Visit of Wafaqi Ombudsman
In this regard it is appraised that during the month of May FMR visited station
Faisalabad and on subsequent meetings at the Headquarters Office Pakistan Railways
Lahore, included Faisalabad in the list of top 20 Railways Station to be upgraded phase wise.
Mail express and Passenger Trains are being restored gradually considering the safety
parameters in connection with disaster caused by the flood and commercial viability.
Auction of the condemned stock is carried out the level of Headquarters Office
Lahore; in this regard very soon the advertisement shall be published as per law.
v. Establishment of Restaurant.
In this regard, the case is under process and after the fulfillment of all codal and legal
formalities; advertisement shall be published in the newspaper to invite interested parties.
Liaison with the Parks and Horticulture Authority shall be made for the beautification
of station Faisalabad.
In this regard P-way branch has been sensitized and the work of maintenance of
market siding is carried out within available resources.
x. Shortage of Staff.
In order to coup the shortage of staff, the concerned authorities have been appraised.
Today’s system does not always encourage the different parts of the sector to work
together, nor reward them for doing the right thing or incentivise them to act in the overall
interest, rather than a narrow agenda. Instead, co-ordination is governed by a costly, inflexible
spider’s web of often adversarial relationships, penalties and disconnected incentives.
Hospital
Periphery hospital
Dr 1
Nurse
40 t0 50
Ladies lhr
Relief train
Pakistan Railways has assets other than land which could be successfully
commercialized. One such asset is the railway stations in cities and big towns which can
be converted into shopping malls.
(c) Similarly sale of advertising rights along the tracks, on the stations inside the passenger
coaches etc can be gainfully utilized for earning revenues if properly managed.
Pakistan Railways own very costly patches of real estate at prime locations in major
cities of the country which have lot of potential for commercial exploitation. Everyone is
after the land owned by the Pakistan Railways and suggests its outright sale to generate
funds for its revamping. Joint ventures through private sector participation in real estate
development on PR’s land will be a preferable solution
Pakistan Railways need massive investments just to arrest the fast depletion of its rolling
stocks and fixed infrastructure as well as their up-gradation. Pakistan railways needs to be run
on purely commercial considerations with due regard
for social welfare aspects, Across the board subsidy needs to be replaced with targeted relief to
passengers with
limited mean
Prepare legal frame work for active participation of private sector in the rail sector
The court observed that functionality of the Pakistan Railways was not in
professional hands, rather was being operated by questionable officials, who
have no capacity, capability or will to run the railways and marred by
corruption, making the operations of railways altogether impossible.
The court observed that the state of affairs in railways prevailing from top to
bottom and despite orders of the court, nothing seems to have been done by
the federal government. The court observed that it has been informed that
railway tracks from Khairpur to Kotri and from Sukkur to Karachi were
altogether unserviceable and dangerous for the operation of railways and until
it was refurbished by new tracks, new surveillance system and other new
infrastructure, railways operation on these tracks will always be under threat of
major accidents.
The court took an exception over the statement of the federal minister for
railways after the Ghotki train accident that he will resign if the lives lost in the
incident were resurrected. The court observed that this was a mocking of
people by the railways minister, which was not expected from a person
holding such a responsible position.
The court directed the minister of railways, secretary railways to refurbish the
railways track from Khairpur to Kotri and from Sukkur to Karachi by laying new
tracks, new signaling system and providing all infrastructure. The court
directed the federal government to immediately step in for overhauling the
railways administration and directed the AGP to submit interim report on June
16.
The court observed that it had been informed that a meeting in the
Governor’s House had taken place where the matter relating to lands of
Pakistan Railways, particularly in Sindh, had been discussed to be sold to
private developers.
The court noted that in one place Pakistan Railways was filing cases before
various courts in Sindh, including the apex court, for obtaining orders for
vacation and retrieving of railways land from encroachers, unauthorised
occupants, illegal allottees and illegal leases for railways operational purposes
but on the other hand the railways seems to be evolving some mechanism by
which its lands are planned to be sold out.
The court ordered that not an inch of railways land shall be sold, transferred,
leased or by any means given to any private person or to any of its employees.
The court observed that all railways land was required to be used for railways
operational purposes and for no other purposes.