0187D7-JVT3-000-MWE-BOQ-0042_0A-HZ_box-Tie-Rods-yse (002).

xlsx Page 1

copping beam as
per permits 5.00m Rails axis 35.00m concrete rail
drawings 3.20m beam
(+)3,00 mKr

1.190m

Length (m) Steel Rate (MPa)


(+)1,00 mKr Tie rod 115mm M130 S500 / 39,20m / @2,598m 1.880m HZ 1080M 34,5 430
MSL (+)0,03 mKr Front Wall AZ 20- 800 24,0 355
Rear Wall concrete pile
4.40m
Tie Rod 115M130 39,2 500
transition slab as
per permits
drawings

CFA pile
Φ800mm
Raked 6:1

CFA pile
Φ800mm CFA pile
Raked 6:1 Φ800mm

CFA pile
HZ box 1080 M B S430 Φ800mm
@2.6m

scour protection

(-)17,5 mKr
(-)18,5 mKr
-(-)17,0 mKr CFA pile
CFA pile Φ800mm
Φ800mm Raked 6:1
Max dredge level Raked 6:1

2.5m
Double AZ 20 -800 S355

2.5m
2.5m

2.5m
2.5m
(-)24,0 mKr CFA pile
Φ800mm

1.5m 1.5m
(-)25,0 mKr -(-)25,0 mKr
4.40m

C:\Users\rtorres\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\P54G60UD\0187D7-JVT3-000-MWE-BOQ-0042_0A-HZ_box-Tie-Rods-yse (002).xlsx