RESPONSI

NO SOW DESCRIPTION
CLIENT

A. ENGINEERING WORK
1 Fabrication procedure
2 Inspection record
B. SUPPLY OF MAN POWER, EQUIPMENT AND TOOLS
Man power such as engineer, supervisor, administration and
1
general worker
2 Hand tools and power tools
3 Personnal protective equipment (PPE)
C. SUPPLY OF CONSUMABLE
1 Welding electrode for steel material
2 Supporting Consumable (grinding Disk, etc)
D. SUPPLY OF MATERIAL
1 Pipe 6''x 6m (A106 GRD B)
2 Pipe 8''x 6m (A106 GRD B)
E. FABRICATION WORK
1 Workshop
2 Training & materi
F. TEST AND INSPECTION
1 Visual Check
2 Thickness Check
3 NDT and Reporting
4 Mill certificate
G. FINISH WORK
1 Reporting and Notice to sign by Client ( Berita acara )

28000
RESPONSIBILITY
REMARKS
LA OTHER

X ASME SECT. IX STANDARD. 2013 Edition


X

X
X
X

X
X

X
X

X
X

X
X
X
X

X
No Description QTY UOM
1 Material 1 ls
3 Consumable 1 ls
4 Equipment and Tools 1 ls
5 Man Power 1 ls
6 Test material & serifikasi 1 ls
7 NDT and report 1 ls
Total Production Cost
Biaya peserta
Unit Price Amount
IDR 28,352,000 IDR 28,325,000
IDR 21,822,000 IDR 21,822,000
IDR 10,500,000 IDR 10,500,000
IDR 15,650,000 IDR 15,650,000
IDR -
IDR 34,500,000 IDR 34,500,000
IDR 76,297,000
No Material Specification Requirement Quantity Remaks
1 Pipe 6''x 6m (A106 GRD B) SCH 160 Thk 18,26mm 1 Length IDR 9,525,000
2 Pipe 8''x 6m (A106 GRD B) SCH 120 Thk 12,70mm 2 Length IDR 12,800,000
3 Steel Plate Thk 3mm 4 Sheet IDR 6,000,000
IDR 28,325,000
No Description Size Requirement Quantity Price Per Unit Ammount
A Consumable
Preparation material
1 Gas acytelin 1 tabung IDR 380,000 IDR 380,000
2 Nozzle Cutting torch 1,3 mm 2 pcs IDR 38,000 IDR 76,000
3 Oxygen 2 tabung IDR 650,000 IDR 1,300,000
4 Grinding disc cutting 1,3 80 pcs IDR 5,800 IDR 464,000
5 Grinding disc 2,3 80 pcs IDR 7,000 IDR 560,000
WELDER TEST IDR 2,780,000
1 Welding wire K- 71T -1C 1.2 mm 10 roll IDR 600,000 IDR 6,000,000
2 Welding Electrode E7016 (Kobelco 5KG) 3.2 mm 15 KG IDR 250,000 IDR 3,750,000
3 CO2 10 tabung IDR 350,000 IDR 3,500,000
4 Welding glass clear 20 Pcs IDR 1,000 IDR 20,000
5 Welding glass black No 10/11 20 Pcs IDR 4,000 IDR 80,000
6 Grinding disc cutting 1,3 80 pcs IDR 5,800 IDR 464,000
7 Grinding disc 2,3 80 pcs IDR 7,000 IDR 560,000
8 Cipping 10 pcs IDR 25,000 IDR 250,000
9 Hand brush 10 pcs IDR 26,000 IDR 260,000
10 Regulator argon 7 Pcs IDR 159,000 IDR 1,113,000
11 Apron 10 PCS IDR 78,000 IDR 780,000
WELDING MACHINE IDR 16,777,000
1 nozzle gun 15 pcs IDR 45,000 IDR 675,000
2 insolator 350A 10 pcs IDR 20,000 IDR 200,000
3 contact tip 1,2 mm 10 pcs IDR 4,500 IDR 45,000
4 Gas diffuser 10 pcs IDR 4,500 IDR 45,000
5 liner 10 pcs IDR 130,000 IDR 1,300,000
IDR 2,265,000

Total IDR 21,822,000


No. Description Qty UoM
1 Workshop facilities 2 ls
2 Welding Machine (GMAW & SMAW process) and accessories 10 unit
3 Gerinding machine 10 unit

Total
Day Price Per Unit Ammount
2 IDR 700,000 IDR 2,800,000
2 IDR 300,000 IDR 6,000,000
2 IDR 85,000 IDR 1,700,000
IDR -
IDR 10,500,000
Meal and Project Over Time
No. Description Qty UoM Hourly Rate Working Hour Daily rate Amount Over Time Cost
Trasport Duration Allowance
A. Direct Man Power
PREPARATION MATERIAL
1 Supervisor 1 person IDR 45,000 8 IDR 360,000 IDR 25,000 2 4 IDR 770,000 IDR 180,000
2 Fitter 2 person IDR 35,000 8 IDR 280,000 IDR 25,000 2 4 IDR 1,220,000 IDR 140,000
3 Grinding 3 person IDR 30,000 8 IDR 240,000 IDR 25,000 2 4 IDR 1,590,000 IDR 120,000
6 person Total Rp 3,580,000 Rp 440,000
WELDER PROCESS
1 Technician 1 person IDR 35,000 8 IDR 280,000 IDR 25,000 2 4 IDR 610,000 IDR 140,000
2 Instructor 2 person IDR 35,000 8 IDR 280,000 IDR 25,000 2 4 IDR 1,220,000 IDR 140,000
3 General Worker 3 person IDR 30,000 8 IDR 240,000 IDR 25,000 2 4 IDR 1,590,000 IDR 120,000
6 person Total Rp 3,420,000 Rp 400,000
PANITIA
1 Documentasi 1 person IDR 30,000 8 IDR 240,000 IDR 25,000 2 4 IDR 530,000 IDR 120,000
2 Reporting 2 person IDR 30,000 8 IDR 240,000 IDR 25,000 2 4 IDR 1,060,000 IDR 120,000
3 administrasi 3 person IDR 30,000 8 IDR 240,000 IDR 25,000 2 4 IDR 1,590,000 IDR 120,000
4 Driver 1 person IDR 30,000 8 IDR 240,000 IDR 25,000 2 4 IDR 530,000 IDR 120,000
5 General Worker 2 person IDR 30,000 8 IDR 240,000 IDR 25,000 2 4 IDR 1,060,000 IDR 120,000
9 person Total IDR 4,770,000 IDR 600,000
A. Indirect Man Power
1 Engineering 1 Person IDR 40,000 IDR 8 IDR 320,000 IDR 25,000 2 IDR 690,000
2 Administrasi 1 Person IDR 30,000 IDR 8 IDR 240,000 IDR 25,000 2 IDR 530,000
Total IDR 1,220,000
Total Man Power Cost IDR 14,210,000 IDR 1,440,000
Total Man Power Cost + Over Time Cost IDR 15,650,000
No. Description Qty UOM Daily rate Days Amount
1 Report 1 Ls Rp 3,000,000 1 IDR 3,000,000
2 Assesment and sertifikasi 1 Ls Rp 3,500,000 1 IDR 3,500,000
3 NDT test and certifcate 1 Ls Rp 28,000,000 1 IDR 28,000,000
4 Mill certificate material 1 Ls
5
Total IDR 34,500,000