App. D. GL reservoir of 5.5LL for Zone-1 with Compound and retaining wall, GL
reservoir of 2.0 LL for Zone-2 with Compound and retaining wall, GL reservoir
of 0.60 LL for Zone-3 with Compound and retaining wall
Noted as Upto date expenditure of the scheme - Rs. 141.70 lakhs (including cost
of materials)
Upto date expenditure excluding cost of materials- Rs. 90.78 lakhs.
As per the submitted payment details total payment from CC Ist and part to
CC VIth and part is Rs. 71,19,162/-
The RE Committee met on 03-11-2022 and the SE, Pathanamthitta has been
contacted during the discussion and it was decided to collect the legible and
authenticated copy of comparative statement, documents related to sanctioning of
excess/extra items at the earliest and to place the RE in the next RE Committee
proposed on 10.11.2022.
Above details were not received until 10.11.2022 and the RE committee met on
10.11.2022 and directed the SE Pathanamthitta to submit the above details on or
before 15.11.2022 and also directed to submit visible measurement of items
executed after physical verification conducted by the Executive Engineer.
Till the date no reply is received from the CE (CR) and field offices.