Professional Documents
Culture Documents
46
Mesh: HA10mm spacing 15cm
0.40 40x40
Mesh: HA12mm spacing 15cm 7.70 0.40
40x40 40x40 40x40
3HA 10mm
6HA 12mm
1.00
2.90
2.70
2.20
0.20cm
0.40
Outlet Chamber
(Outlet pipe + stop pump)
SECTION A-A
R3
A .8 5 A
15cm Reinforced concrete
Slab (HA10 Mesh spaced
0.40 Mesh: HA12mm spacing 15cm 7.70 @15cm) 0.40
3HA 10mm
6HA 12mm
Inlet Pipe
Overflow Pipes
2.70
R4.40
2.20
MAIN CONSULTANT:
1.00
Waste Drain Gutter
Chamber
Waste Pipe Overflow Pipes
B MAIN CONTRACTOR :
NTANCHE COMMUNITY
PROJECT NAME:
LEFT ELEVATION Drain Gutter
CONSTRUCTION OF AN 80M3 (100,000L)
RESERVE WATER TANK IN NTANCHE
FRONT ELEVATION COMMUNITY, MENDANKWE - B'DA 1
DRG. NO.