existing wall
existing wall
Concrete Manhole(see detail)
1.00m
spaced @ .20m 4"CHB 1.00m
OC.
vert. &
[Link]
0.10m
spaced @ 0.10m
.40m OC.
bothways
Varies from 0.60m to 0.80m
Varies from 0.60m to 0.80m
plain cement finish
plain cement finish
spaced @ .40m
OC.
gravel
bedding
0.10m
0.50m 0.10m gravel bedding
0.10m
0.10m
0.40m
[Link] spaced
both ways
Project: Prepared by: Checked by: Submitted by: Sheet No:
Republic of the Philippines
CITY OF DIPOLOG CONSTRUCTION OF DRAINAGE CANAL
D:\logo\Copy of DIPOLOG [Link] D:\eman\Logo [Link]
AT MALVAR ST. (L=63.50M)
2
MA. ANGELICA G. RACHO ALBERT S. ALIMPULOS
Location: Barangay Miputak, Dipolog City Casual Employee Project Dev't. Officer - II City Planning & Dev't. Officer
2