INTEGRATED INDUSTRIAL FACILITY EXPANSION FOR SUZUKI MOTORS AT
HANSALPUR, GUJARAT
BUILT UP
• 10,02,270 SQFT.
AREA
TOTAL
PROJECT • RS. 2500 CRS.
COST
CONSTRUCTI
• RS. 350 CRS.
ON COST
• COMPLETED IN
STATUS
MAR’18.
MANUFACTURING FACILITY
PROCESS
Step 4 PAINT
Step 5
BUMPER
ASSEMBLY SHOP (LINE-B) FLOOR PLAN
ASSEMBLY SHOP (LINE-B) SECTION
ASSEMBLY SHOP (LINE-B) SECTION
ASSEMBLY SHOP COMPARITIVE STUDY OF LINE A & LINE B
MEMBER OTHER CONSULTANT OUR TEAM
LINE A LINE B
Foundations PAD Footings (Uniform Thickness) Stepped Footings (Change in Thickness)
Equipment Pits (Trenches) More Thickness & Reinforcement Optimized Thickness & Reinforcement
Columns RCC Steel Columns (Fast Track Construction)
N-Girders Typical sizes for all members (Verticals, Optimized member sizes based on design
Inclined) force
Jack Beams or Plate Beams Wider Flange widths & thickness Optimized thickness
Truss Rolled Steel Sections (More Weight) Tubular Sections of High Grade (High
Strength to Less Weight Ratio)
PAINT SHOP (LINE-B) FLOOR PLAN
PAINT SHOP COMPARITIVE STUDY OF LINE A
& LINE B
MEMBER OTHER CONSULTANT OUR TEAM
LINE A LINE B
Mezzanine Floors Typical sizes for all members (Verticals, Inclined) Optimized member sizes based on design force
Jack Beams or Plate Beams Wider Flange widths & thickness Optimized thickness
Truss Rolled Steel Sections (More Weight) Tubular Sections of High Grade (High Strength to
Less Weight Ratio)
WELD SHOP (LINE-B) FLOOR PLAN
WELD SHOP COMPARITIVE STUDY OF LINE A
& LINE B
MEMBER OTHER CONSULTANT OUR TEAM
LINE A LINE B
Foundations Pad Footings Pad Footings with reduced size
N-Girders Typical sizes for all members (Verticals, Optimized member sizes based on design force
Inclined)
Jack Beams or Plate Beams Wider Flange width Optimized flange width
OUTCOME OF VALUE ENGINEERING IN SUZUKI PLANT AT BECHARAJI,
GUJARAT
Area SFT Structural Steel Saving Concrete Saving Total
Sl. No. Buildings
in Lacs (INR) (INR) Saving (INR)
1 Press Shop
2 Paint Shop
4 Assembly Shop
5 Bumper Shop
Illustration
(sample area of 40m x 60m)
BUILT UP
• 14,00,000 Sq Ft
AREA
TOTAL
PROJECT • RS. 2000 CRS.
COST
CONSTRUCTI
• RS. 300 CRS.
ON COST
• COMPLETED IN
STATUS
FEB 2020
MANUFACTURING FACILITY PROCESS
STEEL BELT
RM WH FABRIC CORD
PREP.
RUBBER
CURING MILLING
COMPONENTS
Piperack vertical drops at multiple junctions provided for which the Girder
sections can be seen in the above.
CHALLENGES