You are on page 1of 1

CL

1.60
CREST WIDTH
0.40 1.20

0.80 0.80

0.20

0.20
TOP OF REVETMENT, ELEV = 17.368m.

FREEBOARD = 17.068m.
GROUTED RIPRAP, 0.30m THK.

0.40
ORIGINAL GROUND

VAR.
CONCRETE FACING

HANDLAID ROCK EMBANKMENT

BAR 6 HOR. BAR, 12mm Ø AT 13-ROWS

3.00
BAR 4 MAIN BAR, 12mm Ø @ 0.40m O.C.

0.60
BAR 3 DOWEL BAR, 12mm Ø @ 0.40m O.C.
HIGHEST FLOOD LEVEL, ELEV = 15.056m.
0.40
0.40 7-16mm Ø HOR. BARS BAR 1

HAND-LAID ROCK EMBANKMENT

TOP OF PILE CAP, ELEV = 13.818m.

0.40
TOP OF STEEL SHEET PILE ELEV = 13.568

SEE PILE CAP DETAIL

SEE PILE CAP DETAIL


MLLW, LEVEL = 12.46m.
PROPOSED STEEL SHEET PILE
(GSP-2) @ 6.00m. LENGTH RIVER BED

TYPICAL SECTION OF REVETMENT


SCALE 1 : 40 MTS.

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED AND PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - XIII DETAILED ENGINEERING DESIGN PLAN -TYPICAL SECTION OF REVETMENT
CONSTRUCTION OF FLOOD MITIGATING STRUCTURE
SURIGAO DEL NORTE BRGY. MOTORPOOL, TUBOD, SURIGAO DEL NORTE DARREN JOHN S. VALIENTE NESAH B. DAPAR GINA P. SORIANO BEN ALDEN R. SERNA HENRY CRUZ J. MARAPAO A 1
ENGINEER - I (JO) CHIEF, PLANNING AND DESIGN SECTION
2ND DISTRICT ENGINEERING OFFICE SOURCE OF FUND: FOR FUNDING DATE:
ENGINEER II
DATE: DATE:
ASSISTANT DISTRICT ENGINEER
DATE:
DISTRICT ENGINEER
DATE:
1 1 1
SURIGAO CITY
APPROPRIATION: FOR FUNDING
1ST DISTRICT PLANNING AND DESIGN SECTION