0 PSC I Girder)
Length of Span (Exp. To Exp.) 20 20 Skew angle 0
Deck Width 12.00 No of Deck 2
Carriageway width 9.00 No of Span 1
Foundation Length/Width 12.000 5.50 No of Expansion joint 2
Width of Abutment 12.000 No of Girder 4
Length of Cap 12.000 No of Return Wall 2
Width of Footpath 1.50 Median Wall 2
Length of Return Wall 4.10 Median Width 2.3
Lengrh of Independent Wall 0.00
563.694 FRL
0.22
0.5 0.905
1.2
0.60
561.749
1.1 0.3
0.3
0.5
560.324
5.50
10 HT Steel
For PSC Girder( 45 kg/cum) MT 0.045 #REF! #REF!
14 PCC M-15 Below approach Slab m3 2.0 9.00 3.50 63.00 0.15 9.45 19
18 M-25 Grade RCC Railing kerb cum 1.0 27.00 0.4 10.13 0.30 3.04 6
20 Weep Hole
For Abutment m 2.0 10 1.0 20 40
For Return Wall m 2.0 2 1.0 4 8
21 Tack Coat for wearing coat sqm 0.0 27.0 9.00 0.00 0.00 0
Gifford India Pvt. Ltd. 2 of 28 MNB289+890 OLD
Wearing Coat 65 mm (40mmThick BC+25mm
22 sqm 1.0 27.00 9.00 243.00 243.00 486
mastic)
23 Enamel Painting
On Crash Barrier sqm 1 54.00 1 54 54.00 108
24 Stone Pitching
In Front of Abutment cum 2 14.25 2.50 71.25 0.30 21.38
Quadrate Slop cum 2 23.81 47.62 0.30 14.29
Extra Length cum 2 4.00 7.54 60.28 0.30 18.09
53.75 107
25 Filter Material Underneath Pitching
Quadrate Slop cum 2 23.81 47.62 0.15 7.14
Extra Length cum 2 4.00 7.54 60.28 0.15 9.04
16.19 32
a) All Types of soils including marshy soil. Cum 463.00 772.00 801.00 835.00 1,088.00 1,134.00 5093.0 180.8 920,559.75
b) Soft/Ordinary Rock Cum 0.0 -
c) Hard Rock ( Blasting Prohibited) Cum 0.0 -
d) Hard Rock ( with controlled Blasting ) Cum 0.0 -
Dismantling of existing structures like bridges,
retaining walls and other structure comprising of
masonry, cement concrete, wood work, steel
work, including T&P and scaffolding wherever
necessary, sorting the dismantled material,
disposal of unserviceable material and stacking
6.02 the serviceable material with all lifts and lead and 0.0 -
/ or salvaging material as per Technical
Specifications clause 202 and section 2800 of
MORT&H .By Mechanical Means for
a) M-20 Garde Cum 61.00 140.00 37.00 44.00 138.00 152.00 572.0 6,656.05 3,807,260.60
b) M-25 Garde Cum 0.0 -
c) M-30 Garde Cum 0.0 -
d) M-35 Garde Cum 0.0 -
e) M-40 Garde Cum 0.0 -
Providing and laying Reinforced Cement
Concrete in substructure of wing walls, return
walls, Piers, Pier caps, Abutments, Abutment
caps, dirt wall, Pedestal, retaining wall & median
wall, etc. excluding reinforcement complete as
6.07 per drawings and Technical Specifications 0.0 -
Sections 1500, 1700 and 2200 of MORT&H or as
directed by engineer incharge.
a) M-20 Garde Cum 54.00 138.00 43.00 52.00 156.00 173.00 616.0 6,656.05 4,100,126.80
b) M-30 Garde Cum 0.0 -
c) M-30 Garde Cum 0.0 -
d) M-35 Garde Cum 0.0 -
e) M-40 Garde Cum 0.0 -
Providing and laying Reinforced Cement
Concrete/Prestressed Cement Concrete in
superstructure of solid slab, Voided Slab, RCC T-
beam, Box Structres, I-girder, Box Girder, etc.
6.08 excluding reinforcement complete as per 0.0 -
drawings and Technical Specifications Sections
1500, 1700 and 2300 of MORT&H or as directed
by engineer incharge.
a) M-25 Grade Cum 72.00 75.00 251.00 262.00 257.00 261.00 1178.0 7,741.90 9,119,958.20
b) M-30 Grade Cum 0.0 -
c) M-35 Grade Cum 0.0 -
d) M-40 Garde Cum 0.0 -
e) M-45 Grade Cum 0.0 -
Supplying, Fitting and Placing un-coated Fe 500
TMT-HYSD bar Reinforcement in Foundation ,
substructure & superstructure complete as per
6.09 Drawing and Technical Specifications. Ref. to 0.0 -
Technical specification 1600 , 2100, 2200 & 2300
of MORT&H
a) Foundation Kg 4,873.00 11,207.00 2,985.00 3,549.00 11,034.00 12,136.00 45784.0 78.00 3,571,152.00
b) Substructure Kg 4,355.00 11,064.00 3,461.00 4,166.00 12,461.00 13,838.00 49345.0 78.00 3,848,910.00
c) Superstructure Kg 7,924.00 8,254.00 27,606.00 28,775.00 28,291.00 28,749.00 129599.0 78.00 10,108,722.00
Filling annular space around footing in rock. Lean
cement concrete of Grade M 15 as per Clause
6.10 No 2104 of Technical Specification of MORT&H. Cum 0.0 -
CHAPTER-6 BOX CULVERT
Description
S.No. Unit 2x2_1 2x2_2 4x3_1 4x3_2 6x4_1 6x4_2 Total Qty SOR Rate Amount
RCC Railing
(a) In soil Rm 10.00 10.00 10.00 10.00 10.00 10.00 10.00 70.0 1,200.00 84,000.00
(b) In Soft rock Rm 5.00 5.00 5.00 5.00 5.00 5.00 5.00 35.0 1,800.00 63,000.00
(c) In Hard rock Rm 0.0
Total Amount for bill no. 6 B 44,834,797.11
TOTAL FOR BILL NO. 6 B 4.48
MINOR BRIDGE :292+580 (2 x 20.0 PSC I Girder)
Length of Span (Exp. To Exp.) 20 40 Skew angle 0
Deck Width 12.00 No of Deck 2
Carriageway width 9.00 No of Span 2
Foundation Length/Width 12.00 10.50 No of Expansion joint 3
Width of Abutment 12 No of Girder 8
Length of CapAbut/Pier 12 10 No of Return Wall 2
Width of Footpath 1.50 Median Wall 2
Length of Return Wall 16.10 Median Width 2.25
Lengrh of Independent Wall 9.60
length of pier foundation 10.00
Length of pier shaft 5.50
556.584 FRL
0.22
0.5 0.5
1.2
0.00
554.639 0.25
1.1 0.3 1.7 0.5
0.3
0.5
1.5
544.856
10.50 10
10 HT Steel
For PSC Girder( 0 kg/cum) MT 0 #REF! #REF!
14 PCC M-15 Below approach Slab m3 2.0 9.00 3.50 63.00 0.15 9.45 19
18 M-25 Grade RCC Railing kerb cum 1.0 47.00 0.4 17.63 0.30 5.29 11
20 Weep Hole
For Abutment m 2.0 10 8.0 160 320
For Return Wall m 2.0 14 9.0 252 504
21 Tack Coat for wearing coat sqm 0.0 47.0 9.00 0.00 0.00 0
23 Enamel Painting
On Crash Barrier sqm 1 94.00 1 94 94.00 188
24 Stone Pitching
In Front of Abutment cum 2 14.25 2.50 71.25 0.30 21.38
Quadrate Slop cum 2 290.00 580.01 0.30 174.00
Extra Length cum 2 16.00 26.22 839.19 0.30 251.76
447.13 894
25 Filter Material Underneath Pitching
Quadrate Slop cum 2 290.00 580.01 0.15 87.00
Extra Length cum 2 16.00 26.22 839.19 0.15 125.88
212.88 426
For Retaining Wall/ RE/ Abutment cum 4 5.00 4.24 1.25 106.00
463.31 463.00
For Retaining Wall/ RE/ Abutment cum 4 4.60 3.84 0.150 10.60
60.92 61.00
54.44 54.00
5 RCC Box
72.04 72.00
12279.45 12279.00
7 PCC M-15 Below approach Slab m3 0 27.50 3.50 0.15 0.00 0.00 0.00
10 Expansion Joint
Filler Type Joint m 2 2.50 2.55 20.20 20.00
11 Tar Paper Bearing sqm 2.0 2.50 0.30 1.50 1.50 2.00
13 Weep Holes
236.00 236.00
15 Filter medium cum 2.0 31.50 0.60 2.14 37.80 80.80 81.00
17 Painting of Crash Barrier Sqm 4.0 2.50 0.50 1.60 24.20 38.72 39.00
18 Stone Pitching
In Front of Retaining Wall/ RE/
Abutment cum 2 4.00 0.30 4.05 9.72
Quadrate Slop cum 0 10.90 0.30 0.00 0.00
Extra Length cum 0 4.00 5.18 0.30 0.00 0.00
9.72 10.00
13.84 14.00
12.75 13.00
22 Flexible Apron
D/S cum 1 6.50 4.30 0.75 20.96
U/S cum 1 6.50 3.00 0.75 14.63
35.59 36.00
23 Backfill
66.41 66.00
24 RCC Railling
Deck & Approach m 0 2.50 0.00 0.00
Railing Kerb M-25 cum 0 2.50 0.50 0.30 0.00 0.00 0.00
0.00 0.00
For Retaining Wall/ RE/ Abutment cum 8 5.00 5.08 1.25 254.00
771.88 772.00
For Retaining Wall/ RE/ Abutment cum 8 4.60 4.68 0.150 25.83
140.09 140.00
138.31 138.00
5 RCC Box
75.04 75.00
19318.95 19319.00
7 PCC M-15 Below approach Slab m3 0 27.50 3.50 0.15 0.00 0.00 0.00
10 Expansion Joint
Filler Type Joint m 2 2.50 2.60 20.40 20.00
11 Tar Paper Bearing sqm 2.0 2.50 0.30 1.50 1.50 2.00
13 Weep Holes
356.00 356.00
15 Filter medium cum 2.0 31.50 0.60 2.14 37.80 80.80 81.00
17 Painting of Crash Barrier Sqm 4.0 2.50 0.50 2.60 36.20 94.12 94.00
18 Stone Pitching
In Front of Retaining Wall/ RE/
Abutment cum 4 4.00 0.30 5.10 24.48
Quadrate Slop cum 2 10.90 0.30 21.81 6.54
Extra Length cum 2 4.00 5.18 0.30 41.41 12.42
43.45 43.00
13.84 14.00
12.75 13.00
22 Flexible Apron
D/S cum 1 6.50 4.30 0.75 20.96
U/S cum 1 6.50 3.00 0.75 14.63
35.59 36.00
23 Backfill
242.69 243.00
24 RCC Railling
Deck & Approach m 0 2.50 0.00 0.00
Railing Kerb M-25 cum 0 2.50 0.50 0.30 0.00 0.00 0.00
0.00 0.00
For Retaining Wall/ RE/ Abutment cum 4 5.00 5.12 1.25 128.00
800.76 801.00
For Retaining Wall/ RE/ Abutment cum 4 4.60 4.72 0.150 13.03
37.31 37.00
43.26 43.00
5 RCC Box
250.97 251.00
31067.25 31067.00
7 PCC M-15 Below approach Slab m3 0 49.50 3.50 0.15 0.00 0.00 0.00
10 Expansion Joint
Filler Type Joint m 2 4.60 3.65 33.00 33.00
11 Tar Paper Bearing sqm 2.0 4.60 0.30 2.76 2.76 3.00
13 Weep Holes
312.00 312.00
15 Filter medium cum 2.0 53.50 0.60 3.14 64.20 201.43 201.00
17 Painting of Crash Barrier Sqm 4.0 4.60 0.50 1.50 39.80 59.70 60.00
18 Stone Pitching
In Front of Retaining Wall/ RE/
Abutment cum 2 4.00 0.30 5.15 12.36
Quadrate Slop cum 0 23.77 0.30 0.00 0.00
Extra Length cum 0 4.00 7.52 0.30 0.00 0.00
12.36 12.00
36.07 36.00
24.96 25.00
22 Flexible Apron
D/S cum 1 8.60 3.00 0.75 19.35
U/S cum 1 8.60 5.00 0.75 32.25
51.60 52.00
23 Backfill
110.61 111.00
24 RCC Railling
Deck & Approach m 0 4.60 0.00 0.00
Railing Kerb M-25 cum 0 4.60 0.50 0.30 0.00 0.00 0.00
0.00 0.00
For Retaining Wall/ RE/ Abutment cum 4 5.00 5.96 1.25 149.00
834.51 835.00
For Retaining Wall/ RE/ Abutment cum 4 4.60 5.56 0.150 15.35
44.36 44.00
52.08 52.00
5 RCC Box
261.59 262.00
32941.71 32942.00
7 PCC M-15 Below approach Slab m3 0 49.50 3.50 0.15 0.00 0.00 0.00
10 Expansion Joint
Filler Type Joint m 2 4.60 3.70 33.20 33.00
11 Tar Paper Bearing sqm 2.0 4.60 0.30 2.76 2.76 3.00
13 Weep Holes
312.00 312.00
15 Filter medium cum 2.0 53.50 0.60 3.14 64.20 201.43 201.00
17 Painting of Crash Barrier Sqm 4.0 4.60 0.50 1.50 39.80 59.70 60.00
18 Stone Pitching
In Front of Retaining Wall/ RE/
Abutment cum 2 4.00 0.30 6.20 14.88
Quadrate Slop cum 0 23.77 0.30 0.00 0.00
Extra Length cum 0 4.00 7.52 0.30 0.00 0.00
14.88 15.00
36.07 36.00
24.96 25.00
22 Flexible Apron
D/S cum 1 8.60 3.00 0.75 19.35
U/S cum 1 8.60 5.00 0.75 32.25
51.60 52.00
23 Backfill
163.23 163.00
24 RCC Railling
Deck & Approach m 0 4.60 0.00 0.00
Railing Kerb M-25 cum 0 4.60 0.50 0.30 0.00 0.00 0.00
0.00 0.00
For Retaining Wall/ RE/ Abutment cum 8 5.00 6.06 1.25 303.00
1088.26 1088.00
For Retaining Wall/ RE/ Abutment cum 8 4.60 5.66 0.150 31.24
137.93 138.00
155.76 156.00
5 RCC Box
257.19 257.00
40752.20 40752.00
7 PCC M-15 Below approach Slab m3 0 27.50 3.50 0.15 0.00 0.00 0.00
10 Expansion Joint
Filler Type Joint m 2 6.80 4.83 46.50 47.00
11 Tar Paper Bearing sqm 2.0 6.80 0.30 4.08 4.08 4.00
13 Weep Holes
284.00 284.00
15 Filter medium cum 2.0 31.50 0.60 4.14 37.80 156.40 156.00
17 Painting of Crash Barrier Sqm 4.0 6.80 0.50 1.50 57.40 86.10 86.00
18 Stone Pitching
In Front of Retaining Wall/ RE/
Abutment cum 4 4.00 0.30 6.33 30.36
Quadrate Slop cum 2 42.06 0.30 84.12 25.24
Extra Length cum 2 4.00 9.98 0.30 79.87 23.96
79.56 80.00
42.24 42.00
26.88 27.00
22 Flexible Apron
D/S cum 1 10.80 4.30 0.75 34.83
U/S cum 1 10.80 3.00 0.75 24.30
59.13 59.00
23 Backfill
444.27 444.00
24 RCC Railling
Deck & Approach m 0 6.80 0.00 0.00
Railing Kerb M-25 cum 0 6.80 0.50 0.30 0.00 0.00 0.00
0.00 0.00
For Retaining Wall/ RE/ Abutment cum 8 5.00 6.88 1.25 344.00
1134.37 1134.00
For Retaining Wall/ RE/ Abutment cum 8 4.60 6.48 0.150 35.77
151.70 152.00
172.98 173.00
5 RCC Box
261.35 261.00
42587.01 42587.00
7 PCC M-15 Below approach Slab m3 0 27.50 3.50 0.15 0.00 0.00 0.00
10 Expansion Joint
Filler Type Joint m 2 6.80 4.85 46.60 47.00
11 Tar Paper Bearing sqm 2.0 6.80 0.30 4.08 4.08 4.00
13 Weep Holes
284.00 284.00
15 Filter medium cum 2.0 31.50 0.60 4.14 37.80 156.40 156.00
17 Painting of Crash Barrier Sqm 4.0 6.80 0.50 1.50 57.40 86.10 86.00
18 Stone Pitching
In Front of Retaining Wall/ RE/
Abutment cum 4 4.00 0.30 7.35 35.28
Quadrate Slop cum 2 42.06 0.30 84.12 25.24
Extra Length cum 2 4.00 9.98 0.30 79.87 23.96
84.48 84.00
42.24 42.00
26.88 27.00
22 Flexible Apron
D/S cum 1 10.80 4.30 0.75 34.83
U/S cum 1 10.80 3.00 0.75 24.30
59.13 59.00
23 Backfill
569.01 569.00
24 RCC Railling
Deck & Approach m 0 6.80 0.00 0.00
Railing Kerb M-25 cum 0 6.80 0.50 0.30 0.00 0.00 0.00
0.00 0.00
Item No. Description of Item Type of foundation Unit Nos Soil Soft rock Hard Rock Soil Soft rock Hard Rock
B Major Bridges
1 187+404 Abut Pile Rm 2 35 70 0 0
Pier Pile Rm 2 35 70 0 0
2 218+460 Abut Pile Rm 2 35 70 0 0
Pier Pile Rm 3 35 105 0 0
Total 315 0 0
315
28