Material needed:

KG-Pipe DN250 (65-70cm)


Fence Concrete: Type C2530
No core iron needed
excavation about 0,8x0,8x0,8m
concrete around sewer base pipe

Ø0,25m
0,80m
sewer base pipe
Ø250mm and 65-70cm in lenght
~ 3,51m
Steel Mast 0,80m

Don't fill with Concrete


0,10m

Sewer Base Pipe


excavation about 0,8x0,8x0,8m
sewer base pipe Ø250mm
0,80m

90°

0,80m

Mast
0,80m

Compacted dirt Compacted dirt


inside the pipe

0,80m

0,80m

j Project:
i BayWa r.e. Solar Projects GmbH
Watt Ciudad Real
h Arabellastrasse 4 | 81925 München
Telefon +49 89 383932-0 | www.baywa-re.com
Spain
g
f
PV Power Plant
e Date: Name: Client: Scale
d Drawn: 05.05.2021 idh
Changed: ---- ----
BayWa r.e. Solar Project 1:25
c
b Checked ---- ---- Planning Period: Format:
a Drawing Title: 10_detail_security camera
Index Date Name Editor Modification / Adaptation of the drawing file name: BWre21-POB-CD.dwg
Construction A3