PAYMENT DETAILS FOR ACE DESIGN PROJECTS

DD (EAST) PKHA ABBOTTABAD


S.
No

Name of Project

Agreement
signed /
not signed

Total
Consultan
cy Cost
Rs.

Dated Invoices
submitted with
amount

Total Amount
Claimed till
date

Dated
Invoices
Processed by
DD office with
Amount

Total
Amount
Processed

Pending
Invoice
with DD
Office

Balance
Consult
.
Amount

Feasibility Study and Detailed


Engineering
Design
of
Construction
of
Haripur
Bypass Road (24.48 Km)

Signed

1468000

1/ No. 1 = 1064880/03-02-2015
I / No. 2 = 256240/-

1321120

718000/15-04-2015
199200/-

917200/-

Nil

550800

Feasibility Study and Design


of Widening / Dualization of
Murree Chowk Harno Road
and Nawansher Link Road
District Abbottabad

Signed

1120000

1/ No. 1 = 194880/28-08-2014
I / No. 2 = 974400/03-02-2015

1169280/-

168000/572000/15-04-2015

740000/-

Nil

Feasibility Study and Design of


Construction of Western
Bypass Road Abbottabad i/c
Study of Old Army Supply
Route

Signed

2376000

I / No. 1 = 950000
Submitted to Director
(Construction) PKHA
Peshawar
Dated 15-12-2015

950000/-

Remarks/issues

i. An amount of Rs. 200000/- withheld from IPC No. 1 for


undelivered services (Back up calculations of BOQs, TS
DCE) and Rs. 146880 deducted being wrongly claimed (16%
sales tax)
ii. An amount of Rs. 16040 withheld from IPC No. 2 and Rs.
41000 deducted.
iii- The extended time period upto 30-04-2015 stands expired
iv- Revised constr. Drawings of 2 packages submitted out of 7
packages
v- The designs and tender/construction drawings and BOQs
of critical structures like Bridges have been finalized on the
basis of assumed Geotechnical parameters, as accepted by
ACE
i. An amount of Rs. 26880/- deducted from IPC No. 1 being
380000
wrongly claimed (16% sales tax).
ii. An amount of Rs. 134400/- deducted from IPC No. 2 1
being wrongly claimed (16% sales tax), and Rs.268000/withheld for undelivered services (Locating/Estab. Of control
points to supervisory consultants, Back up calculations of
BOQs, TS DCE)
iii- The extended time period upto 30-04-2015 stands expired
iv- Revised constr. Drawings of 1 package (Bridges) remains
un- submitted.
v- The designs and tender/construction drawings and BOQs
of critical structures like Bridges have been finalized on the
basis of assumed Geotechnical parameters, as accepted by
ACE
2376000
The IPC could not be processed by Deputy Director (East)
PKHA Abbottabad due to:
i. The IPC has not been received from Director Construction
office after comments / directions for further processing.
ii- The Engineers Cost Estimate and Tender Drawings were
submitted by ACE vide No. ACE/TESD/JB101/2311 dated
15-12-2015, while the extended period of Consultancy
already expired on 31-05-2015

DEPUTY DIRECTOR (EAST)


PKHA ABBOTTABAD