Professional Documents
Culture Documents
PROJECT ID:
OWNER : CONTRACTOR
UY SING INVESTMENT
#36E0, Street 07, Sangkat Nirot, Khan Chbar Ampov
Phnom Penh, Cambodia
DOCUMENT SUBMITTAL:
APPROVAL
Items DESCRIPTIONS Qty
Yes No
1 METHOD STATEMENT OF PILE STATIC LOAD TEST 1
2
3
MAIN CONTRACTOR Review, Comment and Approval CLIENT Review, Comment and Approval
No further comments
REMARKS:
PLEASE FIND THE DETAILED DOCUMENTS IN SECOND PAGES
UY SING INVESTMENT
1 of 1
Soratat D.
From: agenttommy.tommy@gmail.com
Sent: 13 July 2019 10:28
To: soratat.d@gmail.com
Subject: FW: Tribe PP - Load Testing for Pilot Pile
From: Faun Israsena | S+A <faun@santhaya.com>
Sent: Friday, July 5, 2019 4:53 PM
To: 'Soratat D.' <soratat.d@gmail.com>
Cc: 'Adva Morgenshtern | S+A' <adva@santhaya.com>; agenttommy.tommy@gmail.com; lattlavannkh@gmail.com;
dusit.w1964@gmail.com; chanin@hmdasia.com; 'Deaw' <deaw@hmdasia.com>; r_tanakarn@yahoo.com; Nattapon
Wangsittikul <wangsittikul@gmail.com>
Subject: RE: Tribe PP ‐ Load Testing for Pilot Pile
Dear Khun Soratat,
Kind regards,
From: Soratat D. <soratat.d@gmail.com>
Sent: 04 July 2019 14:12
To: 'Faun Israsena | S+A' <faun@santhaya.com>; r_tanakarn@yahoo.com
Cc: 'Adva Morgenshtern | S+A' <adva@santhaya.com>; agenttommy.tommy@gmail.com; lattlavannkh@gmail.com;
dusit.w1964@gmail.com; chanin@hmdasia.com; 'Deaw' <deaw@hmdasia.com>
Subject: Tribe PP ‐ Load Testing for Pilot Pile
Importance: High
Dear Khun Faun / Khun Ratt
For the Load Testing of Pilot Pile, please support to review the proposed Method Statement from the Piling Contractor (Uy
Sing) in attachment, if it is according to the required engineering design, specifications and standard, hence let us know
with your comment krub.
They would propose to do the Testing Load at 600 tons, which is 2 times of the design load, 300 tons. Our Pilot Pile is not
part of the actual building piles and the Load Testing is now planned on the period of 19-22 July.
1
Any other queries, kindly let us know.
Best Regards,
สรฑัต ดุสิตโรจนวงศ์
Soratat Dusitrojanawong | Project Manager | Thailand
112 Soi Prapinij, Suanplu Road, Thung Mahamek
Sathorn, Bangkok 10120, Thailand
T: + 66 (0) 2679 4050
M: + 66 (0) 81 837 0404
Email: soratat.d@gmail.com
Go GREEN…Print LESS !
From: Lyheng Lang [mailto:lyheng.lang@uysing.com]
Sent: 04 July 2019 11:18
To: 'Soratat D.' <soratat.d@gmail.com>; agenttommy.tommy@gmail.com
Cc: panha.sariem@uysing.com; lattlavannkh@gmail.com; dusit.w1964@gmail.com; hing@hmdasia.com;
engbou.tea@uysing.com
Subject: RFA‐020‐COMPANY PROFILE DG E&C Co.,LTD‐2019.07.04, RFA‐021‐METHOD STATEMENT OF PILE STATIC
LOAD TEST‐2019.07.04
Dear Sir :
We would like to submit the submittal for approval as follows:
1. LIST OF SUBMITTAL‐2019.07.04
2. RFA‐020‐COMPANY PROFILE DG E&C Co.,LTD‐2019.07.04
3. RFA‐021‐METHOD STATEMENT OF PILE STATIC LOAD TEST‐2019.07.04
Kindly find in the attachment.
Best Regards
Lang Ly Heng
2
Static Pile Load Test
Page 1
Static Pile Load Test
ភំេពញ ៃថទី03/07/2019
តិ / CONTENT
---oOo---
A. ពិេ ធន៍ គឹះេ បបនុកេថរ / STATIC LOAD TEST .............................................
1. ឧេទស ម/ INTRODUCTION..............................................................................
4. ដំេណរ រ ម នសំរត
ុ /
PROCEDURES FOR MEASURING PILE MOVEMENT ............................................
5. រ យ រណ៍ពិេ ធន៍ / TEST REPORT ............................................................
1. ឧេទស ម/ INTRODUCTION
ខ័ណដី ែដល ក់ ក់ ងវ ិធី សពិេ ធន៍េផ ងៗេទ តេដម ីយកមក សិក រគំេ ង
- ឬេធ ឯក រស ប់ កំណត់បនុករបស់អកសិក រ
Static load tests provide the best means of determining pile capacity and, if properly
Page 2
Static Pile Load Test
designed, implemented and evaluated, should pay for themselves on most projects. Depending
on availability of time and on cost considerations, the load testing program may be included
either in the design or in the construction phase. The purpose of pile load testing can be:
- To develop criteria to be used for the design and installation of the pile foundation, or
- To prove the adequacy of the pile-soil system for the proposed pile design load.
គឺកំណត់ក ំង ទបនុកធំបំផុត
Length (m)
No. Pile ID Diameter (mm) Design load (Ton) testing load (Ton)
1 PSLT D800 300 35m 600
Page 3
Static Pile Load Test
- ជំ នទី 1/ Step 1: ស តៃផដីជុំវ ិញ គឹះពិេ ធន៍ / Making platform around the testing
pile
- ជំ នទី 2/ Step 2: េធឲ ៃផ គឹះេសរនិង ក់ក ល គឹះេ យ /sika grout/ Making surface
of the pile head smooth by sika grout
- ជំ នទី 3/ Step 3: ក់ែខ ម តកុងបរ ិេវនពិេ ធន៍ / Protecting the pile testing
area
- ជំ នទី 4/ Step 4: ក់កំណល់ / Installing the support bearing concrete blocks
គឹះពិេ ធន៍ / Centering the steel plate hydraulic jacks load cells on the pile head
- ជំ នទី 10/ Step 10: ប ប់ រពិេ ធន៍ រុះេរ និងេ ះយកស រេ ទុក/ Removing the
kentledge system
- ជំ នទី 11/ Step 11: ប ប់ រពិេ ធន៍ ដឹកជ ូ ន ឥ ៉ ន និងស តៃផដី/ Restoring the
pile testing area
- ជំ នទី 12/ Step 12: េធរ យ រណ៍ពិេ ធន៍ ជូនអកេ ៉ រ ឫក៏ ស់គំេ ង / Report
the pile testing result to client The Engineer and Owner
+េ ប ស់ ៉ សុីនសួចរបស់ Robot 50 េ ន / Using crane 50T
ឧបករណ៍ពិេ ធន៍រម
ួ ន បពន័ បនុក បពន័ បតិកមបនុក និង បពន័ ម ននិង
កត់ សំរត
ុ
The test equipment consists of apparatus for applying load, reaction system and system of
settlement measurement.
Page 4
Static Pile Load Test
ពិេ ធន៍
The apparatus for applying load consists of hydraulic jack operated under a hydraulic
pump with pressure gauge. The following apparatus for applying load will be used in the test
- 02 Jack នក ំង 800 T/ Jack (02 hydraulic jacks for, capacity 800 T for each)
The reaction system contains test beam, loading frame and kentledge. The loading frame
is constructed by a system of cross beams. The kentledge with concrete blocks placed safely on
the loading frame, with test beam is formed as reaction system of the apparatus for applying
load.
600x1.2=720tons tons
Page 5
Static Pile Load Test
ជំ ៊ នទី 1: តំេឡងបនុក 25% ឲ ដល់ 300tons ចំេ ះខូបទី1 (Setting upto load 25%
(Continuing test up to load 50% of design load and 100% of desing load of Second cycle,
and 10% of the at the same time setting up and testing according to the loading procedure
600tons )
បពន័ ម នសំរត
ុ រួម ន4 ឡិ ស់សំរត
ុ េ យ ប់និងេ ធឹម 2 ចំេ ះធឹម
គេ ងឬ ស់គេ ង។
Before testing, the inspection and calibration certificates of the dial gauges will be
submitted to the Owner and Consultant.
ទី ំង គឹះពិេ ធន៍ / A leveling machine is also used to monitor the stability of the references
beam and placed in outside of the loading area
3. ដំេណរ រដំេឡងនិងថយបនុ ក / PROCEDURES FOR LOADING
Page 6
LOAD TEST - PRESSURE
Project IBIS PROJECT
Location Phnom Penh
Pile Name Pile Static Load Test
Design Load 3000 kN
Tested Load 6000 kN
The Maintained Load Test Procedure for Compression will be used as follows
200% of the Designed Load ASTM D1143 -07
2
%Design Load Load (kN) Pressure (kgf/cm ) Time of holding Readings
75% 2250.0 72.12 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
100% 3000.0 95.88 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
125% 3750.0 119.63 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
150% 4500.0 143.38 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
175% 5250.0 167.14 1hr,till the settlement rate ≤ 0.25 mm/hour and ≤2 hours 5,10 and 20min, then every 20min
Test Load
0% 0.0 0.00 2hr,till the settlement rate ≤ 0.25 mm/hour and ≤12 hour every 20min
Static Pile Load Test
4. ដំេណរ រ ម នសំរត
ុ / PROCEDURES FOR MEASURING PILE MOVEMENT
-សសរ គឹះ តវ នបំ ញឫដល់កំរ ិតអនុ តិ /The piles so tested shall be deemed to have
*សសរ គឹះ តវ នបំ ញេពល/ The piles so tested shall be deemed to have failed if
-សំរត
ុ សរុបរបស់ក លសសរ គឹះេលសពី 15%D(mm) មសង់ រ េមរ ិច ំង និង
10%D(mm) មសង់ រ អឺរប ៉ុ / Total pile head settlement exceeded (15%(mm) ASTM )10%
- សសរ គឹះ តវ សតចុះ ៉ ងេល នែដល បនុកមិនេកន/ The piles sunk sudden &
uncontrolled
Page 9
Static Pile Load Test
report will be submitted within 4 working days of the completion of the test, which include
/ The test results shall presented in two forms, tabular form and graphical form.
ម ង/ Tabular form
The data including readings of load, time and settlement taken and recorded
during testing for tested pile shall be presented in "Pile Load Test Record" and “Summarised
Test Results”.
x ភិច បនុក-សំរត
ុ (Load - Settlement Curve)
x ភិច សំរត
ុ -រយះេពល (Settlement - Time Curve)
Page 10
Static Pile Load Test
កុង រ ន តវអនុវតន៍ដូច ងេ ម
- រសួចថនិ ងស រ តវ ន រ បង បយ័តខស់
េ មដងសួចឫរបស់ែដលសួច
The following safety rules are in addition to general safety requirements applicable to
construction operations
- No entry to test site for unauthorized people
- All building waste, mud, oil… on test area should be cleaned
- It is necessary to have protection method for test equipment from rain, sun shine
- Hydraulic jacks, pump, system of hydraulic hoses, valves and connectors should
periodically checked and cleaned. Replace timely the damaged parts
- The mobilisation and de-mobilisation of kentledge and test equipment should safety, do
not block public traffic
- Should have safety method for installation of kentledge. People stay under crane and in
operation area of crane
Page 11
Static Pile Load Test
Page 12
Static Pile Load Test
B. APPENDIX
-រ យ រណ៏កត់ សំរត
ុ /DATA RECORD OF PILE HEAD SETTLEMENT
-លិខិតប ក់េផ ងៗ
Page 13
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082
5% 15
0% 0
First Cycle
5'
10'
20'
40' 25% 75
60'
5'
10'
20'
40' 50% 150
60'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082
5'
10'
20'
40' 75% 225
60'
5'
10'
20'
40' 100% 300
60'
5'
10'
20'
40' 125% 375
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082
60'
5'
10'
20'
40' 150% 450
60'
5'
10'
20'
40' 175% 525
60'
5'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082
10'
20'
40'
60'
80'
100'
120'
180'
240'
300'
360'
200% 600
420'
480'
540'
600'
660'
720'
840'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082
960'
1080'
1200'
1320'
1440'
5'
10'
20'
40' 175% 525.0
60'
5'
10'
20'
40' 125% 375.0
60'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082
5'
10'
20'
40' 100% 300.0
60'
5'
10'
20'
40' 75% 225.0
60'
5'
10'
20'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082
5'
10'
20'
40' 25% 75.0
60'
5'
10'
20'
40' 0% 0.0
60'
ងកត់ ទិន័យពិេ ធន៍កង រ ន/DATA RECORD OF LOADING TEST
គេ ង/Project: IBIS PROJECT បនកសិក រ/ Design Load: 300 Tons
េ ះ គឹះ /Pile No: Pile Static Load Test បនុកពិ េ ធន៍ /Testing Load: 600 Tons
មុខ ត់សសរ គឹះ/Pile Diameter: 800mm
ពិេ ធន៍ េ យ/Test by:
បែវង/ Pile Length: 35m
េលខកូ ដ ឡិ សំរុត/Dial Gauge: VYR915/XGW601/XGW616/XJG398 ៃថ ែខ ំពិេ ធន៍ / Testing date:
េលខកូដ ឡិ ស់ក ំង /Pressure Gauge: EN 837-1(114-1) េលខកូ ដដូ យ/ Jack No: 80708/807082
The Owner The Designer The Main Contractor The Testing Contractor