ID Resource Name Type Material

InitialsMax. Std. Rate Accrue At Base


Label Units Calendar

59 13A socket out let Material 1 SDG600.00 Prorated


60 16A socket out let Material 1 SDG850.00 Prorated
54 60*60 flourscent Material 6 SDG2,000.00 Prorated
lamp
58 celling fan Material c SDG4,000.00 Prorated
55 celling lamp Material c SDG3,500.00 Prorated
56 chandlier Material c SDG60,000.00 Prorated
39 disposal well Cost d Prorated
61 Exhaust fan Material E SDG7,500.00 Prorated
63 Main Board Material M SDG80,000.00 Prorated
64 one ganag switsh Material o SDG900.00 Prorated
62 SDB Material S SDG17,000.00 Prorated
38 sub-tank Cost s Prorated
65 TV Antenna Material T SDG15,000.00 Prorated
57 two-gang switch Material t SDG10,000.00 Prorated
45 ‫احواض مطابخ مواس ها‬ Material ‫ا‬ SDG25,000.00 Prorated

2 ‫اس شاري‬ Work ‫ا‬ 100%SDG250,000.00/day Prorated Standard


10 ‫اسمنت‬ Material ton ‫ا‬ SDG135,000.00 Prorated
46 ‫ ال اب‬D0 Material ‫ا‬ SDG150,000.00 Prorated
47 ‫ ال اب‬D01 Material ‫ا‬ SDG115,000.00 Prorated
48 ‫ ال اب‬D02 Material ‫ا‬ SDG100,000.00 Prorated
49 ‫ ال اب‬D03 Material ‫ا‬ SDG85,000.00 Prorated
32 (1:3:6) ‫الخرسانة خلطة‬ Material m3 ‫ا‬ SDG50,000.00 Prorated
‫للفرشة‬
35 (4:2:1) ‫الخرسانة خلطة‬ Material m3 ‫ا‬ SDG70,000.00 Prorated
‫لﻼعمدة‬
33 (4:2:1) ‫الخرسانة خلطة‬ Material m3 ‫ا‬ SDG70,000.00 Prorated
‫للب م‬
36 (4:2:1) ‫الخرسانة خلطة‬ Material m3 ‫ا‬ SDG70,000.00 Prorated
‫للسقف‬
34 (4:2:1) ‫الخرسانة خلطة‬ Material m3 ‫ا‬ SDG70,000.00 Prorated
‫للقواعد‬
50 ‫ الش اك‬W1 Material ‫ا‬ SDG70,000.00 Prorated
51 ‫ الش اك‬W2 Material ‫ا‬ SDG75,000.00 Prorated
52 ‫ الش اك‬W3 Material ‫ا‬ SDG80,000.00 Prorated
53 ‫ الش اك‬W4 Material ‫ا‬ SDG100,000.00 Prorated
15 ‫ا ات‬ Work ‫ب‬ 100% SDG3,000.00/hr Prorated Standard
44 ‫انيو‬ Material ‫ب‬ SDG100,000.00 Prorated
26 ‫جر سلك‬ Cost ‫ج‬ Prorated
31 ‫حفار‬ Work ‫ح‬ 100% SDG15,000.00/day Prorated Standard
37 ‫خﻼط صغ‬ Cost ‫خ‬ Prorated
14 ‫خﻼطات‬ Work ‫خ‬ 300% SDG3,000.00/hr Prorated Standard
17 ‫درداقة‬ Cost ‫د‬ Prorated
42 ‫دش مت امل‬ Material ‫د‬ SDG50,000.00 Prorated
7 ‫رام خشن‬ Material m3 ‫ر‬ SDG190,000.00 Prorated
8 ‫رمل‬ Material m3 ‫ر‬ SDG10,000.00 Prorated
Page 1 Project1
ID Resource Name Type Material
InitialsMax. Std. Rate Accrue At Base
Label Units Calendar

9 ‫سيخ‬ Material ton ‫س‬ SDG500,000.00 Prorated


29 ‫س ام ك‬ Material ‫س‬ SDG0.00 Prorated
30 ‫ش اب ك‬ Material ‫ش‬ SDG0.00 Prorated
41 ‫شور‬ Material ‫ش‬ SDG3,000.00 Prorated
24 ‫طل ة ودهانات‬ Material ‫ط جالون‬ SDG5,452.00 Prorated
13 ‫طوب‬ Material ‫ط ط ة‬ SDG21.25 Prorated
18 ‫عمال بناء‬ Work ‫ع‬ 300% SDG9,000.00/day Prorated Standard
19 ‫عمال ب اض‬ Work ‫ع‬ 800% SDG5,000.00/day Prorated Standard
23 ‫عمال ترك ب‬ Work ‫ع‬ 400% SDG5,000.00/day Prorated Standard
11 ‫عمال حفر و ردم‬ Work ‫ع‬ 700% SDG5,000.00/day Prorated Standard
22 ‫عمال س ام ك‬ Work ‫ع‬ 500% SDG5,000.00/day Prorated Standard
21 ‫عمال نقاشة‬ Work ‫ع‬ 400% SDG3,000.00/day Prorated Standard
4 ‫عمالة حدادة‬ Work ‫ع‬ 500% SDG5,000.00/day Prorated Standard
12 ‫عمالة صب‬ Work ‫ع‬ 800% SDG5,000.00/day Prorated Standard
5 ‫عمالة كه اء‬ Work ‫ع‬ 500% SDG3,000.00/day Prorated Standard
6 ‫عمالة نجارة‬ Work ‫ع‬ 500% SDG5,000.00/day Prorated Standard
27 ‫عوازل‬ Material ‫ع جردل‬ SDG0.00 Prorated
66 ‫غرف تفت ش‬ Material ‫غ‬ SDG0.00 Prorated
20 ‫غف‬ Work ‫غ‬ 100% SDG3,000.00/day Prorated Standard
16 ‫لودر‬ Work ‫ل‬ 200% SDG3,000.00/hr Prorated Standard
1 ‫مدير م وع‬ Work ‫م‬ 100%
SDG500,000.00/mon Prorated Standard
25 ‫معدات‬ Cost ‫م‬ Prorated
40 ‫مقاعد افرنج لة‬ Material ‫م‬ SDG15,000.00 Prorated
28 ‫منهوﻻت‬ Material ‫م‬ SDG10,000.00 Prorated
3 ‫مهندس مق م‬ Work ‫م‬ 100%SDG300,000.00/day Prorated Standard
43 ‫مواس احواض غس ل‬ Material ‫م‬ SDG50,000.00 Prorated
‫ا دي‬

Page 2 Project1