Professional Documents
Culture Documents
The Development of QR ID VERIFICATION CODE System that will protect the vital
information and data of each student and faculty member in the school.
General Problem
The main problem is the lack of purpose of the school ID’s by the students, faculties, and
staff of the institute.
Specific Problem
Students nowadays do not recognize the primary function of their identity cards, resulting
in an unsafe atmosphere both inside and outside of school.
Students perceive the procedure of obtaining their statement of accounts to be time
demanding, requiring them to wait in long lines only to find out their payment status.
There is no other method to protect the information of the institute's students, faculty, and
staff.
The absence of security in the institute's entry and exit processes
OBJECTIVES
General Objectives:
To establish a QR ID VERIFICATION CODE SYSTEM that will protect the vital
information and data of all students, faculty, staff, and visitors to the school.
Specific Objectives:
To develop an application that will provide an online checking of grade results, fees, and
other information of the student
To develop an application that will change the daily time records of the faculties and
staff of the institute.
Conceptual Framework:
INPUT
ID NUMBER
Generate ID
Daily time record monitoring
Report of grades
Student’s data recovery
Reports of time in and time
out
Add student’s data
OUTPUT
Provides Privacy
Secures every data of the user
Gives accurate report of grades
Gives accurate report of time in
and out monitoring
SECURITY FLEXIBILITY
EASY TO USE
CONCEPTUAL PARADIGM OF THE STUDIES
Project Methodology
In designing the system, the team will use the Rapid Application Development (RAD) paradigm.
The system is meant to incorporate an application that secures all student, faculty, and staff data
while also providing users with privacy. It describes how the team will build the system. The
SUPPORT MAINTENANCE
RELEASE OF THE SYSTEM
PLANNING
Analysis Design
Build/Coding
TESTING
project team will use in developing the system. It helps to develop the system accurately and
successfully.
Planning. This relates to the planning of the team project in the system's development. The
project team members must work well together and be aware of their respective roles and
responsibilities. The team's initiative is to create a functional system. This contains the letter of
authorization for defense planning. This step also entails adequate budgeting of funds for all of
Determine Requirements. During the requirements analysis phase, the system project's
requirements were gathered by studying the user's demands. This phase is focused with
determining what the researchers, in collaboration with the system analyst, require for both soft
and hard approaches, which include: interviews, questionnaires, document analysis, and user
observation.
Analysis Design. This is the stage of coding that follows the system analyst's system design.
The team programmer is in charge of this. The system's code must function properly and fulfill
the system's needs. The project team must consult with the system consultant to enhance the
system.
Build/Coding: This is the step of coding in accordance with the system analyst's system design.
The team coder handles this. The system's code must function correctly and fulfill the system's
needs. To upgrade the system, the project team needs consult with the system consultant.
Testing: