You are on page 1of 29
cachsly Jie abn eo: & Alfattaim \carillion Making tomorrow a better place CARILLION CORE FORM HEALTH, SAFETY, SUSTAINABILITY AND QUALITY ‘convact [Expo 2020 Themate Distt Main Contact Feterence ‘0020-MTS-$105400-1.000001(1) ‘Method Statement Tite: | INSTALLATION of Cable Trays and Trunks | MS No: | ASU-OC-EL-TRAYS -MS-GEN- seve Record Rev Nor Date Prepares Reason fr Revision: i 33 Dee 17 Fist esve ‘Name Sanatwe Date Prepared By | Mohamed Tory 13ec. 7 Revewed By: | Mohamed Osama oJ 18000. 17 4. Description ofthe Work. 2- Location ofthe Werk Access, Egress, Traffic Management and Storage APC4S nnn '3- Program - The Sequence of Evens. Interfacing Activites. Constraints. ‘Specie Control Measures. 7 Personal Protective Equipment cy eeeesecemneceenacs 8. Environment nnn 40- Resources... 18 Operatives nn 12: Plant and Equlpment nnn nnn 13-Lighting, 4. Materiales 15-Inspection and Test Rogie. 46: Protection Arrangements. 17-During work execution 18: Segregation. 49- Securly Arangements 20- Emergency Arrangements 21- Waste Management onmnnnn 22- Distribution of Information 23-Welare.. 24. Change Management, 25: Aditonal Information 28: Aachen Sacro ee Ongnnoe ASHAFARUNTED Tp muy | nguooe mane as eae TS ASU |" [822m Sea [Mo mentite ona CARILLION CORE FORM os gen HE carilli HEALTH, SAFETY, SUSTAINABILITY AND QUALITY & Alfattaim \carillion Maing tomorrow a beter place 4-Deserpton of the Work Instaling of Cable rays, Trunks, Ladders and Wie baskets. 2-Location of the Work; Access, Egress, Trafle Management and Storage Areas ‘This method statements appleable forall cable rays and trunks in allareas ofthe project An attached sketch wl be included to leny safe areas, storape, vate management arrangements ncn hating areas and acess and egress pos oo ‘Program The Sequence of Events ‘Werk SequencePzocedure (Handing, Stoage and nsalton), 34.Goneral Requirements A constructoninspecontsting works sha be cared out in accordance wi specication & to be done by (quaiied Eeciical engnoers and shal futher 'o be checked and approved by ASU Construction Manager along wth GNOC Engineer ~ Werks shal be acleved during the normal working Rous. Aline mst received tse shal be as perth approved echnical matt submis& to be inspected upon receipt & approved by tne Engineer prior proceed win instalation hrough MIR & Any dcrepancies, damages et, ‘Should be reported to the supplier for futher acon & tobe removed trom st medal. = Marking of supperts must be done as per routing of cable rays and tunks. Spacing between supports wll comply wah the project specications = Dring mest be done fer the anchor bl insallaton '3.2.Material Manaing and Storage Material deivered othe st wl be stored as per the manufacturer recommendations ‘On receipt ofthe Cable Trays & Trunks ats, te folowing necessary precautonsshalbe taken for unloading, shiting & storage ‘2 Matera shal be stored in 2 covered! ry space at al he time to avd damage, i. Allmateris recived a site shal be inspected and ensured tal he mattis are sper approved material submit, ‘Any dscropancies, damage etc, found wil be notifled and reported fr further action Matera found not ule for te use wil be moved rom st immediately [Accs to storage areas shal be controled and mites cnt autheried personnel Cleannoss and good housekeeping practcos shal aways be enforced in he storage areas 33.Prosnsalation "Ensure tata the materi are received & inspected at store, and avai to cary outhe work + _-Allmaters wil be vsuay inspected to ensure that no damage has ocumed dung stowage and handing, Prete Commencement of work, afeas an access wil be inspected to confirm hat Sites ale and ready to commence the work ~ _Alllovart documentation (shop drawags, material submital& method statement) and materi appeable to (sah aes of warts wil be checked by ats superdsor por fo commencement of work ~The Sto Engineer/Ste Supersor wl ve necessary instucions to Wadesmen and prove necessary approved constuctonshop drawings of aes revision. ‘ox organ ALSHAPARUNTED | ow [asuaoc mer pat ve SASU [iicceinswcoen [Steam |B cee It aba a een ie HEALTH, SAFETY, SUSTAINABILITY AN & AVfattaim &carillion Making tomorrow a beter place = The Ste SupervisorForemen wil also check that prope tls and equipment re aval to cary out the work and are compling the convact specication List of tool icuded as part of hs method statement ~The Ste Supervisor and safety ofr wil explain to the radesmen egacing Stety precautions tobe bserved = Tha outa of Cable Tray and Trunks tobe coordinated wih other services pert str eb 9 maintan the minimum clesranes between networks. 2.4.nstallation of Cable Trays and Trunks =" Mark and Ine out te out of Cable Tray and Trunks as per approved shop dravings & ordnsted drawings wth racking threads. Insta he supports propery ghtoned and by spacing as per he project specications so that aditancebetwoon ‘supports should not exceed 1500 mm, to adequately suppor the weight othe ladder and cable. Fo sides, bends and inorsectons provide supports ata stance not exceeding 300 mn na the cable trays, lngdere and trunks over the supports 3 pe the approved standard detas = A spacing of 75mm wil be considered as a minimum space between any prt ofthe cab ay or cable tac system a the bulding suture = Standare tinge supplied wits the system wil be used Incase of impractaly of standard flings and ate taking permision tom the Engine, things wil be fabricated at te having the same quality and protective ends asthe standard ings. Cuttings wl be eccured forthe cable ays ony along the ne of plan mela, no cuting works wil be occured through the pertoratons = Alloutng areas shoud be smoothed and cleaned ater the outing warts, = Alloating edges wil ba ested by col gavanize pant. Insta the fexible couplers oot cable ade ystems across expansion jit ofthe bulng suture, No ig Joints wil be used across the expansion joints. Level treads shale ineates & acct to above the eve of ceilng or crop beams wreroverhe trunk ode boing comes out Aaj te minum space trom te busing strcture and oherservees to be malntaine as per he approved ‘Standard delist actat easy handing and maintenance of ables. = Sets ana bends wil be sized to alow forthe minimum permisibl agus ofthe largest cable and that cable tain thelr relative postions on all bends and sweeps. Insta of sutable earthing ink betwen al ont to ensure electrical contnuy to perfor a PE function, Connect he bonding of al the Trays & trunks systems to main eating system a the nearest alto the mala arbi terminals tal the dropout pata byte same with ashe cable adder o support he cables a hy et rom he lode ~ Ientfeaton wil be occured as per the project specteatons as folows: ‘2 Voltage markers willbe app io ident highest votage presente wireways at maximum intra of 61m. Identify electrical nazar er abl ay containing conductors operating at over 600 nomial wth the word message "DANGER, HIGH VOLTAGE: KEEP AWAY al maximum intervals of 3m, = Instat of straps, cable cleats ad fe bares wil be performed upon be project specications afer the ables puling activ is ovr. “+interfacing Activities To avis inetacing wth ether MEP setates, the below steps should be flowed =? ‘Reuing of the cable Ways and tanks shall comely wit be approved coranation drawings to avoid intrtacng wih oer actos = Cesrance space wil be considered to avo ntertacing with oer actives ‘be otaor ABHAFARUNTE=D | ne, [aguocc mame a oe FASE PEER wenn [Steen [Fo ee CARILLON CORE FORM alk HEALTH, SAFETY, SUSTAINABILITY AND QUALITY & Alfuttaim \carillion Making tomorrow a beter place = uring work preparation, hore is a probability of interfacing wih oer actives, the Engineer shal be informed immeciatly = Proposed eotion wl be submited to the Engines for approval = Red mark cravings willbe issued upon the solution provided and accepted by the Engineer ‘constraints = Cables puting ace wil not ake place unt the relevant cable rays an trunks work re ished, inspected ‘nd scooped, 6 Specific Control Measures ‘rown Hazards as specfedin th relvant sk assessment Ling injury Swinging load rng ting cable aye and tanks Ris of nutes by mss-use of moblescffong by using improper mobile scaling when working at height Fisk of topping mooie acess plators when workeg at eight, Risk fang abject rom mote secoss/ equipment when working at eight Inaivduais suffering il heath from poor workplace Risk of ecto shock causing humen nury when using electra tools Fisk of Spark by Loose connecton ar overheated wires which may become a source of feincdents when using ‘eciical tos ~ _Fingerp or ether Hand Injuries when using hand tol ‘Permits to work Relevant permit work shouldbe issued before staring instalation af the cable rays and unk, the Ste Engnoer vl communicate wth he safety oftcar fo ese ll ocessary prt 0 WS Permit Requirement Yer [No ett to Work x Pert to Dig/ Break Ground Peitto Pomp ot Work Perm ‘onfined Space Permit Peritto Pump Concrete Pritt Aozess high Levels x Permitto discharge x Permit iste x Pritt ead / isan (emporary works) x ‘#-Personal Protective Equipment ‘Allroqured PPE asa minimum of + Safety shoes = Safety glasses S Helmet ‘on ovonsor ALSHAFARUNTED | o- |aguoocmmer a Ea ZASU | | siceintesscoen [Stew | cascnsly JL gab H CARILLION CORE FORM es HEALTH, SAFETY, SUSTAINABILITY AND QUALITY & AVFattaim \carillion Making tomorrow a better place + Vest shale used. Constant monitoring and supervision of the works shall ensure that al ies the apprepite PPE is wom y affected operatves. s.aualty To ensue e quay of instalation proces, accurate measurement ols (Spit evel, meer cas) wil be used 10 neue the folowing factors are wid the azcoplabl mts: o Cearance distances between the cable ays, bunks and other adjacent works + Height ofthe supports, cable vas and eable trunks 1 Alonment fhe able aye and tanks. ‘Al measures that wil bo ton during the construc process wil be recordod in i's relevant check its a tst heat, 10-Envieonment Everyone In ASU team ha 2 duty to take reasonable are of the envionment, themselves, and those around them, ASU wil ensure that the required envronmentsl mentoring is done and compan withthe pojet Constucion Environmental Management Pin (CEMP) ‘Waste measurements, monitoring and management: To cntibute to a better envionment dung constucton Dyocess the ste management to the waste skip is cul as they provide the prope locaton of waste onthe ste ‘tout creating more mess tothe ste conlton Dust measurements, monitoring and management: Accoring fo OSHA standard, Dust paces of se ranging ‘for 0001 tO mn (1 100 cons) pose area! toheath when thay are arene reducing visa, creating 3m Uncomfonabie nvronment Accordingly, the dust ibe measued and montofed nthe woting ea by a sulle ‘means of dust monitor devi. In ase thatthe dst parties accumulating na exceed tent reconenended by {he dust montonng device manulocure, he area shoul be evacuated ah verlag ithe ats clared "Noise measurements, monitoring and management: Noise lovels wil be measured in tho working ara using a tabi ound evel meter Noise level rom 8010 65 dB: Hearing protectors are not mandatory to be used, Noise level above 85 dB: Hearing protectors shoul be used and be wer propa Energy consumption measurements, monitoring and management: Fue and electcty atch re mandatory ‘uring the constuction process wl be monired by asulabl consumption metas to faite monerng and © {201d any miss use fr the energy rescues, ASU ste management wl be responsible to manta he enecay A Fattaim \carillion Making tomorrow a beter place ~ NonHazardous Wastes 2.” Stel wactes © Weed ‘ASU resources for waste management ieludng the folowing Provision of dedicated waste storage areas, Provision of recyeing bins _Prowsion of employee awareness waling “The folowing stops wi be flowed by ASU stat as pat of ASU waste management plan ‘Conse ypes of wastes (Hazard Non Hazard) tat wil be produced ate working areas and ofces; Estimate the volume ofeach type of waste ‘Store reusable materials separa and abe ther a5 reusable. Separate all non-hazardous waste by type. Never mix any reusable recyclable waste wih food wast. [Any material conaning Vace of ood wate conedered non recyeabe ‘The temporary mixing of waste on sts sould bo avoided se # becomes cificut to eepeate them ltr RResearen waste providers faites capable of handing these types of wast, Provide coflecton sortng units capatleofacconmodabng te estimated waste volumes Ensure Empoyees are property Walned in orer fo separate te wast and achieve organizational targets Plan for sutable callecton and dlsposal ofthe clected waste, Produce reporting forms ana procedures. NON-HAZARDOUS WASTE STORAGE Prope slack matels to mame abil fo euse them and prevent safely hazars, ‘Cover wast sips. Propel latel waste skips Inspect hips daly. De not eave loose waste around ste 1 Transfer waste ina ely manner Betwoon ste andthe wast storage area HAZARDOUS WASTE STORAGE Stored inleak proof cortanere wih proper labeling and hazard signs: ‘Anvays Kap undercover prevent proscing contaminated wate shal an; ‘Stored away trom sources fon, 1 Tigty sated and stored aay from food 2 Hane by tained persons: *_lwentory of hazardous waste is rqured o be mainaines 22.Djtribution of information “This matted statement wl be dstibutod trough ASU GALOC department al concerned staff who willbe involved Inthe cable ays an trunks instalaton, Inepostng and testing Internat in ASU * Project Manager Electrical Corstrucion manager *Bletreal Ste Engineer, clay tothe foreman accordingly. Siteraly ain Coneactor (AFC) Dox oer ALEMAEAR UNITED, | os ey, | ASUGHE Nebr ae Paae FASS [i BEER woren [Ean [Ne aly Ji abot = & Atfattaim \carillion Making tomorrow a better place CARILLION CORE FORM HEALTH, SAFETY, SUSTAINABILITY AND QUALITY zs.wotare Comping wi ihe projet equremert, ASU responsi il enue tn owing “he locate of housing tht wl be povided To worker resale, sulabl, confortable and as close 8 reasonably practical the place of work to avoid excastv journey me tothe works {The accommodation willbe sta dstancs les than ane hour rm ths Expo 2020 Dual Ste + The accommodation wil be away fom envfonmentalpllton sources (eg. 9arbago, lesock, and sewage utes) and tem stom watar and food canage estas, as pers standetds approve by te compete cal ‘Suthers, respective ofthe accommodation housing size 24-Change Management (Once the work as started after the approval ofthis method statement, no deviation rom this procedure shall bo ‘occured s0, be GAC personel wil open an NCR on thse devatons accordingly Incase hat he mets Satoment cannot be followed, the preparator shoul be ened mmedatl to coordinate wit the conection ‘manage and the ste engineer ofan alerative eoson when enowa be compieg wih ne tena! Spectcatons and he projec requrements, Finally, new ous af the mthod statement al De Submit othe ninco for appeova. 25-Additional Information Nt Applicable 26-Attachments ‘a. Checklict b. Feat sheets Inspection and Tost Plan 4. Risk Assessment EZ AAS OO | svcceviers wscenoo | ost. 2017 cotati gabe * z HEALTH, SAFETY, SUS’ IRABILITY AND QU ali | SAFETY, SUSTAINABILITY AND QUALITY & Alfattaim &carillion Making tomorrow a beter place Conta alrenes ae: Method Statement Ref: fed. Date | We he undersigned have boon briefed inte contre one above-mertoned math ster, undaatana he $Sepinmedatay net ne Soperhdanoe' and bet adtoraton be anges tee ences ‘Name: Name: = Senate: Spnance Name: Name: ‘Sonate Sonate: Name: ‘Name: = Siar: strate Name Name: Sonate: ‘Sioetu: ‘Name: - ‘Name: Strate Sina: Name: Name Sirti Strate: ‘Name: ~ | Name: Sina: Sina ‘Name: Name: - 2 Sinatie: sina: Name: Name Sonate: Signatur: Name Nae: inate inate “SAS sccm. | Asv deminer oe ro soon sedordu ‘ated oni ‘004 ‘pous ane] | J2mog ean2aq| ‘ntnememmnensersannmica sensan sis) “aR Buoim Byob woy AyAnoe siys dors ja aM MOH — jrumro rye, Bene oe tos sews 6202 oo yuewssessy ysTy TS OT PORT (uno) 001204 sos pi pote ening Jace yo pe sound tana pon pr von yon 3) gp vou ,, wouny mememcarenmarercamatts [+] |ona] gy own 2 mms yuoulssassy ysIy ON OUT "ON 73H eget ‘g2e won 4 Bape) uosid ou ka ustep on uo pues pus uoge20 24908 2.0 Bune ussossy vont 0d #4 pousduoaze og MOUS MOUSSaSEy YS SL queulssessy ysry 206p0 uado| appe-ypioyeos| ‘bien i 20n WOH, MOURA a rot entero wejpvedi'éxs] | Budeeyosnou) a5} “eeu 4 WOME, OMY Y * roe entra queulssessy ysIy oonao-aur SAR OO SY ous a E NSV Z| sequny 200 ngy bes fuer 1 =. sor2aug toed fa ponosddy snboven 0/v8 fa pausen aSNIONG 90 ‘Aa paredeig 900 : "doa syrsuodeou S001 20 PIOH A sono none fed pas # ‘sau oz0c0axa puviina Tee ns TTORERETTIY SerOTUTS | wm fw ta] | SNe] zona, oumeg at Sree : pe 1d ‘ay, 0d se souossen0e ie jo Aaigetene Auson| wm iletlelw pono 109 oun 51 pu L aro oud | dove sinu-ToO-neY nated oun ease roa 00 oun 51 pu NRO-SW SAVULTEOONSY| sy yuowaners powpou! Wendta: OX “suoneayroods ome wt leer || a ve ‘n-ansmusen | pu ad “fanuenb posmnbou oxp on 2edsou un) 2" ‘Apeod st eoweu re UH AOA eae or earl pono on ‘wo}si0o1 ‘Suawnsop tet ia ee ue sBuymerp enue sooui0g| NOLWAWdSHS OF re (eelace le T =o = paseuap | prey yop mee) wea hoon | HO uopseet| yoy ene Yo s2ed5 sinioa ssanumyoron | pamies | “°y0' bass Nyig 1831 aNV NouO3dsMI ALIS 20014 sanag @ mouowen Bue ALTVNO GNY ALMIEWNIVISAS “AL3.IVS ‘HITVAH WO 3409 NOTHIRIVD TOPNaO air sAveLBoO-eY a : NSV Z|] Joqunn 200 ngy beg ue sn = sor2eug 20rd a ponavddy seBevew ob /V0 ha power ZENON 90 Aa peredaig OOO : "aq e1asuodeoy| ‘S500 IM ula PIOH 20HU0H moneu Avg pn ‘34 oz0zouxa ¢ wing wwe svt RUOMETOTTAY "SSTOTATS | tule) wm | yeciamea = peuneepr hop ane sys me] mia fale | ow yonsa vm miele] | ne vm mie fe] we | om | mena vm alee T wondhoeea ity mscenno 10 1005 ‘iMod ssanum vo c70H ‘ev 1831 aNv Nouzdsw aI ‘22210 s2n2q e movowor Bune AUTTVND GNY ALMIBVNIVASNS ‘ALBavS "ALTWEH Pe OIE ‘so 3409 NOTMIRIVD SF pee loonaoair saui-aoonsy oue a “hs FA sequin 200 ns¥ eq ue) = = 201g sooty fa ponorddy 2ebovey 90/v8 fa BaUsen B3NIONG 20 Aa peredaug 900: sso, sud PIOH seHUeR veg pas 9 ‘sau ocoeoaxa 't mvessing We mim lela] SHOOTIN ao sw: SavuL-Ta-90-1Se| wm | ow 4 suone2011| -wao-sr sanuia-o0 . orgy miata lw svope207 iy ry “nao sie sAMaLTR OO EY wm low 4 svonn2o7 9 . “Nao SW saaL-TR OOTY + min fw law 210ne201 WY] -yao-s- savau-t3-00-1 NOWWTIVISNI ¥BLAV SNOLLVOIINA ©. 2 eet wee shia | uO uopssee| jay ene Yo reds sinioa ssanumyocron | Pames |g" bess vig 1831 GNV NouD3dsMI ALIS ALNVNO GNY ALMIEWNIVISAS ‘ALa.IVS ‘HLTH W404 309 NOTHRIVD e maxower 12H, vaonsbair exnuaonsy ove S NSV Z| erate oa he = “ei ef ta pnany “ebuan 20/70 a puven _uaaNIONS 9D Aapaminig _ SONO veg emusuoden UH ea mH =H corey mses 7 oe mowing ows = = - 5 S¥OREOST IY) wa6-SW SAVUL-T3-00-N8¥ | = )ed =| wom201 | ao ew sanuseoore me * s _ SBOROOTIIV | sy a5-SWe SAVUL-T3-OO-NSY | = . La " S¥OREOPT ITY) wae sie SAVLTE-0-N8¥ | m s . 7 S¥OREOOT IY) wae-sie SAVIL-13-00-N8¥ | we fom |e | ow | esi) etwas] syaose sania 2014 Te = pemnan L = a newt sumovssaumaomon | Pomme vevtasa1 ow nousaasw a5 ALTO GNY ALITIEVNIVISNS ‘AL3VS ‘HIT3H Wao 3409 NOTTIRIVD 2294 sanaq © masiowos ueHY uONTe>... wan soo nao-air sxvai-izo0ney ea wNSVF | sor201g 20rd a ponandy sobevew a0re0 fa payer ZEMIONG 90 fa posedeig _obIWO : dag ejqsuodsey ‘sou {ue PIOH | OHUH ‘moneu a fea pus ase ocvcouxa © wnenina we asvt SUOTETOTATY SSTORUITS| | Ed ve |e fe | apt | smo deus ye wos 20 ove sna vee ‘ONDINTUL TiS ze| miata aaosmsimunzsoniay) Sl vn a u H a = saosm swore ah miatae -Na9sw sinu-ieo0-ey sree ite | fate eet | N30 samurao0-A8v are! v = = T ‘wonduoseg = — sod meena wo s00 ‘ud S=3nLuM Wo GrOH ‘via 1831 ony NouadsM aL (8s0n2q e mowowo BUDE Jarivne anv Aurieyavisns ‘ALzavs tual MOH MAmINE TY viuod N09 NOM = Moab air ena oeneY ona Nn SV. | smu 200 ney tes tu) a = esp ng a pvoty “einsen 2000 Jgbawen _WaaNON390 Aa paminng SOW o Hmmeou iar orn a oes amon tears > noun w2 evs HOORAY EOTITS miele. en “toa 101999 una jo eapas wm ¥ “ s —e “SW SAVEL-TS-O0-N'SY w a a “suoneo0O7 Ny — nm s “SW SAVULFO0-NSY - “SW: SAYELTFOO-NSY = ‘ * " “SW SAVLTOD-NSY smesemo.ws te suse aun oH ALTWNO GNV ALIAVNIVIShS 'ALBavS ‘HITSH ‘Wod 3409 NOTIRIVD uoneres veo nz0 air savai-T#o0-n8¥ ona - | NSV Z| ee tees hea = ep etd ta pvartiy “ebeuen 30/70 apauven __uBzNIONS 90 Aapandais S00 eg waodeey = 108 PH “20H nen aman 7 caw onozoaxa © mivuinawe swt STORET 1 on 00-NaD. 7 juny eye;dwi0> " ee re — oes seme wena "ion anes ‘N a a 4 SAVeLL | 40907 IIy oe epee v ne savas sw savas oo ney uy aunsug | FEE wm} x foe | om | wo sivals | suone20tv | ap sayin SOMES ise ojae9 40 Sumersyyounsug |g ze 8 | 0199 — Sp piepies a una wef | a | | ag] meme] ge evan SR saeddne | get ene ee — siem| ww |e | a | ow | agtShR2 | moor! sauce MEE auounedios ony 10 04 uBnong Buled | ETE | Sore ou logo 0 Sones ena Tee aed = ‘payeiousg | jerouddy ys0,. wri wlod feceet [Sompties| reese eee sumosssaumeocron | tamed [ota wv a1 avy nousaeow au ALND ONY ALTIBYNIVISNS ‘ALadvs "LWA W403 3409 NOTTS ape sanag e mowowen SURE ONE umn NBO-SW SAULT OO-NEY oabair eivareoenSy on : ASVZ" Jequinn 200 NSY a6eg ‘bue7 ne = “erg nega pnartty “eben 20770 paiva uaaNONE Db Kaper am 168 FH 0 anarru? cau ocoroaxa ¢ mains we rows ry . " mi wm s20-m cxraieso et vn wie 4 vn ‘svoneoo7 ity | | milo fu | ow suone201 KY vn fare | eee eae | eine | eoseeescen | reieel a oped pausasue> oxy 8 Aa 5 = lwseq Deu NON IUEAD|94 ze ‘ONITING ST8VO YALSVNOWOSASNITWNI 9 a i = ee J pawseuso | rtay 0: comand wea "prcon) | Yo voRredsui| yoy eentg xo s>adg Sinioassanumac aon | Bewwes |“.o"bena Nvi4.1831 aNy Noutsadsnt aL] ALTIVnd GNY ALMIEYNIVISNS ‘ALaSvS ‘HITWSH W404 3409 NOTIIVD ape so99 emosiowes Bue Teo wee Torna air sivarizooreY os : Nf VW. ge Jequnn 200 nsv sted tury ro = ore0ng reed ia ponotly 28even 20/¥0 fa peuwen ___YBNIONI 9D ‘Aa paredoid __O0/7O wea a1yRUodeen 7 104 POH “aH mane feca pay ‘sau veocuaxs € nmmuingrv nsw TY STO wie fe] e sou | sesdejemunsissong |] eyueunaop Aaenb wuenoos zs wie fel cou | sendeemus6yselg | sBurmeup Lina SY weAmes vs YAO ONIGNVH TTI 7 + wn = rewiswso | maddy ion ee wi speney | Ho wonsadea| yay cent uo eds | ‘umoassamumsocron | Paes | baa ‘v1 1831 ONY NowozasN LI ALMWNO GNY ALIIEVNIVISNS ‘ALB4VS ‘HITVSH WO 3HO9 NOTTIRIVD 20e1dsataq e mowowo UREA wontsw> zp, smn VaeNao-dir sxvairwo0"eY owe = n VW. | ‘nq '900 ns ates tury - “eis nes fa psordey AOeueM 30/70 a peIven _uBaNIONS 90 fypandais 20W0: eg naodsey ron ed “eon wor fu ety csvorrous ¢ nivsins wt nsws awa [ aumeusis | on eae OE MLR av 7 4 7 ie z amy | eatin ot 2 hom |Souopces| massa ao neds sunosssauimuooron | Powis wi 1834 an wouoausw als ALrivno aNY ALMIEvNIvisns ‘ALa3VS 'HLTWSH WaOs 3409 NOTHIID 209d 1229 e mowower SURE uoNTe> wun casebeales oats & Abfittaim &carillion ARILLION CORE FORM HEALTH, SAFETY, SUSTAINABILITY AND QUALITY Making tomorrow a better place Field Verifications Checks DOCUMENT NUMBER: ASU-GC-EL-TRAYS -OR-GEN00% Cable Tray, Ladder & Wire Systems a — ee os : | hime eae ee a ames * recteae aeanrngeeae eee ae Se meme Cesena | hy uneeete se cee reenact Ss Cc ‘ASU Rep. ‘Al Futtaim Rep. ‘EXPO2020 Rep “Third Party = = = = [| fae = ie & Abfittaim cariltion CARILLION CORE FORM. HEALTH, SAFETY, SUSTAINABILITY AND QUALITY Making tomorrow a better place Field Verifications Checks METAL TRUNKING DOCUMENT NUMBER : ASU-GC-EL-TRAYS -OR-GEN.002 Description ‘Acc.| Rej. | Remarks = Dimensions of installed uns are complying wih the approved drawings ~All meal rus are fee from al sharp edges and projections = Coupling sleeves had been installed with each length = Anticorosion protection of stove enameled or"Zntec" inside ad ‘uted had been apple in areas having Clas 2 cond Inetalltons = Anti

You might also like