Subject:- W.P NO.16168-2023 M/S PUNJAB GROUP OF SERVICE VS
GOVT. OF THE PUNJAB The detail of scheme is as under:-
Name of scheme Construction of Water Supply, Sewerage/Tuff Tile
Scheme Mangrotha Gharbi A.A Cost & Date Rs:80.00 Million (27.04.2019) DDWP T.S Cost Rs: 71.513 Million (02.05.2019) Work Order Rs: 63.846 Million (14.06.2019) ST 1 Revised AA Rs:93.441 Million (17.02.2021) 1st T.S Cost Rs: 93.435 Million (25.02.2021) Expenditure upto June 2021 Rs:89.416 Million 2nd Revised AA Rs:95.922 Million (30.04.2022) Pending Liabilities claimed Rs:6.505 Million due to price variation It is submitted that the scheme namely “Construction of Water Supply, Sewerage/Tuff Tile Scheme Mangrotha Gharbi” at the cost of Rs.80.000 Million was administratively approved by the Divisional Development Working Party (DDWP) vide No.2487-98/D dated 27.04.2019 (Annex-A) and technically sanctioned by the Chief Engineer Punjab (South), PHED, Lahore vide letter No.84-E/2017-18/1427/P&D dated 02.05.2019 for Rs.71.513 Million (Annex-B). Subsequently, the work of the said scheme was awarded by the Executive Engineer, PHE Division-I, D.G.Khan vide letter No.2682 dated 14.06.2019 for the amount of Rs.63.846 million (Annex-C). The 1st Revised Administrative Approval at the cost Rs.93.441 million was issued vide No.486-99/B dated 17.02.2021 for (Annex-D) and revised technical sanction was accorded by the Chief Engineer Punjab (South), PHED, Lahore vide letter No.84-E/2018- 19/364/P&D dated 25.02.2021 for Rs.93.435 Million (Annex-E). The 2nd Revised Administrative Approval at the cost of Rs.95.922 Million of the subject scheme issued vide No.1527-40/B dated 30.04.2022 (Annex-F). An expenditure of Rs.89.416 Million has been incurred upto 06/2021 (Annex-G). The scheme became unfunded during 2022-23. The case for provision of balance funds amounting to Rs.6.506 Million to clear the liabilities of the contractor was forwarded to Chief Engineer Punjab (South) PHE Department Lahore by the Superintending Engineer, PHE Circle, D.G.Khan vide letter No.1736-38/B dated 27.05.2022 (Annex-H). Submitted for kind perusal and further appropriate action please.
Consultancy Services for Authority’s Engineer for Supervision of Balance works of rehabilitation and up gradation of Nakrekal to Nagarjunasagar section of NH-565