DIPLOMA IN QUANTITY SURVEYING, PSAS

DRAWING NO: ELEMENT: SLIP NO:


03/ PARKING 1
PORTFOLIOROADWORK
S/S1/01
HEADING:
Excavation in reduce level

DESCRIPTION: UNIT:
Excavate to reduce level max depth not exceeding 1.00m & remove m3

material from the side.


QUANTITY:
50

TAKER
PARKING A&B OFF:

SQUARING:
2 a) LENGTH
10.00 10000
8.00 WIDTH
0.31 8000
49.60 DEPTH
30
225
50
305

b)LENGTH
2 2000
2.00 WIDTH
0.15 150
0.31 DEPTH
0.19 30
49.79 225
50
305
DIPLOMA IN QUANTITY SURVEYING, PSAS
DRAWING NO: ELEMENT: SLIP NO:
03/PORTFOLIOROAD PARKING 2
WORKS/S1/01
HEADING:
Excavation in rock

DESCRIPTION: UNIT:
Extra over for rock excavation m3

QUANTITY:
2

TAKER
OFF:

SQUARING:
5
100
49.79
1.00
1.00
2.49
DIPLOMA IN QUANTITY SURVEYING, PSAS
DRAWING NO: ELEMENT: SLIP NO:
03/PORTFOLIOROADW PARKING 3
ORKS/S1/01
HEADING:
Disposal of excavated material

DESCRIPTION: UNIT:
Dispose of excavated material to contractor’s own dump site area. m3

QUANTITY:
50

TAKER
OFF:
PARKING A&B

SQUARING
2 a) LENGTH :
10.00 10000
8.00 WIDTH
0.31 8000
49.60 DEPTH
30
225
50
305

b) LENGTH
2 2000
2.00 WIDTH
0.15 150
0.31 DEPTH
0.19 30
49.79 225
50
305
DIPLOMA IN QUANTITY SURVEYING, PSAS
DRAWING NO: ELEMENT: SLIP NO:
03/ PARKING 4
PORTFOLIOROADWORK
S/S1/01
HEADING:
Disposal of surface water

DESCRIPTION: UNIT:
Allow for keeping the surface of the site and excavation free of surface water. item

QUANTITY:
item

TAKER
OFF:

Item SQUARING:
DIPLOMA IN QUANTITY SURVEYING, PSAS
DRAWING NO: ELEMENT: SLIP NO:
03/ PARKING 5
PORTFOLIOROADWORK
S/S1/01
HEADING:
Filling sub base

DESCRIPTION: UNIT:
Filling sub base average depth 50mm thick compacted in layers. m2

QUANTITY:
161

TAKER
PARKING A&B OFF:

SQUARING:
2 a) LENGTH
10.00 10000
8.00 WIDTH
160.00 8000

b) LENGTH
2000
2 2.00 WIDTH
0.15 150

0.60
160.60
DIPLOMA IN QUANTITY SURVEYING, PSAS

DRAWING NO: ELEMENT: SLIP NO:


03/ PARKING 6
PORTFOLIOROADWORK
S/S1/01
HEADING:
Filling base course

DESCRIPTION: UNIT:
225mm consolidated thickness of 50mm down crusher run base course laid m2
and consolidated in 2 layers and blinded with quarry dust, consolidated.
QUANTITY:
161

TAKER
PARKING A&B OFF:

SQUARING:
2 a) LENGTH
10.00 10000
8.00 WIDTH
160.00 8000

b) LENGTH
2000
2 2.00 WIDTH
0.15 150

0.60
160.60
DIPLOMA IN QUANTITY SURVEYING, PSAS

DRAWING NO: ELEMENT: SLIP NO:


03/ PARKING 7
PORTFOLIOROADWORK
S/S1/01
HEADING:
Filling wearing course

DESCRIPTION: UNIT:
Filling dense-graded hot mix asphalt premix wearing course 30mm thick laid. m2

QUANTITY:
161

TAKER
PARKING A&B OFF:

SQUARING
2 a) LENGTH :
10.00 10000
8.00 WIDTH
160.00 8000

b) LENGTH
2000
2 2.00 WIDTH
0.15 150

0.60
160.60

DIPLOMA IN QUANTITY SURVEYING, PSAS

DRAWING NO: ELEMENT: SLIP NO:


03/ PARKING 8
PORTFOLIOROADWORK
S/S1/01
HEADING:
Apply prime coat

DESCRIPTION: UNIT:
Apply 30mm thick bitumen prime coat spread evenly over surface of crusher m2
run base course including blinding as described to receive hot mix asphalt
carpet wearing courses. QUANTITY:
161

TAKER
PARKING A&B OFF:

SQUARING:
2 a) LENGTH
10.00 10000
8.00 WIDTH
160.00 8000

b) LENGTH
2000
2 2.00 WIDTH
0.15 150

0.60
160.60

DIPLOMA IN QUANTITY SURVEYING, PSAS

DRAWING NO: ELEMENT: SLIP NO:


03/ PARKING 9
PORTFOLIOROADWORK
S/S1/01
HEADING:
Apply tack coat

DESCRIPTION: UNIT:
Apply 19mm thick bitumen tack coat spread evenly over surface of crusher m2
run base course including blinding as described to receive hot mix asphalt
carpet wearing courses. QUANTITY:
161

TAKER
PARKING A&B OFF:
SQUARING:
2 a) LENGTH
10.00 10000
8.00 WIDTH
160.00 8000

b) LENGTH
2000
2 2.00 WIDTH
0.15 150

0.60
160.60
DIPLOMA IN QUANTITY SURVEYING, PSAS

DRAWING NO: ELEMENT: SLIP NO:


03/ PARKING 10
PORTFOLIOROADWORK
S/S1/01
HEADING:
Parking line

UNIT:
DESCRIPTION: m
Prepare and apply one coat of alkali resisting primer and one coat of
emulsion paint of white colour. QUANTITY:
17

TAKER
PARKING A&B OFF:

8 SQUARING:
2.15 LENGTH
2000
17.20 WIDTH
150