Professional Documents
Culture Documents
Salaries of Permanent Positions 50101010 62,065,083 42,742,958 13,040,801 - 55,783,759 2,873,157 3,063,148 - 5,936,305
Personal Economic Relief Allowance (PERA) 50102010 4,032,000 3,096,000 572,200 - 3,668,200 254,646 124,000 - 378,646
Representation Allowance 50102020 162,000 148,500 - - 148,500 13,500 - - 13,500
Transportation Allowance 50102030 162,000 148,500 - - 148,500 13,500 - - 13,500
Clothing/Uniform allowance 50102040 - - 996,000 - 996,000 - - - -
Honoraria 50102100 - - - - - - - - -
Hazard Pay 50102110a - - 153,500 - 153,500 - - - -
Flying Pay 50102110b - - - - - - - - -
Overtime Pay 50102130a - - 5,995,835 - 5,995,835 42,930 107,438 - 150,368
Night Differential 50102130b - - 1,295,732 - 1,295,732 - - - -
Mid-Year Bonus 50102140a 5,172,090 5,172,090 1,792 - 5,173,882 277 - - 277
Year-End Bonus (13th Month Pay) 50102140b 5,172,090 1,690,174 3,304,099 - 4,994,273 1,684,517 3,037,918 - 4,722,435
Cash Gift 50102150 840,000 455,000 345,000 - 800,000 446,000 315,000 - 761,000
Productivity Enhancement Incentive 50104990 840,000 - - - - - - - -
Performance Based Bonus 50102990-14 - - - - - - - - -
Occupational Specialty Pay 50102990-99a - - - - - - - - -
Anniversary Bonus 50104990-99b - - - - - - - - -
Retirement & Life Insurance Premium ( RLIP ) 50103010 7,447,810 5,133,997 1,607,426 - 6,741,423 452,453 525,409 - 977,862
Pag-Ibig Contributions 50103020 201,600 152,400 28,620 - 181,020 5,800 3,800 - 9,600
Phil. Health contributions 50103030 930,976 637,783 258,306 - 896,090 67,537 49,015 - 116,552
Employees Comp. Insurance Premium 50103040 201,600 152,400 28,620 - 181,020 11,800 11,400 - 23,200
Terminal Leave Benefits 50104030 - (0) 8,073,398 - 8,073,398 - - - -
50104990
Other Personnel Benefits - - - - - - - - -
(SRI)
Total, Personal Services 87,227,250 59,529,802 35,701,330 - 95,231,132 5,866,117 7,237,128 - 13,103,245
Gasoline, Oil and Lubricants Expenses 50203090 3,627,773 2,865,758 - 762,015 3,627,773 - - 1,048,261 1,048,261
Area 9 - Sanga-Sanga/
Repair/Repainting of Runway Markers/Markings 0636 650,000 - - 239,400 239,400 - - - -
BARMM
Area 9 - Sanga-Sanga/
Vegetation Control 0637 250,000 - - 206,082 206,082 - - - -
BARMM
Repair/Repainting of Runway Markers/Markings Area 9 - Jolo / BARMM 0638 650,000 - - 525,957 525,957 - - - -
Vegetation Control Area 9 - Jolo / BARMM 0639 250,000 - - 206,082 206,082 - - - -
Area 9 - Cagayan De Sulu /
Repair/Repainting of Runway Markers/Markings 0640 150,000 - - 112,588 112,588 - - - -
BARMM De Sulu /
Area 9 - Cagayan
Vegetation Control 0641 100,000 - - 89,190 89,190 - - - -
BARMM
- - - - - - - - -
Repairs and Maintenance - Buildings & Other Structures 50213040 - - - 2,112,664 2,112,664 - - - -
Improvement of Finance Office Area 9 - Zamboanga 0642 1,000,000 - - 970,031 970,031 - - - -
Repair/Rehab of ARFF Building Area 9 - Zamboanga 0643 1,500,000 - - - - - - - -
Repair of Concrete Pavement Fronting PTB and other Works Area 9 - Zamboanga 0644 3,500,000 - - - - - - - -
Rehab of Guardhouse at Maindoor Area 9 - Zamboanga 0645 200,000 - - 187,487 187,487 - - - -
- - - - - - - - -
Repairs and Maintenance - Machinery & Equipment 50213050 - - - 1,706,824 1,706,824 - - - -
Preventive Maintenance of 350 KVA Genset Area 9 - Zamboanga 0646 150,000 - - 147,714 147,714 - - - -
Preventive Maintenance of 318 KVA Genset Area 9 - Zamboanga 0647 120,000 - - 119,120 119,120 - - - -
- - - - - - - - -
Repairs and Maintenance - Transportation Equipment 50213060 - - 120,000 877,518 997,518 - - - -
ANS Service Vehicle Area 9 - Zamboanga 0648 100,000 - - - - - - - -
Periodic Maintenance of Service Vehicle Area 9 - Zamboanga 0649 60,000 - - - - - - - -
Repair of Tractor Area 9 - Zamboanga 0650 500,000 - - - - - - - -
- - - - - - - - -
Repairs and Maintenance - Semi-Expendable Machinery and
50213210 - - - - - - - - -
Equipment - Airport Equipment
Repair/Maintenance of Airconditioning System Area 9 - Zamboanga 0651 150,000 - - 143,638 143,638 - - - -
Repair/Maintenance of Airconditioning System Area 9 - Pagadian 0652 50,000 - - - - - - - -
Repair/Maintenance of Airconditioning System Area 9 - Dipolog 0653 80,000 - - - - - - - -
Preventive Maintenance of 3-167 KVA Transformer Area 9 - Zamboanga 0654 200,000 - - 153,390 153,390 - - - -
- - - - - - - -
BUDGET UTILIZATION THIS PERIOD
Account TOTAL
PURPOSE END USER Code / Item NAOB 2020 NBA from BUDGET Nov. 1-30, 2022 TOTAL
No. NBA from HO GAA SUBSIDY (2+3)
NAOB from NAOB from HO from GAA
(1) (2) (3) (4)
CAPITAL OUTLAY
IT EQUIPMENT/MACHINERIES/OTHER ASSETS
OFFICE EQUIPMENT 10605020 - - - - - - -
INFRASTRUCTURE PROJECTS
OTHER LAND IMRPOVEMENTS 10602990 - - - - - - -
BUILDINGS 10604010 - - - - - - -
TOTAL CY- 2021 CURRENT OPERATING BUDGET 139,054,805 81,907,230 45,356,703 36,921,141 164,185,073 5,912,197 7,237,128 7,787,633 20,936,957
Prepared by: Approved by:
BUDGET UTILIZATION THIS PERIOD
Account TOTAL
PURPOSE END USER Code / Item NAOB 2020 NBA from BUDGET Nov. 1-30, 2022 TOTAL
No. NBA from HO GAA SUBSIDY (2+3)
NAOB from NAOB from HO from GAA
(1) (2) (3) (4)
- - - - -
- - - - -
- - - - -
UTILIZATION
TOTAL BALANCE
REMARKS
from NAOB from HO from GAA (5+6) (4-7)
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Area 9 - Cagayan
0641 Vegetation Control 100,000.00
De Sulu / BARMM
Area 9 -
0645 Rehab of Guardhouse at Maindoor 200,000.00
Zamboanga
SUB - TOTAL -
INFRASTRUCTURE PROJECTS
10602990 OTHER LAND IMRPOVEMENTS -
10603050 POWER SUPPLY SYSTEMS
10604010 BUILDINGS -
SUB - TOTAL -
GRAND TOTAL 19,130,000.00
Prepared by:
ACE Y. ZAFRA
Budget Officer III
ANNEX A
- - 0%
- - 0% NOA 7/4/22
- - 0% -
- - 0% -
- - 0% -
- - 0% NOA 5/23/22
- - 0% NOA 5/23/22
- - 0% NOA 5/23/22
- - 0% NOA 8/15/22
- - 0% NOA 5/23/22
- - 0% -
- - 0% NOA 5/31/22
- - 0% NOA 8/5/22
Modified to Replacement of
Defective Articulating Boom Lift
- - 0% Battery at ZIA 337,050.00 and
Replacement of Defective Aircon
Compressor at ZIA 252,000.00
(NOA 7/4/22)
- - 0% NOA 5/23/22
- - 0% NOA 5/23/22
- - 0% NOA 5/23/22
- - 0% NOA 6/6/22
- - 0% NOA 6/6/22
- - 0%
- - 0% NOA 7/4/22
- - 0% -
- - 0% -
- - 0% NOA 7/4/22
- - 0% -
- - 0% NOA 8/22/22
- - 0% NOA 8/22/22
- - 0% -
- - 0% -
- - 0% -
- - 0% -
- - 0% NOA 7/4/22
- - 0% NOA 7/4/22
- - 0% -
- - 0% -
- - 0% NOA 7/4/22
- - 0% -
- - 0% -
- - 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- - 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- - 0%
- 0%
- 0%
- 0%
- 0%
- 0%
- - 0%
- - 0%
Approved by:
ANTONIO B. ALFONSO
Civil Aviation Area Manager
ACCOMPLISHMENT REPORT ON BUDGET UT
As of November 30, 2022
Area Center 9 - Pagadian Airport
Prepared by:
ACE Y. ZAFRA
Budget Officer III
ANNEX B
REPORT ON BUDGET UTILIZATION
s of November 30, 2022
Center 9 - Pagadian Airport
ESTIMATED
DISBURSED % ACCOMPLISHED ACCOMPLISHMENT REMARKS
AS OF DEC 31
55,137,836 73%
3,550,034 77%
148,500 92%
148,500 92%
996,000 100%
- 0%
- 0%
5,394,040 90%
1,178,615 91%
5,003,089 97%
4,752,950 56%
771,000 65%
- 0%
- 0%
6,708,089 74%
180,642 78%
892,197 75%
168,820 73%
7,889,897 98%
- 0%
92,920,209 76%
1,410,116 138%
65,120 #DIV/0!
615,324 94%
7,609 15%
322,395 55%
5,899,365 163%
12,000 13%
- 0%
7,428,591 110%
734,255 87%
21,491,157 130%
42,263 99%
174,914 125%
200,006 88%
818,086 100%
18,777 89%
956,003 109%
341,922 115%
8,981,417 175%
3,086,081 110%
128,400 55%
37,153 61%
17,244 45%
28,251 83%
942,889 126%
41,988 97%
114,898 82%
- 0%
215,832 110%
15,600 27%
54,357,654 129%
147,277,862 89%
Approved by:
ANTONIO B. ALFONSO
Civil Aviation Area Manager