To,
Kind Attention,
Sub:- Quotation for Preparation of details project report (DPR) , excluding ground survey (i.e
topo, traffic, lab test etc) and Land acquisition for widening for Widening &
Improvement of Existing 2/4-Lanes K.K. Road (Tentative Length: 10 KM) Including
Construction of 4-Lane Link Road of Kandla Bypass Connecting to NH-8A (Tentative
Length 2 KM).
Scope of Work:- Preparation of details project report (DPR) , excluding ground survey (i.e
topo, traffic, lab test etc) and Land acquisition for widening for Widening & Improvement of
Existing 2/4-Lanes K.K. Road (Tentative Length: 10 KM) Including Construction of 4-Lane Link
Road of Kandla Bypass Connecting to NH-8A (Tentative Length 2 KM).
Cost Breakup:
Total 8,00,000/-
Note- GST at applicable rate shall have to be paid over and above the total
professional fees.
10% of TDS Also be applicable on fees.
Payment Terms:
1. Inception Report = 5%
2. Final feasibility = 10%
3. Draft DPR = 20%
4. Final DPR = 35%
5. Technical Schedule = 30%
Bank Details
Account Name: KQC GLOBAL CONSULTANTS PVT LTD
Current Account No: 084305000850
Bank Name : ICICI BANK
IFSC CODE : ICIC0000843
Branch: HL Square, Plot No 06, Sector 5 (MLU), Dwarka, New Delhi -110075
PAN CARD NO: 06AACCD6742K
GST No 07AAECK6259L1Z2
Thanks& Regards