FOR STATIC LOAD TEST

-តំេឡងស រ ពិេ ធន៏/EQUIPMENT SETTING FOR STATIC LOAD TEST

-លិខិតប ក់េផ ងៗ

Page 13
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082

បនុ កពិ េ ធន៍ /Testing Load ទិ ន័ យកត់ សំ រត


ុ សសរ គឹះ/Dial Gauge reading (0.01mm) Settlement
(mm)
Day Hours Min
Load Pressure
% DL No 1 No 2 No 3 No 4 S1 S2 S3 S4 Average Total
(Tons) (kg/cm2)

5% 15
0% 0

First Cycle
5'
10'
20'
40' 25% 75
60'

5'
10'
20'
40' 50% 150
60'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082

បនុ កពិ េ ធន៍ /Testing Load ទិ ន័ យកត់ សំ រត


ុ សសរ គឹះ/Dial Gauge reading (0.01mm) Settlement
(mm)
Day Hours Min
Load Pressure
% DL No 1 No 2 No 3 No 4 S1 S2 S3 S4 Average Total
(Tons) (kg/cm2)

5'
10'
20'
40' 75% 225
60'

5'
10'
20'
40' 100% 300
60'

5'
10'
20'
40' 125% 375
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082

បនុ កពិ េ ធន៍ /Testing Load ទិ ន័ យកត់ សំ រត


ុ សសរ គឹះ/Dial Gauge reading (0.01mm) Settlement
(mm)
Day Hours Min
Load Pressure
% DL No 1 No 2 No 3 No 4 S1 S2 S3 S4 Average Total
(Tons) (kg/cm2)

60'

5'
10'
20'
40' 150% 450
60'

5'
10'
20'
40' 175% 525
60'

5'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082

បនុ កពិ េ ធន៍ /Testing Load ទិ ន័ យកត់ សំ រត


ុ សសរ គឹះ/Dial Gauge reading (0.01mm) Settlement
(mm)
Day Hours Min
Load Pressure
% DL No 1 No 2 No 3 No 4 S1 S2 S3 S4 Average Total
(Tons) (kg/cm2)

10'
20'
40'
60'
80'
100'
120'
180'
240'
300'
360'
200% 600
420'
480'
540'
600'
660'
720'
840'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082

បនុ កពិ េ ធន៍ /Testing Load ទិ ន័ យកត់ សំ រត


ុ សសរ គឹះ/Dial Gauge reading (0.01mm) Settlement
(mm)
Day Hours Min
Load Pressure
% DL No 1 No 2 No 3 No 4 S1 S2 S3 S4 Average Total
(Tons) (kg/cm2)

960'
1080'
1200'
1320'
1440'
5'
10'
20'
40' 175% 525.0
60'

5'
10'
20'
40' 125% 375.0
60'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082

បនុ កពិ េ ធន៍ /Testing Load ទិ ន័ យកត់ សំ រត


ុ សសរ គឹះ/Dial Gauge reading (0.01mm) Settlement
(mm)
Day Hours Min
Load Pressure
% DL No 1 No 2 No 3 No 4 S1 S2 S3 S4 Average Total
(Tons) (kg/cm2)

5'
10'
20'
40' 100% 300.0
60'

5'
10'
20'
40' 75% 225.0
60'

5'
10'
20'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082

បនុ កពិ េ ធន៍ /Testing Load ទិ ន័ យកត់ សំ រត


ុ សសរ គឹះ/Dial Gauge reading (0.01mm) Settlement
(mm)
Day Hours Min
Load Pressure
% DL No 1 No 2 No 3 No 4 S1 S2 S3 S4 Average Total
(Tons) (kg/cm2)

40' 50% 150.0


60'

5'
10'
20'
40' 25% 75.0
60'

5'
10'
20'
40' 0% 0.0
60'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082

បនុ កពិ េ ធន៍ /Testing Load ទិ ន័ យកត់ សំ រត


ុ សសរ គឹះ/Dial Gauge reading (0.01mm) Settlement
(mm)
Day Hours Min
Load Pressure
% DL No 1 No 2 No 3 No 4 S1 S2 S3 S4 Average Total
(Tons) (kg/cm2)

មតិ េ យេពលពិេ ធន៍ តវ នប ប់ !

The Owner The Designer The Main Contractor The Testing Contractor